Commercialization of Robotic Prototypes:
“The big problem is production. They overestimate how easy it is to do. It’s really hard.”
- Dimitry Grishin, xconomy 9/24/14
Late 2010
3 Employees
3 Robots
Mid 2012
70 Employees
100+ Robots
Improving on the Concept: Our Case Study
Improving on the Concept: Who we are
• Goals and requirements
• Breadboard development, component
selection
• Packaging options
• Drive-Train analysis
• Thermal modeling
• Structure – materials, process capability,
tooling approach?
• Manufacturing plan
• Cost analysis
• Down-selection of concepts, layouts,
performance metrics.
Improving on the Concept: How to Get There
• CAD design
• Updated analysis, thermal,
structural, tolerance
• Mfg Qualification, sourcing
plan.
• DFM integration from supply
base.
• Prototype build
• Goals and requirements
• Breadboard development, component
selection
• Packaging options
• Drive-Train analysis
• Thermal modeling
• Structure – materials, process capability,
tooling approach?
• Manufacturing plan
• Cost analysis
• Down-selection of concepts, layouts,
performance metrics.
Improving on the Concept: How to Get There
• CAD design
• Updated analysis, thermal,
structural, tolerance
• Mfg Qualification, sourcing
plan.
• DFM integration from supply
base.
• Prototype build
• “Test” – Validate, don’t test.
• Production design, analysis
updates.
• Vendor management
• Tool reviews, mold-flow, First-
Article inspection
• Qualification
• CM build support
• Goals and requirements
• Breadboard development, component
selection
• Packaging options
• Drive-Train analysis
• Thermal modeling
• Structure – materials, process capability,
tooling approach?
• Manufacturing plan
• Cost analysis
• Down-selection of concepts, layouts,
performance metrics.
Improving on the Concept: How to Get There
The Prototype
Phase 1: Concept Generation, Evaluation
• Defining Realistic Goals/Objectives for the Commercial Product
• Designing for Manufacturing & Challenges
• Weight
• Strength
• Performance
Phase 2: Detailed Design
• CAD Implementations
• Analysis refinements
Phase 3: Test, Production Design
• Supply Chain Challenges
• Testing, Reliability
The Results
Improving on the Concept: A Case Study
The starting point: Machined aluminum
chassis. CNC,
expensive, heavy.
Compression, flat gasket
sealing
Bolt-in-place, all at once
assembly process.
Functional! Runs great, performs all basic tasks.
Too expensive, too heavy
Not a product, yet.
COTS / Commercial drive
components.
Poor reliability, hand-wired
Over-stressed components
The Prototype
• Weight targets –
• Prototype was 35+ lbs.
• Target = <25lbs. This includes “fixed” weight metrics like battery, motor, electronics.
• Rugged
• Needs to be run by un-trained operators on unknown terrain.
• Durable, pull it out, use, put it back.
• 60” repeated drop test requirement, thrown deployment
• Custom treads
• Modular payloads
• Need space, lots of it! Future expansion possibilities
• Common interface, power, high-speed signal, water-proof
• Costs
• Needed a reduction of ~>50% in BOM (Bill of Material) costs
• This is a must for the business case
Phase 1: Goals, Realistic and Otherwise
At the concept level:
How do we fit all the required components, and meet the
performance requirements?
Evaluated several different layouts, each with:
• Thermal solutions – solar load, internal power
dissipation
• Payload capability – how big, how many?
• Climbing performance - FWD, RWD, CG, traction,
balance
• Cost
Phase 1: Concept Generation
How to we design around the CNC chassis, what are the alternatives?
Plastics: Low cost
High complexity, feature rich
Good impact, low strength
Major risks to structural & tolerance goals
New supply chain
Thixomolding: Licensed magnesium die-cast process
~Low cost, high complexity
High strength, light weight.
More accurate than aluminum die casting
New supply chain
These choices impact our concept – we need analysis at the system level.
Gaining in popularity, camera shells,
transmission cases, consumer products.
Phase 1: Concept Generation - Materials
• Will this survive the ambient conditions?
>45C ambient, desert solar load
Multiple levels & Increasing effort and reward:
• Hand-Calcs – quick, can rapidly apply to several
concepts. Rinse, Repeat as concepts evolve.
• CFD – for times when you need better than ~+/-
25% accuracy. This are slow, time-consuming,
and not 100% accurate either.
Phase 1: Concept Generation – Thermal Evaluation
We were very concerned on the drop impact:
• High cantilevered loads
• Can we use SST for the shafts, aluminum, Ti?
• Relationship between shaft OD and attachment
method?
• Will our plastic construction concepts be strong
enough?
g
Phase 1: Concept Generation – Structural Evaluation
Took several concept iterations to support the cold
