CIS 518 Week 3 Assignment 1 Activity Graph
For more classes visit
www.snaptutorial.com
Assignment 1: Activity Graph
Due Week 3 and worth 120 points
This assignment consists of two (2) sections: a written project
plan and a PowerPoint presentation. You must submit the two
(2) sections as separate files for the completion of this
assignment. Label each file name according to the section of the
assignment it is written for.
Section 1: Written Project Plan
Imagine you are a software engineer working on a fixed budget
and you are tasked to develop a Web-based student registration
system. This Web-based system allows students to register for
classes, authenticate their credentials, and select classes for
which they are eligible to register. It also registers the students,
prints a confirmation receipt, and prepares a registration invoice.
You have been asked to provide senior management with a
detailed summary, activity graph, and project plan of how you
plan to execute the project.
Write a five to six (5-6) page paper in which you:
Describe the development of the student registration project as a
work breakdown structure of actions and transitions among
these actions.
Create an activity graph from the breakdown structure using
Microsoft Visio or its open source alternative, Dia. Be sure to
identify the time estimates and critical path in your submission.
Note: The graphically depicted solution is not included in the
required page length.
Write a project plan for this project which includes, but is not
limited to, a risk analysis, task scheduling, and personnel
staffing for the project.
Provide a rationale for the decisions you made in your project
plan to senior management.
Section 1 of this assignment must follow these formatting
requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and references
must follow APA or school-specific format. Check with your
professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
Include charts or diagrams created in MS Visio or Dia as an
appendix of the project plan. All references to these diagrams
must be included in the body of the project plan.
Section 2: PowerPoint Presentation
The senior management team has also requested that you present
the plan in a concise presentation to the Board of Directors
during the organization’s next operations meeting.
Create a five to ten (5-10) slide PowerPoint presentation for the
presentation to the Board of Directors in which you:
Present the proposed plan documented in the written project
plan.
Include the key elements of the project plan (i.e., work
breakdown structure, activity graph, risk management, project
schedule, and project staffing).
Include a justification of the decisions made in the proposed
plan to senior management.
Create bulleted speaking notes for the presentation to the Board
of Directors in the Notes section of the PowerPoint. Note: You
may create or assume any fictitious names, data, or scenarios
that have not been established in this assignment for a realistic
flow of communication.
Use a professional technically written style to graphically
convey the information.
The specific course learning outcome associated with this
assignment is:
Develop project plans and schedules that satisfy user
requirements.
Use technology and information resources to research issues in
software engineering.
Write clearly and concisely about advanced software
engineering topics using proper writing mechanics and technical
style conventions.
***************************************************
*
CIS 518 Week 4 Assignment 2 Requirements
For more classes visit
www.snaptutorial.com
Assignment 2: Requirements
Due Week 4 and worth 60 points
In a previous assignment you were tasked to develop a Web-
based student registration system. This Web-based system
allows students to register for classes, authenticate their
credentials, and select classes for which they are eligible to
register. It also registers the students, prints a confirmation
receipt, and prepares a registration invoice. You created a
project plan proposal to senior management and they liked it,
giving you the green light to start with the project. Now, it is
time to define what the student registration system should do.
Write a five to six (5-6) page paper in which you:
Select a requirement specification technique that you would use
to state the requirements of this software system and explain the
reasons for the selection.
Specify the requirements for registering a student for a class
based on the selected technique. You can make any assumptions
that you need to complete the specification as long as you state
them clearly in the response.
Create the necessary diagrams through the use of graphical tools
in Microsoft Word or Visio, or an open source alternative such
as Dia that illustrates and complements the specification. Note:
The graphically depicted solution is not included in the required
page length.
Write a validation and verification plan to validate and verify the
requirement.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and references
must follow APA or school-specific format. Check with your
professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
Include charts or diagrams created in Visio or Dia. The
completed diagrams / charts must be imported into the Word
document before the paper is submitted.
The specific course learning outcome associated with this
assignment is:
Describe the different types of requirements that include
abstraction and modeling techniques.
Use technology and information resources to research issues in
software engineering.
Write clearly and concisely about advanced software
engineering topics using proper writing mechanics and technical
style conventions.
***************************************************
*
CIS 518 Week 9 Assignment 4 Software Developer Development
and Improvement
For more classes visit
www.snaptutorial.com
Assignment 4: Software Developer Development and
Improvement
Due Week 9 and worth 60 points
This assignment consists of two (2) sections: an improvement
plan and a PowerPoint presentation. You must submit the two
(2) sections as separate files for the completion of this
assignment. Label each file name according to the section of the
assignment it is written for.
