Business benefits of Cloud Computing for Banking
Areas Benefits
Quick launch of banking, insurance
and financial products
Cloud computing allows quick & easy provisioning of IT environments for rolling new business functionalities,
products & services to maintain competitive advantage. Cloud computing helps to accelerate global payment
processing, KYC, Anti-money Laundering initiatives, card processes etc.
Ability to cope with growth,
seasonal peaks or even
divestments/spin-offs.
The cloud system is designed to cope with sharp increases as well as decreases in workload. This increases
the speed of response, reduces risks and operational costs. Moreover Banks only pay for what they
use/consume.
Increased collaboration, higher
productivity
Cloud services enable and increase productivity with real-time business collaboration. Banks and their
employees are able to collaborate on shared documents and retrieve critical business information from
anywhere, anytime and on any device.
Regulatory, Compliance and Market
Changes
Fast provisioning of the future platforms on Cloud provides the ability to begin the early development
and deployment of new capability to cope with market, regulatory, compliance, economic & political
changes.
Access to latest security features Cloud providers have industrialised approach when it comes to enhancing, updating/upgrading security
features, data loss prevention measures, user authentication, fraud protection, Cyber Attacks etc.
Lower Costs Allow re-purposing of the HW to run non-production environments at different times to achieve higher SID to
HW ratio.
Greener IT, Reduced Carbon
Footprint. Better Corporate Social
responsibility rating.
Cloud computing has helped organisations become greener by reducing the overall footprint of DCs and
associated energy consumption
Banks are already widely using cloud computing for non-core and non-critical uses, such as human resources, e-mail, customer analytics, customer
relationship management, and development and testing (88% of surveyed EU-based financial institutions were already using cloud based services by
June 2015).
Benefits of moving to Cloud
 Consolidate Applications & Infra Landscape with in-built technology refresh, monitoring tools, OS, Database Management, Middleware and other
ongoing support services.
 Raise average utilisation of underlying infrastructure to at least 90% in terms of SAPS and Storage utilized.
 Reduce DC footprint and associated power, cooling and space by 60% thereby lowering associated Carbon footprint and provisioning Greener IT
 Allow re-purposing of the HW to run any non-production environments at different times to achieve higher SID to HW ratio.
 Facilitate quick (on-demand) provisioning of temporary environments for short durations (say days to months) and quick turning-off
(decommissioning) of unwanted environments.
 Provide full flexibility of ramping-up and ramping-down in-line with business workloads with continuous capacity and service level management.
 Facilitate consumption-based billing based on actual usage/consumption on set time-frame as opposed to 'installed/unused' model.
 Provide priority access to Demos, PoVs (Point-of-Views), PoCs, PROVIDER’s Consulting, PROVIDER and PROVIDER’s Co-Innovation Lab.
 Ensures you as a customer are not locked into a particular Vendor; whereby Customer can terminate the contract without any liabilities/
liquidated damages by serving an advance notice of 6 months.
 Reduce business downtime during migration phase(s) as well as operational maintenance after Go-Live by leveraging NZDT (Near Zero Downtime)
Maintenance approach.
Application Transformation To Cloud (AT2C)
 Business case driven approach; application analysis will inform a financial analysis to
ensure that the timing and nature of workload migration contribute to the TCO
reduction goal
 Application driven approach; analysis of the application workload will be performed to
both minimise the risk of business impact and ensure that the correct target platform
is selected
 A quick win opportunity – fast provisioning of the future platforms provides the ability
to begin the early development and deployment of new capability
 Workload migration – where desirable existing workload running in a virtualised
environment can be assimilated to run under CSA (Cloud System Automation)
providing a low impact route to improved visibility and control of the VM’s running
within the environment
It is all about deciding the to-be landing zones &
treatments
Typical Cloud Models
Private cloud
Public cloud
Build(Mulesoft)
or
Consume
Integratedservicedelivery
A proven set of services
to Transform applications to
exploit cloud solutions,
deliver superior customer
experience and accelerate
business outcomes:
Advise
- Assess & Plan
Transform
- Execute & Integrate
Manage
- Optimise & Innovate
Also use Application Modernisation Services to leverage core business IP contained in legacy applications & data
Applications transformation to the cloud (AT2C)
Solution Overview
Cloud
Suitability
Analysis
Cloud
service
types
Cloud
Transformation
Strategy
Determination
Cloud Apps
Portfolio
Analysis
Portfolio Analysis and Planning
Cloud -specific workload
analysis
Risk analysis
and ROI
Architecture
IaaS PaaSSaaS
Cloud deployment
models
Public PrivateManaged
Dedicated/hosted
(retain, retire)
Suitable for cloud
Need deeper
analysis
Not suitable
for cloud
Retire
Tactical
retain
Cloud
Prequalification
Cloud application
criteria
Cloud application
barriers
Apps
Rehost/S2S
migration
Replace
Re -architect /
Re-factor
Integrate/
Re -interface
Transformation Strategy
Suitable
for SaaS
Cloud suitability mapping
PROVIDER will identify transformation/ journey treatments required to migrate the applications and application groupings to their future state infrastructure.
The above activities will be performed prior to May 21st. The following activities will take place post May 21st and will also consist of an increase in scope to include all locations (MDC’s and regional DC’s. Timescales for this work will be defined post May 21st.
7 possible treatments
1. Re-learn: A discovery process that captures the intellectual property investment that has been made in legacy applications over many years and enables that investment
to be preserved and carried forward through modernisation.
2. Re-factor Code optimisation to improve the run-time efficiency of an application. In the context of transformation to cloud ,make code changes to take advantage of the
cloud platform without changing the application business logic or programming language.
3. Re-host
Midrange
There are two types of re-host for midrange environments: Re-host binary and Server-to-Server (S2S) migration):
Re-host (Binary): Migration of applications to lower cost modern platforms without significantly changing the business features and functions. In the context of
transformation to cloud, this involves a lift and shift the current application to the target platform without any code changes. Re-host Binary is not performed
by AT2C.
Re-host: Server-to-Server (S2S): This modernization strategy focuses cases where target environment and servers are not 100% compatible and application
changes are necessary. Migrations typically run on a set of standardised platforms and technologies. S2S is a capability that can be offered as part of the AT2C
re-host area or as a stand-alone engagement.
4. Re-
architect
Forward engineering applications to Java J2EE or Windows .NET Agile Application Architecture to enable true enterprise agility. May consist of business rule
analysis followed by recoding the application, changing the business logic and function including use of automated language conversion tooling to translate to
JAVA or /NET.
5. Re-
interface
Re-interface applications by creating new interfaces to leverage and extend the application features and value. In the context of transformation to cloud
,service-enable applications, create web services and web interfaces to be consumed as part of the application integration architecture and consumption of the
application in the cloud.
6. Replace Provides a framework to replace existing legacy applications with standard enterprise applications, industry standard applications, or newly developed
applications. In the context of transformation to cloud ,it will consist of replacing an existing application by a SaaS offering
7. Retire Decommission legacy applications from the applications portfolio. We assess the linkage of applications to be retired and then systematically manage the
shutdown of applications so that the business is not interrupted.
As part of the assessment process we will identify which treatments are the most appropriate with the customer. The criteria developed with customer to date
has already identified the initial Retire applications and some of the Replace candidates.
Treatments for Applications transformation to the
cloud (AT2C)
The objective of S2S
Application transformation is to
migrate and adapt application
from a current environment to a
modern target Environment &
Architecture (Cloud) without
any functional and/or technical
changes to applications
The migration implies,
remediation, update, upgrade
and any other actions to make
the applications compatible with
their target environments.
Also use Application Modernisation Services to leverage core business IP contained in legacy applications & data
Server-to-Server (S2S) Application Transformation
Solution Overview
Cloud
Suitability
Analysis
Cloud
service
types
Cloud
Transformation
Strategy
Determination
Cloud Apps
Portfolio
Analysis
Portfolio Analysis and Planning
Cloud-specific workload
analysis
Risk analysis
and ROI
Architecture
IaaS PaaSSaaS
Cloud deployment
models
Public PrivateManaged
Dedicated/hosted
(retain, retire)
Suitable for cloud
Need deeper
analysis
Not suitable
for cloud
Retire
Tactical
retain
Cloud
Prequalification
Cloud application
criteria
Cloud application
barriers
Apps
Rehost/S2S
migration
Replace
Re-architect /
Re-factor
Integrate/
Re-interface
Transformation Strategy
Suitable
for SaaS
Cloud suitability mapping
A transformation technique for legacy servers
Industrialized midrange server application rehost
Server-to-Server (S2S) Application Transformation
An S2S engagement is “as-is” (no functional changes) transformation engagement that is aimed to provide an industrialized
approach to transformation of a large application portfolio from one platform to another, typically Next Generation Data Center
or Cloud.
S2S Application Transformation is an end-to-end solution for mid-range servers, which combines the
expertise of data engineering, applications and infrastructure. With a thorough identification and
assessment of a client’s current environment, applications are modified suitably so they can be moved
from one server type to another, especially target cloud platforms
An advanced transformation technique for mid-range servers
For applications that
suit the new infrastructure
For Transformations an
application is recompiled
When target environment &
servers not 100% compatible
For more than a simple
‘lift and shift’ migration
Target
Infrastructure
Traditional
MPC
VPC
Cloud Maps
Application
Suitability
Fit to Future
Application
Roadmaps
Fit to Future
Enterprise
Architecture
Fit to Future
Business
Strategy
Fit to Future
Business
Processes
Application
Transformation
to Cloud
Application
Lift and Shift
Ready for Cloud
Encapsulated
Application
Server
Lift and Shift
Application
O/S
Server to Server
Leave As-Is
Public
Private
Managed
Factorybased
Migration approaches
Workload Migration Principles
Application
Treatment Group A
Application
Treatment Group B
Application
Treatment Group C
Application Treatment
Group D
Application Treatment
Group O
Application
Treatment Group L
Where applications are
currently already virtual
(virtual to virtual),
Complexity rating
Simple/ Medium,
Proprietary software non
Bespoke.
Where applications are
currently Physical but the
future direction is Virtual
(Physical to virtual),
Complexity rating Simple/
Medium, Proprietary
software non Bespoke.
Where applications are
currently Physical and the
future direction is
Physical (Physical to
Physical), Complexity
rating Simple/ Medium,
Proprietary software non
Bespoke.
Where applications are
currently Physical or Virtual
but there are reasons why
these cannot move directly to
a cloud function (Unsupported
software Retired before
migration, Unstable platform,
Direction Lift, remediate,
shift)
Where applications are
currently not in scope.
Where there is not
enough information
about the Application
therefore more
information is required
to make an assessment.
Have operating systems
that can be supported by
the future cloud
infrastructure and
therefore, require little
remediation to migrate
them across to the
service.
Move to the target stack
is dependent on the
nature of the application
and the compatibility
with the target stack
components. Therefore,
additional due diligence
may be required with the
application provider.
Some additional
measures need to be in
place to determine
whether they stay on
physical infrastructure or
move to virtualised
environments.
Move to Cloud - Reduces Complexity & Associated
Infra Costs
Fact File- Global Bank
Focus on Agility, Creativity & Innovations
Consumption Based Services & Infrastructure
RUN PHASET&T/SET-UP PHASE
Dev/SBX
QA
Prod
Prod + DR+ Others
Capacity
Ramp-Up
Capacity
Ramp-Up
Capacity
Ramp-Down
Alternatives to internal IT create competition
Emergence of the Internal Service
Provider
Public
Cloud
SaaS Private
Cloud
IaaS PaaS Public
Cloud
Private
Cloud
SaaS
Today’s IT Reality
• LOB becoming more technology aware
• Alternatives exist in the market for
direct consumption
• Technology is viewed in terms of
service value from the user
• Users & developers want simple
• Security, compliance, availability
Service
Catalog
Dev
Platform
• Compliance
• Governance
• Competence
• Data sovereignty
• Budget constraints
• IP protection
• Culture
• Agility
• Secure data transfer
Considerations
Internal Service Provider – providing the right destination for the right
application
Use the right destination for the right applicationHybrid IT :
C o m m o n f o u n d a t i o n & O p e n t e c h n o l o g y
Private
Cloud
Managed Private
Cloud
Managed Virtual
Private Cloud
Public
Cloud
Centralized Management Layer
Classic IT,
Enterprise
applications
Cloud Native
applications
• Security
• Availability
• Resiliency
• Compliance
• Data
Sovereignty
• Performance
• Open
• Cost
Bridge old and new
Key Factors:
Definition of Migration vs. AMoD
phases
Adapt Evolve
Move and adapt the current environment to a modern target
structure & Architecture without any functional and/or technical
changes to applications.
It only includes any update, upgrade and action to make the
applications compatible with their target environment
The evolve phase concerns all modernisation activities to apply
to the applications to improve its flexibility, elasticity, business
value, cloud adoption, etc...
It usually implies functional and/or technical changes
Unless absolute necessity and only for very minor actions no functional and technical changes should be applied to the application during
the adopt mode
If it is required it should be part of the Evolve mode
Transformation approach
Single networking environment Current & Target environments in a single network configurationAdapt Network2
1 Deploy target environment IaaS / PaaS
Production
Pre-Production
SLA 99.9
SLA 99.5
OS and SW version
levels at n or n-1
MS Windows
Linux RedHat
Linux Suse
5
PrerequisiteMigrationapproach/Factory
Secure both Current & Target env. as one Current & Target environments in a single Security configuration3
Adapt user access Security (AD)
Adapt & simplify network Security
Repeatable Migration Process
Tools / Process
Discover
Information gathering from repositories, tools & application owner
HP AT2C tools & process - HP methodology (EDGE)
Prepare
Align Design
Verify and Validate
the current situation
Develop/Refine and
prioritise
modernisation &
transformation
Options
Develop/Refine &
Validate the Target
situation
Refine the
transformation
strategy
Refine and validate
the project scope
Design / Refine
Solution
Refine transformation
Plan
Refine switch over &
back-out plan
Confirm & authorise
DevOps framework tools & Processes
Transfer to Target
Deploy Manage
All environment &
operational situation
Validated & ready
Review / validate
back-out process
Review validate &
execute switch over
process
Handover
Operate & Support
Manage Performance
Continuous
improvement,.
etc
Existing tooling &
processes
DevOps Tooling
OO – CSA – CODAR - Jenkins - Nexus AppZero – DMA ..
HP AT2C tools & process - HP methodology (EDGE)
Provision
Migrate
Industrialised Factory process
Adapt Integrate
Provision platforms
environments on
target
Migrate production &
pre-production(s)
Verify and validate
architecture
compliancy
Test
test application to
ensure full
compliancy with
Business & User
requirements on new
architecture
Run and Validate
acceptance
Integrate for operational
Situation
(re-establish interfaces, &
