CCTV Headquarters
Architect: Rem Koolhaas
  Model by: Etienne Ma
    TA: Julia Barber
CCTV HQ
BACKGROUND

Description:
Located in Beijing, Koolhaas’s China Central Television (CCTV) Headquarters Building is 44 storeys tall, measuring 234m and 194m in height.
The building is in a deconstructivist style, and its most distinctive feature is its hollow center and irregular tube-like structure, which is
created by having two towers connected at a 90 degree angle at both the top and bottom to form one continuous loop. The building is
connected above the 37th floor and below the 10th floor. The gross floor area of the building is 540,000 meters squared.

On the surface of the building, there is a network of latticework that provides the main support for the structure, with areas of denser
diagonal grid patterns indicating the greater the support. Some of the challenges of constructing this building included its location in a
seismic zone, as well as the necessity of constructing it as three separate buildings before joining them in May 2007.

Beijing residents have nicknamed the building “giant shorts.”




History:
The CCTV Headquarters was commissioned to be unveiled prior to the 2008 Beijing Olympics. The Office for Metropolitan Architecture
won the contract to construct the CCTV Headquarters, and the architects behind the design were Rem Koolhaas and Ole Scheeren of OMA.
The Headquarters houses the administrative functions of the CCTV along with news, broadcasting, studios, and
productions, and is also part of a larger plan to expand the capacities of the CCTV from 13 to 200 channels.

In 2009, a fire ignited by fireworks on the day of the Lantern Festival (9th February, 2009), caused a building adjacent to the CCTV Headquarters,
the Television Cultural Center, to catch on fire. According to government reports, the landmark building was undamaged.
CCTV HQ
IMAGES
CCTV HQ
MODEL MAKING
Initial Proposal:
I intend on building a scaled model of Koolhaas’s CCTV Headquarters by laser cutting sheets of acrylic and potentially securing them
together via a system of interlocking teeth. I will also laser cut the criss-cross latticework that is on the building onto the sheets of acrylic
to accurately emulate the appearance of Koolhaas’s building.

This will entail first determining the appropriate dimensions and angles of the building’s contours, then constructing that digitally via Adobe
Illustrator and/or Google SketchUp. This will be followed by a period of experimentation with the laser cutter and acrylic material in order to
determine a method of fixation that will adequately provide the structural support necessary for the model to stand upright.


Adjustments to Proposal:
While the early-stage planning of the model remained the same, I
realized that having interlocking sheets of acrylic would expose the
edges of the building in an aesthetically unpleasing way, as well as
pose some structural difficulties for myself as a first-time model
maker.

I entertained the idea of using a CNC machine to carve the entire
model out of a single wood block, but due to limitations to Brown’s
CNC machine, the model would have been limited to less than 7
inches in height; I would also have needed to basically move the
model as it was being carved in order to get the shape I desired.

I then thought of having a system of vertical supports across which
each floor of the CCTV HQ would be shown, with each floor being
carved out of individual layers of masonite. The building would then
be covered in a sheet of tracing paper with etched-on lattice-work,
exposing the interior of the building. However, the complexity of
the design, as well as the over 100 separate pieces necessary for the
construction posed a significant challenge, and I opted to go for a
separate approach.
CCTV HQ
MODEL MAKING
Final Proposal:
Materials:
- Two sheets of 2-ply museum board
- Spray adhesive
- Construction glue

Process:
- First construct a 3D digital model using Google Sketchup
- Deconstruct the planes of the model and import them into Adobe Illustrator as vectors
- Add lattice-work onto vectors
- Determine system of connecting/folding sheets to minimize the number of cuts necessary and maximize the support provided by the folds.


Process:
                                             Initial sketch




                                           Google SketchUp
                                              Rendings
CCTV HQ
MODEL MAKING
Process:

                     A
                                       D
Individual Planes                                   G
                                                                J
                                                                            M
                                                            I

                                                                        L



                                                        H
                                                                    K
                          B


                                            E   F
                               C                                                N




             Fitting the pieces together,
                  adding tabs for glue
CCTV HQ
MODEL MAKING
Process:




      Adding lattice-work, demarcating
        where the laser-cutter should cut
CCTV HQ
MODEL MAKING
Process:

Laser cutter
  in action




Practice models
     1&2




                  Laser-cut
                  lattice-work
CCTV HQ
MODEL MAKING
Process:




   Final model
CCTV HQ
REFLECTIONS

The Importance of Planning and Protyping:
I spent more time researching, conceptualizing, and prototyping for my model than actually building it. Because I had so thoroughly explored
the various manners by which I could construct the model and also went through more than 3 prototypes to determine the optimal way to
build the model, when it finally came time to the building of the actual model, there were relatively few hiccups during the process. Putting
in the time ahead of building it, as opposed to rushing head-on into the building process, is what I would attribute the relative success of my
CCTV model.