temperature drop performance.
Goals
+
Brainstorming
+
Layout Options
+
Material Choices
Analysis:
Thermal
Structural
Tolerance
Performance
Down-select,
Refine, Repeat
Phase 1: Concept Generation – Synthesis and Analysis
Centerpiece of the re-design effort was a common, single-molded chassis solution.
Early concept Model
Used for basic strength
calculations, molding
feedback, vendor RFQ
process
Production Design Model
Final FEA simulations
Tolerance analysis
Phase 2: Detailed Design - Chassis
Tolerances are a key aspect of the detailed design.
There are several approaches here, each with their own advantages:
Worst-Case
Analysis:
“RSS”, Root Sum
Squared
Direct Linearization
Method
Monte-Carlo
Setup Time
(fast)
(slow)(high)
Accuracy
(low)
In everyone’s toolbox. Not realistic, doesn’t hold up for
multi-part solutions. Can’t plan for the worst!
Good approximation, weights all variables the same.
Difficult to get a predicative value.
Good balance of speed, accuracy. Combines actual
process capability into a predictive approach.
“Holy Grail”. Iterative, simulation to predict results. This
is only as good as your input data. Not recommended
unless you have measured manufacturing data on your
parts.
Phase 2: Detailed Design – Tolerance Analysis
Direct Linearization Method Approach:
Element 1:
Plastic
Feature
Element 2:
Shaft
Dimension
Element 3:
Bolt fit in
clearance
hole
Sum generates a
composite
Gaussian curve
Adding up
our
elements,
based on a
sketched
loop
New Predicted Gaussian
3 sigma = 99.9%,
or 1350 DPPM
4 sigma =
99.997%, or 32
DPPM
Phase 2: Detailed Design – Tolerance Analysis
Element n:
Hole clearance,
biased by gravity
Gear Mesh Tolerance
Loop generation, from one side of the
gap to the other.
Expected
Center
distance?
Solving for our predicted distances:
Z (Sigma) = 3.98 @ +/- 0.27mm
Or, 99.997% of the time, we expect
+/- 0.27mm of the CAD distance.
Phase 2: Detailed Design – Tolerance Analysis
Revisit our thermal solutions, at a systems level.
Early runs shown – safe plastic touch limits exceeded!
Verification of motor peak
temperatures
Phase 2: Detailed Design – Thermal Refinement
Plastics are not an overnight solution.
SLA, 3D print, machined equivalents are good mock-ups, but not functional equivalents.
We decided to build an iterative option, with a sheetmetal core chassis.
This gave us a working platform, with the similar weight profile, in a short amount of time:
Interim path:
Production path:
Phase 2: Detailed Design - Chassis
• 4-slide, large molded chassis in 8
weeks?
• Yes, it can be done!
• Global Sourcing, Vetting
suppliers remotely
• Tooling < $80k investment
• Vendor Management is key
• Tooling approvals, design
approvals, be involved.
• In process photos are a must
• Weekly communication at a
minimum
In process B-plate
In process slide
Phase 3: Supply Chain Challenges
• Tooling Drawing Reviews
• Inserts as needed, materials
• Cooling lines, gating, runner systems, ejection
Typical tool construction
drawings
Typical cooling and runner
visualizations
Phase 3: Supply Chain Challenges
• Mold-Flow Studies
• Gate & Process
verification
• Venting, Air Trap
concerns
• Done ourselves, and/or
cross-checked from
vendor provided data.
Phase 3: Supply Chain Challenges
First Article Inspection
• Just because it’s done – doesn’t mean it’s right!
Phase 3: Supply Chain Challenges
• Drop Test – this was a challenge with a high mass
object…
• Aggressive 5ft drop requirement onto pavement
Phase 3: Testing, Reliability
• Still break a few eggs!
Traced back to material issue
at supplier.
Wrong level of impact modifier
not present in the parts
provided.
Phase 3: Testing, Reliability
Empirical measurements of thermal solutions.
Done @ max power conditions, per CFD models.
CFD modeling assumed max power
@ ½ speed. Testing did not include
airflow over robot. Predicted values
are 20% lower.
Good correlation otherwise (10-20%
resolution)
Phase 3: Testing, Reliability
Lighter, Cheaper, More Capable!
• Weight savings of >10lbs
• Reduction in cost by > than an order of magnitude!
• BOM Cost Start: $10,000’s per system
• BOM Cost End: $100’s per system
• Final part count:
• 3x Die-cast/Thixo
• 25x Injection Molding
• 7x CNC
• 19x Sheetmetal
• 2x Extrusion
• Passed ruggedness/durability tests
• Payload support increase by >100%
The Results:
In Action….
The Results:
• This is hard! Production design requires different tool kits, different
approaches to meet the cost, manufacturability, performance targets.
• Production design doesn’t mean limited functionality!
• The concept – it all starts there.
• Analyze, proceed with confidence, & validate
The Results:
Q and A
Thank You
(Come see the robot in Booth 520!)
Address Contact
1 Broadway, 14th Floor Barry Braunstein
Cambridge, MA 02142 P 617-475-1541
E bbraunstein@acornpd.com

