Chapter 11
Engineering Controls
© 2012 Delmar, Cengage Learning
Risk Evaluation
• Hazardous materials
• Chemical process
• Physical operations
• Equipment design
• Plant location and layout
• Operator practices and training
© 2012 Delmar, Cengage Learning
Hazardous Materials
Evaluation
• A detailed analysis of all the properties
of the materials handled, stored, and
processed in the plant:
• Quantities
• Physical properties
• Toxicity
• Stability hazards
• Corrosiveness
• Impurities
© 2012 Delmar, Cengage Learning
Chemical Process Evaluation
• Analyzes the hazardous properties of
reactants, which are products that might
be formed under certain conditions, and
the environmental effects of those
products.
© 2012 Delmar, Cengage Learning
Physical Operations
Evaluations
• Dusting
• Heat transfer
• Pressure
• Vaporization
• Spaying
• Mixing
• Separation
• Generation
© 2012 Delmar, Cengage Learning
Equipment Design Evaluation
• Equipment systems are designed so
that the failure of one or more devices
will not result in a disaster.
© 2012 Delmar, Cengage Learning
Plant Location and Layout
Evaluation
Key elements include:
• Drainage and runoff control
• Climatic conditions
• Effects of uncontrolled release
• Community capability and emergency response
• Plant accessibility
• Available utilities
• Gate security
• Hazardous unit placement
• Spacing of equipment
© 2012 Delmar, Cengage Learning
Operator Practices and
Training Evaluation
• Operational failures have been
identified as the most frequent cause of
industrial disasters.
© 2012 Delmar, Cengage Learning
Design and Operation of
Plants for Safety
• There must be adequate spacing
between process equipment, specific
storage, and loading facilities.
• Evaluate and limit the storage of
hazardous material.
• Evaluate the use of open structures and
will recommend new designs for total
storage containment.
© 2012 Delmar, Cengage Learning
Figure 11-1 Triangular Equipment Placement
© 2012 Delmar, Cengage Learning
Alarms and Indicators
The most effective tool used by process
technicians in the operation of a large
chemical facility are alarms and
indicators.
© 2012 Delmar, Cengage Learning
Fire Alarms and Detection
Systems
Automatic fire alarm systems come in
three types:
• Fixed-temperature type
• Rate-of-rise type
• Nuclear detector type
© 2012 Delmar, Cengage Learning
Redundant Alarm and
Shutdown Devices
Operating a large chemical complex
requires the use of redundant systems
that provide emergency warning and
shutdown protection. Redundancy is a
process that uses two or more devices
to shut down a system.
© 2012 Delmar, Cengage Learning
Interlocks and Automatic
Shutdown Devices
• An interlock is a device that will prevent
an operational action unless a specific
condition has been satisfied
• Software
• Hardwire
• A permissive is a special type of
interlock that contains a set of
conditions that must be satisfied before
a piece of equipment can be started.
© 2012 Delmar, Cengage Learning
Process Containment and
Upset Control
• There are a number of elements in
controlling process containment and in
the design of upset control:
• Reduction in hazardous material storage
inventory
• Storage of liquefied gases and the conditions
under which these should be stored
• Plan for a design that provides total
containment
© 2012 Delmar, Cengage Learning
Figure 11-3 Traditional and Nontraditional Diking Systems (Totally Self-Contained).
© 2012 Delmar, Cengage Learning
Closed System/Closed-Loop
Sampling
Closed systems/closed-loop sampling is
a procedure where a bypass loop is
installed that allow a small part of the
system to be diverted from the main
flow.
© 2012 Delmar, Cengage Learning
Figure 11-4 Closed-Loop Sampling System
© 2012 Delmar, Cengage Learning
Floating Roof Tank and
Ventilation Systems
• Floating roof storage tanks are used for
storing materials at atmospheric
pressure.
• Ventilation systems are usually
designed to protect process technicians
from organic vapors, harmful additive
dusts, and fumes.
© 2012 Delmar, Cengage Learning
Figure 11-5 Floating Tank Designs
© 2012 Delmar, Cengage Learning
Effluent Control and waste
Water Treatment
New technicians are typically assigned
to this area in order to train on a variety
of complex systems.
© 2012 Delmar, Cengage Learning
Figure 11-6 Clarifier
© 2012 Delmar, Cengage Learning
Figure 11-7 Settling Basin
© 2012 Delmar, Cengage Learning
Noise Abatement
• Noise abatement is an engineering
procedure designed to reduce or limit
noise through the use of modern
technology.
© 2012 Delmar, Cengage Learning
Flares
• Flares are used to burn waste gases
and control pressure generated by
process upsets.
© 2012 Delmar, Cengage Learning
Figure 11-8 Flare System
© 2012 Delmar, Cengage Learning
Pressure Relief Devices
• Safety valves for gases
• Relief valves for liquids
• Rupture discs for both
© 2012 Delmar, Cengage Learning
Figure 11-9 Pressure Relief Devices