all other operational
dependencies)
configuration into DevOps
tooling
Apply reversed
maintenance
Validate integration
Same iteration per instance/Application/DB migrated
Review & Validate Wave plan & Project scope4
This DevOps Framework comprises an integrated set of existing and Open
Source operations and development tools
OM
Repository of re-usable
Models / Templates / Cloud
Maps
EM
Architecture
XS
BSM
VPV
MonitoringConfiguration Mgmt.
uCMDBNexus
Developer Workflow
Jenkins
Service Automation
OO SA DMA
CSA
CODAR
TFS
Visual Studio
MS Workbench
SAP Dev workbench
SAP Workbench
GIT
Maven
Eclipse
Java Workbench
Compute, storage and network infrastructure
OperationsDevelopment
Optional Additions Workbench Specific
Key
DevOps Framework
SiteScope
Fortify ALM
Manage and Quality Assurance
AGM SonarPPM
ALI UFT
QC
Transition Environment
Both Current and Target environments must be seen as One network
Adapt Security
Target Environment
Transition
Platform
High Speed
network link
Current
DC
Non-Cloud
managed
White
White MC
Grey
Black
Target Production
SLA 99.9
White
White MC
Grey
Black
Target Pre-production
SLA 99.5
Dev. –Test - Training …
White
White MC
Grey
Black
DR - Target Production
SLA 99.9
Note: An application is anything with logic in it, which could very well be a DataBase with built in logic
Adapt - Waves approach
•
• Cluster:
• Should remain small enough to limit complexity and risk
• Must be technologically and functionally logically grouped
• May just affect one Business Service and/or one Application but could also affect more than one
• Ideally focus to address business service one after the other
Waves Set of Clusters or a cluster of objects
Business Service mapping
A cluster of objects can be a subset of an application, an entire application, a DB or a group of
DBs, set of services or anything that forms a logical minimum entity to group
It includes all its Production and Pre-Production instances
It is defined according to Business services and Application classification mapping, and/or cross
functionality
Map object family against a or few
business services
Application classification
Classify application according to
Technology, Criticality, Complexity & risk
The move/adopt of all applications to the target environment is done through a series of waves
Discover & Assess
GovernanceCustomer
contributi
on
Support for information gathering from application owner
Mngtof
change
Enterprise capacity for change analysis
Early Business Implementation & Training requirement
Change leadership mobilise
Engagement initialisation & planning
Process&ToolsTechnology
architecture
Business
Architecture
Application Assessment
When required
Collect extra application
information to complete
existing InfoBase
To highlight technical &
business aspect, &
dependencies to take into
consideration in the
migration process
Analyse Develop & refine Option Prioritise & Select
Current Situation
Analyse collected application
data
Confirm current application
situation
Highlight modernisation
opportunities
Option
Define/Refine
modernisation &
transformation options
• Vision & core
capabilities
• Technology option
• Improvement
• Target Model
Prioritise and select
options
Strategy overview
Information gathering from
repositories, tools (uCMDB,
CSA, ..) & application owner
HP AT2C tools & process
HP methodology (EDGE)
Current Situation
Model Current
Model Current
Confirm the current
application architecture
together with
dependencies (Interfaces,
MdW,..)
Continuous process feedback & improvement
Align
Process&ToolsTechnology
architecture
Business
Architecture
Target Architecture High Level Solution Transformation strategy Refine Business case
Develop Target Situation
Describe the Target
application architecture
Highlight
modernisation actions
HP AT2C tools & process
HP methodology (EDGE)
High level Business
requirement and
technological solution
Refine the transformation
strategy to adapt application
on target
platform/architecture
Develop Target Define transformation Plan Project
GovernanceCustomer
contributi
on
Mngtof
change
Validate and approve Transformation strategy and
transition Plan
Project plan & Process
Project Management structure Planning for next phaseProject Management structure
Business
Implementation and
Training requirement
Change Impact
Refine and validate the
project scope
Continuous process feedback & improvement
Design/Refine
Process&ToolsTechnology
architecture
Business
Architecture
Detailed current
situation
Detailed business &
technical
requirements
Provide details
current application
architecture
Stipulate specific
requirements and pre-
requisites needed to
conduct the
transformation from the
current to the Target
situation
HP AT2C tools & process - HP methodology (EDGE) – DevOps Processes
Detailed and review
business & technical
design
Detail Target situation
design
Review and validate
Target architecture
Test Pan
Produce/Refine Test
plan required to ensure
full compliancy with
Business and User
requirements and new
architecture
Design Solution Plan Transformation Confirm & Authorise
Transition
plan
Adapt transformation plan
to include specific tasks
and actions to include in
order to adapt the
application to target
architecture
Refine switch over & back-
out plan
GovernanceCustomer
contributi
on
Mngtof
change
Validate and approve Transformation/Transition Plan
Planning for Adapt phase
Stakeholder
communication &
Involvement design
stage
Detailed Change
Impact and readiness
assessment
MoC Effectiveness
assessment design
stage
Implementation and
training capability
design
If needed refine
business case
Existing test tooling &
processes
Continuous process feedback & improvement
Conduct application and/or Data/DB actions to adapt and migrate it onto Transition platform.
Adapt (application)Process&ToolsTechnology
architecture
Business
Architecture
Provision platforms on
Target
Migrate application Adapt Migrate & Adapt
Business and technology
review
Fully configured
(as per defined
specification from design
phase) transition and
target platforms must be
provisioned on target
environment
Transfer application from
current onto Transition
platform(s)
Service Automation
processes and tools CSA –
OO -
Conduct all necessary updates
and other activities to ensure
full compliancy with target
architecture
Repeat until fully compliant
When applicable recreate Pre-
production environments from
production environment using
existing process and tools.
If not execute same migration
and adapt phases as production
to all pre-production
environments
Run necessary actions
to verify and validate
architecture compliancy
Provision Migrate Demonstrate & review
Production Pre- Production
ALI/ALM - CSA – CODAR – Jenkins - Nexus - AppZero – Double-Take – PlateSpin - …
HP transformation Factory tooling & process
GovernanceCustomer
contributi
on
Mngtof
change
Project plan & Process
Validate and approve Transformation strategy and
transition Plan
Project Management structure Planning for design phaseProject Management structure
Continuous process feedback & improvement
Ongoing
Stakeholder communication &
Involvement
Ongoing
Change Implementation and
training delivery
Conduct application and/or Data/DB actions to adapt and migrate it onto Transition platform.
Adapt (Oracle)Process&ToolsTechnology
architecture
Business
Architecture
Provision platforms on
Target
Migrate Oracle DB and
business logic
Adapt
Fully configured
(as per defined
specification from design
phase) transition and
target platforms must be
provisioned on target
environment
Transfer Oracle DB and
business logic from current
onto Transition platform
Service Automation
processes and tools CSA –
OO -
Conduct all necessary updates
and other activities to ensure
full compliancy with target
architecture
Upgrade Oracle to required
target version level
Repeat until compliant
Provision Migrate Demonstrate & review
Production
GovernanceCustomer
contributi
on
Mngtof
change
Project plan & Process
Validate and approve Transformation strategy and
transition Plan
Project Management structure Planning for design phaseProject Management structure
Ongoing
Stakeholder communication &
Involvement
Ongoing
Change Implementation and
training delivery
Migrate & Adapt
Business and technology
review
When applicable recreate Pre-
production environments from
production environment using
existing process and tools.
If not execute same migration
and adapt phases as production
to all pre-production
environments
Run necessary actions
to verify and validate
architecture compliancy
Pre- Production
ALI/ALM - CSA – DMA – CODAR - Jenkins - Nexus ….
HP transformation Factory tooling & process
Continuous process feedback & improvement
Integrate into new environment: Interfaces, Processes, Tools, monitoring, etc.
IntegrateProcess&ToolsTechnology
architecture
Business
Architecture
Prepare for
operational
Situation
Implement for
operational
Situation
Prepare to Integrate
into DevOps Tooling
Integrate into
DevOps Tooling
Verify integration
ValidateDependencies
Apply reversed
maintenance
DevOps framework
Reversed
maintenance
GovernanceCustomer
contributi
on
Mngtof
change
Project plan & Process
Project Management structure Planning for test phaseProject Management structure
Development supportProcess support
Ongoing
Stakeholder communication &
Involvement
Ongoing
Change Implementation and
training delivery
Validate all actions
to re-integrate the
application/DB into
an operational
situation
Execute activities to
prepare for operational
situation
Re-establish and validate
interfaces, and all other
dependencies (network,
security, scheduling,
printing, etc..)
Validate all actions to
Integrate the
application/DB into
DevOps tooling
Configure DevOps
tooling to Integrate the
application/DB
Finalise & validate
operational Situation
Verify and validate
integration phases and
activities and prepare
for test
Apply all development
changes made to
application during all
earlier migration
processes
ALM - CSA - HP AT2C tools & process , HP
methodology (EDGE)
All DevOps framework tools and processes
“ Developer Workflow Automation, Configuration Mgt, Monitoring
Service Automation, Architecture,.. ”
HP transformation Factory tooling & process
Continuous process feedback & improvement
Thoroughly test application to ensure full compliancy with Business & User requirements on new
architecture
Test
Process&ToolsTechnology
architecture
Business
Architecture
Existing Test tooling & processes
DevOps Tooling & Processes
HP Test Factory tooling a process
AcceptancePrepare test
Prepare test cycle schedule
Prepare test environment
Validate environment
before running the test
Execute test
Execute test scripts,
compare results with
expected results, identify
and resolve any
discrepancies
Deliverables are the
results, fixed defects, and a
fully implemented test plan
Run acceptance test
and Validate
acceptance
AcceptanceTesting process
Closing the test
Close test
Complete test phase as
needed
Verify all exit criteria are
met and all benefits are
recorded
The expected results are
the test report
Define approach
test strategy as a starting
point
Describe objectives, scope,
input / output criteria,
tools and test environment
for testing phase
Plan tests
Identify scenarios & test
conditions
Define test cycles for entire
phases
Plan test environment
Identify and plan the test
environment needs
GovernanceCustomer
contributi
on
Mngtof
change
Validate acceptance
Project plan & Process
Project Management structure Planning for deploy phaseProject Management structure
Provide test scripts, scenario & processes , contribute to test planning, execution and validation
Ongoing
Stakeholder communication &
Involvement
Ongoing
Change Implementation and
training delivery
Continuous process feedback & improvement
Deploy
Process&ToolsTechnology
architecture
Business
Architecture
Business rollout
preparation
Rollout
Synchronise
target with current state
Validate Rollout process
for
production &
pre-production
environments
DevOps framework tools & Processes
Prepare Switch-Over Handover
Solution
Implemented
Execute
Switch-Over
process
Validate Solution
readiness for handover
Switch-Over review
Review and validate
entire Switch-Over &
back-out processes
Handover
Environment now into
production
Post
Implementation
Post-implementation
assessment and
review
GovernanceCustomer
contributi
on
Mngtof
change
Launch preparation
Validate and approve switch-Over
Project closed
Perform Management for implementation
Manage Continuous change
Application Development freeze period
Validate and approve handover
Management of Change effectiveness
implementation review
Finalise communication and training activities
Production
environment &
operational situation
validated & ready
Continuous process feedback & improvement
Execute Project closure
Manage
Process&ToolsTechnology
architecture
Business
Architecture
Live Operation services and functions
DevOps framework tools & Processes
Operate & Support Manage Performance Continuous improvement
Performance management Continuous improvement
GovernanceCustomer
contributi
on
Mngtof
change
Change leadership renew MoC Strategy & Plan Review
Stakeholder communication
and involvement manage
stage
Release and project management plans
Program management office
Release and project performance monitoring
Continuous process feedback & improvement
© Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP Restricted.
Sample Wave plan
Adapt - Wave Strategy
Wave content selection method
• The cluster selection criteria per wave are:
1. Current technology
• To optimise migration process & resources efficiency, the Wave should address the same technological migration strategy: e.g: migrate from RedHat 5.8 and
Oracle 11.2 to RedHat 6.4 and Oracle 11.2 or Win2003 to Win2012
2. Business Services
• Focus on a specific Business Service, although clusters will likely affect other BS
3. Cluster classification
• All Clusters within the same wave should preferably contain object (Application, DB, Services,…) of similar profile : e.g. Oracle DB
Adapt - Wave Strategy
• The Wave execution approach is to start with a simple wave to prove &
validate the adapt process, a next wave to get the entire process into gear,
then proceed with the remaining asset
• Wave0:
• Proving wave to test, validate and improve the Adopt migration process
• Unlike other waves, group clusters of different profile to test different migration factory processes
• Wave1
• Focuses on business service and similar current technological profile (RedHat 5.8/6.4 & Oracle 11.2)
• Wave will Execute standalone
• Being in early process phase it will take longer as it gets the entire practice into gear
• Other Waves
• Waves will execute both in parallel and sequentially
Wave 0
Proving Wave
Provision
Target
Prepare
Migrate
Transfer to TargetSetup DevOps
Prepare DevOps Tooling
Configuration into DevOps
Tooling
Cluster 1
Provision
Target
Prepare
Migrate
Transfer to TargetSetup DevOps
Prepare DevOps Tooling
Configuration into DevOps
Tooling
Cluster 2
Provision
Target
Prepare
Migrate
Transfer to TargetSetup DevOps
Prepare DevOps Tooling
Configuration into DevOps
Tooling
Cluster 3
Provision
Target
Prepare
Migrate
Transfer to TargetSetup DevOps
Prepare DevOps Tooling
Configuration into DevOps
Tooling
Cluster 4
Continuous Adopt / Migration process review & improvement
Short cycled with low complexity and criticality clusters
Different technology profiles e.g.:
- RH5.8/Oracle 11.2 to RH6.4/Oracle 11G
- RH5.8 / Oracle10.2 to to RH6.4/Oracle 11G
- Win 2008 to Win 2012
- Win 2003 to WIn2012
Review and improve process
Prepare for
Wave 1
Wave 1 to #
Clusters of same technology profiles
Clusters may have mixed cycle, complexity and criticality
May apply focus on one Business Service
Review and improve process
Continuous Adopt / Migration process review & improvement
Prepare DevOps Tooling
Prepare Migrate Transfer to Target
Configuration into DevOps
Tooling
Continuous Target Provisioning
Prepare Migrate Transfer to Target
Configuration into DevOps Tooling
Prepare Migrate Transfer to Target
Configuration into DevOps
Tooling
Prepare
Prepare
Migrate Transfer to Target
Configuration into DevOps Tooling
Migrate Transfer to Target
Configuration into DevOps Tooling
Migrate Transfer to Target
Configuration into DevOps
Tooling
Migrate Transfer to Target
Configuration into DevOps Tooling
Prepare
Prepare
DevOps Ready
ETC..ETC..
HybridCloudDevOpsBusinessServices
Organisation
Governance
Workplace
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12
Wave 0 - (Proving Wave) Wave 1 Central Invest ProgrammeRemaining Waves
Adapt - Wave Plan
Helion Cloud
Enablement
Adapt Network &
Security
Review &
Validate
Wave plan &
Project scope
Wave 0
(Proving Wave)
Horizontal Business Service Monitoring
End-to-end B-SLA reporting
Setup DevOps
Continuous provisioning of target environment for wave activities
Configure DevOps Tooling
End of Wave MigrationStart Wave Migration
DevOps
Operational
CC80 Monitoring
Field Agents Monitoring
Developer Workflow & Workbench
Wave 1
Configure
DevOps Tooling
Configure DevOps Tooling
Wave 2
Wave 3
Wave 4
Wave 5
Wave 6
Wave 7
Wave 8
Wave 9
Wave 10
Wave #
Wave 11
Prepare DevOps Tooling