More Related Content

Similar to Commercialization of Robotic Prototypes: Improving the Concept for Manufacturability and Sale.

NWC 2015 - Critical - Path Simulation
NWC 2015 - Critical - Path Simulation NWC 2015 - Critical - Path Simulation
NWC 2015 - Critical - Path Simulation Jennifer Day
 
Introduction into Mechanical Design - Reverse Engineering.pptx
Introduction into Mechanical Design - Reverse Engineering.pptxIntroduction into Mechanical Design - Reverse Engineering.pptx
Introduction into Mechanical Design - Reverse Engineering.pptxAhmedYounis676020
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs SAJJAD KHUDHUR ABBAS
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs SAJJAD KHUDHUR ABBAS
 
Building best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingBuilding best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingTony Lopez
 
Plast-Pro Solutions PPT
Plast-Pro Solutions PPTPlast-Pro Solutions PPT
Plast-Pro Solutions PPTMaxpromotion
 
Post Processing
Post Processing Post Processing
Post Processing KTN
 
midas NFX 2013: Towards a New Generation of Mechanical FEA Solution
midas NFX 2013: Towards a New Generation of Mechanical FEA Solutionmidas NFX 2013: Towards a New Generation of Mechanical FEA Solution
midas NFX 2013: Towards a New Generation of Mechanical FEA SolutionMIDAS Information Technology
 
Plastpro solutions presentation_jan2017
Plastpro solutions presentation_jan2017Plastpro solutions presentation_jan2017
Plastpro solutions presentation_jan2017Maxpromotion
 
Ptc creo mold analysis extension (cma)tutorial
Ptc creo mold analysis extension (cma)tutorialPtc creo mold analysis extension (cma)tutorial
Ptc creo mold analysis extension (cma)tutorialVictor Mitov
 
Virtualmech energy CSP presentation
Virtualmech energy CSP presentationVirtualmech energy CSP presentation
Virtualmech energy CSP presentationCésar Hoyos Martín
 
Senior Design Presentation
Senior Design PresentationSenior Design Presentation
Senior Design PresentationJon Zickermann
 
CAE FEA Services from ProSIM Bangalore (Updated 22092022).pptx
CAE FEA Services from ProSIM Bangalore (Updated 22092022).pptxCAE FEA Services from ProSIM Bangalore (Updated 22092022).pptx
CAE FEA Services from ProSIM Bangalore (Updated 22092022).pptxprosim1
 
Ptc creo mold analysis extension (cma) sales presentation
Ptc creo mold analysis extension (cma) sales presentationPtc creo mold analysis extension (cma) sales presentation
Ptc creo mold analysis extension (cma) sales presentationVictor Mitov
 
Practical unit testing in c & c++
Practical unit testing in c & c++Practical unit testing in c & c++
Practical unit testing in c & c++Matt Hargett
 
Process Control & CV history
Process Control & CV historyProcess Control & CV history
Process Control & CV historyacdnexpat
 
Improvement strategy by using ML and TM. A case study for solving cracking i...
Improvement strategy by using ML and TM. A  case study for solving cracking i...Improvement strategy by using ML and TM. A  case study for solving cracking i...
Improvement strategy by using ML and TM. A case study for solving cracking i...q-Maxim
 
Modeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and EnergyModeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and EnergyIllinois ASHRAE
 