More Related Content

Similar to Chapter 11.ppt

Mono Ethylene Glycol
Mono Ethylene GlycolMono Ethylene Glycol
Mono Ethylene Glycol
Advisian
 
dokumen.tips_pptheating-and-air-conditioning-viewheating-and-air-conditioning...
dokumen.tips_pptheating-and-air-conditioning-viewheating-and-air-conditioning...dokumen.tips_pptheating-and-air-conditioning-viewheating-and-air-conditioning...
dokumen.tips_pptheating-and-air-conditioning-viewheating-and-air-conditioning...
ssuser037415
 
Engineering design guidelines cooling towers - rev01
Engineering design guidelines   cooling towers - rev01Engineering design guidelines   cooling towers - rev01
Engineering design guidelines cooling towers - rev01
Muhammad Ali
 
Fire suppression systems Full aisle containment and cooling
Fire suppression systems Full aisle containment  and coolingFire suppression systems Full aisle containment  and cooling
Fire suppression systems Full aisle containment and cooling
Ivett Hadik
 
Solutions that Integrate - White Paper Series Part III: Oil and Gas Connectio...
Solutions that Integrate - White Paper Series Part III: Oil and Gas Connectio...Solutions that Integrate - White Paper Series Part III: Oil and Gas Connectio...
Solutions that Integrate - White Paper Series Part III: Oil and Gas Connectio...
NorthwireCable
 
Dropped Objects (DROPS) Prevention
Dropped Objects (DROPS) PreventionDropped Objects (DROPS) Prevention
Dropped Objects (DROPS) Prevention
Lloyd's Register Energy
 
What are you doing to prevent dropped objects (drops)?
What are you doing to prevent dropped objects (drops)?What are you doing to prevent dropped objects (drops)?
What are you doing to prevent dropped objects (drops)?
Lloyd's Register Energy
 
Resume-1 (4)
Resume-1 (4)Resume-1 (4)
Resume-1 (4)
hasmukh. patel
 
Scaling mature systems
Scaling mature systemsScaling mature systems
Scaling mature systems
HanMorten
 
Dermarkar
DermarkarDermarkar
Dermarkar
hernandezgerardo
 
Presentation for MEED - Copy
Presentation for MEED - CopyPresentation for MEED - Copy
Presentation for MEED - Copy
Senthil Kumar, S
 
Continuous Performance Monitoring of a Distributed Application [CON4730]
Continuous Performance Monitoring of a Distributed Application [CON4730]Continuous Performance Monitoring of a Distributed Application [CON4730]
Continuous Performance Monitoring of a Distributed Application [CON4730]
Ashish Srivastava
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Design World
 
Solvent vs Water Based Web Coating
Solvent vs Water Based Web CoatingSolvent vs Water Based Web Coating
Solvent vs Water Based Web Coating
neweraconverting
 