More Related Content

What's hot

An Overview of Best Practices for Large Scale Migrations - AWS Transformation...
An Overview of Best Practices for Large Scale Migrations - AWS Transformation...An Overview of Best Practices for Large Scale Migrations - AWS Transformation...
An Overview of Best Practices for Large Scale Migrations - AWS Transformation...
Amazon Web Services
 
On-premise to Microsoft Azure Cloud Migration.
 On-premise to Microsoft Azure Cloud Migration. On-premise to Microsoft Azure Cloud Migration.
On-premise to Microsoft Azure Cloud Migration.
Emtec Inc.
 
Getting started on your AWS migration journey
Getting started on your AWS migration journeyGetting started on your AWS migration journey
Getting started on your AWS migration journey
Amazon Web Services
 
Journey to Cloud-Native: Where to start in your app modernization process
Journey to Cloud-Native: Where to start in your app modernization processJourney to Cloud-Native: Where to start in your app modernization process
Journey to Cloud-Native: Where to start in your app modernization process
VMware Tanzu
 
Expanding Your Data Center with Hybrid Cloud Infrastructure
Expanding Your Data Center with Hybrid Cloud InfrastructureExpanding Your Data Center with Hybrid Cloud Infrastructure
Expanding Your Data Center with Hybrid Cloud Infrastructure
Amazon Web Services
 
Accelerating Your Cloud Migration Journey with MAP
Accelerating Your Cloud Migration Journey with MAPAccelerating Your Cloud Migration Journey with MAP
Accelerating Your Cloud Migration Journey with MAP
Amazon Web Services
 
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud MigrationCapgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
Floyd DCosta
 
Building A Cloud Strategy PowerPoint Presentation Slides
Building A Cloud Strategy PowerPoint Presentation SlidesBuilding A Cloud Strategy PowerPoint Presentation Slides
Building A Cloud Strategy PowerPoint Presentation Slides
SlideTeam
 
A Roadmap to Cloud Center of Excellence Adoption
A Roadmap to Cloud Center of Excellence AdoptionA Roadmap to Cloud Center of Excellence Adoption
A Roadmap to Cloud Center of Excellence Adoption
Amazon Web Services
 
Application Migration: How to Start, Scale and Succeed
Application Migration: How to Start, Scale and SucceedApplication Migration: How to Start, Scale and Succeed
Application Migration: How to Start, Scale and Succeed
VMware Tanzu
 
App Modernization
App ModernizationApp Modernization
App Modernization
PT Datacomm Diangraha
 
Cloud Migration, Application Modernization and Security for Partners
Cloud Migration, Application Modernization and Security for PartnersCloud Migration, Application Modernization and Security for Partners
Cloud Migration, Application Modernization and Security for Partners
Amazon Web Services
 
Executing a Large-Scale Migration to AWS
Executing a Large-Scale Migration to AWSExecuting a Large-Scale Migration to AWS
Executing a Large-Scale Migration to AWS
Amazon Web Services
 
AWS Migration Planning Roadmap
AWS Migration Planning RoadmapAWS Migration Planning Roadmap
AWS Migration Planning Roadmap
Amazon Web Services
 
Cloud Migration: A How-To Guide
Cloud Migration: A How-To GuideCloud Migration: A How-To Guide
Cloud Migration: A How-To Guide
Amazon Web Services
 
Setting up a Cloud Center of Excellence (CCoE) for Enterprise Customers
Setting up a Cloud Center of Excellence (CCoE) for Enterprise CustomersSetting up a Cloud Center of Excellence (CCoE) for Enterprise Customers
Setting up a Cloud Center of Excellence (CCoE) for Enterprise Customers
Ali Asgar Juzer
 
Data Center Migration to the AWS Cloud
Data Center Migration to the AWS CloudData Center Migration to the AWS Cloud
Data Center Migration to the AWS CloudTom Laszewski
 
Modern Enterprise integration Strategies
Modern Enterprise integration StrategiesModern Enterprise integration Strategies
Modern Enterprise integration Strategies
Jesus Rodriguez
 
Migrating Thousands of Workloads to AWS at Enterprise Scale – Chris Wegmann, ...
Migrating Thousands of Workloads to AWS at Enterprise Scale – Chris Wegmann, ...Migrating Thousands of Workloads to AWS at Enterprise Scale – Chris Wegmann, ...
Migrating Thousands of Workloads to AWS at Enterprise Scale – Chris Wegmann, ...
Amazon Web Services
 
A Roadmap to Cloud Center of Excellence Adoption
A Roadmap to Cloud Center of Excellence AdoptionA Roadmap to Cloud Center of Excellence Adoption
A Roadmap to Cloud Center of Excellence Adoption
Amazon Web Services
 

What's hot (20)

An Overview of Best Practices for Large Scale Migrations - AWS Transformation...
An Overview of Best Practices for Large Scale Migrations - AWS Transformation...An Overview of Best Practices for Large Scale Migrations - AWS Transformation...
An Overview of Best Practices for Large Scale Migrations - AWS Transformation...
 
On-premise to Microsoft Azure Cloud Migration.
 On-premise to Microsoft Azure Cloud Migration. On-premise to Microsoft Azure Cloud Migration.
On-premise to Microsoft Azure Cloud Migration.
 
Getting started on your AWS migration journey
Getting started on your AWS migration journeyGetting started on your AWS migration journey
Getting started on your AWS migration journey
 
Journey to Cloud-Native: Where to start in your app modernization process
Journey to Cloud-Native: Where to start in your app modernization processJourney to Cloud-Native: Where to start in your app modernization process
Journey to Cloud-Native: Where to start in your app modernization process
 
Expanding Your Data Center with Hybrid Cloud Infrastructure
Expanding Your Data Center with Hybrid Cloud InfrastructureExpanding Your Data Center with Hybrid Cloud Infrastructure
Expanding Your Data Center with Hybrid Cloud Infrastructure
 
Accelerating Your Cloud Migration Journey with MAP
Accelerating Your Cloud Migration Journey with MAPAccelerating Your Cloud Migration Journey with MAP
Accelerating Your Cloud Migration Journey with MAP
 
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud MigrationCapgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
Capgemini Cloud Assessment - A Pathway to Enterprise Cloud Migration
 
Building A Cloud Strategy PowerPoint Presentation Slides
Building A Cloud Strategy PowerPoint Presentation SlidesBuilding A Cloud Strategy PowerPoint Presentation Slides
Building A Cloud Strategy PowerPoint Presentation Slides
 
A Roadmap to Cloud Center of Excellence Adoption
A Roadmap to Cloud Center of Excellence AdoptionA Roadmap to Cloud Center of Excellence Adoption
A Roadmap to Cloud Center of Excellence Adoption
 
Application Migration: How to Start, Scale and Succeed
Application Migration: How to Start, Scale and SucceedApplication Migration: How to Start, Scale and Succeed
Application Migration: How to Start, Scale and Succeed
 
App Modernization
App ModernizationApp Modernization
App Modernization
 
Cloud Migration, Application Modernization and Security for Partners
Cloud Migration, Application Modernization and Security for PartnersCloud Migration, Application Modernization and Security for Partners
Cloud Migration, Application Modernization and Security for Partners
 
Executing a Large-Scale Migration to AWS
Executing a Large-Scale Migration to AWSExecuting a Large-Scale Migration to AWS
Executing a Large-Scale Migration to AWS
 
AWS Migration Planning Roadmap
AWS Migration Planning RoadmapAWS Migration Planning Roadmap
AWS Migration Planning Roadmap
 
Cloud Migration: A How-To Guide
Cloud Migration: A How-To GuideCloud Migration: A How-To Guide
Cloud Migration: A How-To Guide
 
Setting up a Cloud Center of Excellence (CCoE) for Enterprise Customers
Setting up a Cloud Center of Excellence (CCoE) for Enterprise CustomersSetting up a Cloud Center of Excellence (CCoE) for Enterprise Customers
Setting up a Cloud Center of Excellence (CCoE) for Enterprise Customers
 
Data Center Migration to the AWS Cloud
Data Center Migration to the AWS CloudData Center Migration to the AWS Cloud
Data Center Migration to the AWS Cloud
 
Modern Enterprise integration Strategies
Modern Enterprise integration StrategiesModern Enterprise integration Strategies
Modern Enterprise integration Strategies
 
Migrating Thousands of Workloads to AWS at Enterprise Scale – Chris Wegmann, ...
Migrating Thousands of Workloads to AWS at Enterprise Scale – Chris Wegmann, ...Migrating Thousands of Workloads to AWS at Enterprise Scale – Chris Wegmann, ...
Migrating Thousands of Workloads to AWS at Enterprise Scale – Chris Wegmann, ...
 
A Roadmap to Cloud Center of Excellence Adoption
A Roadmap to Cloud Center of Excellence AdoptionA Roadmap to Cloud Center of Excellence Adoption
A Roadmap to Cloud Center of Excellence Adoption
 

Similar to Cloud proposition for banking

Application Modernization With Cloud Native Approach_ An in-depth Guide.pdf
Application Modernization With Cloud Native Approach_ An in-depth Guide.pdfApplication Modernization With Cloud Native Approach_ An in-depth Guide.pdf
Application Modernization With Cloud Native Approach_ An in-depth Guide.pdf
basilmph
 
CloudPilot Application Migration Tools Datasheet - CloudOrigin®
CloudPilot Application Migration Tools Datasheet - CloudOrigin®CloudPilot Application Migration Tools Datasheet - CloudOrigin®
CloudPilot Application Migration Tools Datasheet - CloudOrigin®
UnifyCloud
 
Cloud Migration Key Points to Consider.pdf
Cloud Migration  Key Points to Consider.pdfCloud Migration  Key Points to Consider.pdf
Cloud Migration Key Points to Consider.pdf
niahiggins21
 
Cloud Migration Services | Mindtree
Cloud Migration Services | MindtreeCloud Migration Services | Mindtree
Cloud Migration Services | Mindtree
AnikeyRoy
 
Transform IT Operations with CSC
Transform IT Operations with CSCTransform IT Operations with CSC
Transform IT Operations with CSC
Amazon Web Services
 
Migrating apps-to-the-cloud-final
Migrating apps-to-the-cloud-finalMigrating apps-to-the-cloud-final
Migrating apps-to-the-cloud-final
eng999
 
Managing the move to virtualization and cloud
Managing the move to virtualization and cloudManaging the move to virtualization and cloud
Managing the move to virtualization and cloud
Bhaskar Jayaraman
 
7 Essential Steps to Cloud Adoption.pdf
7 Essential Steps to Cloud Adoption.pdf7 Essential Steps to Cloud Adoption.pdf
7 Essential Steps to Cloud Adoption.pdf
Anil
 
Seamless Cloud Integration: Leveraging Application Modernization for Business...
Seamless Cloud Integration: Leveraging Application Modernization for Business...Seamless Cloud Integration: Leveraging Application Modernization for Business...
Seamless Cloud Integration: Leveraging Application Modernization for Business...
basilmph
 
The simplest cloud migration in the world by Webscale
The simplest cloud migration in the world by WebscaleThe simplest cloud migration in the world by Webscale
The simplest cloud migration in the world by Webscale
Webscale Networks
 
Cloud Migration Strategies.pdf
Cloud Migration Strategies.pdfCloud Migration Strategies.pdf
Cloud Migration Strategies.pdf
Mr. Business Magazine
 
Cloud Adoption and Risk Report 2019
Cloud Adoption and Risk Report 2019Cloud Adoption and Risk Report 2019
Cloud Adoption and Risk Report 2019
CompatibL Technologies ltd
 
Modernizing Mainframe Applications For The Cloud Environment.pdf
Modernizing Mainframe Applications For The Cloud Environment.pdfModernizing Mainframe Applications For The Cloud Environment.pdf
Modernizing Mainframe Applications For The Cloud Environment.pdf
PetaBytz Technologies
 
Achieve Economic Synergies by Managing Your Enterprise Assets In The Cloud
Achieve Economic Synergies by Managing Your Enterprise Assets In The CloudAchieve Economic Synergies by Managing Your Enterprise Assets In The Cloud
Achieve Economic Synergies by Managing Your Enterprise Assets In The Cloud
Dr. HJ Raza, Ph.D/MBA
 
Accelerating hybrid-cloud adoption in banking and securities
Accelerating hybrid-cloud adoption in banking and securitiesAccelerating hybrid-cloud adoption in banking and securities
Accelerating hybrid-cloud adoption in banking and securities
McKinsey & Company
 
Cloud: a disruptive technlogy that CEO should use to transform their business
Cloud:  a disruptive technlogy that CEO should use to transform their businessCloud:  a disruptive technlogy that CEO should use to transform their business
Cloud: a disruptive technlogy that CEO should use to transform their business
Bertrand MAES
 
Q&A: Why cloud-native apps are better?
Q&A: Why cloud-native apps are better?Q&A: Why cloud-native apps are better?
Q&A: Why cloud-native apps are better?
CompatibL Technologies ltd
 