Case Study On Metal To Plastic Substitution Opm
Case Study On Metal To Plastic Substitution OpmCase Study On Metal To Plastic Substitution Opm
Case Study On Metal To Plastic Substitution OpmNilesh Nevrekar
 

Similar to Commercialization of Robotic Prototypes: Improving the Concept for Manufacturability and Sale. (20)

NWC 2015 - Critical - Path Simulation
NWC 2015 - Critical - Path Simulation NWC 2015 - Critical - Path Simulation
NWC 2015 - Critical - Path Simulation
 
Introduction into Mechanical Design - Reverse Engineering.pptx
Introduction into Mechanical Design - Reverse Engineering.pptxIntroduction into Mechanical Design - Reverse Engineering.pptx
Introduction into Mechanical Design - Reverse Engineering.pptx
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs
 
Episode 27 : Project Management Costs
Episode 27 : Project Management Costs Episode 27 : Project Management Costs
Episode 27 : Project Management Costs
 
This two
This twoThis two
This two
 
Building best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturingBuilding best in-class quality in footwear manufacturing
Building best in-class quality in footwear manufacturing
 
Plast-Pro Solutions PPT
Plast-Pro Solutions PPTPlast-Pro Solutions PPT
Plast-Pro Solutions PPT
 
Post Processing
Post Processing Post Processing
Post Processing
 
midas NFX 2013: Towards a New Generation of Mechanical FEA Solution
midas NFX 2013: Towards a New Generation of Mechanical FEA Solutionmidas NFX 2013: Towards a New Generation of Mechanical FEA Solution
midas NFX 2013: Towards a New Generation of Mechanical FEA Solution
 
Plastpro solutions presentation_jan2017
Plastpro solutions presentation_jan2017Plastpro solutions presentation_jan2017
Plastpro solutions presentation_jan2017
 
Ptc creo mold analysis extension (cma)tutorial
Ptc creo mold analysis extension (cma)tutorialPtc creo mold analysis extension (cma)tutorial
Ptc creo mold analysis extension (cma)tutorial
 
Virtualmech energy CSP presentation
Virtualmech energy CSP presentationVirtualmech energy CSP presentation
Virtualmech energy CSP presentation
 
Senior Design Presentation
Senior Design PresentationSenior Design Presentation
Senior Design Presentation
 
CAE FEA Services from ProSIM Bangalore (Updated 22092022).pptx
CAE FEA Services from ProSIM Bangalore (Updated 22092022).pptxCAE FEA Services from ProSIM Bangalore (Updated 22092022).pptx
CAE FEA Services from ProSIM Bangalore (Updated 22092022).pptx
 
Ptc creo mold analysis extension (cma) sales presentation
Ptc creo mold analysis extension (cma) sales presentationPtc creo mold analysis extension (cma) sales presentation
Ptc creo mold analysis extension (cma) sales presentation
 
Practical unit testing in c & c++
Practical unit testing in c & c++Practical unit testing in c & c++
Practical unit testing in c & c++
 
Process Control & CV history
Process Control & CV historyProcess Control & CV history
Process Control & CV history
 
Improvement strategy by using ML and TM. A case study for solving cracking i...
Improvement strategy by using ML and TM. A  case study for solving cracking i...Improvement strategy by using ML and TM. A  case study for solving cracking i...
Improvement strategy by using ML and TM. A case study for solving cracking i...
 
Modeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and EnergyModeling, It's Not Just For Calendars and Energy
Modeling, It's Not Just For Calendars and Energy
 
Case Study On Metal To Plastic Substitution Opm
Case Study On Metal To Plastic Substitution OpmCase Study On Metal To Plastic Substitution Opm
Case Study On Metal To Plastic Substitution Opm
 

Recently uploaded

PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...SUHANI PANDEY
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdfSuman Jyoti
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 

Recently uploaded (20)

PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 

Commercialization of Robotic Prototypes: Improving the Concept for Manufacturability and Sale.