The Role of Technology:
I was astounded by the detail and precision that readily-available technology can provide. The power afforded by software like Google
SketchUp, Adobe Illustrator gave me a way to create a model that fit together perfectly. It helped that I had access to a laser-cutter that could
carve out the pieces in the exact dimensions specified by my Illustrator files.


Concerns:
During the building process, I was always concerned that my initial Google Sketchup model was wrong, given the fact that every single part
of my project was derived from those plans. I was also concerned about the structure itself, and whether it could support itself - or topple
over, given the size of the overhang joining the roofs of the two towers. Luckily, it didn’t.


Final Thoughts
While it was a lot of work and could be incredibly frustrating at times, I had a lot of fun building this model, especially coming from a
background of English and Political Science, where writing papers is the norm. It was gratifying to put in an effort to actually create something
tangible and ‘make something’, and during the process I was able to appreciate, to some extent, the process that architects undergo when
designing a building.
CCTV HQ
BIBLIOGRAPHY

  • Wikipedia - China Central Television Headquarters:
  	      http://en.wikipedia.org/wiki/China_Central_Television_Headquarters
  • Arup (Engineering firm behind the construction)–
  	      Overview:
  	      http://www.arup.com/Projects/China_Central_Television_Headquarters.aspx
  	      How to Build a ‘Loopscraper’:
  	      http://archidose.blogspot.com/2005/10/how-to-build-loopscraper.html
  	      Services Engineering Design:
  	      http://www.formpig.com/pdf/formpig_ARUP%20cctv_koolhaas2.pdf
  •Peter Bach – CCTV Building, A Structural Design Overview:
  	      http://www.slideshare.net/peterbach/cctv-building-a-structural-design-overview
  •Structurae Overview:
  	      http://en.structurae.de/structures/data/index.cfm?id=s0013674
  •ArchINFORM Overview:
  	      http://eng.archinform.net/projekte/19629.htm
  •ArchSpace:
  	      http://www.arcspace.com/architects/koolhaas/chinese_television/
  •Emporis Overview:
  	      http://www.emporis.com/building/cctvheadquarters-beijing-china
  •The Guardian:
  	      http://www.guardian.co.uk/artanddesign/2011/oct/09/rem-koolhaas-oma-progress-barbican
CCTV Headquarters
Architect: Rem Koolhaas
  Model by: Etienne Ma
    TA: Julia Barber

More Related Content

What's hot

Deconstructivism
DeconstructivismDeconstructivism
Deconstructivismanjali s
 
barcelona pavilion
barcelona pavilionbarcelona pavilion
barcelona pavilionZubda Sajda
 
Ludwig Meis Van Der Rohe
Ludwig Meis Van Der RoheLudwig Meis Van Der Rohe
Ludwig Meis Van Der RoheMayur Bhagat
 
Church of light- A Case study
Church of light-  A Case studyChurch of light-  A Case study
Church of light- A Case studyDhanya Pravin
 
Chicago School of Architecture
Chicago School of ArchitectureChicago School of Architecture
Chicago School of ArchitectureAndhra University
 
Brutalist architecture
Brutalist architectureBrutalist architecture
Brutalist architectureNehal Gherwada
 
Robie House and Bradley House by Sir F.L.Wright
Robie House and Bradley House by Sir F.L.WrightRobie House and Bradley House by Sir F.L.Wright
Robie House and Bradley House by Sir F.L.WrightViv S
 
Cubism & le corbusier
Cubism & le corbusier Cubism & le corbusier
Cubism & le corbusier poojayadav3276
 
Oscar niemeyer - Design philosophies and projects
Oscar niemeyer - Design philosophies and projectsOscar niemeyer - Design philosophies and projects
Oscar niemeyer - Design philosophies and projectsBimenpreet Kaur
 

What's hot (20)

