http://withworks.solutions
For the freeform building facade construction, we provide several solution for design development, manufacturing, and construction. With our solution, you can get the quite good quality of freeform metal/GFRC/UHPC/Curtain wall facade.
10. 10
Chunghwa Arts University
KEPCO NEW HEADQUATER in Kimcheon Magog Plant Cultural Center in Seoul
50th Anniversary Sculpture at KIST CJ Nine Bridge Pavalion in Jeju
WITHWORKS PROJECTS
23. 23
Applying Digital Fabrication SolutionOn-site production method
Tri bowl, Songdo
Lotte Tower, Lobby
1.2 Why we need Digital Fabrication Solution
1. WHAT IS DIGITAL FABRICATION SOLUTION?
25. 25
Digital Design
Digital Manufacturing
Construction & Management
Fabrication Engineering &
Construction Document
• Generating form(Rhino,
3D MAX, MAYA,…)
• Automated production
design with CATIA
• Factory manufacturing
• with CNC machine
• Reverse Engineering System
• Assembly on-site
2. PROCESS OF DIGITAL FABRICATION
DesigningConstruction
33. 33
3.1 Automated production design with CATIA
Standard Modeling
Automated designing Template
3D Modeling for production Exploded drawing for CNC Machine
(T-BAR, Panel)
Construction quality can be ensured by assembling all elements with bolted joint.
Through the CATIA automated designing system, increase precision and productivity
3. DIGITAL FABRICATION SOLUTIONS
35. 35
Using the CNC Laser Cutting method
Can be used for interior and exterior of freeform building
국립생태원 생태체험관
3.2 CNC T-BAR SYSTEM
3. DIGITAL FABRICATION SOLUTIONS CNC T-BAR SYSTEM
36. 36
Accurate freeform shapes can be produced if the cross section is arranged at regular intervals
in the UV direction.
CNC cutting
▣ Principles of CNC T-BAR SYSTEM
3. DIGITAL FABRICATION SOLUTIONS CNC T-BAR SYSTEM
37. 37
3D
modeling
2D G-
Code
CNC Laser Cutting
& Welding
Assemble
▣ Manufacturing Process of CNC T-BAR SYSTEM
3. DIGITAL FABRICATION SOLUTIONS CNC T-BAR SYSTEM
38. 38
▣ Project with CNC T-BAR SYSTEM
ECORIUM River Culture Pavilion
Suwon Gymnasium
MBC HEAD OFFICE IN SANGAM
Open-air Theater at Seoul National University Lotte world
Tower Podium
3. DIGITAL FABRICATION SOLUTIONS CNC T-BAR SYSTEM
39. 39
3.3 CNC TWIST TUBE SYSTEM
Secondary system with high structural performance.
Can be used as primary steel structure.
First applied to the River Culture Pavilion in Korea.
Can be applied to non-linear curtain walls that can not
be implemented with the grid shell system.
River Culture Pavilion
3. DIGITAL FABRICATION SOLUTIONS CNC T-BAR SYSTEM
Opera House in Busan, 2019
41. 41
▣ Project with CNC TWISTED TUBE SYSTEM
MBC HEAD OFFICE IN SANGAM
River Culture Pavilion
3. DIGITAL FABRICATION SOLUTIONS CNC TWISTED TUBE SYSTEM
42. 42
3. DIGITAL FABRICATION SOLUTIONS
3.4 3D CURVED OPEN JOINT PANEL SYSTEM
①
②
③
④
⑤⑥
1. 3mm AL. Sheet Panel/ PVDF
2. 3D Point Bracket
3. EPDM Sheet 1.6mm
4. Aqua board
5. Main Steel Pipe 200*100*6T
(or CNC T-BAR)
6. Insulation 55mm (48k)
7. Perforated Acoustic Ceiling Panel
8. Sub Steel Pipe 100*50*3.2T(or CNC T-BAR)
⑦
⑧
①
②
⑧
3D Point Bracket
OPEN JOINT PANEL SYSTEM
44. 44
3. DIGITAL FABRICATION SOLUTIONS
3.7. UNITIZED CLADDING SYSTEM
Developed to construction the Ecorium roof shown below.
Manufactured at the factory and assembled in the field.
Minimizes the errors that can occur in the field work, so the construction quality is excellent and
the construction period can be shortened.
More complex shape, more effective with this method.
