CHAPTER 8
CRASHING AND
COST PLAN
8-1 REDUCING TIME AND COST
The activity time for project constructions are normally estimated for some given
level of resources.
Project construction time is influenced by the following:
1. To avoid penalties for not completing the project on time
2. .To take advantage of monetary incentives for completing the project on or
before the target.
3. To free the resources such as money, equipment and men for use on other
projects.
4. Reduce indirect costs associated with project such as :
A fourth key aspect is the process by which decisions are
made in these areas.
So a fourth key area is: .
1. Decision-making techniques (Chapters 10 and 11)
1.3 Strategic management
Chapter 2 aims to explain the role of corporate strategic
management within the construction industry. It traces the
evolution of strategic management thinking through succeeding
schools of thought from the 1960s to the present day. The chapter
thus presents a comprehensive overview of strategic
management theory and practice.
Chapter 3 is specifically concerned with strategic
management systems or the ways in which strategy is
developed within organizations. Three pure systems, strategic
planning, strategic vision and strategic learning, are shown to
be points on a continuum of strategic decision-making.
1.4 Managing People
Three key aspects of managing people in this industry are
dealt with in the next three chapters. Industrial relations
legislation and trades union power have always been undermined
in the construction industry by the widespread use of labour only
subcontracting. Chapter 4 argues that the formal industrial
relations systems have had to be adapted to the unique
construction environment but still have a contribution to make in
protecting workers, establishing minimum pay levels and
representing the industry at government level.
The crucial aspect of health and safety of construction people is
addressed in Chapter 5. It is argued that safety issues do not just start once
site activities commence but that designers have a duty to design for safe
production. An understanding of the health and safety regulations is seen as
a minimum requirement, which must be translated into safety policies,
attitudes and activities by senior management. 6 Construction Management
in Practice.
Obtaining and developing people for construction firms is the subject
of Chapter 6. The mapping and matching of a company's human resources to
its strategic plans is a vital role for senior management. A formal system for
inducting, developing and training people at all levels is a key part of a
company's human relation's strategy. The creation of a genuine learning
organization is still an aspiration for most construction firms but a process is
presented whereby it may be achieved.
1.4 Managing Money
Chapter 7 deals with the financing of business units. As
stated earlier the construction industry is a large project-based
industry of small firms; this has implications for the types of
business units which exist and for the sources of capital which
operate. Short-term capital requirements are particularly
important to contractors. The capital structure of the firm is
clearly a strategic decision which senior management must
determine.
Monitoring and managing finance is the subject of Chapter 8.
Often survival is the motivation for the close monitoring of costs and
revenues seen in the construction industry. Clients, consultants and
contractors have a joint interest in ensuring that project costs are
monitored and controlled and this is dealt with in some depth. A
more strategic issue is investment appraisal for projects and a
number of techniques is reviewed.
Chapter 9 is concerned with financial performance. In particular,
decisions about bidding and risk are key strategic decisions in an
industry in which the majority of projects are still let in competition
for both professional and contracting firms. Financial reporting is a
legal requirement for companies and the understanding and
interpreting of financial reports and accounts is discussed.
1.6 Decision-making techniques
These chapters give quantitative support to the chapters
on strategic management and, particularly, to the chapters on
financial management. Such is the scope of the book. Each
chapter starts with an overview of the content of the chapter and
concludes with a summary of the main Construction Management
in Practice 7 Civildatas.blogspot.in ideas together with relevant
questions for consideration and suggestions for further reading.
Thank you
for listening!
- Santoyo, Jullie Anne R.

More Related Content

Similar to CE15 Report Part 2.pptx

IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project Management
IRJET Journal
 
Ch 13
Ch 13Ch 13
Ch 13
kpserver
 
Decisions of investments in operating fixed assets using an indicator arising...
Decisions of investments in operating fixed assets using an indicator arising...Decisions of investments in operating fixed assets using an indicator arising...
Decisions of investments in operating fixed assets using an indicator arising...
irjes
 
document-part- (8).doc
document-part- (8).docdocument-part- (8).doc
document-part- (8).doc
PawanNegi39
 
Document
DocumentDocument
Document
guestd8bce08
 
Working capital management on kotak mahindra group
Working capital management on kotak mahindra groupWorking capital management on kotak mahindra group
Working capital management on kotak mahindra group
Projects Kart
 
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...
IJECEIAES
 
ch04.ppt
ch04.pptch04.ppt
ch04.ppt
MarlonMagtibay2
 
Corporate Finance Essay
Corporate Finance EssayCorporate Finance Essay
Corporate Finance Essay
Leslie Lee
 
Russian business incubator program _ prospect development and strategic plan ...
Russian business incubator program _ prospect development and strategic plan ...Russian business incubator program _ prospect development and strategic plan ...
Russian business incubator program _ prospect development and strategic plan ...
Vasily Ryzhonkov
 