Rem koolhas
Rem koolhasRem koolhas
Rem koolhas
 
Deconstructivism
DeconstructivismDeconstructivism
Deconstructivism
 
Santiago calatrava
Santiago calatravaSantiago calatrava
Santiago calatrava
 
Robert Venturi
Robert Venturi Robert Venturi
Robert Venturi
 
Zaha hadid
Zaha hadidZaha hadid
Zaha hadid
 
barcelona pavilion
barcelona pavilionbarcelona pavilion
barcelona pavilion
 
Ludwig Meis Van Der Rohe
Ludwig Meis Van Der RoheLudwig Meis Van Der Rohe
Ludwig Meis Van Der Rohe
 
Church of light- A Case study
Church of light-  A Case studyChurch of light-  A Case study
Church of light- A Case study
 
Chicago School of Architecture
Chicago School of ArchitectureChicago School of Architecture
Chicago School of Architecture
 
Mies van der rohe
Mies van der roheMies van der rohe
Mies van der rohe
 
The Gherkin
The GherkinThe Gherkin
The Gherkin
 
Architect Santiago
Architect SantiagoArchitect Santiago
Architect Santiago
 
Michael graves
Michael gravesMichael graves
Michael graves
 
Brutalist architecture
Brutalist architectureBrutalist architecture
Brutalist architecture
 
Robie House and Bradley House by Sir F.L.Wright
Robie House and Bradley House by Sir F.L.WrightRobie House and Bradley House by Sir F.L.Wright
Robie House and Bradley House by Sir F.L.Wright
 
Rem koolhass
Rem  koolhassRem  koolhass
Rem koolhass
 
Tadao ando
Tadao andoTadao ando
Tadao ando
 
Architectural Concept
Architectural Concept Architectural Concept
Architectural Concept
 
Cubism & le corbusier
Cubism & le corbusier Cubism & le corbusier
Cubism & le corbusier
 
Oscar niemeyer - Design philosophies and projects
Oscar niemeyer - Design philosophies and projectsOscar niemeyer - Design philosophies and projects
Oscar niemeyer - Design philosophies and projects
 

Similar to CCTV HQ Model Building Process

Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2Christian Munoz
 
Case Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and ModellingCase Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and ModellingBDS VirCon
 
Ck21 presentation team 2
Ck21 presentation team 2Ck21 presentation team 2
Ck21 presentation team 2Campus
 
Team 2 mep presentation
Team 2  mep presentationTeam 2  mep presentation
Team 2 mep presentationCampus
 
Trusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationTrusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationClearEdge3D Inc
 
Digital fabrication solutions
Digital fabrication solutionsDigital fabrication solutions
Digital fabrication solutionsJaekyung Lee
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014Graham H Stewart
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahem Naeem
 
Lyon.Michael-Samples
Lyon.Michael-SamplesLyon.Michael-Samples
Lyon.Michael-SamplesMichael Lyon
 
The Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationThe Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationBrij Consulting, LLC
 
Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015Jim Mercer
 
Essential Autodesk Revit Plumbing Courses
Essential Autodesk Revit Plumbing CoursesEssential Autodesk Revit Plumbing Courses
Essential Autodesk Revit Plumbing CoursesNI BT
 
06Class_Presentation_AS463561.pdf
06Class_Presentation_AS463561.pdf06Class_Presentation_AS463561.pdf
06Class_Presentation_AS463561.pdfssusere16b3b
 
The Remote Build V1 Planning a Theoretical Production
The Remote Build V1 Planning a Theoretical ProductionThe Remote Build V1 Planning a Theoretical Production
The Remote Build V1 Planning a Theoretical ProductionBrij Consulting, LLC
 
DevOps Gathering - How Containerized Pipelines Can Boost Your CI/CD
DevOps Gathering - How Containerized Pipelines Can Boost Your CI/CDDevOps Gathering - How Containerized Pipelines Can Boost Your CI/CD
DevOps Gathering - How Containerized Pipelines Can Boost Your CI/CDNico Meisenzahl
 
Marcin Klocek - Architecture + BIM portfolio.pdf
Marcin Klocek - Architecture + BIM portfolio.pdfMarcin Klocek - Architecture + BIM portfolio.pdf
Marcin Klocek - Architecture + BIM portfolio.pdfMarcin Klocek
 
SeeSite Company Profile - Exteriors renders 2011
SeeSite Company Profile - Exteriors renders 2011 SeeSite Company Profile - Exteriors renders 2011
SeeSite Company Profile - Exteriors renders 2011 sandyseesite
 

Similar to CCTV HQ Model Building Process (20)

Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2Citation- Enchanted Storybrook Castle2
Citation- Enchanted Storybrook Castle2
 
Case Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and ModellingCase Study of BIM, Detailing and Modelling
Case Study of BIM, Detailing and Modelling
 