Section 1: Improvement Plan
Suppose you are working as a senior software development
manager in a software house. The company develops custom
software for clients. In one of the development projects, a
postmortem analysis reveals that a particular developer out of a
team of five (5) was responsible for the major failure of the
developed software product. This has caused the project to run
20% behind schedule and exceed its monetary budget by 30%.
Initial estimates point to an additional twelve (12) weeks from
the original 36-week effort to correct the failures. You have
been asked by your supervisor to create an improvement plan to
address these issues using the People Capability Maturity Model
(P-CMM). The P-CMM model is available at the following
URL:http://www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA512354.
Write a five to six (5-6) page paper in which you:
Evaluate the key practices and improvement activities from the
people capability maturity model and recommend the practices
you would use to address the software failure.
Describe an appropriate strategy for implementing the
recommended improvement activities that you have identified.
Explain how to measure the return on the company investment
after applying the key practices and improvement activities.
Use at least two (2) quality resources in this assignment. Note:
Wikipedia and similar Websites do not qualify as quality
resources.
Section 1 of this assignment must follow these formatting
requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and references
must follow APA or school-specific format. Check with your
professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
Section 2: PowerPoint Presentation
You have also been asked to develop a presentation to be shown
to your CEO to explain why you have chosen to implement the
specific strategy outlined in your improvement plan.
Prepare a seven to ten (7-10) slide PowerPoint presentation in
which you:
Summarize the main points in the improvement plan.
Create bulleted speaking notes for the presentation to the
executive board in the Notes section of the PowerPoint. Note:
You may create or assume any fictitious names, data, or
scenarios that have not been established in this assignment for a
realistic flow of communication.
Use a professional technically written style to graphically
convey the information.
The specific course learning outcome associated with this
assignment is:
Develop practices to evaluate products, processes, and system
resources.
Develop a software engineering plan to address and solve a
proposed business problem.
Use technology and information resources to research issues in
software engineering.
Write clearly and concisely about advanced software
engineering topics using proper writing mechanics and technical
style conventions.
***************************************************
*
CIS 518 Week 10 Term Paper: Future Research and
Development in Software Engineering
For more classes visit
www.snaptutorial.com
Term Paper: Future Research and Development in Software
Engineering
Due Week 10 and worth 200 points
This assignment consists of two (2) sections: a research report
and a PowerPoint presentation. You must submit the two (2)
sections as separate files for the completion of this assignment.
Label each file name according to the section of the assignment
it is written for.
Section 1: Research Report
Imagine you are employed as a senior software engineer in a
company that designs and produces mobile software
applications for health-care providers. Your CIO has asked you
to research trends in mobile software development so that your
organization is prepared for the next wave of software
innovation. The focus of your efforts will be on deciding
whether to utilize the Android, iOS, or Microsoft tablet
development approach while keeping in mind that you need to
make a recommendation that will allow your company to launch
its product to customers in 90 days or less using an agile
methodological approach. Your research must consider all three
(3) platforms with a recommended course of action on one.
Write a ten to fifteen (10-15) page paper in which you:
Identify trends in mobile software development and explain why
they are relevant to the scenario described above.
Explain how the different mobile platform will affect the
different phases of requirements, design, development, and
deployment of the mobile software product.
Make a recommendation on which mobile platform to use and
justify the recommendation.
Describe the agile methodological approach that you would
implement to bring the product to the market in 90 days or less.
Propose a testing plan to ensure that the developed product is
both valid and verifiable.
Use at least six (6) quality resources in this assignment.Note:
Wikipedia and similar Websites do not qualify as quality
resources.
Section 1 of this assignment must follow these formatting
requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and references
must follow APA or school-specific format. Check with your
professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
Include charts or diagrams created in MS Visio or Dia as an
appendix of the project plan. All references to these diagrams
must be included in the body of the project plan.
Section 2: PowerPoint Presentation
You have also been asked to develop a presentation to be shown
to your Senior Executive Board to explain why you have chosen
to implement the specific strategy outlined in your research
report.
Prepare a ten to fifteen (10-15) slide PowerPoint presentation in
which you:
Summarize the main points in the research report.
Create bulleted speaking notes for the presentation to the
executive board in the Notes section of the PowerPoint.Note:
You may create or assume any fictitious names, data, or
scenarios that have not been established in this assignment for a
realistic flow of communication.
Use a professional technically written style to graphically
convey the information.
Your assignment must follow these formatting requirements:
Be typed, double spaced, using Times New Roman font (size
12), with one-inch margins on all sides; citations and references
must follow APA or school-specific format. Check with your
professor for any additional instructions.