Dataquest-Cigniti_October 2016
Dataquest-Cigniti_October 2016Dataquest-Cigniti_October 2016
Dataquest-Cigniti_October 2016Sairam Vedam
 

Similar to Cloud proposition for banking (20)

Application Modernization With Cloud Native Approach_ An in-depth Guide.pdf
Application Modernization With Cloud Native Approach_ An in-depth Guide.pdfApplication Modernization With Cloud Native Approach_ An in-depth Guide.pdf
Application Modernization With Cloud Native Approach_ An in-depth Guide.pdf
 
CloudPilot Application Migration Tools Datasheet - CloudOrigin®
CloudPilot Application Migration Tools Datasheet - CloudOrigin®CloudPilot Application Migration Tools Datasheet - CloudOrigin®
CloudPilot Application Migration Tools Datasheet - CloudOrigin®
 
Cloud Migration Key Points to Consider.pdf
Cloud Migration  Key Points to Consider.pdfCloud Migration  Key Points to Consider.pdf
Cloud Migration Key Points to Consider.pdf
 
Cloud Migration Services | Mindtree
Cloud Migration Services | MindtreeCloud Migration Services | Mindtree
Cloud Migration Services | Mindtree
 
Transform IT Operations with CSC
Transform IT Operations with CSCTransform IT Operations with CSC
Transform IT Operations with CSC
 
Migrating apps-to-the-cloud-final
Migrating apps-to-the-cloud-finalMigrating apps-to-the-cloud-final
Migrating apps-to-the-cloud-final
 
Managing the move to virtualization and cloud
Managing the move to virtualization and cloudManaging the move to virtualization and cloud
Managing the move to virtualization and cloud
 
7 Essential Steps to Cloud Adoption.pdf
7 Essential Steps to Cloud Adoption.pdf7 Essential Steps to Cloud Adoption.pdf
7 Essential Steps to Cloud Adoption.pdf
 
Seamless Cloud Integration: Leveraging Application Modernization for Business...
Seamless Cloud Integration: Leveraging Application Modernization for Business...Seamless Cloud Integration: Leveraging Application Modernization for Business...
Seamless Cloud Integration: Leveraging Application Modernization for Business...
 
The simplest cloud migration in the world by Webscale
The simplest cloud migration in the world by WebscaleThe simplest cloud migration in the world by Webscale
The simplest cloud migration in the world by Webscale
 
Cloud Migration Strategies.pdf
Cloud Migration Strategies.pdfCloud Migration Strategies.pdf
Cloud Migration Strategies.pdf
 
Cloud Adoption and Risk Report 2019
Cloud Adoption and Risk Report 2019Cloud Adoption and Risk Report 2019
Cloud Adoption and Risk Report 2019
 
Modernizing Mainframe Applications For The Cloud Environment.pdf
Modernizing Mainframe Applications For The Cloud Environment.pdfModernizing Mainframe Applications For The Cloud Environment.pdf
Modernizing Mainframe Applications For The Cloud Environment.pdf
 
Achieve Economic Synergies by Managing Your Enterprise Assets In The Cloud
Achieve Economic Synergies by Managing Your Enterprise Assets In The CloudAchieve Economic Synergies by Managing Your Enterprise Assets In The Cloud
Achieve Economic Synergies by Managing Your Enterprise Assets In The Cloud
 
Accelerating hybrid-cloud adoption in banking and securities
Accelerating hybrid-cloud adoption in banking and securitiesAccelerating hybrid-cloud adoption in banking and securities
Accelerating hybrid-cloud adoption in banking and securities
 
Cloud: a disruptive technlogy that CEO should use to transform their business
Cloud:  a disruptive technlogy that CEO should use to transform their businessCloud:  a disruptive technlogy that CEO should use to transform their business
Cloud: a disruptive technlogy that CEO should use to transform their business
 
Q&A: Why cloud-native apps are better?
Q&A: Why cloud-native apps are better?Q&A: Why cloud-native apps are better?
Q&A: Why cloud-native apps are better?
 
internship paper
internship paperinternship paper
internship paper
 
CRAFT Brochure
CRAFT BrochureCRAFT Brochure
CRAFT Brochure
 
Dataquest-Cigniti_October 2016
Dataquest-Cigniti_October 2016Dataquest-Cigniti_October 2016
Dataquest-Cigniti_October 2016
 

More from Ajay Kumar Uppal

Microservices for Application Modernisation
Microservices for Application ModernisationMicroservices for Application Modernisation
Microservices for Application Modernisation
Ajay Kumar Uppal
 
Sap on aws cloud technology proposition
Sap on aws  cloud  technology propositionSap on aws  cloud  technology proposition
Sap on aws cloud technology proposition
Ajay Kumar Uppal
 
Sap sap hana s4 on cloud
Sap sap hana s4 on cloudSap sap hana s4 on cloud
Sap sap hana s4 on cloud
Ajay Kumar Uppal
 
Sap sap hana s4 on cloud
Sap sap hana s4 on cloudSap sap hana s4 on cloud
Sap sap hana s4 on cloud
Ajay Kumar Uppal
 
Business value of Enterprise Security Architecture
Business value of Enterprise Security Architecture Business value of Enterprise Security Architecture
Business value of Enterprise Security Architecture
Ajay Kumar Uppal
 
Enterprise Architecture - Information Security
Enterprise Architecture - Information SecurityEnterprise Architecture - Information Security
Enterprise Architecture - Information Security
Ajay Kumar Uppal
 
Cloud dev ops costs prices sap hana ms
Cloud dev ops costs prices sap hana msCloud dev ops costs prices sap hana ms
Cloud dev ops costs prices sap hana ms
Ajay Kumar Uppal
 
S 4 HANA 4 CEOs and CFOs
S 4 HANA 4 CEOs and CFOsS 4 HANA 4 CEOs and CFOs
S 4 HANA 4 CEOs and CFOs
Ajay Kumar Uppal
 
SAP Configuration Data
SAP Configuration Data SAP Configuration Data
SAP Configuration Data
Ajay Kumar Uppal
 
BW on HANA optimisation answers
BW on HANA optimisation answersBW on HANA optimisation answers
BW on HANA optimisation answers
Ajay Kumar Uppal
 
Cio forum s4hana
Cio forum s4hanaCio forum s4hana
Cio forum s4hana
Ajay Kumar Uppal
 
Business case for SAP HANA
Business case for SAP HANABusiness case for SAP HANA
Business case for SAP HANA
Ajay Kumar Uppal
 
Cloud, big data, sap, hana, iot, ms azure & way forward
Cloud, big data, sap, hana, iot, ms azure & way forwardCloud, big data, sap, hana, iot, ms azure & way forward
Cloud, big data, sap, hana, iot, ms azure & way forward
Ajay Kumar Uppal
 
ICT strategy and architecture principles by ajay kumar uppal
ICT strategy and architecture principles  by ajay kumar uppalICT strategy and architecture principles  by ajay kumar uppal
ICT strategy and architecture principles by ajay kumar uppal
Ajay Kumar Uppal
 
Architecture review certificate generation of client files
Architecture review certificate generation of client files Architecture review certificate generation of client files
Architecture review certificate generation of client files
Ajay Kumar Uppal
 
Cutover strategy - Legacy to new billing, invoicing engine
Cutover strategy - Legacy to new billing, invoicing engineCutover strategy - Legacy to new billing, invoicing engine
Cutover strategy - Legacy to new billing, invoicing engine
Ajay Kumar Uppal
 
Data migration blueprint legacy to sap
Data migration blueprint  legacy to sapData migration blueprint  legacy to sap
Data migration blueprint legacy to sap
Ajay Kumar Uppal
 
End to end business transformation
End to end business transformationEnd to end business transformation
End to end business transformation
Ajay Kumar Uppal
 
Consolidating the Application Landscape
Consolidating the Application LandscapeConsolidating the Application Landscape
Consolidating the Application Landscape
Ajay Kumar Uppal
 
Cloud centric consumption based services for SAP, HANA, Concur, Ariba, C4C
Cloud centric consumption based services for SAP, HANA, Concur, Ariba, C4CCloud centric consumption based services for SAP, HANA, Concur, Ariba, C4C
Cloud centric consumption based services for SAP, HANA, Concur, Ariba, C4C
Ajay Kumar Uppal
 

More from Ajay Kumar Uppal (20)

Microservices for Application Modernisation
Microservices for Application ModernisationMicroservices for Application Modernisation
Microservices for Application Modernisation
 
Sap on aws cloud technology proposition
Sap on aws  cloud  technology propositionSap on aws  cloud  technology proposition
Sap on aws cloud technology proposition
 
Sap sap hana s4 on cloud
Sap sap hana s4 on cloudSap sap hana s4 on cloud
Sap sap hana s4 on cloud
 
Sap sap hana s4 on cloud
Sap sap hana s4 on cloudSap sap hana s4 on cloud
Sap sap hana s4 on cloud
 
Business value of Enterprise Security Architecture
Business value of Enterprise Security Architecture Business value of Enterprise Security Architecture
Business value of Enterprise Security Architecture
 
Enterprise Architecture - Information Security
Enterprise Architecture - Information SecurityEnterprise Architecture - Information Security
Enterprise Architecture - Information Security
 
Cloud dev ops costs prices sap hana ms
Cloud dev ops costs prices sap hana msCloud dev ops costs prices sap hana ms
Cloud dev ops costs prices sap hana ms
 
S 4 HANA 4 CEOs and CFOs
S 4 HANA 4 CEOs and CFOsS 4 HANA 4 CEOs and CFOs
S 4 HANA 4 CEOs and CFOs
 
SAP Configuration Data
SAP Configuration Data SAP Configuration Data
SAP Configuration Data
 
BW on HANA optimisation answers
BW on HANA optimisation answersBW on HANA optimisation answers
BW on HANA optimisation answers
 
Cio forum s4hana
Cio forum s4hanaCio forum s4hana
Cio forum s4hana
 
Business case for SAP HANA
Business case for SAP HANABusiness case for SAP HANA
Business case for SAP HANA
 
Cloud, big data, sap, hana, iot, ms azure & way forward
Cloud, big data, sap, hana, iot, ms azure & way forwardCloud, big data, sap, hana, iot, ms azure & way forward
Cloud, big data, sap, hana, iot, ms azure & way forward
 
ICT strategy and architecture principles by ajay kumar uppal
ICT strategy and architecture principles  by ajay kumar uppalICT strategy and architecture principles  by ajay kumar uppal
ICT strategy and architecture principles by ajay kumar uppal
 
Architecture review certificate generation of client files
Architecture review certificate generation of client files Architecture review certificate generation of client files
Architecture review certificate generation of client files
 
Cutover strategy - Legacy to new billing, invoicing engine
Cutover strategy - Legacy to new billing, invoicing engineCutover strategy - Legacy to new billing, invoicing engine
Cutover strategy - Legacy to new billing, invoicing engine
 
Data migration blueprint legacy to sap
Data migration blueprint  legacy to sapData migration blueprint  legacy to sap
Data migration blueprint legacy to sap
 
End to end business transformation
End to end business transformationEnd to end business transformation
End to end business transformation
 
Consolidating the Application Landscape
Consolidating the Application LandscapeConsolidating the Application Landscape
Consolidating the Application Landscape
 
Cloud centric consumption based services for SAP, HANA, Concur, Ariba, C4C
Cloud centric consumption based services for SAP, HANA, Concur, Ariba, C4CCloud centric consumption based services for SAP, HANA, Concur, Ariba, C4C
Cloud centric consumption based services for SAP, HANA, Concur, Ariba, C4C
 

Recently uploaded

The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
Elena Simperl
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
Product School
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Product School
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
Cheryl Hung
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
DianaGray10
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
Alan Dix
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Tobias Schneck
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
Fwdays
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Product School
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
Frank van Harmelen
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
ThousandEyes
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance
 

Recently uploaded (20)

The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
Knowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and backKnowledge engineering: from people to machines and back
Knowledge engineering: from people to machines and back
 
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
AI for Every Business: Unlocking Your Product's Universal Potential by VP of ...
 
