SlideShare a Scribd company logo
List of Minimum Docs Required for QMS & OHSAS
1. Ensure Quality Policy is Signed, Dated and Displayed
2. Status on Achievement of Quality Objectives and action Plan
3. QMS & OHSAS MANUAL Signed and dated must be available
4. Any Process Change be Incorporated in the QMS & OHSAS MANUAL
5. Prepare Process Documents for :
6. Any Procedure Changed or Amended must be incorporated in QPM
7. Up datation of Record Control Matrix and List of Records
Prepare Process documents for all of the following
Electrical Safety Inspection
Emergency Preparedness Plan
Fire Safety
First Aid
Oil Handling
PPE Maintenance
Safe fabrication work (gas cutting & Welding)
Safety in Tool Use
Safety in handling and use of compressed gas cylinders
Safe Working At Height
Safety instructions for HDD
Traffic Regulations
Disposal of waste (oil, metal)
Health Surveillance
Excavation Work
Safety in load bearing equipments
Pipe String Operation
Hoisting Gear and Material
Storing Material
List of OCPs to be prepared
8. Up date Document Control Matrix or List of Files or Master List of Documents
9. At least Two Internal Audits for year should be conducted
10. Prepare a Circular for Internal Audit
11. Conduct Internal Audit
12. Internal Audit Plan / Calendar is Must
13. One Internal Audit with maximum five to six NCs and these must be closed dated
within Last six months
14. Check for Internal Audit for all departments as per Internal Audit Plan
15. Prepare a Internal Audit Report
16. Ensure MRM completed against last Internal Audit Documentation
17. Check and Update , Training Record Some Minimum Trainings Must appear
18. Check and Update Records of Purchase
19. Prepare an Approved Vendor List
20. Organize Regular Purchase Records where available
21. AMCs for Equipments Record to be made available in a file
1. Safe working at height (including scaffold and ladder safety)
2. Excavation and foundation work
3. Oil handling
4. First Aid
5. Environment Protection & Waste disposal
6. Safe fabrication work (gas cutting & Welding)
7. Safety in handling and use of compressed gas cylinders
8. Safety in Erection of tower and OH lines
9. Wet (lead acid) battery handling, use & disposal
10. Safety in load bearing equipment
11. Safety in Tools use
12. Fire Safety in Office Buildings
13. Protection against Heat stress
14. PPE Maintenance
15. Electrical safety inspection
16. Emergency preparedness and response
17. Transportation safety
18. Integration of EHS requirements in the planning stage
19. Health surveillance
20. Emergency Preparedness Plan
21. Control of substances Hazardous to health
22. Circulars for MR Appointment or Change of MR
23. Any Maintenance Check Sheets if applicable
24. Any SOPs or Work Instructions where available
25. On Audit date House Keeping should be good with Check sheets
26. Ensure No Loose Wiring Exists
27. Fire Extinguishers are serviceable, easy accessible, and not covered by any object
28. Employee and Customer Feed Back record where available
29. Emergency contact nos. internal numbers displayed at appropriate places
30. Employee Evaluation Records
31. Client Placement & Requirement Records File
32. Up dated Process Flow Charts for the entire processes and for each sub process
33. External Training Record
34. Internal Training Record
35. Significant Events during the Year at Company
36. All NCs of Last Audit available
37. Closure evidence of all NCs of Last Audit
38. Any compliance record of Minor NCs / Suggestions by Auditors

More Related Content

Similar to Check list for documents at wog

Module 1 - Health and Safety in Oxygen Systems.pptx
Module 1 - Health and Safety in Oxygen Systems.pptxModule 1 - Health and Safety in Oxygen Systems.pptx
Module 1 - Health and Safety in Oxygen Systems.pptx
MpumeleloNcube4
 
Hướng dẫn bảo quản và vận chuyển dược phẩm nhạy cảm với nhiệt độ
Hướng dẫn bảo quản và vận chuyển dược phẩm nhạy cảm với nhiệt độHướng dẫn bảo quản và vận chuyển dược phẩm nhạy cảm với nhiệt độ
Hướng dẫn bảo quản và vận chuyển dược phẩm nhạy cảm với nhiệt độ
Công ty cổ phần GMPc Việt Nam | Tư vấn GMP, HS GMP, CGMP ASEAN, EU GMP, WHO GMP
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1Jahanzeb Khan
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...Saleem P.P
 
