The document outlines a contract between Mask Building Construction and Corporate Loyalty Contracting Coating and Flooring for the supply and installation of 2cm thick Saudi white stone on the walls and appendices of a villa in Dubai for 150,000 AED. The stone work must be completed within 3 months of delivery to the site. Payment will be made in three installments: 50% upon stone delivery, 20% after 30% completion, and the remaining 30% according to completion of interfaces. Scaffolding and other services during installation will be provided by the main contractor.
1. contract
First party :
Contracting mask the buildings mask building construction
Tel: 0097142652119
Fax 0097142652118
Email: sapkotas@emirates.ae
Second Party: Corporate loyalty to the Contracting coating and flooring
abdulla.artshop@hotmail.com
Address: Sharjah Industrial Area 12 next to the record number of trucks Gallery (2)
Telephone: 00971553993447 00971503801546
Topic: supply and installation of a Saudi white stone thickness of 2 cm width by price previously submitted and
approved by the
First party . The villa located in the Emirate of Dubai Khawaneej First party company
The villa with only the wall of and the Appendix
Project implementation period: three months from the date of supply quantities to the site in the ground
Stone specifications: Following the approval by the owner and the main contractor has been sampling the
adoption and signature of a Saudi Stone
Thickness of 2 cm
Installation Procedure: riding a stone Dravks deviation angles and bolts and JLo by assets and cleans work
after installation
The total value of the work (150000) hundred and fifty thousand drams only to change
Riding a stone villa designed by the fact unchanged. We change altitude or additions mentioned items in the
display price
The former is subject to increase depending on the quantity and type of whether or plain stone decorations and
add this value to the total value
Is essential that the contract was in apiece as a decoration or meters square the
Scaffolding and services: On the main contractor that this full-service when the demand on site during work
Of scaffolding, electricity, wood and pedals installed and removed by the workplace
Way payments
Paid 50% of the value of the contract mentioned above for the supply of stone to the villa
Paid 20% after the completion of the implementation of the 30% of the value of the business
Payments are divided according to the remaining interfaces in the villa by achievement
First party: the mask Contracting Dressing and second floors party: loyalty to the Contracting coating and
flooring.