The first object of CAR insurance




                               Lambeth Bridge is
                                the first object of
                                 CAR insurance



2
Would you provide these builders with life
                  insurance?




3
How could risks be assessed?




4
Land subsidence and collapse
             diagnosis




5
Unfinished fire extinguishing system
     in the building under construction




6
Combustible materials in the building
           under construction




7
Stages of construction works




8
Pre-insurance survey


              Advantages                       Disadvantages

    Making decision       before   the Contractors can be assessed on
    construction starts                their previous projects only

    Some recommendations can be All conclusions are made on the
    given before the construction base of design examination
    started




9
Construction stage


                Advantages                         Disadvantages
     We can assess the performance        Usually the insurance policy is
     of contractors at the construction   already issued
     site
     Some design errors can be
     revealed at the construction site
     Planned and actual way of work
     performing can be compared
     We can define the
     implementation of
     recommendations
     More recommendations can be
     elaborated


10
Start-up and commissioning


               Advantages                          Disadvantages
     We can define the                    The final stage of construction, it
     implementation of                    is to late to recommend
     recommendations                      something regarding the
                                          operations

     Some recommendations
     regarding housekeeping can be
     given

     We have los history for the object




11
Warranty period


                Advantages                         Disadvantages

     The majority of problems appear       The building (structure) is
     at the initial stages of buildings’   finished, so we cannot change
     operation                             something in it




12
Stages of survey



     Before the   • Examination of design
        visit     • Study of contractors



     During the   • Site survey
       visit      • Documentation examination



     After the    • Recommendation elaboration
       visit      • Survey report preparation

13
What do underwriters need to assess
                   the risk?

     • Location map
     •Over-all contoured side plan – showing contract site,
     storage and work areas
     •Full Contract Value (broken down into major sections of
     work) – also include ‘free issue’ or other materials not
     included in contract value, but for which cover is required
     •Detailed description of project works including method of
     construction, equipment materials etc.
     •A copy of the contract specification/feasibility study
     •Scale drawings, general arrangement drawings and cross
     sectional drawings
     •Construction schedule bar chart
     •Contractors and Sub-contractors’ experience
     •Photographs (if available)
14
Survey report content

     Survey report contains the following sections:



     1.   Risk assessment summary

     2.   Area description – regional features, climatic features, geographical and hydro
          geological characteristics of region

     3.   General data – location, contractors, etc.

     4.   Construction methods – brief construction methods description, state of means of
          production, construction control methods

     5.   Design parameters of buildings and structures – technical features, construction
          materials, current state of buildings and structures

     6.   Infrastructure – features and state of engineering equipment and communications

     7.   Loss history

     8.   Fire protection – technical and managerial procedures aimed at fire prevention and
          loss minimization

15
Survey report content


     9.   Security – physical security and engineered safety features

     10. Insurance conditions – insured perils, sum insured, significant conditions of
          insurance policy

     11. Risk assessment – each insured risk is examined separately, its probability and
          consequences are estimated. Hazardous occurrence scenarios are elaborated if
          necessary

     12. Risk improvement recommendations

     13. Conclusion and proposals – general conclusions based on the results of
          engineering risk assessment, recommendations of insurance coverage optimization




16
Survey report content

     Survey report provided with tables, diagrams and schemes




17
Survey report content

     Photographs, diagrams and schemes are given to describe manufacturing method and
                                   means of production




18
Funds application – loss growth




                PML         Funds application

19
McCormic Place exibition center(before the fire)




20
McCormic Place exhibition center(after the fire)




21
Loss estimation




22
Large losses’ causes: EAR, CAR and guarantee



     Столбец1, 1, 2
        8.50%



           Столбец1, 2, 1
              8.60%

                        Столбец1, 3, 1
                                Столбец1, 4, 1
                           1.80%     1.10%Столбец1, 5, 9
                                                  Столбец1, 6, 9
                                              .60%     .40%Столбец1, 7, 6
                                                                  Столбец1, 8, 4
                                                                .20%
                                                                      .80%


        1. Faulty material and workmanship   5. Faulty operation
        2. Flood and inundation              6. Storm
        3. Others                            7. Fire

23      4. Explosions                        8. Faulty design
St. Francis Dam under construction




24
St. Francis Dam before and after collapse




25
Inundation of construction site in Dubai




26
World Trade Center’s construction site




27
Storm in Sochi Cargo seaport




28
Storm in Sochi Cargo seaport




29
Fire in Vostok tower of Moscow international
                    business center




30
Vladivostok bridge in flames




31
Fire in Transport Tower (Kazakhstan)




32
Fire in Transport Tower (Kazakhstan)




33
Residential building under construction (China)




34
Connecticut power plant explosion




35
Connecticut power plant explosion




36
Any questions?



37
Malakut international offices


                                        Moscow


                                    Kiev               Almaty


                                               Dubai                    Hanoi
                                                                (Representative office)