The Retail Store Where convenience, quali.docx
The Retail Store  Where convenience, quali.docxThe Retail Store  Where convenience, quali.docx
The Retail Store Where convenience, quali.docx
arnoldmeredith47041
 
document-part- (9).doc
document-part- (9).docdocument-part- (9).doc
document-part- (9).doc
PawanNegi39
 
Strategic Management Essay
Strategic Management EssayStrategic Management Essay
Strategic Management Essay
Paper Writing Services Reviews
 
Risk Management Process
Risk Management ProcessRisk Management Process
Risk Management Process
Monica Carter
 
Project management-office-models-a-review 2016-procedia-computer-science
Project management-office-models-a-review 2016-procedia-computer-scienceProject management-office-models-a-review 2016-procedia-computer-science
Project management-office-models-a-review 2016-procedia-computer-science
Bernardo Baiz
 
How to Increase the Value of the PMMMs as a Business-oriented Framework
How to Increase the Value of the PMMMs as a Business-oriented FrameworkHow to Increase the Value of the PMMMs as a Business-oriented Framework
How to Increase the Value of the PMMMs as a Business-oriented Framework
Yasmin AbdelAziz
 
Project integration management
Project integration managementProject integration management
Project integration management
Dhani Ahmad
 
Measure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio SelectionMeasure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio Selection
UMT
 

Similar to CE15 Report Part 2.pptx (18)

IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project Management
 
Ch 13
Ch 13Ch 13
Ch 13
 
Decisions of investments in operating fixed assets using an indicator arising...
Decisions of investments in operating fixed assets using an indicator arising...Decisions of investments in operating fixed assets using an indicator arising...
Decisions of investments in operating fixed assets using an indicator arising...
 
document-part- (8).doc
document-part- (8).docdocument-part- (8).doc
document-part- (8).doc
 
Document
DocumentDocument
Document
 
Working capital management on kotak mahindra group
Working capital management on kotak mahindra groupWorking capital management on kotak mahindra group
Working capital management on kotak mahindra group
 
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...
Multi-objective IT Project Selection Model for Improving SME Strategy Deploym...
 
ch04.ppt
ch04.pptch04.ppt
ch04.ppt
 
Corporate Finance Essay
Corporate Finance EssayCorporate Finance Essay
Corporate Finance Essay
 
Russian business incubator program _ prospect development and strategic plan ...
Russian business incubator program _ prospect development and strategic plan ...Russian business incubator program _ prospect development and strategic plan ...
Russian business incubator program _ prospect development and strategic plan ...
 
The Retail Store Where convenience, quali.docx
The Retail Store  Where convenience, quali.docxThe Retail Store  Where convenience, quali.docx
The Retail Store Where convenience, quali.docx
 
document-part- (9).doc
document-part- (9).docdocument-part- (9).doc
document-part- (9).doc
 
Strategic Management Essay
Strategic Management EssayStrategic Management Essay
Strategic Management Essay
 
Risk Management Process
Risk Management ProcessRisk Management Process
Risk Management Process
 
Project management-office-models-a-review 2016-procedia-computer-science
Project management-office-models-a-review 2016-procedia-computer-scienceProject management-office-models-a-review 2016-procedia-computer-science
Project management-office-models-a-review 2016-procedia-computer-science
 
How to Increase the Value of the PMMMs as a Business-oriented Framework
How to Increase the Value of the PMMMs as a Business-oriented FrameworkHow to Increase the Value of the PMMMs as a Business-oriented Framework
How to Increase the Value of the PMMMs as a Business-oriented Framework
 
Project integration management
Project integration managementProject integration management
Project integration management
 
Measure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio SelectionMeasure What Matters - New Perspectives on Portfolio Selection
Measure What Matters - New Perspectives on Portfolio Selection
 

Recently uploaded

Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
MuhammadJazib15
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
Atif Razi
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
paraasingh12 #V08
 
Digital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes completeDigital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes complete
shubhamsaraswat8740
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
OKORIE1
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
wafawafa52
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Beckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview PresentationBeckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview Presentation
VanTuDuong1
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
Pallavi Sharma
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
pvpriya2
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Massimo Talia
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
Seetal Daas
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
Lubi Valves
 

Recently uploaded (20)

Impartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 StandardImpartiality as per ISO /IEC 17025:2017 Standard
Impartiality as per ISO /IEC 17025:2017 Standard
 
Applications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdfApplications of artificial Intelligence in Mechanical Engineering.pdf
Applications of artificial Intelligence in Mechanical Engineering.pdf
 