4 FACILITY LAYOUT.ppt
4  FACILITY LAYOUT.ppt4  FACILITY LAYOUT.ppt
4 FACILITY LAYOUT.ppt
SandeshHambir1
 
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...
Triumvirate Environmental
 
Unit-III Safety in process.pptx
Unit-III Safety in process.pptxUnit-III Safety in process.pptx
Unit-III Safety in process.pptx
TYPPEOnlineLecture
 
1133716253 371790
1133716253 3717901133716253 371790
1133716253 371790
cit-cit
 
Asset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment PurchaseAsset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment Purchase
DNVGLEnergy
 
Best Practices for EHS Management in Data Centers.pdf
Best Practices for EHS Management in Data Centers.pdfBest Practices for EHS Management in Data Centers.pdf
Best Practices for EHS Management in Data Centers.pdf
ASK EHS Engineering & Consultants
 

Similar to Chapter 11.ppt (20)

Mono Ethylene Glycol
Mono Ethylene GlycolMono Ethylene Glycol
Mono Ethylene Glycol
 
dokumen.tips_pptheating-and-air-conditioning-viewheating-and-air-conditioning...
dokumen.tips_pptheating-and-air-conditioning-viewheating-and-air-conditioning...dokumen.tips_pptheating-and-air-conditioning-viewheating-and-air-conditioning...
dokumen.tips_pptheating-and-air-conditioning-viewheating-and-air-conditioning...
 
Engineering design guidelines cooling towers - rev01
Engineering design guidelines   cooling towers - rev01Engineering design guidelines   cooling towers - rev01
Engineering design guidelines cooling towers - rev01
 
Fire suppression systems Full aisle containment and cooling
Fire suppression systems Full aisle containment  and coolingFire suppression systems Full aisle containment  and cooling
Fire suppression systems Full aisle containment and cooling
 
Solutions that Integrate - White Paper Series Part III: Oil and Gas Connectio...
Solutions that Integrate - White Paper Series Part III: Oil and Gas Connectio...Solutions that Integrate - White Paper Series Part III: Oil and Gas Connectio...
Solutions that Integrate - White Paper Series Part III: Oil and Gas Connectio...
 
Dropped Objects (DROPS) Prevention
Dropped Objects (DROPS) PreventionDropped Objects (DROPS) Prevention
Dropped Objects (DROPS) Prevention
 
What are you doing to prevent dropped objects (drops)?
What are you doing to prevent dropped objects (drops)?What are you doing to prevent dropped objects (drops)?
What are you doing to prevent dropped objects (drops)?
 
Resume-1 (4)
Resume-1 (4)Resume-1 (4)
Resume-1 (4)
 
Scaling mature systems
Scaling mature systemsScaling mature systems
Scaling mature systems
 
Dermarkar
DermarkarDermarkar
Dermarkar
 
Presentation for MEED - Copy
Presentation for MEED - CopyPresentation for MEED - Copy
Presentation for MEED - Copy
 
Continuous Performance Monitoring of a Distributed Application [CON4730]
Continuous Performance Monitoring of a Distributed Application [CON4730]Continuous Performance Monitoring of a Distributed Application [CON4730]
Continuous Performance Monitoring of a Distributed Application [CON4730]
 
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic SafetyAre you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
Are you at Risk? The Role of Lockout/Tagout in Pneumatic Safety
 
Solvent vs Water Based Web Coating
Solvent vs Water Based Web CoatingSolvent vs Water Based Web Coating
Solvent vs Water Based Web Coating
 
4 FACILITY LAYOUT.ppt
4  FACILITY LAYOUT.ppt4  FACILITY LAYOUT.ppt
4 FACILITY LAYOUT.ppt
 
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...
Complying with OSHA's Lockout/Tagout Rules: Control Hazardous Energy and Ensu...
 