     Panama


                                                                Kuala Lumpur




     Russia – Ukraine – Kazakhstan – Vietnam – Malaysia – UAE – Panama
38

More Related Content

Similar to Construction and erection risks assessment engineering outlook

A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)Ahmed Youssef
 
Eight deadly defects in systems engineering and how to fix them
Eight deadly defects in systems engineering and how to fix themEight deadly defects in systems engineering and how to fix them
Eight deadly defects in systems engineering and how to fix themJoseph KAsser
 
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...Global CCS Institute
 
K dev-slides(7a)red manual-foong-150511
K dev-slides(7a)red manual-foong-150511K dev-slides(7a)red manual-foong-150511
K dev-slides(7a)red manual-foong-150511REDceo.net
 
Project Management Report for Tank Farm
Project Management Report for Tank FarmProject Management Report for Tank Farm
Project Management Report for Tank FarmAbhik Tushar Das
 
FPSO & FLNG Asia 2016 - Final
FPSO & FLNG Asia 2016 - FinalFPSO & FLNG Asia 2016 - Final
FPSO & FLNG Asia 2016 - FinalGurin Hanspal
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphbhlksd
 
Handbook For Process Plant Project Engineers - Peter Watermeyer
Handbook For Process Plant Project Engineers - Peter WatermeyerHandbook For Process Plant Project Engineers - Peter Watermeyer
Handbook For Process Plant Project Engineers - Peter WatermeyerVeerender Putta
 
Final -jan-apr_2013
Final  -jan-apr_2013Final  -jan-apr_2013
Final -jan-apr_2013Sporsho
 
descon internship report
descon internship  reportdescon internship  report
descon internship reportEngineerQazi
 
How to assess PV technical risks and ensure your project is bankable
How to assess PV technical risks and ensure your project is bankableHow to assess PV technical risks and ensure your project is bankable
How to assess PV technical risks and ensure your project is bankableSolarbabaGlobal
 
Lecture notes on_construction_project_ma
Lecture notes on_construction_project_maLecture notes on_construction_project_ma
Lecture notes on_construction_project_mamohammedsameer129
 
Construction Planning of an Offshore Petroleum Platform
Construction Planning of an Offshore Petroleum PlatformConstruction Planning of an Offshore Petroleum Platform
Construction Planning of an Offshore Petroleum PlatformProfessor Kabir Sadeghi
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)pranay kumar
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CVAli Khidr
 

Similar to Construction and erection risks assessment engineering outlook (20)

A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)A.youssef_c.v.2014.doc-2(3)
A.youssef_c.v.2014.doc-2(3)
 
Eight deadly defects in systems engineering and how to fix them
Eight deadly defects in systems engineering and how to fix themEight deadly defects in systems engineering and how to fix them
Eight deadly defects in systems engineering and how to fix them
 
HUSSIEN CV 24-12-2012
HUSSIEN CV 24-12-2012HUSSIEN CV 24-12-2012
HUSSIEN CV 24-12-2012
 
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
CCS Projects Integration Workshop - London 3Nov11 - ROAD - CCS project integr...
 
P introduction
P introductionP introduction
P introduction
 
bridge construction
bridge constructionbridge construction
bridge construction
 
K dev-slides(7a)red manual-foong-150511
K dev-slides(7a)red manual-foong-150511K dev-slides(7a)red manual-foong-150511
K dev-slides(7a)red manual-foong-150511
 
Project Management Report for Tank Farm
Project Management Report for Tank FarmProject Management Report for Tank Farm
Project Management Report for Tank Farm
 
FPSO & FLNG Asia 2016 - Final
FPSO & FLNG Asia 2016 - FinalFPSO & FLNG Asia 2016 - Final
FPSO & FLNG Asia 2016 - Final
 
Construction practices aphb
Construction practices aphbConstruction practices aphb
Construction practices aphb
 
Handbook For Process Plant Project Engineers - Peter Watermeyer
Handbook For Process Plant Project Engineers - Peter WatermeyerHandbook For Process Plant Project Engineers - Peter Watermeyer
Handbook For Process Plant Project Engineers - Peter Watermeyer
 
Final -jan-apr_2013
Final  -jan-apr_2013Final  -jan-apr_2013
Final -jan-apr_2013
 
descon internship report
descon internship  reportdescon internship  report
descon internship report
 
How to assess PV technical risks and ensure your project is bankable
How to assess PV technical risks and ensure your project is bankableHow to assess PV technical risks and ensure your project is bankable
How to assess PV technical risks and ensure your project is bankable
 
Lecture notes on_construction_project_ma
Lecture notes on_construction_project_maLecture notes on_construction_project_ma
Lecture notes on_construction_project_ma
 
Construction Planning of an Offshore Petroleum Platform
Construction Planning of an Offshore Petroleum PlatformConstruction Planning of an Offshore Petroleum Platform
Construction Planning of an Offshore Petroleum Platform
 
Industrial case study report (Final)
Industrial case study report (Final)Industrial case study report (Final)
Industrial case study report (Final)
 