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
Unsubscribed: Combat Subscription Fatigue With a Membership Mentality by Head...
 
Key Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdfKey Trends Shaping the Future of Infrastructure.pdf
Key Trends Shaping the Future of Infrastructure.pdf
 
FIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdfFIDO Alliance Osaka Seminar: Overview.pdf
FIDO Alliance Osaka Seminar: Overview.pdf
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
Connector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a buttonConnector Corner: Automate dynamic content and events by pushing a button
Connector Corner: Automate dynamic content and events by pushing a button
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
Epistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI supportEpistemic Interaction - tuning interfaces to provide information for AI support
Epistemic Interaction - tuning interfaces to provide information for AI support
 
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024
 
"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi"Impact of front-end architecture on development cost", Viktor Turskyi
"Impact of front-end architecture on development cost", Viktor Turskyi
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...Designing Great Products: The Power of Design and Leadership by Chief Designe...
Designing Great Products: The Power of Design and Leadership by Chief Designe...
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*Neuro-symbolic is not enough, we need neuro-*semantic*
Neuro-symbolic is not enough, we need neuro-*semantic*
 
Assuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyesAssuring Contact Center Experiences for Your Customers With ThousandEyes
Assuring Contact Center Experiences for Your Customers With ThousandEyes
 
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdfFIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
FIDO Alliance Osaka Seminar: FIDO Security Aspects.pdf
 