River Culture Pavilion
45. 45
비정형 UNIT MODULE WALL 시스템
Manufacturing Process_ ECORIUM
3D modeling CNC laser cutting Part Assembling
Unit Assembing Lifting and Installation Finish
3. DIGITAL FABRICATION SOLUTIONS
46. 46
▣ Project with Unitized Cladding System
MBC HEAD OFFICE IN SANGAM
River Culture Pavilion
비정형 UNIT MODULE WALL 시스템3. DIGITAL FABRICATION SOLUTIONS
47. 47
3.6 3D Laser Scanning & Reverse Engineering
Atypical
section1
Atypical
section2
Cloud Points Government building in Se-jong city
3. DIGITAL FABRICATION SOLUTIONS
50. 50
KEB HANA BANK REMODELING
•Material : UHPC
•Construction Area: about 3,450m2
•Number of Panel : 256 Units
•Construction design(with 3D): 7 month
▣ Architectural Overview
51. 51
[ UHPC Plan] [ UHPC types ]
• UHPC area : 3,450m2
• UHPC amount : 256 UNITS
KEB HANA BANK REMODELING
52. 52
구분
2016 2017
8 9 10 11 12 1 2 3 4
10 20 30 10 20 30 10 20 30 10 20 30 10 20 30 10 20 30 10 20 30 10 20 30 10 20 30
Design
Design confirm / Mock-up
SHOP.DWG / Fabrication BIM
Const
Fab
Steel Reinforcement(256SET)
Bracket etc. (256SET)
EPS & FRP mold (17SET)
UHPC pouring (256EA)
Install Module installation(256EA)
(SHOP.DWG / Fabrication BIM)
(Flat area molds: 13SET) (Corner area molds :4SET)
(UHPC Pouring & Painting)
(Steel Reinforcement)
(Bracket & Miscellaneous)
(UHPC Installation)
ITEM CODE Area Type Height(m) Amount (EA)
A TPYE Flat 4.2m 140 EA
C TPYE Flat 4.4m 28 EA
D TPYE Corner 4.2m 10 EA
F TPYE Corner 4.4m 2 EA
M TPYE Flat 6.2m 36 EA
M’ TPYE Flat 6.2m 36 EA
N TPYE Corner 6.2m 2 EA
N’ TPYE Corner 6.2m 2 EA
TOTAL 256 EA
▣ Design Optimization
KEB HANA BANK REMODELING
53. 53
•1 UNIT size change
•3D mold optimization
•UHPC fixing detail development
•UHPC lifting method development
[Changed design : 2 units ][ Original design : 1 unit ]
▣ Module Optimization
KEB HANA BANK REMODELING
56. 56
3d modeling CNC milling FRP work FRP+steel
CNC 3 axis milling
FRP +Steel connection
▣ FRP type mold fabrication process
KEB HANA BANK REMODELING
57.
58. 58
• UHPC casting, transportation, lifting
and installation condition
• Channel Anchor design and
reinforcement design
channel anchor for lifting
Steel reinforcement
▣ UHPC reinforcement detail
KEB HANA BANK REMODELING
60. 60
•Architect : KPF + Bum Architecture
•Period : 2015.12~2014.7
•Locaiton : Jamsil, Lotte tower, Seoul
•Application method:
CNC T-BAR SYSTEM Z & Open Joint NT Panel
•Material : NT panel
•Construction Area: about 8,200m2
•Construction design(with 3D): 7 month
▣ Architectural Overview
LOTTE WORLD TOWER 3D PODIUM
61. 61
Curbed Section
Optimization modeling is needed to set the range of curved sections and straight
sections. (Considering curved shape, material, construction cost, construction)
▣ Initial Construction Mock-up & Construction Review
LOTTE WORLD TOWER 3D PODIUM
62. 62
Segment
welding
bending
Segment welding or bending
Precision numerical control is not
possible due to error occurrence
sections and straight sections.
(Considering curved shape, material,
construction cost, construction)
LOTTE WORLD TOWER 3D PODIUM
63. 63
CNC T-BAR SYSTEM
In order to precisely install different finishes, needs Vertical and horizontal
cross-sectional Frames.
LOTTE WORLD TOWER 3D PODIUM
65. 65
▣ 3D Fabrication Modeling_CNC T-BAR, Form Plate, Reveal, NT Panel
CNC T-BAR(vertical)
CNC T-
BAR(horizontal)
Form Plate
Reveal
NT Panel
LOTTE WORLD TOWER 3D PODIUM
66. 66
▣ Survey & 3D Scanning
LOTTE WORLD TOWER 3D PODIUM
68. WITHWORKS Contact
ADDRESS No. 1216 Beobwon-ro 11-gil 7, Songpa-gu, Seoul, 05836, Rebublic of Korea
Tel +82-2-417-0782
EMAIL works0217@gmail.com
WEB www.withworks.kr
Editor's Notes
Freeform 3D shape control with CNC Machine(Laser, Router, Plasma,…)
Manufacturing and constructing by precise numerical control (minimization of construction error, securing construction quality)
Currently, it is widely used in aviation, ship, automobile industry, etc.
Freeform 3D shape control with CNC Machine(Laser, Router, Plasma,…)
Manufacturing and constructing by precise numerical control (minimization of construction error, securing construction quality)
Currently, it is widely used in aviation, ship, automobile industry, etc.
Continuous increase of freeform buildings due to innovative design demands and development of digital industrial technology
Switching from on-site construction to factory manufacturing
If this digital fabrication solution is combined with Architectural industry, the new era will open.
This building is made up of two kinds of panels.
Why we need to use UHPC, not GFRC. This panel was visible from the inside, so we need to make it well both inside and outside.
But, GFRC can not be made well inside. So, we use the UHPC for this project.
4m Width 4.2m height(maximum 6.2m), and depth is 1.5m
It was very challenging, because when we lift up at the site, one unit need 4 hanging points, but the unit is no longer symmetrical.
Therefore other problem arise.
Steel reinforcement object : CNC fabricated
The surface quality of the panel is far below our goal.
With that channel anchor we can fix the bolts and fix the other plates.
The panel break when stress is concentrated in one place.