Chief Engineer (CE)
15 April 2023 1
• Head of the department
• Responsible for all administrative and establishment matters of
all employees of PWD
• Appointing authority and also conducts transfers of the officers
in department
• Advices the government on technical matters
• Prepares annual budget and submit to the government
• DPR of all major projects are approved and submitted to the
government
• Empowered with unlimited powers of technical sanctions
• Approves the proposal for departmental execution of works
Superintending Engineer (SE)
15 April 2023 2
• Technical head of the region commonly known as the circle.
• Supervision and inspection of the activities taking place within
the circle
• Gives AS and TS as per financial powers entrusted as per rule
• Standard datas and specifications are reviewed and that for new
items of work arising are prepared
• All communications to CE on technical matters from lower level
offices is routed through SE
Executive Engineer (EE)
15 April 2023 3
• Technical head of the region commonly known as the division.
• Hence called divisional engineer
• Participating in District Development Committee
• Land acquisition plan for public projects is prepared by division
office
• During calamities, EE should take necessary actions associated
with district administration
Assistant Executive Engineer (AEE)
15 April 2023 4
• Technical head of the region commonly known as the Sub
division.
• Hence called Sub divisional engineer
• Inspects works executed in various section offices under the
jurisdiction of sub division
• 25% of the measurements recorded by the AE should be check
measured
• Estimates & bills submitted by the AE is scrutinised at the
subdivision
• Accounts at the sub division should be forwarded to the division
office
• Quality control of work, upkeep of government property,
ensuring progress of project and submitting the DPD
PROJECT MANAGEMENT
15 April 2023 5
• A structural way of planning, scheduling, executing,
monitoring and controlling various phases of project
• Project management tools
- should be easy to plan, schedule and showing the inter
relationships between activities
- able to schedule, and if necessary reschedule activities
- should optimise resource utilization
- helps complete the project as per schedule
PROJECT MANAGEMENT TOOLS
15 April 2023 6
(1) Bar chart / Gantt chart
Example of a simple bar chart for the planning, design and
construction of a chair
• Graphical representation
• Formed with a list of activities, specifying the start date,
duration of the activity and completion date of each activity,
and then plotted on a project timescale.
• Activities to be performed on the Y-axis and time interval on
the X-axis
15 April 2023 7
• Advantages
- easy to construct
- easy to understand
- all activities can be visualized at a glance
- suitable for limited number of activities (usually < 30)
- easy to make presentaions with
- easy to understand delayed activities

More Related Content

Similar to CMCM33.pptx

CM1CM1.pptx
CM1CM1.pptxCM1CM1.pptx
CM1CM1.pptx
ATHUL609783
 
CM1CM1.pptx
CM1CM1.pptxCM1CM1.pptx
CM1CM1.pptx
ATHUL609783
 
CMCMCM.pptx
CMCMCM.pptxCMCMCM.pptx
CMCMCM.pptx
ATHUL609783
 
CMCM88.pptx
CMCM88.pptxCMCM88.pptx
CMCM88.pptx
ATHUL609783
 
CMCM99.pptx
CMCM99.pptxCMCM99.pptx
CMCM99.pptx
ATHUL609783
 
Public Work Accounts- Contracts, Accounts and Tenders.pptx
Public Work Accounts- Contracts, Accounts and Tenders.pptxPublic Work Accounts- Contracts, Accounts and Tenders.pptx
Public Work Accounts- Contracts, Accounts and Tenders.pptx
Vinod Nejkar
 
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxCONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
surekha1287
 
CTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptxCTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptx
RaoAnkitYadav1
 
CTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptxCTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptx
RaoAnkitYadav1
 
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdfctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
GagandeepKaur617299
 
Scheduling of a project
Scheduling of a projectScheduling of a project
Scheduling of a project
Sailish Cephas
 
Project Tracking & SPC
Project Tracking & SPCProject Tracking & SPC
Project Tracking & SPC
Meghaj Mallick
 
Ici&itd presentation project 1(1) copy
Ici&itd presentation project 1(1)   copyIci&itd presentation project 1(1)   copy
Ici&itd presentation project 1(1) copy
IRFAANYADUN
 
FNBE AUGUST'14 ICI&ITD Presentation Project 1
FNBE AUGUST'14 ICI&ITD Presentation Project 1FNBE AUGUST'14 ICI&ITD Presentation Project 1
FNBE AUGUST'14 ICI&ITD Presentation Project 1
yangkanglim
 
Ici&itd presentation project 1
Ici&itd presentation project 1Ici&itd presentation project 1
Ici&itd presentation project 1Json96
 
ICI and ITD presentation
ICI and ITD presentationICI and ITD presentation
ICI and ITD presentation
Marco Leong
 
Ici&itd presentation project 1
Ici&itd presentation project 1Ici&itd presentation project 1
Ici&itd presentation project 1
IRFAANYADUN
 

Similar to CMCM33.pptx (20)