Ck21 presentation team 2
Ck21 presentation team 2Ck21 presentation team 2
Ck21 presentation team 2
 
Team 2 mep presentation
Team 2  mep presentationTeam 2  mep presentation
Team 2 mep presentation
 
Trusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project CoordinationTrusted BIM: Accurate As-Builts for Project Coordination
Trusted BIM: Accurate As-Builts for Project Coordination
 
Digital fabrication solutions
Digital fabrication solutionsDigital fabrication solutions
Digital fabrication solutions
 
Chapter 1.pptx
Chapter 1.pptxChapter 1.pptx
Chapter 1.pptx
 
BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014BuildingSmart COBie presentation March 2014
BuildingSmart COBie presentation March 2014
 
Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio Ibrahim Naeem BIM Projects Portfolio
Ibrahim Naeem BIM Projects Portfolio
 
Lyon.Michael-Samples
Lyon.Michael-SamplesLyon.Michael-Samples
Lyon.Michael-Samples
 
The Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit AssimilationThe Remote Build V2 Ark Conduit Assimilation
The Remote Build V2 Ark Conduit Assimilation
 
Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015Ken Neyer Plumbing Case Study_June 2015
Ken Neyer Plumbing Case Study_June 2015
 
Essential Autodesk Revit Plumbing Courses
Essential Autodesk Revit Plumbing CoursesEssential Autodesk Revit Plumbing Courses
Essential Autodesk Revit Plumbing Courses
 
internship ppt.pptx
internship ppt.pptxinternship ppt.pptx
internship ppt.pptx
 
06Class_Presentation_AS463561.pdf
06Class_Presentation_AS463561.pdf06Class_Presentation_AS463561.pdf
06Class_Presentation_AS463561.pdf
 
The Remote Build V1 Planning a Theoretical Production
The Remote Build V1 Planning a Theoretical ProductionThe Remote Build V1 Planning a Theoretical Production
The Remote Build V1 Planning a Theoretical Production
 
DevOps Gathering - How Containerized Pipelines Can Boost Your CI/CD
DevOps Gathering - How Containerized Pipelines Can Boost Your CI/CDDevOps Gathering - How Containerized Pipelines Can Boost Your CI/CD
DevOps Gathering - How Containerized Pipelines Can Boost Your CI/CD
 
Marcin Klocek - Architecture + BIM portfolio.pdf
Marcin Klocek - Architecture + BIM portfolio.pdfMarcin Klocek - Architecture + BIM portfolio.pdf
Marcin Klocek - Architecture + BIM portfolio.pdf
 
SeeSite Company Profile - Exteriors renders 2011
SeeSite Company Profile - Exteriors renders 2011 SeeSite Company Profile - Exteriors renders 2011
SeeSite Company Profile - Exteriors renders 2011
 
Kook_ Portfolio_Rev 01
Kook_ Portfolio_Rev 01Kook_ Portfolio_Rev 01
Kook_ Portfolio_Rev 01
 

More from etiennema

Converse Festival Signs
Converse Festival SignsConverse Festival Signs
Converse Festival Signsetiennema
 
Luan dun july 2011
Luan dun   july 2011Luan dun   july 2011
Luan dun july 2011etiennema
 
Braincandy W+K
Braincandy W+KBraincandy W+K
Braincandy W+Ketiennema
 

More from etiennema (6)

Converse Festival Signs
Converse Festival SignsConverse Festival Signs
Converse Festival Signs
 
Luan dun july 2011
Luan dun   july 2011Luan dun   july 2011
Luan dun july 2011
 
Braincandy W+K
Braincandy W+KBraincandy W+K
Braincandy W+K
 
Bca photos
Bca photosBca photos
Bca photos
 
Wbru photos
Wbru photosWbru photos
Wbru photos
 
JCA Photos
JCA PhotosJCA Photos
JCA Photos
 

Recently uploaded

Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahimamgadibrahim92
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样yhavx
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...Amil baba
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...nirzagarg
 
cholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdfcholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdfRawalRafiqLeghari
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Websitemark11275
 
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Nitya salvi
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...gajnagarg
 
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...HyderabadDolls
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherrymeghakumariji156
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Nitya salvi
 
TRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxTRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxtrose8
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...gajnagarg
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationZenSeloveres
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证ehyxf
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKMarekMitek1
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...nirzagarg
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfamanda2495
 

Recently uploaded (20)

Gamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad IbrahimGamestore case study UI UX by Amgad Ibrahim
Gamestore case study UI UX by Amgad Ibrahim
 
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
一比一原版(ANU毕业证书)澳大利亚国立大学毕业证原件一模一样
 
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
NO1 Top Pakistani Amil Baba Real Amil baba In Pakistan Najoomi Baba in Pakist...
 