Acetic Acid Process Plant Design
Acetic Acid Process Plant DesignAcetic Acid Process Plant Design
Acetic Acid Process Plant Design
Sinthujan Pushpakaran
 
OSHA PSM Regulations
OSHA PSM RegulationsOSHA PSM Regulations
OSHA PSM Regulations
sanjeev saraf
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
Personal Secret
 
EHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
EHS Regulatory Compliance in 2018 and the Changes That Lie AheadEHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
EHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
Triumvirate Environmental
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation Switchgear
Marty Stevenson
 
078 switchgear install 1.0
078 switchgear install 1.0078 switchgear install 1.0
078 switchgear install 1.0
Invest Northern Ireland
 
OH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.doc
Mirza Saifullah Baig
 
SAFETY AUDIT.pptx
SAFETY AUDIT.pptxSAFETY AUDIT.pptx
SAFETY AUDIT.pptx
Palani kumar
 
Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kiln
mkpq pasha
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineers
Amanda Ribeiro
 
CV of Ghulam Shabbir------
CV of Ghulam Shabbir------CV of Ghulam Shabbir------
CV of Ghulam Shabbir------Ghulam Shabbir
 
production and maintenance
production and maintenanceproduction and maintenance
production and maintenancealfredo ruggiero
 
Industrial safety engineering, oil,gas & refinery
Industrial safety engineering, oil,gas & refineryIndustrial safety engineering, oil,gas & refinery
Industrial safety engineering, oil,gas & refinery
Mahfuz Haq
 
R002
R002R002

Similar to Check list for documents at wog (20)

Module 1 - Health and Safety in Oxygen Systems.pptx
Module 1 - Health and Safety in Oxygen Systems.pptxModule 1 - Health and Safety in Oxygen Systems.pptx
Module 1 - Health and Safety in Oxygen Systems.pptx
 
Hướng dẫn bảo quản và vận chuyển dược phẩm nhạy cảm với nhiệt độ
Hướng dẫn bảo quản và vận chuyển dược phẩm nhạy cảm với nhiệt độHướng dẫn bảo quản và vận chuyển dược phẩm nhạy cảm với nhiệt độ
Hướng dẫn bảo quản và vận chuyển dược phẩm nhạy cảm với nhiệt độ
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1
 
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...SUPERVISOR CV  for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
SUPERVISOR CV for ONSHORE and OFFSHORE MECHANICAL, MANTENANCE, CONSTRUCTION ...
 
Acetic Acid Process Plant Design
Acetic Acid Process Plant DesignAcetic Acid Process Plant Design
Acetic Acid Process Plant Design
 
OSHA PSM Regulations
OSHA PSM RegulationsOSHA PSM Regulations
OSHA PSM Regulations
 
Precommisioning and commissioning updated
Precommisioning and commissioning updatedPrecommisioning and commissioning updated
Precommisioning and commissioning updated
 
EHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
EHS Regulatory Compliance in 2018 and the Changes That Lie AheadEHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
EHS Regulatory Compliance in 2018 and the Changes That Lie Ahead
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation Switchgear
 
078 switchgear install 1.0
078 switchgear install 1.0078 switchgear install 1.0
078 switchgear install 1.0
 
AHU.pdf
AHU.pdfAHU.pdf
AHU.pdf
 
OH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.docOH&S Audit Report- JSW Nandyal.doc
OH&S Audit Report- JSW Nandyal.doc
 
SAFETY AUDIT.pptx
SAFETY AUDIT.pptxSAFETY AUDIT.pptx
SAFETY AUDIT.pptx
 
Alignment of-kiln
Alignment of-kilnAlignment of-kiln
Alignment of-kiln
 
Resume Tahir
Resume TahirResume Tahir
Resume Tahir
 
Process design for chemical engineers
Process design for chemical engineersProcess design for chemical engineers
Process design for chemical engineers
 
CV of Ghulam Shabbir------
CV of Ghulam Shabbir------CV of Ghulam Shabbir------
CV of Ghulam Shabbir------
 
production and maintenance
production and maintenanceproduction and maintenance
production and maintenance
 
