Geth is widely used to interact with Ethereum networks. Ethereum software enables a user to set up a
“private” or “testnet” Ethereum chain. This chain will be totally different from main chain.
Component that tell geth that we want to use/create a private Ethereum Chain:
1. Custom Genesis file
2. Custom Data Directory
3. Custom Network Id
4. Disable Node Discovery
Codepot - Pig i Hive: szybkie wprowadzenie / Pig and Hive crash courseSages
Szybkie wprowadzenie do technologii Pig i Hive z ekosystemu Hadoop. Prezentacja wykonana w ramach warsztatów Codepot w dniu 29.08.2015. Prezentacja wykonana przez Radosława Stankiewicza oraz Bartłomieja Tartanusa.
Webinar: Building Your First App in Node.jsMongoDB
Node.js is one of the fastest growing and most popular application frameworks today. It offers a set of features that is both useful and challenging to modern web and back-end developer. Most engineers think of it as a cool, simple, and fast application framework that makes iterative development easier.
In this webinar we will talk about how Node.js and MongoDB interact, discuss the best ways to get started, and walk through how to use MongoDB and Node.js in a set of use cases.
Geth is widely used to interact with Ethereum networks. Ethereum software enables a user to set up a
“private” or “testnet” Ethereum chain. This chain will be totally different from main chain.
Component that tell geth that we want to use/create a private Ethereum Chain:
1. Custom Genesis file
2. Custom Data Directory
3. Custom Network Id
4. Disable Node Discovery
Codepot - Pig i Hive: szybkie wprowadzenie / Pig and Hive crash courseSages
Szybkie wprowadzenie do technologii Pig i Hive z ekosystemu Hadoop. Prezentacja wykonana w ramach warsztatów Codepot w dniu 29.08.2015. Prezentacja wykonana przez Radosława Stankiewicza oraz Bartłomieja Tartanusa.
Webinar: Building Your First App in Node.jsMongoDB
Node.js is one of the fastest growing and most popular application frameworks today. It offers a set of features that is both useful and challenging to modern web and back-end developer. Most engineers think of it as a cool, simple, and fast application framework that makes iterative development easier.
In this webinar we will talk about how Node.js and MongoDB interact, discuss the best ways to get started, and walk through how to use MongoDB and Node.js in a set of use cases.
MySQL flexible schema and JSON for Internet of ThingsAlexander Rubin
My presentation at Oracle Open World Conference 2017: Using MySQL Flexible Schema (Document Store/JSON) for IoT
Tuesday, Oct 03, 11:30 a.m. - 12:15 p.m. | Marriott Marquis (Yerba Buena Level) - Salon 14
Storing data from sensors (Internet of Things) may be challenging in many respects, specifically due to the changing nature of the data. For example, if you have a fixed table structure and a sensor will need to store new property, it will be hard to make this change. This session discusses different options for implementing flexible schemas with MySQL 5.7 and MySQL 8.0, using JSON and calculated fields as well as the MySQL Document Store feature. It includes a demo with IoT devices where data is stored in MySQL 8.0.
Dask is a task scheduler that seamlessly parallelizes Python functions across threads, processes, or cluster nodes. It also offers a DataFrame class (similar to Pandas) that can handle data sets larger than the available memory.