Cloud proposition for banking

  • 1. Business benefits of Cloud Computing for Banking Areas Benefits Quick launch of banking, insurance and financial products Cloud computing allows quick & easy provisioning of IT environments for rolling new business functionalities, products & services to maintain competitive advantage. Cloud computing helps to accelerate global payment processing, KYC, Anti-money Laundering initiatives, card processes etc. Ability to cope with growth, seasonal peaks or even divestments/spin-offs. The cloud system is designed to cope with sharp increases as well as decreases in workload. This increases the speed of response, reduces risks and operational costs. Moreover Banks only pay for what they use/consume. Increased collaboration, higher productivity Cloud services enable and increase productivity with real-time business collaboration. Banks and their employees are able to collaborate on shared documents and retrieve critical business information from anywhere, anytime and on any device. Regulatory, Compliance and Market Changes Fast provisioning of the future platforms on Cloud provides the ability to begin the early development and deployment of new capability to cope with market, regulatory, compliance, economic & political changes. Access to latest security features Cloud providers have industrialised approach when it comes to enhancing, updating/upgrading security features, data loss prevention measures, user authentication, fraud protection, Cyber Attacks etc. Lower Costs Allow re-purposing of the HW to run non-production environments at different times to achieve higher SID to HW ratio. Greener IT, Reduced Carbon Footprint. Better Corporate Social responsibility rating. Cloud computing has helped organisations become greener by reducing the overall footprint of DCs and associated energy consumption Banks are already widely using cloud computing for non-core and non-critical uses, such as human resources, e-mail, customer analytics, customer relationship management, and development and testing (88% of surveyed EU-based financial institutions were already using cloud based services by June 2015).
  • 2. Benefits of moving to Cloud  Consolidate Applications & Infra Landscape with in-built technology refresh, monitoring tools, OS, Database Management, Middleware and other ongoing support services.  Raise average utilisation of underlying infrastructure to at least 90% in terms of SAPS and Storage utilized.  Reduce DC footprint and associated power, cooling and space by 60% thereby lowering associated Carbon footprint and provisioning Greener IT  Allow re-purposing of the HW to run any non-production environments at different times to achieve higher SID to HW ratio.  Facilitate quick (on-demand) provisioning of temporary environments for short durations (say days to months) and quick turning-off (decommissioning) of unwanted environments.  Provide full flexibility of ramping-up and ramping-down in-line with business workloads with continuous capacity and service level management.  Facilitate consumption-based billing based on actual usage/consumption on set time-frame as opposed to 'installed/unused' model.  Provide priority access to Demos, PoVs (Point-of-Views), PoCs, PROVIDER’s Consulting, PROVIDER and PROVIDER’s Co-Innovation Lab.  Ensures you as a customer are not locked into a particular Vendor; whereby Customer can terminate the contract without any liabilities/ liquidated damages by serving an advance notice of 6 months.  Reduce business downtime during migration phase(s) as well as operational maintenance after Go-Live by leveraging NZDT (Near Zero Downtime) Maintenance approach.
  • 3. Application Transformation To Cloud (AT2C)  Business case driven approach; application analysis will inform a financial analysis to ensure that the timing and nature of workload migration contribute to the TCO reduction goal  Application driven approach; analysis of the application workload will be performed to both minimise the risk of business impact and ensure that the correct target platform is selected  A quick win opportunity – fast provisioning of the future platforms provides the ability to begin the early development and deployment of new capability  Workload migration – where desirable existing workload running in a virtualised environment can be assimilated to run under CSA (Cloud System Automation) providing a low impact route to improved visibility and control of the VM’s running within the environment
  • 4. It is all about deciding the to-be landing zones & treatments
  • 5.
  • 6. Typical Cloud Models Private cloud Public cloud Build(Mulesoft) or Consume Integratedservicedelivery
  • 7. A proven set of services to Transform applications to exploit cloud solutions, deliver superior customer experience and accelerate business outcomes: Advise - Assess & Plan Transform - Execute & Integrate Manage - Optimise & Innovate Also use Application Modernisation Services to leverage core business IP contained in legacy applications & data Applications transformation to the cloud (AT2C) Solution Overview Cloud Suitability Analysis Cloud service types Cloud Transformation Strategy Determination Cloud Apps Portfolio Analysis Portfolio Analysis and Planning Cloud -specific workload analysis Risk analysis and ROI Architecture IaaS PaaSSaaS Cloud deployment models Public PrivateManaged Dedicated/hosted (retain, retire) Suitable for cloud Need deeper analysis Not suitable for cloud Retire Tactical retain Cloud Prequalification Cloud application criteria Cloud application barriers Apps Rehost/S2S migration Replace Re -architect / Re-factor Integrate/ Re -interface Transformation Strategy Suitable for SaaS Cloud suitability mapping
  • 8. PROVIDER will identify transformation/ journey treatments required to migrate the applications and application groupings to their future state infrastructure. The above activities will be performed prior to May 21st. The following activities will take place post May 21st and will also consist of an increase in scope to include all locations (MDC’s and regional DC’s. Timescales for this work will be defined post May 21st. 7 possible treatments 1. Re-learn: A discovery process that captures the intellectual property investment that has been made in legacy applications over many years and enables that investment to be preserved and carried forward through modernisation. 2. Re-factor Code optimisation to improve the run-time efficiency of an application. In the context of transformation to cloud ,make code changes to take advantage of the cloud platform without changing the application business logic or programming language. 3. Re-host Midrange There are two types of re-host for midrange environments: Re-host binary and Server-to-Server (S2S) migration): Re-host (Binary): Migration of applications to lower cost modern platforms without significantly changing the business features and functions. In the context of transformation to cloud, this involves a lift and shift the current application to the target platform without any code changes. Re-host Binary is not performed by AT2C. Re-host: Server-to-Server (S2S): This modernization strategy focuses cases where target environment and servers are not 100% compatible and application changes are necessary. Migrations typically run on a set of standardised platforms and technologies. S2S is a capability that can be offered as part of the AT2C re-host area or as a stand-alone engagement. 4. Re- architect Forward engineering applications to Java J2EE or Windows .NET Agile Application Architecture to enable true enterprise agility. May consist of business rule analysis followed by recoding the application, changing the business logic and function including use of automated language conversion tooling to translate to JAVA or /NET. 5. Re- interface Re-interface applications by creating new interfaces to leverage and extend the application features and value. In the context of transformation to cloud ,service-enable applications, create web services and web interfaces to be consumed as part of the application integration architecture and consumption of the application in the cloud. 6. Replace Provides a framework to replace existing legacy applications with standard enterprise applications, industry standard applications, or newly developed applications. In the context of transformation to cloud ,it will consist of replacing an existing application by a SaaS offering 7. Retire Decommission legacy applications from the applications portfolio. We assess the linkage of applications to be retired and then systematically manage the shutdown of applications so that the business is not interrupted. As part of the assessment process we will identify which treatments are the most appropriate with the customer. The criteria developed with customer to date has already identified the initial Retire applications and some of the Replace candidates. Treatments for Applications transformation to the cloud (AT2C)
  • 9. The objective of S2S Application transformation is to migrate and adapt application from a current environment to a modern target Environment & Architecture (Cloud) without any functional and/or technical changes to applications The migration implies, remediation, update, upgrade and any other actions to make the applications compatible with their target environments. Also use Application Modernisation Services to leverage core business IP contained in legacy applications & data Server-to-Server (S2S) Application Transformation Solution Overview Cloud Suitability Analysis Cloud service types Cloud Transformation Strategy Determination Cloud Apps Portfolio Analysis Portfolio Analysis and Planning Cloud-specific workload analysis Risk analysis and ROI Architecture IaaS PaaSSaaS Cloud deployment models Public PrivateManaged Dedicated/hosted (retain, retire) Suitable for cloud Need deeper analysis Not suitable for cloud Retire Tactical retain Cloud Prequalification Cloud application criteria Cloud application barriers Apps Rehost/S2S migration Replace Re-architect / Re-factor Integrate/ Re-interface Transformation Strategy Suitable for SaaS Cloud suitability mapping
  • 10. A transformation technique for legacy servers Industrialized midrange server application rehost Server-to-Server (S2S) Application Transformation An S2S engagement is “as-is” (no functional changes) transformation engagement that is aimed to provide an industrialized approach to transformation of a large application portfolio from one platform to another, typically Next Generation Data Center or Cloud. S2S Application Transformation is an end-to-end solution for mid-range servers, which combines the expertise of data engineering, applications and infrastructure. With a thorough identification and assessment of a client’s current environment, applications are modified suitably so they can be moved from one server type to another, especially target cloud platforms An advanced transformation technique for mid-range servers For applications that suit the new infrastructure For Transformations an application is recompiled When target environment & servers not 100% compatible For more than a simple ‘lift and shift’ migration
  • 11. Target Infrastructure Traditional MPC VPC Cloud Maps Application Suitability Fit to Future Application Roadmaps Fit to Future Enterprise Architecture Fit to Future Business Strategy Fit to Future Business Processes Application Transformation to Cloud Application Lift and Shift Ready for Cloud Encapsulated Application Server Lift and Shift Application O/S Server to Server Leave As-Is Public Private Managed Factorybased Migration approaches
  • 12. Workload Migration Principles Application Treatment Group A Application Treatment Group B Application Treatment Group C Application Treatment Group D Application Treatment Group O Application Treatment Group L Where applications are currently already virtual (virtual to virtual), Complexity rating Simple/ Medium, Proprietary software non Bespoke. Where applications are currently Physical but the future direction is Virtual (Physical to virtual), Complexity rating Simple/ Medium, Proprietary software non Bespoke. Where applications are currently Physical and the future direction is Physical (Physical to Physical), Complexity rating Simple/ Medium, Proprietary software non Bespoke. Where applications are currently Physical or Virtual but there are reasons why these cannot move directly to a cloud function (Unsupported software Retired before migration, Unstable platform, Direction Lift, remediate, shift) Where applications are currently not in scope. Where there is not enough information about the Application therefore more information is required to make an assessment. Have operating systems that can be supported by the future cloud infrastructure and therefore, require little remediation to migrate them across to the service. Move to the target stack is dependent on the nature of the application and the compatibility with the target stack components. Therefore, additional due diligence may be required with the application provider. Some additional measures need to be in place to determine whether they stay on physical infrastructure or move to virtualised environments.
  • 13. Move to Cloud - Reduces Complexity & Associated Infra Costs Fact File- Global Bank
  • 14. Focus on Agility, Creativity & Innovations
  • 15. Consumption Based Services & Infrastructure RUN PHASET&T/SET-UP PHASE Dev/SBX QA Prod Prod + DR+ Others Capacity Ramp-Up Capacity Ramp-Up Capacity Ramp-Down
  • 16. Alternatives to internal IT create competition Emergence of the Internal Service Provider Public Cloud SaaS Private Cloud IaaS PaaS Public Cloud Private Cloud SaaS Today’s IT Reality • LOB becoming more technology aware • Alternatives exist in the market for direct consumption • Technology is viewed in terms of service value from the user • Users & developers want simple • Security, compliance, availability Service Catalog Dev Platform • Compliance • Governance • Competence • Data sovereignty • Budget constraints • IP protection • Culture • Agility • Secure data transfer Considerations Internal Service Provider – providing the right destination for the right application
  • 17. Use the right destination for the right applicationHybrid IT : C o m m o n f o u n d a t i o n & O p e n t e c h n o l o g y Private Cloud Managed Private Cloud Managed Virtual Private Cloud Public Cloud Centralized Management Layer Classic IT, Enterprise applications Cloud Native applications • Security • Availability • Resiliency • Compliance • Data Sovereignty • Performance • Open • Cost Bridge old and new Key Factors:
  • 18. Definition of Migration vs. AMoD phases Adapt Evolve Move and adapt the current environment to a modern target structure & Architecture without any functional and/or technical changes to applications. It only includes any update, upgrade and action to make the applications compatible with their target environment The evolve phase concerns all modernisation activities to apply to the applications to improve its flexibility, elasticity, business value, cloud adoption, etc... It usually implies functional and/or technical changes Unless absolute necessity and only for very minor actions no functional and technical changes should be applied to the application during the adopt mode If it is required it should be part of the Evolve mode
  • 19. Transformation approach Single networking environment Current & Target environments in a single network configurationAdapt Network2 1 Deploy target environment IaaS / PaaS Production Pre-Production SLA 99.9 SLA 99.5 OS and SW version levels at n or n-1 MS Windows Linux RedHat Linux Suse 5 PrerequisiteMigrationapproach/Factory Secure both Current & Target env. as one Current & Target environments in a single Security configuration3 Adapt user access Security (AD) Adapt & simplify network Security Repeatable Migration Process Tools / Process Discover Information gathering from repositories, tools & application owner HP AT2C tools & process - HP methodology (EDGE) Prepare Align Design Verify and Validate the current situation Develop/Refine and prioritise modernisation & transformation Options Develop/Refine & Validate the Target situation Refine the transformation strategy Refine and validate the project scope Design / Refine Solution Refine transformation Plan Refine switch over & back-out plan Confirm & authorise DevOps framework tools & Processes Transfer to Target Deploy Manage All environment & operational situation Validated & ready Review / validate back-out process Review validate & execute switch over process Handover Operate & Support Manage Performance Continuous improvement,. etc Existing tooling & processes DevOps Tooling OO – CSA – CODAR - Jenkins - Nexus AppZero – DMA .. HP AT2C tools & process - HP methodology (EDGE) Provision Migrate Industrialised Factory process Adapt Integrate Provision platforms environments on target Migrate production & pre-production(s) Verify and validate architecture compliancy Test test application to ensure full compliancy with Business & User requirements on new architecture Run and Validate acceptance Integrate for operational Situation (re-establish interfaces, & all other operational dependencies) configuration into DevOps tooling Apply reversed maintenance Validate integration Same iteration per instance/Application/DB migrated Review & Validate Wave plan & Project scope4