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
Top profile Call Girls In Mau [ 7014168258 ] Call Me For Genuine Models We ar...
 
cholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdfcholilithiasis, cholecystitis,gall bladdder .pdf
cholilithiasis, cholecystitis,gall bladdder .pdf
 
Hackathon evaluation template_latest_uploadpdf
Hackathon evaluation template_latest_uploadpdfHackathon evaluation template_latest_uploadpdf
Hackathon evaluation template_latest_uploadpdf
 
How to Build a Simple Shopify Website
How to Build a Simple Shopify WebsiteHow to Build a Simple Shopify Website
How to Build a Simple Shopify Website
 
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
Just Call Vip call girls Kasganj Escorts ☎️8617370543 Two shot with one girl ...
 
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Meerut [ 7014168258 ] Call Me For Genuine Models We...
 
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
Nishatganj ? Book Call Girls in Lucknow | Book 9548273370 Extreme Naughty Cal...
 
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime PondicherryPondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
Pondicherry Escorts Service Girl ^ 9332606886, WhatsApp Anytime Pondicherry
 
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
Call Girls In Ratnagiri Escorts ☎️8617370543 🔝 💃 Enjoy 24/7 Escort Service En...
 
TRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptxTRose UXPA Experience Design Concord .pptx
TRose UXPA Experience Design Concord .pptx
 
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman MuscatAbortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
Abortion Pills in Oman (+918133066128) Cytotec clinic buy Oman Muscat
 
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
Top profile Call Girls In eluru [ 7014168258 ] Call Me For Genuine Models We ...
 
Q4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentationQ4-W4-SCIENCE-5 power point presentation
Q4-W4-SCIENCE-5 power point presentation
 
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
怎样办理莫纳什大学毕业证(Monash毕业证书)成绩单留信认证
 
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEKLANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
LANDSCAPE ARCHITECTURE PORTFOLIO - MAREK MITACEK
 
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
Top profile Call Girls In Sonipat [ 7014168258 ] Call Me For Genuine Models W...
 
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdfJordan_Amanda_DMBS202404_PB1_2024-04.pdf
Jordan_Amanda_DMBS202404_PB1_2024-04.pdf
 