Unit-III Safety in process.pptx
Unit-III Safety in process.pptxUnit-III Safety in process.pptx
Unit-III Safety in process.pptx
 
1133716253 371790
1133716253 3717901133716253 371790
1133716253 371790
 
Asset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment PurchaseAsset Management Before and After the Equipment Purchase
Asset Management Before and After the Equipment Purchase
 
Best Practices for EHS Management in Data Centers.pdf
Best Practices for EHS Management in Data Centers.pdfBest Practices for EHS Management in Data Centers.pdf
Best Practices for EHS Management in Data Centers.pdf
 

Recently uploaded

writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
Nicholas Montgomery
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
simonomuemu
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
Celine George
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
tarandeep35
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
Celine George
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
Scholarhat
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
chanes7
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
NgcHiNguyn25
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
ak6969907
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
Celine George
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Mohd Adib Abd Muin, Senior Lecturer at Universiti Utara Malaysia
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
Celine George
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
PECB
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
Academy of Science of South Africa
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
TechSoup
 

Recently uploaded (20)

writing about opinions about Australia the movie
writing about opinions about Australia the moviewriting about opinions about Australia the movie
writing about opinions about Australia the movie
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
Smart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICTSmart-Money for SMC traders good time and ICT
Smart-Money for SMC traders good time and ICT
 
How to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRMHow to Manage Your Lost Opportunities in Odoo 17 CRM
How to Manage Your Lost Opportunities in Odoo 17 CRM
 
S1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptxS1-Introduction-Biopesticides in ICM.pptx
S1-Introduction-Biopesticides in ICM.pptx
 
How to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP ModuleHow to Add Chatter in the odoo 17 ERP Module
How to Add Chatter in the odoo 17 ERP Module
 
Azure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHatAzure Interview Questions and Answers PDF By ScholarHat
Azure Interview Questions and Answers PDF By ScholarHat
 
Digital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments UnitDigital Artifact 1 - 10VCD Environments Unit
Digital Artifact 1 - 10VCD Environments Unit
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
 
World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024World environment day ppt For 5 June 2024
World environment day ppt For 5 June 2024
 
How to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold MethodHow to Build a Module in Odoo 17 Using the Scaffold Method
How to Build a Module in Odoo 17 Using the Scaffold Method
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptxChapter 4 - Islamic Financial Institutions in Malaysia.pptx
Chapter 4 - Islamic Financial Institutions in Malaysia.pptx
 
How to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 InventoryHow to Setup Warehouse & Location in Odoo 17 Inventory
How to Setup Warehouse & Location in Odoo 17 Inventory
 
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
ISO/IEC 27001, ISO/IEC 42001, and GDPR: Best Practices for Implementation and...
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)South African Journal of Science: Writing with integrity workshop (2024)
South African Journal of Science: Writing with integrity workshop (2024)
 
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat  Leveraging AI for Diversity, Equity, and InclusionExecutive Directors Chat  Leveraging AI for Diversity, Equity, and Inclusion
Executive Directors Chat Leveraging AI for Diversity, Equity, and Inclusion
 