  • 20. This DevOps Framework comprises an integrated set of existing and Open Source operations and development tools OM Repository of re-usable Models / Templates / Cloud Maps EM Architecture XS BSM VPV MonitoringConfiguration Mgmt. uCMDBNexus Developer Workflow Jenkins Service Automation OO SA DMA CSA CODAR TFS Visual Studio MS Workbench SAP Dev workbench SAP Workbench GIT Maven Eclipse Java Workbench Compute, storage and network infrastructure OperationsDevelopment Optional Additions Workbench Specific Key DevOps Framework SiteScope Fortify ALM Manage and Quality Assurance AGM SonarPPM ALI UFT QC
  • 21. Transition Environment Both Current and Target environments must be seen as One network Adapt Security Target Environment Transition Platform High Speed network link Current DC Non-Cloud managed White White MC Grey Black Target Production SLA 99.9 White White MC Grey Black Target Pre-production SLA 99.5 Dev. –Test - Training … White White MC Grey Black DR - Target Production SLA 99.9
  • 22. Note: An application is anything with logic in it, which could very well be a DataBase with built in logic Adapt - Waves approach • • Cluster: • Should remain small enough to limit complexity and risk • Must be technologically and functionally logically grouped • May just affect one Business Service and/or one Application but could also affect more than one • Ideally focus to address business service one after the other Waves Set of Clusters or a cluster of objects Business Service mapping A cluster of objects can be a subset of an application, an entire application, a DB or a group of DBs, set of services or anything that forms a logical minimum entity to group It includes all its Production and Pre-Production instances It is defined according to Business services and Application classification mapping, and/or cross functionality Map object family against a or few business services Application classification Classify application according to Technology, Criticality, Complexity & risk The move/adopt of all applications to the target environment is done through a series of waves
  • 23. Discover & Assess GovernanceCustomer contributi on Support for information gathering from application owner Mngtof change Enterprise capacity for change analysis Early Business Implementation & Training requirement Change leadership mobilise Engagement initialisation & planning Process&ToolsTechnology architecture Business Architecture Application Assessment When required Collect extra application information to complete existing InfoBase To highlight technical & business aspect, & dependencies to take into consideration in the migration process Analyse Develop & refine Option Prioritise & Select Current Situation Analyse collected application data Confirm current application situation Highlight modernisation opportunities Option Define/Refine modernisation & transformation options • Vision & core capabilities • Technology option • Improvement • Target Model Prioritise and select options Strategy overview Information gathering from repositories, tools (uCMDB, CSA, ..) & application owner HP AT2C tools & process HP methodology (EDGE) Current Situation Model Current Model Current Confirm the current application architecture together with dependencies (Interfaces, MdW,..) Continuous process feedback & improvement
  • 24. Align Process&ToolsTechnology architecture Business Architecture Target Architecture High Level Solution Transformation strategy Refine Business case Develop Target Situation Describe the Target application architecture Highlight modernisation actions HP AT2C tools & process HP methodology (EDGE) High level Business requirement and technological solution Refine the transformation strategy to adapt application on target platform/architecture Develop Target Define transformation Plan Project GovernanceCustomer contributi on Mngtof change Validate and approve Transformation strategy and transition Plan Project plan & Process Project Management structure Planning for next phaseProject Management structure Business Implementation and Training requirement Change Impact Refine and validate the project scope Continuous process feedback & improvement
  • 25. Design/Refine Process&ToolsTechnology architecture Business Architecture Detailed current situation Detailed business & technical requirements Provide details current application architecture Stipulate specific requirements and pre- requisites needed to conduct the transformation from the current to the Target situation HP AT2C tools & process - HP methodology (EDGE) – DevOps Processes Detailed and review business & technical design Detail Target situation design Review and validate Target architecture Test Pan Produce/Refine Test plan required to ensure full compliancy with Business and User requirements and new architecture Design Solution Plan Transformation Confirm & Authorise Transition plan Adapt transformation plan to include specific tasks and actions to include in order to adapt the application to target architecture Refine switch over & back- out plan GovernanceCustomer contributi on Mngtof change Validate and approve Transformation/Transition Plan Planning for Adapt phase Stakeholder communication & Involvement design stage Detailed Change Impact and readiness assessment MoC Effectiveness assessment design stage Implementation and training capability design If needed refine business case Existing test tooling & processes Continuous process feedback & improvement
  • 26. Conduct application and/or Data/DB actions to adapt and migrate it onto Transition platform. Adapt (application)Process&ToolsTechnology architecture Business Architecture Provision platforms on Target Migrate application Adapt Migrate & Adapt Business and technology review Fully configured (as per defined specification from design phase) transition and target platforms must be provisioned on target environment Transfer application from current onto Transition platform(s) Service Automation processes and tools CSA – OO - Conduct all necessary updates and other activities to ensure full compliancy with target architecture Repeat until fully compliant When applicable recreate Pre- production environments from production environment using existing process and tools. If not execute same migration and adapt phases as production to all pre-production environments Run necessary actions to verify and validate architecture compliancy Provision Migrate Demonstrate & review Production Pre- Production ALI/ALM - CSA – CODAR – Jenkins - Nexus - AppZero – Double-Take – PlateSpin - … HP transformation Factory tooling & process GovernanceCustomer contributi on Mngtof change Project plan & Process Validate and approve Transformation strategy and transition Plan Project Management structure Planning for design phaseProject Management structure Continuous process feedback & improvement Ongoing Stakeholder communication & Involvement Ongoing Change Implementation and training delivery
  • 27. Conduct application and/or Data/DB actions to adapt and migrate it onto Transition platform. Adapt (Oracle)Process&ToolsTechnology architecture Business Architecture Provision platforms on Target Migrate Oracle DB and business logic Adapt Fully configured (as per defined specification from design phase) transition and target platforms must be provisioned on target environment Transfer Oracle DB and business logic from current onto Transition platform Service Automation processes and tools CSA – OO - Conduct all necessary updates and other activities to ensure full compliancy with target architecture Upgrade Oracle to required target version level Repeat until compliant Provision Migrate Demonstrate & review Production GovernanceCustomer contributi on Mngtof change Project plan & Process Validate and approve Transformation strategy and transition Plan Project Management structure Planning for design phaseProject Management structure Ongoing Stakeholder communication & Involvement Ongoing Change Implementation and training delivery Migrate & Adapt Business and technology review When applicable recreate Pre- production environments from production environment using existing process and tools. If not execute same migration and adapt phases as production to all pre-production environments Run necessary actions to verify and validate architecture compliancy Pre- Production ALI/ALM - CSA – DMA – CODAR - Jenkins - Nexus …. HP transformation Factory tooling & process Continuous process feedback & improvement
  • 28. Integrate into new environment: Interfaces, Processes, Tools, monitoring, etc. IntegrateProcess&ToolsTechnology architecture Business Architecture Prepare for operational Situation Implement for operational Situation Prepare to Integrate into DevOps Tooling Integrate into DevOps Tooling Verify integration ValidateDependencies Apply reversed maintenance DevOps framework Reversed maintenance GovernanceCustomer contributi on Mngtof change Project plan & Process Project Management structure Planning for test phaseProject Management structure Development supportProcess support Ongoing Stakeholder communication & Involvement Ongoing Change Implementation and training delivery Validate all actions to re-integrate the application/DB into an operational situation Execute activities to prepare for operational situation Re-establish and validate interfaces, and all other dependencies (network, security, scheduling, printing, etc..) Validate all actions to Integrate the application/DB into DevOps tooling Configure DevOps tooling to Integrate the application/DB Finalise & validate operational Situation Verify and validate integration phases and activities and prepare for test Apply all development changes made to application during all earlier migration processes ALM - CSA - HP AT2C tools & process , HP methodology (EDGE) All DevOps framework tools and processes “ Developer Workflow Automation, Configuration Mgt, Monitoring Service Automation, Architecture,.. ” HP transformation Factory tooling & process Continuous process feedback & improvement
  • 29. Thoroughly test application to ensure full compliancy with Business & User requirements on new architecture Test Process&ToolsTechnology architecture Business Architecture Existing Test tooling & processes DevOps Tooling & Processes HP Test Factory tooling a process AcceptancePrepare test Prepare test cycle schedule Prepare test environment Validate environment before running the test Execute test Execute test scripts, compare results with expected results, identify and resolve any discrepancies Deliverables are the results, fixed defects, and a fully implemented test plan Run acceptance test and Validate acceptance AcceptanceTesting process Closing the test Close test Complete test phase as needed Verify all exit criteria are met and all benefits are recorded The expected results are the test report Define approach test strategy as a starting point Describe objectives, scope, input / output criteria, tools and test environment for testing phase Plan tests Identify scenarios & test conditions Define test cycles for entire phases Plan test environment Identify and plan the test environment needs GovernanceCustomer contributi on Mngtof change Validate acceptance Project plan & Process Project Management structure Planning for deploy phaseProject Management structure Provide test scripts, scenario & processes , contribute to test planning, execution and validation Ongoing Stakeholder communication & Involvement Ongoing Change Implementation and training delivery Continuous process feedback & improvement
  • 30. Deploy Process&ToolsTechnology architecture Business Architecture Business rollout preparation Rollout Synchronise target with current state Validate Rollout process for production & pre-production environments DevOps framework tools & Processes Prepare Switch-Over Handover Solution Implemented Execute Switch-Over process Validate Solution readiness for handover Switch-Over review Review and validate entire Switch-Over & back-out processes Handover Environment now into production Post Implementation Post-implementation assessment and review GovernanceCustomer contributi on Mngtof change Launch preparation Validate and approve switch-Over Project closed Perform Management for implementation Manage Continuous change Application Development freeze period Validate and approve handover Management of Change effectiveness implementation review Finalise communication and training activities Production environment & operational situation validated & ready Continuous process feedback & improvement Execute Project closure
  • 31. Manage Process&ToolsTechnology architecture Business Architecture Live Operation services and functions DevOps framework tools & Processes Operate & Support Manage Performance Continuous improvement Performance management Continuous improvement GovernanceCustomer contributi on Mngtof change Change leadership renew MoC Strategy & Plan Review Stakeholder communication and involvement manage stage Release and project management plans Program management office Release and project performance monitoring Continuous process feedback & improvement
  • 32. © Copyright 2013 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice. HP Restricted. Sample Wave plan
  • 33. Adapt - Wave Strategy Wave content selection method • The cluster selection criteria per wave are: 1. Current technology • To optimise migration process & resources efficiency, the Wave should address the same technological migration strategy: e.g: migrate from RedHat 5.8 and Oracle 11.2 to RedHat 6.4 and Oracle 11.2 or Win2003 to Win2012 2. Business Services • Focus on a specific Business Service, although clusters will likely affect other BS 3. Cluster classification • All Clusters within the same wave should preferably contain object (Application, DB, Services,…) of similar profile : e.g. Oracle DB
  • 34. Adapt - Wave Strategy • The Wave execution approach is to start with a simple wave to prove & validate the adapt process, a next wave to get the entire process into gear, then proceed with the remaining asset • Wave0: • Proving wave to test, validate and improve the Adopt migration process • Unlike other waves, group clusters of different profile to test different migration factory processes • Wave1 • Focuses on business service and similar current technological profile (RedHat 5.8/6.4 & Oracle 11.2) • Wave will Execute standalone • Being in early process phase it will take longer as it gets the entire practice into gear • Other Waves • Waves will execute both in parallel and sequentially
  • 35. Wave 0 Proving Wave Provision Target Prepare Migrate Transfer to TargetSetup DevOps Prepare DevOps Tooling Configuration into DevOps Tooling Cluster 1 Provision Target Prepare Migrate Transfer to TargetSetup DevOps Prepare DevOps Tooling Configuration into DevOps Tooling Cluster 2 Provision Target Prepare Migrate Transfer to TargetSetup DevOps Prepare DevOps Tooling Configuration into DevOps Tooling Cluster 3 Provision Target Prepare Migrate Transfer to TargetSetup DevOps Prepare DevOps Tooling Configuration into DevOps Tooling Cluster 4 Continuous Adopt / Migration process review & improvement Short cycled with low complexity and criticality clusters Different technology profiles e.g.: - RH5.8/Oracle 11.2 to RH6.4/Oracle 11G - RH5.8 / Oracle10.2 to to RH6.4/Oracle 11G - Win 2008 to Win 2012 - Win 2003 to WIn2012 Review and improve process Prepare for Wave 1
  • 36. Wave 1 to # Clusters of same technology profiles Clusters may have mixed cycle, complexity and criticality May apply focus on one Business Service Review and improve process Continuous Adopt / Migration process review & improvement Prepare DevOps Tooling Prepare Migrate Transfer to Target Configuration into DevOps Tooling Continuous Target Provisioning Prepare Migrate Transfer to Target Configuration into DevOps Tooling Prepare Migrate Transfer to Target Configuration into DevOps Tooling Prepare Prepare Migrate Transfer to Target Configuration into DevOps Tooling Migrate Transfer to Target Configuration into DevOps Tooling Migrate Transfer to Target Configuration into DevOps Tooling Migrate Transfer to Target Configuration into DevOps Tooling Prepare Prepare DevOps Ready ETC..ETC..
  • 37. HybridCloudDevOpsBusinessServices Organisation Governance Workplace Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Wave 0 - (Proving Wave) Wave 1 Central Invest ProgrammeRemaining Waves Adapt - Wave Plan Helion Cloud Enablement Adapt Network & Security Review & Validate Wave plan & Project scope Wave 0 (Proving Wave) Horizontal Business Service Monitoring End-to-end B-SLA reporting Setup DevOps Continuous provisioning of target environment for wave activities Configure DevOps Tooling End of Wave MigrationStart Wave Migration DevOps Operational CC80 Monitoring Field Agents Monitoring Developer Workflow & Workbench Wave 1 Configure DevOps Tooling Configure DevOps Tooling Wave 2 Wave 3 Wave 4 Wave 5 Wave 6 Wave 7 Wave 8 Wave 9 Wave 10 Wave # Wave 11 Prepare DevOps Tooling