Include a cover page containing the title of the assignment, the
student’s name, the professor’s name, the course title, and the
date. The cover page and the reference page are not included in
the required assignment page length.
The specific course learning outcomes associated with this
assignment are:
Develop practices to evaluate products, processes, and system
resources.
Develop a software engineering plan to address and solve a
proposed business problem.
Use technology and information resources to research issues in
software engineering.
Write clearly and concisely about advanced software
engineering topics using proper writing mechanics and technical
style conventions
***************************************************
*

Cis 518 Enhance teaching / snaptutorial.com

  • 1.
    CIS 518 Week3 Assignment 1 Activity Graph For more classes visit www.snaptutorial.com Assignment 1: Activity Graph Due Week 3 and worth 120 points This assignment consists of two (2) sections: a written project plan and a PowerPoint presentation. You must submit the two (2) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Section 1: Written Project Plan Imagine you are a software engineer working on a fixed budget and you are tasked to develop a Web-based student registration system. This Web-based system allows students to register for classes, authenticate their credentials, and select classes for which they are eligible to register. It also registers the students, prints a confirmation receipt, and prepares a registration invoice. You have been asked to provide senior management with a detailed summary, activity graph, and project plan of how you plan to execute the project. Write a five to six (5-6) page paper in which you: Describe the development of the student registration project as a work breakdown structure of actions and transitions among these actions.
  • 2.
    Create an activitygraph from the breakdown structure using Microsoft Visio or its open source alternative, Dia. Be sure to identify the time estimates and critical path in your submission. Note: The graphically depicted solution is not included in the required page length. Write a project plan for this project which includes, but is not limited to, a risk analysis, task scheduling, and personnel staffing for the project. Provide a rationale for the decisions you made in your project plan to senior management. Section 1 of this assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. Include charts or diagrams created in MS Visio or Dia as an appendix of the project plan. All references to these diagrams must be included in the body of the project plan. Section 2: PowerPoint Presentation The senior management team has also requested that you present the plan in a concise presentation to the Board of Directors during the organization’s next operations meeting. Create a five to ten (5-10) slide PowerPoint presentation for the presentation to the Board of Directors in which you:
  • 3.
    Present the proposedplan documented in the written project plan. Include the key elements of the project plan (i.e., work breakdown structure, activity graph, risk management, project schedule, and project staffing). Include a justification of the decisions made in the proposed plan to senior management. Create bulleted speaking notes for the presentation to the Board of Directors in the Notes section of the PowerPoint. Note: You may create or assume any fictitious names, data, or scenarios that have not been established in this assignment for a realistic flow of communication. Use a professional technically written style to graphically convey the information. The specific course learning outcome associated with this assignment is: Develop project plans and schedules that satisfy user requirements. Use technology and information resources to research issues in software engineering. Write clearly and concisely about advanced software engineering topics using proper writing mechanics and technical style conventions. *************************************************** * CIS 518 Week 4 Assignment 2 Requirements For more classes visit
  • 4.
    www.snaptutorial.com Assignment 2: Requirements DueWeek 4 and worth 60 points In a previous assignment you were tasked to develop a Web- based student registration system. This Web-based system allows students to register for classes, authenticate their credentials, and select classes for which they are eligible to register. It also registers the students, prints a confirmation receipt, and prepares a registration invoice. You created a project plan proposal to senior management and they liked it, giving you the green light to start with the project. Now, it is time to define what the student registration system should do. Write a five to six (5-6) page paper in which you: Select a requirement specification technique that you would use to state the requirements of this software system and explain the reasons for the selection. Specify the requirements for registering a student for a class based on the selected technique. You can make any assumptions that you need to complete the specification as long as you state them clearly in the response. Create the necessary diagrams through the use of graphical tools in Microsoft Word or Visio, or an open source alternative such as Dia that illustrates and complements the specification. Note: The graphically depicted solution is not included in the required page length. Write a validation and verification plan to validate and verify the requirement.
  • 5.
    Your assignment mustfollow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. Include charts or diagrams created in Visio or Dia. The completed diagrams / charts must be imported into the Word document before the paper is submitted. The specific course learning outcome associated with this assignment is: Describe the different types of requirements that include abstraction and modeling techniques. Use technology and information resources to research issues in software engineering. Write clearly and concisely about advanced software engineering topics using proper writing mechanics and technical style conventions. *************************************************** * CIS 518 Week 9 Assignment 4 Software Developer Development and Improvement For more classes visit
  • 6.