Robert Pankowecki - Czy sprzedawcy SQLowych baz nas oszukali?SegFaultConf
Wyobraź sobie, że w twojej aplikacji zachodzą jakieś zmiany (domain eventy). Chcielibyśmy te zmiany wystawić na zewnątrz, żebyśmy mogli na ich podstawie robić sobie raporty, read modele, sagi, synchronizować dane. Czy to zadanie okaże się być trudne czy proste, jeśli użyjemy bazy danych SQL. Co zyskaliśmy dzięki temu, że używam RDBMS/SQL a co utraciliśmy, być może, bezpowrotnie. W tej prezentacji opowiem wam jak chciałem zbudować pewną funkcjonalność dla biblioteki Rails Event Store, dlaczego okazało być się to trudniejsze niż myślałem, o modelu MVCC w PostgreSQL, czy jest sposób, żeby go obejść i uzyskać emulację trybu READ UNCOMMITTED. A może możnaby do całego problemu podejśc zupełnie inaczej i podłączyć się pod Write-Ahead-Log (WAL) i wygrać świat w ten sposób? Pokażę też jak moim zdaniem, korzystając z dokładnie tych samych konceptów, które stoją za Event Sourcingiem i bazami danych moglibyśmy budować API, tak bym za każdym razem pisząc integrację z serwisem X nie musiał się zastanawiać czy jego autorzy rozumieją pojęcie idempotent czy nie. Albo jak moglibyśmy osiągnąć prostotę dzięki używaniu Convergent Replicated Data Types (CRDT). Być może jako community stać nas na więcej niż REST nad CRUDem. Zastanowimy się, czy sprzedawcy SQLa zlasowali nam mózgi, sprawili, że zapomnieliśmy o najprostszym sposobie, który może działać i wprowadzili nas w maliny, w których aktualnie się znajdujemy. A może sami jesteśmy sobie winni? TLDR: Czy nasze aplikacje nie mogłyby działać tak jak pod spodem działają bazy danych? Czy to wszystko musi być takie ciężkie i skomplikowane jeśli chcemy mieć mikro-serwisy, zwłaszcza w małym zespole, który niekoniecznie lubi dostawiać 5 bazę danych do stacku technologicznego.
Beyond php it's not (just) about the codeWim Godden
Most PHP developers focus on writing code. But creating Web applications is about much more than just wrting PHP. Take a step outside the PHP cocoon and into the big PHP ecosphere to find out how small code changes can make a world of difference on servers and network. This talk is an eye-opener for developers who spend over 80% of their time coding, debugging and testing.
CakePHP is a nice way of using MVC architecture in you PHP environment. Looking through this presentation you'll get introduced to MVC and get some start up code examples for you to explore.
MySQL flexible schema and JSON for Internet of ThingsAlexander Rubin
My presentation at Oracle Open World Conference 2017: Using MySQL Flexible Schema (Document Store/JSON) for IoT
Tuesday, Oct 03, 11:30 a.m. - 12:15 p.m. | Marriott Marquis (Yerba Buena Level) - Salon 14
Storing data from sensors (Internet of Things) may be challenging in many respects, specifically due to the changing nature of the data. For example, if you have a fixed table structure and a sensor will need to store new property, it will be hard to make this change. This session discusses different options for implementing flexible schemas with MySQL 5.7 and MySQL 8.0, using JSON and calculated fields as well as the MySQL Document Store feature. It includes a demo with IoT devices where data is stored in MySQL 8.0.
Dask is a task scheduler that seamlessly parallelizes Python functions across threads, processes, or cluster nodes. It also offers a DataFrame class (similar to Pandas) that can handle data sets larger than the available memory.
Robert Pankowecki - Czy sprzedawcy SQLowych baz nas oszukali?SegFaultConf
Wyobraź sobie, że w twojej aplikacji zachodzą jakieś zmiany (domain eventy). Chcielibyśmy te zmiany wystawić na zewnątrz, żebyśmy mogli na ich podstawie robić sobie raporty, read modele, sagi, synchronizować dane. Czy to zadanie okaże się być trudne czy proste, jeśli użyjemy bazy danych SQL. Co zyskaliśmy dzięki temu, że używam RDBMS/SQL a co utraciliśmy, być może, bezpowrotnie. W tej prezentacji opowiem wam jak chciałem zbudować pewną funkcjonalność dla biblioteki Rails Event Store, dlaczego okazało być się to trudniejsze niż myślałem, o modelu MVCC w PostgreSQL, czy jest sposób, żeby go obejść i uzyskać emulację trybu READ UNCOMMITTED. A może możnaby do całego problemu podejśc zupełnie inaczej i podłączyć się pod Write-Ahead-Log (WAL) i wygrać świat w ten sposób? Pokażę też jak moim zdaniem, korzystając z dokładnie tych samych konceptów, które stoją za Event Sourcingiem i bazami danych moglibyśmy budować API, tak bym za każdym razem pisząc integrację z serwisem X nie musiał się zastanawiać czy jego autorzy rozumieją pojęcie idempotent czy nie. Albo jak moglibyśmy osiągnąć prostotę dzięki używaniu Convergent Replicated Data Types (CRDT). Być może jako community stać nas na więcej niż REST nad CRUDem. Zastanowimy się, czy sprzedawcy SQLa zlasowali nam mózgi, sprawili, że zapomnieliśmy o najprostszym sposobie, który może działać i wprowadzili nas w maliny, w których aktualnie się znajdujemy. A może sami jesteśmy sobie winni? TLDR: Czy nasze aplikacje nie mogłyby działać tak jak pod spodem działają bazy danych? Czy to wszystko musi być takie ciężkie i skomplikowane jeśli chcemy mieć mikro-serwisy, zwłaszcza w małym zespole, który niekoniecznie lubi dostawiać 5 bazę danych do stacku technologicznego.
