CEIA SDM PROJECT
DUBAI AIRPORTS
BY
RADHAKRISHNAN
&
HANEESH
SCOPE OF PROJECT
 Networking of passenger & staff Security screening metal Detectors (CEIA)
in CA, CB, T3 all areas.
 Server Integration for SDM Data collection requirements in passenger
security screening areas & staff screening Areas.
 Make all devices status Online to generate SDM report with accurate
passenger count, alarm count and random alarm statistics.
 Port activation and VPN & IP configuration.
 APSIM Module & Programming module configuration, parameter settings
with standard security levels in compliance with Dubai police .
 Device renaming with drawing ID, Location and Graphical design.
OUR MOTIVATORS
 MR.KHALIFA AL HABSI- SECURITY SYSTEMS MANAGER, ABL-SAS ENGINEERING.
 MR.HARIS POOKOTH –SYSTEM ENGINEER, XRAY SYSTEMS.
 MR.THOMAS LAKAPARAMBU – SYSTEM ENGINEER, BUSINESS SUPPORT.
 MR.ROSHAN RAMAKRISHNAN- SYSTEM ENGINEER, XRAY SYSTEMS.
 MR.ARSHAD KHAN- SYSTEM SPECIALIST.
 MR.THUMMY VARGHESE –SYSTEM SPECIALIST.
THANK YOU FOR ALL AND CELEBRATING THE TEAM WORK.
CEIA METAL DETECTOR MODELS
BEGINNING-ONLINE STATUS MONITOR
COMPLETION- ONLINE STATUS MONITOR
SDM PRIORITY REPORT
Priority Area Total ONLINE Comp %
Priority 1 Departure Passenger 22 22 100%
Priority 2 Concourse 3 Upper Level 1 24 24 100%
Priority 3 Departure Transfer Desk K 12 12 100%
Priority 4 Departure Transfer Desk G 27 27 100%
Priority 5 Concourse 3 Ground Floor 13 13 100%
Priority 6 Departure Transfer Passenger 4 4 100%
Priority 7 Apron Staff Entrance 16 16 100%
Total 118 118 100%
SDM PROGRESS DASH BOARD
COMPLETED PROJECTS 2014
 CEIA SDM NETWORKING AND INTEGRATIOIN PROJECT- CA,CB-T3,T2
 ETD NETWORKING & REMOTE CONNECTIVITY- CA,CB-T3,T1,T2.
 DATA COLLECTION OF ASSETS & NETWORK DETAILS- CA,CB-T3,T2.
 MASTER DOCUMENTS PREPARATION FOR ALL ABOVE.
 CEIA SYSTEM FUTURE ENHACEMENTS -INPROGRESS
 SAS CONTROL ROOM- MONITORING PROVISION IN T3 L5- IN PROGRESS
 MULTI MONITORING SYSTEM SOFTWARE DEVELOPMENT – IN PROGRESS
CEIA SDM PROJECT

CEIA SDM PROJECT

  • 1.
    CEIA SDM PROJECT DUBAIAIRPORTS BY RADHAKRISHNAN & HANEESH
  • 2.
    SCOPE OF PROJECT Networking of passenger & staff Security screening metal Detectors (CEIA) in CA, CB, T3 all areas.  Server Integration for SDM Data collection requirements in passenger security screening areas & staff screening Areas.  Make all devices status Online to generate SDM report with accurate passenger count, alarm count and random alarm statistics.  Port activation and VPN & IP configuration.  APSIM Module & Programming module configuration, parameter settings with standard security levels in compliance with Dubai police .  Device renaming with drawing ID, Location and Graphical design.
  • 3.
    OUR MOTIVATORS  MR.KHALIFAAL HABSI- SECURITY SYSTEMS MANAGER, ABL-SAS ENGINEERING.  MR.HARIS POOKOTH –SYSTEM ENGINEER, XRAY SYSTEMS.  MR.THOMAS LAKAPARAMBU – SYSTEM ENGINEER, BUSINESS SUPPORT.  MR.ROSHAN RAMAKRISHNAN- SYSTEM ENGINEER, XRAY SYSTEMS.  MR.ARSHAD KHAN- SYSTEM SPECIALIST.  MR.THUMMY VARGHESE –SYSTEM SPECIALIST. THANK YOU FOR ALL AND CELEBRATING THE TEAM WORK.
  • 4.
  • 6.
  • 7.
  • 8.
    SDM PRIORITY REPORT PriorityArea Total ONLINE Comp % Priority 1 Departure Passenger 22 22 100% Priority 2 Concourse 3 Upper Level 1 24 24 100% Priority 3 Departure Transfer Desk K 12 12 100% Priority 4 Departure Transfer Desk G 27 27 100% Priority 5 Concourse 3 Ground Floor 13 13 100% Priority 6 Departure Transfer Passenger 4 4 100% Priority 7 Apron Staff Entrance 16 16 100% Total 118 118 100%
  • 9.
  • 10.
    COMPLETED PROJECTS 2014 CEIA SDM NETWORKING AND INTEGRATIOIN PROJECT- CA,CB-T3,T2  ETD NETWORKING & REMOTE CONNECTIVITY- CA,CB-T3,T1,T2.  DATA COLLECTION OF ASSETS & NETWORK DETAILS- CA,CB-T3,T2.  MASTER DOCUMENTS PREPARATION FOR ALL ABOVE.  CEIA SYSTEM FUTURE ENHACEMENTS -INPROGRESS  SAS CONTROL ROOM- MONITORING PROVISION IN T3 L5- IN PROGRESS  MULTI MONITORING SYSTEM SOFTWARE DEVELOPMENT – IN PROGRESS