  • 1. Commercialization of Robotic Prototypes: Improving the Concept for Manufacturability and Sale Jon Appleby Engineering Manager, Boston Acorn Product Development
  • 2. Commercialization of Robotic Prototypes: “The big problem is production. They overestimate how easy it is to do. It’s really hard.” - Dimitry Grishin, xconomy 9/24/14
  • 3. Late 2010 3 Employees 3 Robots Mid 2012 70 Employees 100+ Robots Improving on the Concept: Our Case Study
  • 4. Improving on the Concept: Who we are
  • 5. • Goals and requirements • Breadboard development, component selection • Packaging options • Drive-Train analysis • Thermal modeling • Structure – materials, process capability, tooling approach? • Manufacturing plan • Cost analysis • Down-selection of concepts, layouts, performance metrics. Improving on the Concept: How to Get There
  • 6. • CAD design • Updated analysis, thermal, structural, tolerance • Mfg Qualification, sourcing plan. • DFM integration from supply base. • Prototype build • Goals and requirements • Breadboard development, component selection • Packaging options • Drive-Train analysis • Thermal modeling • Structure – materials, process capability, tooling approach? • Manufacturing plan • Cost analysis • Down-selection of concepts, layouts, performance metrics. Improving on the Concept: How to Get There
  • 7. • CAD design • Updated analysis, thermal, structural, tolerance • Mfg Qualification, sourcing plan. • DFM integration from supply base. • Prototype build • “Test” – Validate, don’t test. • Production design, analysis updates. • Vendor management • Tool reviews, mold-flow, First- Article inspection • Qualification • CM build support • Goals and requirements • Breadboard development, component selection • Packaging options • Drive-Train analysis • Thermal modeling • Structure – materials, process capability, tooling approach? • Manufacturing plan • Cost analysis • Down-selection of concepts, layouts, performance metrics. Improving on the Concept: How to Get There
  • 8. The Prototype Phase 1: Concept Generation, Evaluation • Defining Realistic Goals/Objectives for the Commercial Product • Designing for Manufacturing & Challenges • Weight • Strength • Performance Phase 2: Detailed Design • CAD Implementations • Analysis refinements Phase 3: Test, Production Design • Supply Chain Challenges • Testing, Reliability The Results Improving on the Concept: A Case Study
  • 9. The starting point: Machined aluminum chassis. CNC, expensive, heavy. Compression, flat gasket sealing Bolt-in-place, all at once assembly process. Functional! Runs great, performs all basic tasks. Too expensive, too heavy Not a product, yet. COTS / Commercial drive components. Poor reliability, hand-wired Over-stressed components The Prototype
  • 10. • Weight targets – • Prototype was 35+ lbs. • Target = <25lbs. This includes “fixed” weight metrics like battery, motor, electronics. • Rugged • Needs to be run by un-trained operators on unknown terrain. • Durable, pull it out, use, put it back. • 60” repeated drop test requirement, thrown deployment • Custom treads • Modular payloads • Need space, lots of it! Future expansion possibilities • Common interface, power, high-speed signal, water-proof • Costs • Needed a reduction of ~>50% in BOM (Bill of Material) costs • This is a must for the business case Phase 1: Goals, Realistic and Otherwise
  • 11. At the concept level: How do we fit all the required components, and meet the performance requirements? Evaluated several different layouts, each with: • Thermal solutions – solar load, internal power dissipation • Payload capability – how big, how many? • Climbing performance - FWD, RWD, CG, traction, balance • Cost Phase 1: Concept Generation
  • 12. How to we design around the CNC chassis, what are the alternatives? Plastics: Low cost High complexity, feature rich Good impact, low strength Major risks to structural & tolerance goals New supply chain Thixomolding: Licensed magnesium die-cast process ~Low cost, high complexity High strength, light weight. More accurate than aluminum die casting New supply chain These choices impact our concept – we need analysis at the system level. Gaining in popularity, camera shells, transmission cases, consumer products. Phase 1: Concept Generation - Materials
  • 13. • Will this survive the ambient conditions? >45C ambient, desert solar load Multiple levels & Increasing effort and reward: • Hand-Calcs – quick, can rapidly apply to several concepts. Rinse, Repeat as concepts evolve. • CFD – for times when you need better than ~+/- 25% accuracy. This are slow, time-consuming, and not 100% accurate either. Phase 1: Concept Generation – Thermal Evaluation