Editor's Notes

  1. S2S application transformation is an end-to-end solution for mid-range servers, which combines the expertise of data engineering, applications and infrastructure. With a thorough identification and assessment of a client’s current environment, applications are modified suitably so they can be moved from one server type to another, including target cloud platforms. unique Server-to-Server solution is implemented through an industrialized model to cover all aspects from existing hardware and application complexity to infrastructure and the right resources. The customer doesn’t need to work with multiple third party entities as provider has the ability to quickly assemble teams to complete required activities. An S2S engagement is an applications “as is” (no functional change) transformation engagement that is aimed to transform a large application portfolio from one platform to another, typically to Next Generation Data Center or Cloud target platforms. It is expected that the in-scope applications being considered for a S2S transformation have common existing technologies and platforms. This type of common environment can benefit significantly from Server-to-Server’s industrialized approach. With Server-2-Server transformation services, customers can achieve the agility they need to tackle some of the other issues it is faced with. More on this topic will be covered in the second section of this training course.
  2. IT organizations must transform themselves from being a builder of custom IT services to being an internal service provider. This means they need to source some IT services externally, build IT services where they offer competitive differentiation, and provide a single portal where their internal customers can access all the IT services. Here you see the primary reasons why an IT organization should become an internal service provider.
  3. Most applications today are what we call “classic” IT applications. These are applications that have been deployed over the last 5-10 years. These “classic” applications are typically multi-tier web applications comprised of a web tier, middleware, applications and databases. Today, many new applications are being developed as cloud native applications, applications designed specifically for deployment in the cloud. These applications are inherently highly scalable, resilient, distributed and API-based. With classic applications, IT had one choice of deployment platform, typically within a company data center. With the advent of cloud computing, IT organizations have multiple choices of platforms, private cloud, managed private cloud, managed virtual private cloud, public cloud and classic IT. Cloud native applications can be deployed on multiple platforms and can be moved from one platform to another. IT must now determine the best platform for each application. Here are the key factors that are used to determine the best platform for each application. Security Availability Compliance Data Sovereignty Performance Open Cost To manage multiple platforms, its important to have a common foundation that allows applications to be moved from one platform to another. And to simplify management, there should be centralized management across all the platforms.