CM1CM1.pptx
CM1CM1.pptxCM1CM1.pptx
CM1CM1.pptx
 
CM1CM1.pptx
CM1CM1.pptxCM1CM1.pptx
CM1CM1.pptx
 
CMCMCM.pptx
CMCMCM.pptxCMCMCM.pptx
CMCMCM.pptx
 
CMCM88.pptx
CMCM88.pptxCMCM88.pptx
CMCM88.pptx
 
Module-1 (1).pptx
Module-1 (1).pptxModule-1 (1).pptx
Module-1 (1).pptx
 
CMCM99.pptx
CMCM99.pptxCMCM99.pptx
CMCM99.pptx
 
Public Work Accounts- Contracts, Accounts and Tenders.pptx
Public Work Accounts- Contracts, Accounts and Tenders.pptxPublic Work Accounts- Contracts, Accounts and Tenders.pptx
Public Work Accounts- Contracts, Accounts and Tenders.pptx
 
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptxCONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
CONSTRUCTION PLANNING AND SCHEDULING-MODULE 1.pptx
 
CTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptxCTM - 02 - Construction Project Planning - Copy.pptx
CTM - 02 - Construction Project Planning - Copy.pptx
 
CTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptxCTM - 02 - Construction Project Planning.pptx
CTM - 02 - Construction Project Planning.pptx
 
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdfctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
ctm-02-constructionprojectplanning-copy-220827180427-63b477c3.pdf
 
Scheduling of a project
Scheduling of a projectScheduling of a project
Scheduling of a project
 
Project Tracking & SPC
Project Tracking & SPCProject Tracking & SPC
Project Tracking & SPC
 
Appli. for the Const. Mngr
Appli. for the Const. MngrAppli. for the Const. Mngr
Appli. for the Const. Mngr
 
The construction programme - assurance and controls
The construction programme - assurance and controlsThe construction programme - assurance and controls
The construction programme - assurance and controls
 
Ici&itd presentation project 1(1) copy
Ici&itd presentation project 1(1)   copyIci&itd presentation project 1(1)   copy
Ici&itd presentation project 1(1) copy
 
FNBE AUGUST'14 ICI&ITD Presentation Project 1
FNBE AUGUST'14 ICI&ITD Presentation Project 1FNBE AUGUST'14 ICI&ITD Presentation Project 1
FNBE AUGUST'14 ICI&ITD Presentation Project 1
 
Ici&itd presentation project 1
Ici&itd presentation project 1Ici&itd presentation project 1
Ici&itd presentation project 1
 
ICI and ITD presentation
ICI and ITD presentationICI and ITD presentation
ICI and ITD presentation
 
Ici&itd presentation project 1
Ici&itd presentation project 1Ici&itd presentation project 1
Ici&itd presentation project 1
 

Recently uploaded

English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
AafreenAbuthahir2
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
ViniHema
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 

Recently uploaded (20)

English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234WATER CRISIS and its solutions-pptx 1234
WATER CRISIS and its solutions-pptx 1234
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 

CMCM33.pptx

  • 1. Chief Engineer (CE) 15 April 2023 1 • Head of the department • Responsible for all administrative and establishment matters of all employees of PWD • Appointing authority and also conducts transfers of the officers in department • Advices the government on technical matters • Prepares annual budget and submit to the government • DPR of all major projects are approved and submitted to the government • Empowered with unlimited powers of technical sanctions • Approves the proposal for departmental execution of works
  • 2. Superintending Engineer (SE) 15 April 2023 2 • Technical head of the region commonly known as the circle. • Supervision and inspection of the activities taking place within the circle • Gives AS and TS as per financial powers entrusted as per rule • Standard datas and specifications are reviewed and that for new items of work arising are prepared • All communications to CE on technical matters from lower level offices is routed through SE
  • 3. Executive Engineer (EE) 15 April 2023 3 • Technical head of the region commonly known as the division. • Hence called divisional engineer • Participating in District Development Committee • Land acquisition plan for public projects is prepared by division office • During calamities, EE should take necessary actions associated with district administration
  • 4. Assistant Executive Engineer (AEE) 15 April 2023 4 • Technical head of the region commonly known as the Sub division. • Hence called Sub divisional engineer • Inspects works executed in various section offices under the jurisdiction of sub division • 25% of the measurements recorded by the AE should be check measured • Estimates & bills submitted by the AE is scrutinised at the subdivision • Accounts at the sub division should be forwarded to the division office • Quality control of work, upkeep of government property, ensuring progress of project and submitting the DPD
  • 5. PROJECT MANAGEMENT 15 April 2023 5 • A structural way of planning, scheduling, executing, monitoring and controlling various phases of project • Project management tools - should be easy to plan, schedule and showing the inter relationships between activities - able to schedule, and if necessary reschedule activities - should optimise resource utilization - helps complete the project as per schedule
  • 6. PROJECT MANAGEMENT TOOLS 15 April 2023 6 (1) Bar chart / Gantt chart Example of a simple bar chart for the planning, design and construction of a chair • Graphical representation • Formed with a list of activities, specifying the start date, duration of the activity and completion date of each activity, and then plotted on a project timescale. • Activities to be performed on the Y-axis and time interval on the X-axis
  • 7. 15 April 2023 7 • Advantages - easy to construct - easy to understand - all activities can be visualized at a glance - suitable for limited number of activities (usually < 30) - easy to make presentaions with - easy to understand delayed activities