Beyond php it's not (just) about the codeWim Godden
Most PHP developers focus on writing code. But creating Web applications is about much more than just wrting PHP. Take a step outside the PHP cocoon and into the big PHP ecosphere to find out how small code changes can make a world of difference on servers and network. This talk is an eye-opener for developers who spend over 80% of their time coding, debugging and testing.
CakePHP is a nice way of using MVC architecture in you PHP environment. Looking through this presentation you'll get introduced to MVC and get some start up code examples for you to explore.
DN 2017 | Reducing pain in data engineering | Martin Loetzsch | Project ADataconomy Media
Making the data of a company accessible to analysts, business users and data scientists can be a quite painful endeavor. In the past 5 years, Project A has supported many of its portfolio companies with building data infrastructures and we experienced many of these pains first-hand. This talk shows how some of these pains can be overcome by applying common sense and standard software engineering best practices.
Scylla Summit 2018: From SAP to Scylla - Tracking the Fleet at GPS InsightScyllaDB
Originally using SAP Adaptive Server Enterprise (ASE), the GPS Insight team soon found that relational databases simply aren’t a match for high volume machine data. To top it off, SAP ASE’s clustering technology proved cumbersome to manage and operate. In this presentation, you’ll learn about GPS Insight’s hybrid Scylla deployment that runs on-premises and on AWS datacenter. GPS Insight relies on Scylla to capture and analyze GPS data, offloading data from RDBMS to Scylla for hybrid analytics approach.
So you’re an infrastructure guru but you don’t think you can code. And because of that, you think that AWS is not for you – it’s just for coders, right? Wrong! Let’s walk through some of the things you can do on AWS with just a basic knowledge of scripting and how powerful the platform is.
MongoDB World 2014 - BillRun, Billing on top of MongoDBOfer Cohen
Presentation from MongoDB world conference 2014. BillRun is open-source billing system. Presentation demonstrate the advantages of MongoDB as storage for billing system.
Software is eating the world. The rate at which we produce new software is astounding. Understanding and preventing potential issues is a growing concern.
Building software security teams is much different than building IT security teams. It requires different backgrounds and focus. Software security groups without an emphasis on software fail.
Join Aaron as he talks about the right way to build and run a software security group. You will walk away with a concrete list of actions that you can take back to your job and start working on right away.
PostgreSQL as seen by Rubyists (Kaigi on Rails 2022)Андрей Новиков
PostgreSQL has become the most popular RDBMS in the Ruby ecosystem in the last decade. It has a great set of built-in features, including a variety of versatile data types, both common and very specific.
But when we load data from the database to our application code, we're working with Ruby data types: classes from the standard library, Rails, or other gems. So while they can seem to be the same as their PostgreSQL counterparts, they are not absolutely identical, and sometimes that could lead to surprising behavior.
In this talk, I would like to explore the power of data types in PostgreSQL and Ruby and how to work with them properly to use both Ruby and PostgreSQL on 100% of their power!