Industrial safety engineering, oil,gas & refinery
Industrial safety engineering, oil,gas & refineryIndustrial safety engineering, oil,gas & refinery
Industrial safety engineering, oil,gas & refinery
 
R002
R002R002
R002
 

Recently uploaded

Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
anoopmanoharan2
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
manasideore6
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
ClaraZara1
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
AkolbilaEmmanuel1
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 

Recently uploaded (20)

Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
PPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testingPPT on GRP pipes manufacturing and testing
PPT on GRP pipes manufacturing and testing
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
Fundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptxFundamentals of Electric Drives and its applications.pptx
Fundamentals of Electric Drives and its applications.pptx
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)6th International Conference on Machine Learning & Applications (CMLA 2024)
6th International Conference on Machine Learning & Applications (CMLA 2024)
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
Steel & Timber Design according to British Standard
Steel & Timber Design according to British StandardSteel & Timber Design according to British Standard
Steel & Timber Design according to British Standard
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 

Check list for documents at wog

  • 1. List of Minimum Docs Required for QMS & OHSAS 1. Ensure Quality Policy is Signed, Dated and Displayed 2. Status on Achievement of Quality Objectives and action Plan 3. QMS & OHSAS MANUAL Signed and dated must be available 4. Any Process Change be Incorporated in the QMS & OHSAS MANUAL 5. Prepare Process Documents for : 6. Any Procedure Changed or Amended must be incorporated in QPM 7. Up datation of Record Control Matrix and List of Records Prepare Process documents for all of the following Electrical Safety Inspection Emergency Preparedness Plan Fire Safety First Aid Oil Handling PPE Maintenance Safe fabrication work (gas cutting & Welding) Safety in Tool Use Safety in handling and use of compressed gas cylinders Safe Working At Height Safety instructions for HDD Traffic Regulations Disposal of waste (oil, metal) Health Surveillance Excavation Work Safety in load bearing equipments Pipe String Operation Hoisting Gear and Material Storing Material
  • 2. List of OCPs to be prepared
  • 3. 8. Up date Document Control Matrix or List of Files or Master List of Documents 9. At least Two Internal Audits for year should be conducted 10. Prepare a Circular for Internal Audit 11. Conduct Internal Audit 12. Internal Audit Plan / Calendar is Must 13. One Internal Audit with maximum five to six NCs and these must be closed dated within Last six months 14. Check for Internal Audit for all departments as per Internal Audit Plan 15. Prepare a Internal Audit Report 16. Ensure MRM completed against last Internal Audit Documentation 17. Check and Update , Training Record Some Minimum Trainings Must appear 18. Check and Update Records of Purchase 19. Prepare an Approved Vendor List 20. Organize Regular Purchase Records where available 21. AMCs for Equipments Record to be made available in a file 1. Safe working at height (including scaffold and ladder safety) 2. Excavation and foundation work 3. Oil handling 4. First Aid 5. Environment Protection & Waste disposal 6. Safe fabrication work (gas cutting & Welding) 7. Safety in handling and use of compressed gas cylinders 8. Safety in Erection of tower and OH lines 9. Wet (lead acid) battery handling, use & disposal 10. Safety in load bearing equipment 11. Safety in Tools use 12. Fire Safety in Office Buildings 13. Protection against Heat stress 14. PPE Maintenance 15. Electrical safety inspection 16. Emergency preparedness and response 17. Transportation safety 18. Integration of EHS requirements in the planning stage 19. Health surveillance 20. Emergency Preparedness Plan 21. Control of substances Hazardous to health
  • 4. 22. Circulars for MR Appointment or Change of MR 23. Any Maintenance Check Sheets if applicable 24. Any SOPs or Work Instructions where available 25. On Audit date House Keeping should be good with Check sheets 26. Ensure No Loose Wiring Exists 27. Fire Extinguishers are serviceable, easy accessible, and not covered by any object 28. Employee and Customer Feed Back record where available 29. Emergency contact nos. internal numbers displayed at appropriate places 30. Employee Evaluation Records 31. Client Placement & Requirement Records File 32. Up dated Process Flow Charts for the entire processes and for each sub process 33. External Training Record 34. Internal Training Record 35. Significant Events during the Year at Company 36. All NCs of Last Audit available 37. Closure evidence of all NCs of Last Audit 38. Any compliance record of Minor NCs / Suggestions by Auditors