SlideShare a Scribd company logo
contract
First party :
Contracting mask the buildings mask building construction
Tel: 0097142652119
Fax 0097142652118
Email: sapkotas@emirates.ae
Second Party: Corporate loyalty to the Contracting coating and flooring
abdulla.artshop@hotmail.com
Address: Sharjah Industrial Area 12 next to the record number of trucks Gallery (2)
Telephone: 00971553993447 00971503801546
Topic: supply and installation of a Saudi white stone thickness of 2 cm width by price previously submitted and
approved by the
First party . The villa located in the Emirate of Dubai Khawaneej First party company
The villa with only the wall of and the Appendix
Project implementation period: three months from the date of supply quantities to the site in the ground
Stone specifications: Following the approval by the owner and the main contractor has been sampling the
adoption and signature of a Saudi Stone
Thickness of 2 cm
Installation Procedure: riding a stone Dravks deviation angles and bolts and JLo by assets and cleans work
after installation
The total value of the work (150000) hundred and fifty thousand drams only to change
Riding a stone villa designed by the fact unchanged. We change altitude or additions mentioned items in the
display price
The former is subject to increase depending on the quantity and type of whether or plain stone decorations and
add this value to the total value
Is essential that the contract was in apiece as a decoration or meters square the
Scaffolding and services: On the main contractor that this full-service when the demand on site during work
Of scaffolding, electricity, wood and pedals installed and removed by the workplace
Way payments
Paid 50% of the value of the contract mentioned above for the supply of stone to the villa
Paid 20% after the completion of the implementation of the 30% of the value of the business
Payments are divided according to the remaining interfaces in the villa by achievement
First party: the mask Contracting Dressing and second floors party: loyalty to the Contracting coating and
flooring.
Best wishes

More Related Content

Similar to contrac1

Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
Kailyn Lee
 
Prestige point res and comm specification
Prestige point   res and comm specificationPrestige point   res and comm specification
Prestige point res and comm specification
chris1870
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
Stephen Nzima
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
grahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
grahamelanders
 

Similar to contrac1 (12)

Contract presentation
Contract presentation  Contract presentation
Contract presentation
 
Bill Of Quantities Issued For Construction
Bill Of Quantities Issued For ConstructionBill Of Quantities Issued For Construction
Bill Of Quantities Issued For Construction
 
Car park bq
Car park bqCar park bq
Car park bq
 
A2768 103 - floor plans - building regs
A2768 103 - floor plans - building regsA2768 103 - floor plans - building regs
A2768 103 - floor plans - building regs
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
Measurement 4 presentation
Measurement 4 presentation Measurement 4 presentation
Measurement 4 presentation
 
SPECIFICATION
SPECIFICATIONSPECIFICATION
SPECIFICATION
 
2_2._BOQ.pdf
2_2._BOQ.pdf2_2._BOQ.pdf
2_2._BOQ.pdf
 
Prestige point res and comm specification
Prestige point   res and comm specificationPrestige point   res and comm specification
Prestige point res and comm specification
 
Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)Bo q for joint cuart hall block construction in pamir (3)
Bo q for joint cuart hall block construction in pamir (3)
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 

contrac1

  • 1. contract First party : Contracting mask the buildings mask building construction Tel: 0097142652119 Fax 0097142652118 Email: sapkotas@emirates.ae Second Party: Corporate loyalty to the Contracting coating and flooring abdulla.artshop@hotmail.com Address: Sharjah Industrial Area 12 next to the record number of trucks Gallery (2) Telephone: 00971553993447 00971503801546 Topic: supply and installation of a Saudi white stone thickness of 2 cm width by price previously submitted and approved by the First party . The villa located in the Emirate of Dubai Khawaneej First party company The villa with only the wall of and the Appendix Project implementation period: three months from the date of supply quantities to the site in the ground Stone specifications: Following the approval by the owner and the main contractor has been sampling the adoption and signature of a Saudi Stone Thickness of 2 cm Installation Procedure: riding a stone Dravks deviation angles and bolts and JLo by assets and cleans work after installation The total value of the work (150000) hundred and fifty thousand drams only to change Riding a stone villa designed by the fact unchanged. We change altitude or additions mentioned items in the display price The former is subject to increase depending on the quantity and type of whether or plain stone decorations and add this value to the total value Is essential that the contract was in apiece as a decoration or meters square the Scaffolding and services: On the main contractor that this full-service when the demand on site during work Of scaffolding, electricity, wood and pedals installed and removed by the workplace Way payments Paid 50% of the value of the contract mentioned above for the supply of stone to the villa Paid 20% after the completion of the implementation of the 30% of the value of the business Payments are divided according to the remaining interfaces in the villa by achievement First party: the mask Contracting Dressing and second floors party: loyalty to the Contracting coating and flooring. Best wishes