InfluxDB IOx Tech Talks: A Rusty Introduction to Apache Arrow and How it App...InfluxData
InfluxDB IOx Tech Talks - December 2020
A Rusty Introduction to Apache Arrow and How it Applies to a Time Series Database
This session will start with a tech talk from an InfluxDB IOx team member. This is your chance to interact directly with Influxers who are available to answer your questions about all things InfluxDB IOx and time series — including Paul Dix, Founder and CTO of InfluxData. This event will last about an hour and there will be time for live Q&A.
Самые вкусные баги из игрового кода: как ошибаются наши коллеги-программисты ...DevGAMM Conference
Один из лучших способов снизить количество багов в играх – это показывать программистам, как не стоит писать код. В своём докладе я соберу самые вкусные и необычные ошибки, которые удалось найти в C++ и C# коде таких игр, как VVVVVV, Space Engineers, Command & Conquer, osu! и даже Doom. Я уверен, что каждый из слушателей обязательно узнает для себя что-то новое. В конце концов, это просто приятно – лично увидеть ошибки из кода знакомой и любимой игры!
Skalierbarkeit mit MariaDB und MaxScale - MariaDB Roadshow Summer 2014 Hambur...MariaDB Corporation
Skalierbarkeit mit MariaDB und MaxScale
Presented by Ralf Gebhardt at the MariaDB Roadshow Germany: 4.7.2014 in Hamburg, 8.7.2014 in Berlin and 11.7.2014 in Frankfurt.
Hochverfügbarkeit mit MariaDB Enterprise
Presented by Ralf Gebhardt at the MariaDB Roadshow Germany: 4.7.2014 in Hamburg, 8.7.2014 in Berlin and 11.7.2014 in Frankfurt.
Automatisierung & Verwaltung von Datenbank - Clustern mit Severalnines - Mari...MariaDB Corporation
Automatisierung & Verwaltung von Datenbank - Clustern mit Severalnines
Presented by Jean-Jérôme Schmidt 8.7.2014 at the MariaDB Roadshow in Berlin, Germany.
Galaxy Big Data with MariaDB 10 by Bernard Garros, Sandrine Chirokoff and Stéphane Varoqui.
Presented 26.6.2014 at the MariaDB Roadshow in Paris, France.
Automatisation et Gestion de Cluster de Bases de Données MariaDB RoadshowMariaDB Corporation
Automatisation et Gestion de Cluster de Bases de Données by Jean-Jerome Schmidt, Severalnines
Presented 26.6.2014 at the MariaDB Roadshow in Paris, France.
Automation and Management of Database Clusters MariaDB Roadshow 2014MariaDB Corporation
Automation and Management of Database Clusters by Jean-Jerome Schmidt, Severalnines
Presented 24.6.2014 at the MariaDB Roadshow in Maarssen, The Netherlands.
MariaDB 10 and Beyond - the Future of Open Source Databases by Ivan Zoratti.
Presented 24.6.2014 at the MariaDB Roadshow in Maarssen, Utrecht, The Netherlands.
Neuro-symbolic is not enough, we need neuro-*semantic*Frank van Harmelen
Neuro-symbolic (NeSy) AI is on the rise. However, simply machine learning on just any symbolic structure is not sufficient to really harvest the gains of NeSy. These will only be gained when the symbolic structures have an actual semantics. I give an operational definition of semantics as “predictable inference”.
All of this illustrated with link prediction over knowledge graphs, but the argument is general.
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
GraphRAG is All You need? LLM & Knowledge GraphGuy Korland
Guy Korland, CEO and Co-founder of FalkorDB, will review two articles on the integration of language models with knowledge graphs.
1. Unifying Large Language Models and Knowledge Graphs: A Roadmap.
https://arxiv.org/abs/2306.08302
2. Microsoft Research's GraphRAG paper and a review paper on various uses of knowledge graphs:
https://www.microsoft.com/en-us/research/blog/graphrag-unlocking-llm-discovery-on-narrative-private-data/
Elevating Tactical DDD Patterns Through Object CalisthenicsDorra BARTAGUIZ
After immersing yourself in the blue book and its red counterpart, attending DDD-focused conferences, and applying tactical patterns, you're left with a crucial question: How do I ensure my design is effective? Tactical patterns within Domain-Driven Design (DDD) serve as guiding principles for creating clear and manageable domain models. However, achieving success with these patterns requires additional guidance. Interestingly, we've observed that a set of constraints initially designed for training purposes remarkably aligns with effective pattern implementation, offering a more ‘mechanical’ approach. Let's explore together how Object Calisthenics can elevate the design of your tactical DDD patterns, offering concrete help for those venturing into DDD for the first time!