    www.snaptutorial.com Assignment 4: SoftwareDeveloper Development and Improvement Due Week 9 and worth 60 points This assignment consists of two (2) sections: an improvement plan and a PowerPoint presentation. You must submit the two (2) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Section 1: Improvement Plan Suppose you are working as a senior software development manager in a software house. The company develops custom software for clients. In one of the development projects, a postmortem analysis reveals that a particular developer out of a team of five (5) was responsible for the major failure of the developed software product. This has caused the project to run 20% behind schedule and exceed its monetary budget by 30%. Initial estimates point to an additional twelve (12) weeks from the original 36-week effort to correct the failures. You have been asked by your supervisor to create an improvement plan to address these issues using the People Capability Maturity Model (P-CMM). The P-CMM model is available at the following URL:http://www.dtic.mil/cgi-bin/GetTRDoc?AD=ADA512354. Write a five to six (5-6) page paper in which you: Evaluate the key practices and improvement activities from the people capability maturity model and recommend the practices you would use to address the software failure.
  • 7.
    Describe an appropriatestrategy for implementing the recommended improvement activities that you have identified. Explain how to measure the return on the company investment after applying the key practices and improvement activities. Use at least two (2) quality resources in this assignment. Note: Wikipedia and similar Websites do not qualify as quality resources. Section 1 of this assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. Section 2: PowerPoint Presentation You have also been asked to develop a presentation to be shown to your CEO to explain why you have chosen to implement the specific strategy outlined in your improvement plan. Prepare a seven to ten (7-10) slide PowerPoint presentation in which you: Summarize the main points in the improvement plan. Create bulleted speaking notes for the presentation to the executive board in the Notes section of the PowerPoint. Note: You may create or assume any fictitious names, data, or scenarios that have not been established in this assignment for a realistic flow of communication.
  • 8.
    Use a professionaltechnically written style to graphically convey the information. The specific course learning outcome associated with this assignment is: Develop practices to evaluate products, processes, and system resources. Develop a software engineering plan to address and solve a proposed business problem. Use technology and information resources to research issues in software engineering. Write clearly and concisely about advanced software engineering topics using proper writing mechanics and technical style conventions. *************************************************** * CIS 518 Week 10 Term Paper: Future Research and Development in Software Engineering For more classes visit www.snaptutorial.com Term Paper: Future Research and Development in Software Engineering Due Week 10 and worth 200 points
  • 9.
    This assignment consistsof two (2) sections: a research report and a PowerPoint presentation. You must submit the two (2) sections as separate files for the completion of this assignment. Label each file name according to the section of the assignment it is written for. Section 1: Research Report Imagine you are employed as a senior software engineer in a company that designs and produces mobile software applications for health-care providers. Your CIO has asked you to research trends in mobile software development so that your organization is prepared for the next wave of software innovation. The focus of your efforts will be on deciding whether to utilize the Android, iOS, or Microsoft tablet development approach while keeping in mind that you need to make a recommendation that will allow your company to launch its product to customers in 90 days or less using an agile methodological approach. Your research must consider all three (3) platforms with a recommended course of action on one. Write a ten to fifteen (10-15) page paper in which you: Identify trends in mobile software development and explain why they are relevant to the scenario described above. Explain how the different mobile platform will affect the different phases of requirements, design, development, and deployment of the mobile software product. Make a recommendation on which mobile platform to use and justify the recommendation. Describe the agile methodological approach that you would implement to bring the product to the market in 90 days or less. Propose a testing plan to ensure that the developed product is both valid and verifiable.
  • 10.
    Use at leastsix (6) quality resources in this assignment.Note: Wikipedia and similar Websites do not qualify as quality resources. Section 1 of this assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. Include charts or diagrams created in MS Visio or Dia as an appendix of the project plan. All references to these diagrams must be included in the body of the project plan. Section 2: PowerPoint Presentation You have also been asked to develop a presentation to be shown to your Senior Executive Board to explain why you have chosen to implement the specific strategy outlined in your research report. Prepare a ten to fifteen (10-15) slide PowerPoint presentation in which you: Summarize the main points in the research report. Create bulleted speaking notes for the presentation to the executive board in the Notes section of the PowerPoint.Note: You may create or assume any fictitious names, data, or scenarios that have not been established in this assignment for a realistic flow of communication.
  • 11.
    Use a professionaltechnically written style to graphically convey the information. Your assignment must follow these formatting requirements: Be typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides; citations and references must follow APA or school-specific format. Check with your professor for any additional instructions. Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page and the reference page are not included in the required assignment page length. The specific course learning outcomes associated with this assignment are: Develop practices to evaluate products, processes, and system resources. Develop a software engineering plan to address and solve a proposed business problem. Use technology and information resources to research issues in software engineering. Write clearly and concisely about advanced software engineering topics using proper writing mechanics and technical style conventions *************************************************** *