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls ChennaiCall Girls Chennai +91-8824825030 Vip Call Girls Chennai
Call Girls Chennai +91-8824825030 Vip Call Girls Chennai
 
Digital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes completeDigital Image Processing Unit -2 Notes complete
Digital Image Processing Unit -2 Notes complete
 
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
DESIGN AND MANUFACTURE OF CEILING BOARD USING SAWDUST AND WASTE CARTON MATERI...
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
Ericsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.pptEricsson LTE Throughput Troubleshooting Techniques.ppt
Ericsson LTE Throughput Troubleshooting Techniques.ppt
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Beckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview PresentationBeckhoff Programmable Logic Control Overview Presentation
Beckhoff Programmable Logic Control Overview Presentation
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdfSELENIUM CONF -PALLAVI SHARMA - 2024.pdf
SELENIUM CONF -PALLAVI SHARMA - 2024.pdf
 
Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...Determination of Equivalent Circuit parameters and performance characteristic...
Determination of Equivalent Circuit parameters and performance characteristic...
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
Assistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdfAssistant Engineer (Chemical) Interview Questions.pdf
Assistant Engineer (Chemical) Interview Questions.pdf
 
Butterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdfButterfly Valves Manufacturer (LBF Series).pdf
Butterfly Valves Manufacturer (LBF Series).pdf
 

CE15 Report Part 2.pptx

  • 2. 8-1 REDUCING TIME AND COST The activity time for project constructions are normally estimated for some given level of resources. Project construction time is influenced by the following: 1. To avoid penalties for not completing the project on time 2. .To take advantage of monetary incentives for completing the project on or before the target. 3. To free the resources such as money, equipment and men for use on other projects. 4. Reduce indirect costs associated with project such as :
  • 3. A fourth key aspect is the process by which decisions are made in these areas. So a fourth key area is: . 1. Decision-making techniques (Chapters 10 and 11)
  • 4. 1.3 Strategic management Chapter 2 aims to explain the role of corporate strategic management within the construction industry. It traces the evolution of strategic management thinking through succeeding schools of thought from the 1960s to the present day. The chapter thus presents a comprehensive overview of strategic management theory and practice.
  • 5. Chapter 3 is specifically concerned with strategic management systems or the ways in which strategy is developed within organizations. Three pure systems, strategic planning, strategic vision and strategic learning, are shown to be points on a continuum of strategic decision-making.
  • 6. 1.4 Managing People Three key aspects of managing people in this industry are dealt with in the next three chapters. Industrial relations legislation and trades union power have always been undermined in the construction industry by the widespread use of labour only subcontracting. Chapter 4 argues that the formal industrial relations systems have had to be adapted to the unique construction environment but still have a contribution to make in protecting workers, establishing minimum pay levels and representing the industry at government level.
  • 7. The crucial aspect of health and safety of construction people is addressed in Chapter 5. It is argued that safety issues do not just start once site activities commence but that designers have a duty to design for safe production. An understanding of the health and safety regulations is seen as a minimum requirement, which must be translated into safety policies, attitudes and activities by senior management. 6 Construction Management in Practice.
  • 8. Obtaining and developing people for construction firms is the subject of Chapter 6. The mapping and matching of a company's human resources to its strategic plans is a vital role for senior management. A formal system for inducting, developing and training people at all levels is a key part of a company's human relation's strategy. The creation of a genuine learning organization is still an aspiration for most construction firms but a process is presented whereby it may be achieved.
  • 9. 1.4 Managing Money Chapter 7 deals with the financing of business units. As stated earlier the construction industry is a large project-based industry of small firms; this has implications for the types of business units which exist and for the sources of capital which operate. Short-term capital requirements are particularly important to contractors. The capital structure of the firm is clearly a strategic decision which senior management must determine.
  • 10. Monitoring and managing finance is the subject of Chapter 8. Often survival is the motivation for the close monitoring of costs and revenues seen in the construction industry. Clients, consultants and contractors have a joint interest in ensuring that project costs are monitored and controlled and this is dealt with in some depth. A more strategic issue is investment appraisal for projects and a number of techniques is reviewed.
  • 11. Chapter 9 is concerned with financial performance. In particular, decisions about bidding and risk are key strategic decisions in an industry in which the majority of projects are still let in competition for both professional and contracting firms. Financial reporting is a legal requirement for companies and the understanding and interpreting of financial reports and accounts is discussed.
  • 12. 1.6 Decision-making techniques These chapters give quantitative support to the chapters on strategic management and, particularly, to the chapters on financial management. Such is the scope of the book. Each chapter starts with an overview of the content of the chapter and concludes with a summary of the main Construction Management in Practice 7 Civildatas.blogspot.in ideas together with relevant questions for consideration and suggestions for further reading.
  • 13. Thank you for listening! - Santoyo, Jullie Anne R.