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Albert Hoitingh
In this session I delve into the encryption technology used in Microsoft 365 and Microsoft Purview. Including the concepts of Customer Key and Double Key Encryption.
Key Trends Shaping the Future of Infrastructure.pdfCheryl Hung
Keynote at DIGIT West Expo, Glasgow on 29 May 2024.
Cheryl Hung, ochery.com
Sr Director, Infrastructure Ecosystem, Arm.
The key trends across hardware, cloud and open-source; exploring how these areas are likely to mature and develop over the short and long-term, and then considering how organisations can position themselves to adapt and thrive.
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Ramesh Iyer
In today's fast-changing business world, Companies that adapt and embrace new ideas often need help to keep up with the competition. However, fostering a culture of innovation takes much work. It takes vision, leadership and willingness to take risks in the right proportion. Sachin Dev Duggal, co-founder of Builder.ai, has perfected the art of this balance, creating a company culture where creativity and growth are nurtured at each stage.
The Art of the Pitch: WordPress Relationships and SalesLaura Byrne
Clients don’t know what they don’t know. What web solutions are right for them? How does WordPress come into the picture? How do you make sure you understand scope and timeline? What do you do if sometime changes?
All these questions and more will be explored as we talk about matching clients’ needs with what your agency offers without pulling teeth or pulling your hair out. Practical tips, and strategies for successful relationship building that leads to closing the deal.
Accelerate your Kubernetes clusters with Varnish CachingThijs Feryn
A presentation about the usage and availability of Varnish on Kubernetes. This talk explores the capabilities of Varnish caching and shows how to use the Varnish Helm chart to deploy it to Kubernetes.
This presentation was delivered at K8SUG Singapore. See https://feryn.eu/presentations/accelerate-your-kubernetes-clusters-with-varnish-caching-k8sug-singapore-28-2024 for more details.
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualityInflectra
In this insightful webinar, Inflectra explores how artificial intelligence (AI) is transforming software development and testing. Discover how AI-powered tools are revolutionizing every stage of the software development lifecycle (SDLC), from design and prototyping to testing, deployment, and monitoring.
Learn about:
• The Future of Testing: How AI is shifting testing towards verification, analysis, and higher-level skills, while reducing repetitive tasks.
• Test Automation: How AI-powered test case generation, optimization, and self-healing tests are making testing more efficient and effective.
• Visual Testing: Explore the emerging capabilities of AI in visual testing and how it's set to revolutionize UI verification.
• Inflectra's AI Solutions: See demonstrations of Inflectra's cutting-edge AI tools like the ChatGPT plugin and Azure Open AI platform, designed to streamline your testing process.
Whether you're a developer, tester, or QA professional, this webinar will give you valuable insights into how AI is shaping the future of software delivery.
Epistemic Interaction - tuning interfaces to provide information for AI supportAlan Dix
Paper presented at SYNERGY workshop at AVI 2024, Genoa, Italy. 3rd June 2024
https://alandix.com/academic/papers/synergy2024-epistemic/
As machine learning integrates deeper into human-computer interactions, the concept of epistemic interaction emerges, aiming to refine these interactions to enhance system adaptability. This approach encourages minor, intentional adjustments in user behaviour to enrich the data available for system learning. This paper introduces epistemic interaction within the context of human-system communication, illustrating how deliberate interaction design can improve system understanding and adaptation. Through concrete examples, we demonstrate the potential of epistemic interaction to significantly advance human-computer interaction by leveraging intuitive human communication strategies to inform system design and functionality, offering a novel pathway for enriching user-system engagements.