Ahmed cv 2014
Ahmed cv  2014Ahmed cv  2014
Ahmed cv 2014
 
Ali Khidr CV
Ali Khidr CVAli Khidr CV
Ali Khidr CV
 
Jed air hangar development project final draft vrs 3
Jed air hangar development project   final draft vrs 3Jed air hangar development project   final draft vrs 3
Jed air hangar development project final draft vrs 3
 

Construction and erection risks assessment engineering outlook

  • 1.
  • 2. The first object of CAR insurance Lambeth Bridge is the first object of CAR insurance 2
  • 3. Would you provide these builders with life insurance? 3
  • 4. How could risks be assessed? 4
  • 5. Land subsidence and collapse diagnosis 5
  • 6. Unfinished fire extinguishing system in the building under construction 6
  • 7. Combustible materials in the building under construction 7
  • 9. Pre-insurance survey Advantages Disadvantages Making decision before the Contractors can be assessed on construction starts their previous projects only Some recommendations can be All conclusions are made on the given before the construction base of design examination started 9
  • 10. Construction stage Advantages Disadvantages We can assess the performance Usually the insurance policy is of contractors at the construction already issued site Some design errors can be revealed at the construction site Planned and actual way of work performing can be compared We can define the implementation of recommendations More recommendations can be elaborated 10
  • 11. Start-up and commissioning Advantages Disadvantages We can define the The final stage of construction, it implementation of is to late to recommend recommendations something regarding the operations Some recommendations regarding housekeeping can be given We have los history for the object 11
  • 12. Warranty period Advantages Disadvantages The majority of problems appear The building (structure) is at the initial stages of buildings’ finished, so we cannot change operation something in it 12
  • 13. Stages of survey Before the • Examination of design visit • Study of contractors During the • Site survey visit • Documentation examination After the • Recommendation elaboration visit • Survey report preparation 13
  • 14. What do underwriters need to assess the risk? • Location map •Over-all contoured side plan – showing contract site, storage and work areas •Full Contract Value (broken down into major sections of work) – also include ‘free issue’ or other materials not included in contract value, but for which cover is required •Detailed description of project works including method of construction, equipment materials etc. •A copy of the contract specification/feasibility study •Scale drawings, general arrangement drawings and cross sectional drawings •Construction schedule bar chart •Contractors and Sub-contractors’ experience •Photographs (if available) 14
  • 15. Survey report content Survey report contains the following sections: 1. Risk assessment summary 2. Area description – regional features, climatic features, geographical and hydro geological characteristics of region 3. General data – location, contractors, etc. 4. Construction methods – brief construction methods description, state of means of production, construction control methods 5. Design parameters of buildings and structures – technical features, construction materials, current state of buildings and structures 6. Infrastructure – features and state of engineering equipment and communications 7. Loss history 8. Fire protection – technical and managerial procedures aimed at fire prevention and loss minimization 15
  • 16. Survey report content 9. Security – physical security and engineered safety features 10. Insurance conditions – insured perils, sum insured, significant conditions of insurance policy 11. Risk assessment – each insured risk is examined separately, its probability and consequences are estimated. Hazardous occurrence scenarios are elaborated if necessary 12. Risk improvement recommendations 13. Conclusion and proposals – general conclusions based on the results of engineering risk assessment, recommendations of insurance coverage optimization 16
  • 17. Survey report content Survey report provided with tables, diagrams and schemes 17
  • 18. Survey report content Photographs, diagrams and schemes are given to describe manufacturing method and means of production 18
  • 19. Funds application – loss growth PML Funds application 19
  • 20. McCormic Place exibition center(before the fire) 20
  • 21. McCormic Place exhibition center(after the fire) 21
  • 23. Large losses’ causes: EAR, CAR and guarantee Столбец1, 1, 2 8.50% Столбец1, 2, 1 8.60% Столбец1, 3, 1 Столбец1, 4, 1 1.80% 1.10%Столбец1, 5, 9 Столбец1, 6, 9 .60% .40%Столбец1, 7, 6 Столбец1, 8, 4 .20% .80% 1. Faulty material and workmanship 5. Faulty operation 2. Flood and inundation 6. Storm 3. Others 7. Fire 23 4. Explosions 8. Faulty design
  • 24. St. Francis Dam under construction 24
  • 25. St. Francis Dam before and after collapse 25
  • 26. Inundation of construction site in Dubai 26
  • 27. World Trade Center’s construction site 27
  • 28. Storm in Sochi Cargo seaport 28
  • 29. Storm in Sochi Cargo seaport 29
  • 30. Fire in Vostok tower of Moscow international business center 30
  • 32. Fire in Transport Tower (Kazakhstan) 32
  • 33. Fire in Transport Tower (Kazakhstan) 33
  • 34. Residential building under construction (China) 34
  • 35. Connecticut power plant explosion 35
  • 36. Connecticut power plant explosion 36
  • 38. Malakut international offices Moscow Kiev Almaty Dubai Hanoi (Representative office) Panama Kuala Lumpur Russia – Ukraine – Kazakhstan – Vietnam – Malaysia – UAE – Panama 38