  • 14. We were very concerned on the drop impact: • High cantilevered loads • Can we use SST for the shafts, aluminum, Ti? • Relationship between shaft OD and attachment method? • Will our plastic construction concepts be strong enough? g Phase 1: Concept Generation – Structural Evaluation Took several concept iterations to support the cold temperature drop performance.
  • 16. Centerpiece of the re-design effort was a common, single-molded chassis solution. Early concept Model Used for basic strength calculations, molding feedback, vendor RFQ process Production Design Model Final FEA simulations Tolerance analysis Phase 2: Detailed Design - Chassis
  • 17. Tolerances are a key aspect of the detailed design. There are several approaches here, each with their own advantages: Worst-Case Analysis: “RSS”, Root Sum Squared Direct Linearization Method Monte-Carlo Setup Time (fast) (slow)(high) Accuracy (low) In everyone’s toolbox. Not realistic, doesn’t hold up for multi-part solutions. Can’t plan for the worst! Good approximation, weights all variables the same. Difficult to get a predicative value. Good balance of speed, accuracy. Combines actual process capability into a predictive approach. “Holy Grail”. Iterative, simulation to predict results. This is only as good as your input data. Not recommended unless you have measured manufacturing data on your parts. Phase 2: Detailed Design – Tolerance Analysis
  • 18. Direct Linearization Method Approach: Element 1: Plastic Feature Element 2: Shaft Dimension Element 3: Bolt fit in clearance hole Sum generates a composite Gaussian curve Adding up our elements, based on a sketched loop New Predicted Gaussian 3 sigma = 99.9%, or 1350 DPPM 4 sigma = 99.997%, or 32 DPPM Phase 2: Detailed Design – Tolerance Analysis Element n: Hole clearance, biased by gravity
  • 19. Gear Mesh Tolerance Loop generation, from one side of the gap to the other. Expected Center distance? Solving for our predicted distances: Z (Sigma) = 3.98 @ +/- 0.27mm Or, 99.997% of the time, we expect +/- 0.27mm of the CAD distance. Phase 2: Detailed Design – Tolerance Analysis
  • 20. Revisit our thermal solutions, at a systems level. Early runs shown – safe plastic touch limits exceeded! Verification of motor peak temperatures Phase 2: Detailed Design – Thermal Refinement
  • 21. Plastics are not an overnight solution. SLA, 3D print, machined equivalents are good mock-ups, but not functional equivalents. We decided to build an iterative option, with a sheetmetal core chassis. This gave us a working platform, with the similar weight profile, in a short amount of time: Interim path: Production path: Phase 2: Detailed Design - Chassis
  • 22. • 4-slide, large molded chassis in 8 weeks? • Yes, it can be done! • Global Sourcing, Vetting suppliers remotely • Tooling < $80k investment • Vendor Management is key • Tooling approvals, design approvals, be involved. • In process photos are a must • Weekly communication at a minimum In process B-plate In process slide Phase 3: Supply Chain Challenges
  • 23. • Tooling Drawing Reviews • Inserts as needed, materials • Cooling lines, gating, runner systems, ejection Typical tool construction drawings Typical cooling and runner visualizations Phase 3: Supply Chain Challenges
  • 24. • Mold-Flow Studies • Gate & Process verification • Venting, Air Trap concerns • Done ourselves, and/or cross-checked from vendor provided data. Phase 3: Supply Chain Challenges
  • 25. First Article Inspection • Just because it’s done – doesn’t mean it’s right! Phase 3: Supply Chain Challenges
  • 26. • Drop Test – this was a challenge with a high mass object… • Aggressive 5ft drop requirement onto pavement Phase 3: Testing, Reliability
  • 27. • Still break a few eggs! Traced back to material issue at supplier. Wrong level of impact modifier not present in the parts provided. Phase 3: Testing, Reliability
  • 28. Empirical measurements of thermal solutions. Done @ max power conditions, per CFD models. CFD modeling assumed max power @ ½ speed. Testing did not include airflow over robot. Predicted values are 20% lower. Good correlation otherwise (10-20% resolution) Phase 3: Testing, Reliability
  • 29. Lighter, Cheaper, More Capable! • Weight savings of >10lbs • Reduction in cost by > than an order of magnitude! • BOM Cost Start: $10,000’s per system • BOM Cost End: $100’s per system • Final part count: • 3x Die-cast/Thixo • 25x Injection Molding • 7x CNC • 19x Sheetmetal • 2x Extrusion • Passed ruggedness/durability tests • Payload support increase by >100% The Results:
  • 31. • This is hard! Production design requires different tool kits, different approaches to meet the cost, manufacturability, performance targets. • Production design doesn’t mean limited functionality! • The concept – it all starts there. • Analyze, proceed with confidence, & validate The Results:
  • 33. Thank You (Come see the robot in Booth 520!) Address Contact 1 Broadway, 14th Floor Barry Braunstein Cambridge, MA 02142 P 617-475-1541 E bbraunstein@acornpd.com