CCTV HQ Model Building Process

  • 1. CCTV Headquarters Architect: Rem Koolhaas Model by: Etienne Ma TA: Julia Barber
  • 2. CCTV HQ BACKGROUND Description: Located in Beijing, Koolhaas’s China Central Television (CCTV) Headquarters Building is 44 storeys tall, measuring 234m and 194m in height. The building is in a deconstructivist style, and its most distinctive feature is its hollow center and irregular tube-like structure, which is created by having two towers connected at a 90 degree angle at both the top and bottom to form one continuous loop. The building is connected above the 37th floor and below the 10th floor. The gross floor area of the building is 540,000 meters squared. On the surface of the building, there is a network of latticework that provides the main support for the structure, with areas of denser diagonal grid patterns indicating the greater the support. Some of the challenges of constructing this building included its location in a seismic zone, as well as the necessity of constructing it as three separate buildings before joining them in May 2007. Beijing residents have nicknamed the building “giant shorts.” History: The CCTV Headquarters was commissioned to be unveiled prior to the 2008 Beijing Olympics. The Office for Metropolitan Architecture won the contract to construct the CCTV Headquarters, and the architects behind the design were Rem Koolhaas and Ole Scheeren of OMA. The Headquarters houses the administrative functions of the CCTV along with news, broadcasting, studios, and productions, and is also part of a larger plan to expand the capacities of the CCTV from 13 to 200 channels. In 2009, a fire ignited by fireworks on the day of the Lantern Festival (9th February, 2009), caused a building adjacent to the CCTV Headquarters, the Television Cultural Center, to catch on fire. According to government reports, the landmark building was undamaged.
  • 4. CCTV HQ MODEL MAKING Initial Proposal: I intend on building a scaled model of Koolhaas’s CCTV Headquarters by laser cutting sheets of acrylic and potentially securing them together via a system of interlocking teeth. I will also laser cut the criss-cross latticework that is on the building onto the sheets of acrylic to accurately emulate the appearance of Koolhaas’s building. This will entail first determining the appropriate dimensions and angles of the building’s contours, then constructing that digitally via Adobe Illustrator and/or Google SketchUp. This will be followed by a period of experimentation with the laser cutter and acrylic material in order to determine a method of fixation that will adequately provide the structural support necessary for the model to stand upright. Adjustments to Proposal: While the early-stage planning of the model remained the same, I realized that having interlocking sheets of acrylic would expose the edges of the building in an aesthetically unpleasing way, as well as pose some structural difficulties for myself as a first-time model maker. I entertained the idea of using a CNC machine to carve the entire model out of a single wood block, but due to limitations to Brown’s CNC machine, the model would have been limited to less than 7 inches in height; I would also have needed to basically move the model as it was being carved in order to get the shape I desired. I then thought of having a system of vertical supports across which each floor of the CCTV HQ would be shown, with each floor being carved out of individual layers of masonite. The building would then be covered in a sheet of tracing paper with etched-on lattice-work, exposing the interior of the building. However, the complexity of the design, as well as the over 100 separate pieces necessary for the construction posed a significant challenge, and I opted to go for a separate approach.
  • 5. CCTV HQ MODEL MAKING Final Proposal: Materials: - Two sheets of 2-ply museum board - Spray adhesive - Construction glue Process: - First construct a 3D digital model using Google Sketchup - Deconstruct the planes of the model and import them into Adobe Illustrator as vectors - Add lattice-work onto vectors - Determine system of connecting/folding sheets to minimize the number of cuts necessary and maximize the support provided by the folds. Process: Initial sketch Google SketchUp Rendings
  • 6. CCTV HQ MODEL MAKING Process: A D Individual Planes G J M I L H K B E F C N Fitting the pieces together, adding tabs for glue
  • 7. CCTV HQ MODEL MAKING Process: Adding lattice-work, demarcating where the laser-cutter should cut
  • 8. CCTV HQ MODEL MAKING Process: Laser cutter in action Practice models 1&2 Laser-cut lattice-work
  • 10. CCTV HQ REFLECTIONS The Importance of Planning and Protyping: I spent more time researching, conceptualizing, and prototyping for my model than actually building it. Because I had so thoroughly explored the various manners by which I could construct the model and also went through more than 3 prototypes to determine the optimal way to build the model, when it finally came time to the building of the actual model, there were relatively few hiccups during the process. Putting in the time ahead of building it, as opposed to rushing head-on into the building process, is what I would attribute the relative success of my CCTV model. The Role of Technology: I was astounded by the detail and precision that readily-available technology can provide. The power afforded by software like Google SketchUp, Adobe Illustrator gave me a way to create a model that fit together perfectly. It helped that I had access to a laser-cutter that could carve out the pieces in the exact dimensions specified by my Illustrator files. Concerns: During the building process, I was always concerned that my initial Google Sketchup model was wrong, given the fact that every single part of my project was derived from those plans. I was also concerned about the structure itself, and whether it could support itself - or topple over, given the size of the overhang joining the roofs of the two towers. Luckily, it didn’t. Final Thoughts While it was a lot of work and could be incredibly frustrating at times, I had a lot of fun building this model, especially coming from a background of English and Political Science, where writing papers is the norm. It was gratifying to put in an effort to actually create something tangible and ‘make something’, and during the process I was able to appreciate, to some extent, the process that architects undergo when designing a building.
  • 11. CCTV HQ BIBLIOGRAPHY • Wikipedia - China Central Television Headquarters: http://en.wikipedia.org/wiki/China_Central_Television_Headquarters • Arup (Engineering firm behind the construction)– Overview: http://www.arup.com/Projects/China_Central_Television_Headquarters.aspx How to Build a ‘Loopscraper’: http://archidose.blogspot.com/2005/10/how-to-build-loopscraper.html Services Engineering Design: http://www.formpig.com/pdf/formpig_ARUP%20cctv_koolhaas2.pdf •Peter Bach – CCTV Building, A Structural Design Overview: http://www.slideshare.net/peterbach/cctv-building-a-structural-design-overview •Structurae Overview: http://en.structurae.de/structures/data/index.cfm?id=s0013674 •ArchINFORM Overview: http://eng.archinform.net/projekte/19629.htm •ArchSpace: http://www.arcspace.com/architects/koolhaas/chinese_television/ •Emporis Overview: http://www.emporis.com/building/cctvheadquarters-beijing-china •The Guardian: http://www.guardian.co.uk/artanddesign/2011/oct/09/rem-koolhaas-oma-progress-barbican