Chapter 11.ppt

  • 1. © 2012 Delmar, Cengage Learning Chapter 11 Engineering Controls
  • 2. © 2012 Delmar, Cengage Learning Risk Evaluation • Hazardous materials • Chemical process • Physical operations • Equipment design • Plant location and layout • Operator practices and training
  • 3. © 2012 Delmar, Cengage Learning Hazardous Materials Evaluation • A detailed analysis of all the properties of the materials handled, stored, and processed in the plant: • Quantities • Physical properties • Toxicity • Stability hazards • Corrosiveness • Impurities
  • 4. © 2012 Delmar, Cengage Learning Chemical Process Evaluation • Analyzes the hazardous properties of reactants, which are products that might be formed under certain conditions, and the environmental effects of those products.
  • 5. © 2012 Delmar, Cengage Learning Physical Operations Evaluations • Dusting • Heat transfer • Pressure • Vaporization • Spaying • Mixing • Separation • Generation
  • 6. © 2012 Delmar, Cengage Learning Equipment Design Evaluation • Equipment systems are designed so that the failure of one or more devices will not result in a disaster.
  • 7. © 2012 Delmar, Cengage Learning Plant Location and Layout Evaluation Key elements include: • Drainage and runoff control • Climatic conditions • Effects of uncontrolled release • Community capability and emergency response • Plant accessibility • Available utilities • Gate security • Hazardous unit placement • Spacing of equipment
  • 8. © 2012 Delmar, Cengage Learning Operator Practices and Training Evaluation • Operational failures have been identified as the most frequent cause of industrial disasters.
  • 9. © 2012 Delmar, Cengage Learning Design and Operation of Plants for Safety • There must be adequate spacing between process equipment, specific storage, and loading facilities. • Evaluate and limit the storage of hazardous material. • Evaluate the use of open structures and will recommend new designs for total storage containment.
  • 10. © 2012 Delmar, Cengage Learning Figure 11-1 Triangular Equipment Placement
  • 11. © 2012 Delmar, Cengage Learning Alarms and Indicators The most effective tool used by process technicians in the operation of a large chemical facility are alarms and indicators.
  • 12. © 2012 Delmar, Cengage Learning Fire Alarms and Detection Systems Automatic fire alarm systems come in three types: • Fixed-temperature type • Rate-of-rise type • Nuclear detector type
  • 13. © 2012 Delmar, Cengage Learning Redundant Alarm and Shutdown Devices Operating a large chemical complex requires the use of redundant systems that provide emergency warning and shutdown protection. Redundancy is a process that uses two or more devices to shut down a system.
  • 14. © 2012 Delmar, Cengage Learning Interlocks and Automatic Shutdown Devices • An interlock is a device that will prevent an operational action unless a specific condition has been satisfied • Software • Hardwire • A permissive is a special type of interlock that contains a set of conditions that must be satisfied before a piece of equipment can be started.
  • 15. © 2012 Delmar, Cengage Learning Process Containment and Upset Control • There are a number of elements in controlling process containment and in the design of upset control: • Reduction in hazardous material storage inventory • Storage of liquefied gases and the conditions under which these should be stored • Plan for a design that provides total containment
  • 16. © 2012 Delmar, Cengage Learning Figure 11-3 Traditional and Nontraditional Diking Systems (Totally Self-Contained).
  • 17. © 2012 Delmar, Cengage Learning Closed System/Closed-Loop Sampling Closed systems/closed-loop sampling is a procedure where a bypass loop is installed that allow a small part of the system to be diverted from the main flow.
  • 18. © 2012 Delmar, Cengage Learning Figure 11-4 Closed-Loop Sampling System
  • 19. © 2012 Delmar, Cengage Learning Floating Roof Tank and Ventilation Systems • Floating roof storage tanks are used for storing materials at atmospheric pressure. • Ventilation systems are usually designed to protect process technicians from organic vapors, harmful additive dusts, and fumes.
  • 20. © 2012 Delmar, Cengage Learning Figure 11-5 Floating Tank Designs
  • 21. © 2012 Delmar, Cengage Learning Effluent Control and waste Water Treatment New technicians are typically assigned to this area in order to train on a variety of complex systems.
  • 22. © 2012 Delmar, Cengage Learning Figure 11-6 Clarifier
  • 23. © 2012 Delmar, Cengage Learning Figure 11-7 Settling Basin
  • 24. © 2012 Delmar, Cengage Learning Noise Abatement • Noise abatement is an engineering procedure designed to reduce or limit noise through the use of modern technology.
  • 25. © 2012 Delmar, Cengage Learning Flares • Flares are used to burn waste gases and control pressure generated by process upsets.
  • 26. © 2012 Delmar, Cengage Learning Figure 11-8 Flare System
  • 27. © 2012 Delmar, Cengage Learning Pressure Relief Devices • Safety valves for gases • Relief valves for liquids • Rupture discs for both
  • 28. © 2012 Delmar, Cengage Learning Figure 11-9 Pressure Relief Devices