1) The document provides assembly instructions for excavator final drive components in 60 steps, requiring various tools and following cleanliness procedures.
2) Key steps include pressing bearings into housings, installing seals, assembling planetary gear carriers, and securing the assembly with bolts torqued to specific values.
3) Final steps include leak testing the seals and installing remaining components like plugs and sprockets. Proper assembly ensures the final drive functions as intended.
Caterpillar cat 330 d excavator (prefix mey) service repair manual (mey00001 ...hhjsekmdmm
1) The document provides assembly instructions for excavator final drive components in 60 steps, requiring various tools and following cleanliness procedures.
2) Key steps include pressing bearings into housings, installing seals, assembling planetary gear carriers, and attaching the final drive housing, cover, and sprocket.
3) Proper bearing preload is set using shims and measurements, and seal integrity is tested with air pressure before installation is complete.
Caterpillar cat 330 d l hydraulic excavator (prefix gge) service repair manua...jfdskekdmme
This document provides assembly instructions for excavator final drive models 330D L, 330D N, and 330D LN in 3 sentences:
The instructions list 59 steps and required tools to assemble the final drive components, including installing bearings and seals, assembling carrier assemblies, and testing the final seal. Cleanliness is important during assembly and O-rings, gaskets, and seals should always be replaced with new parts. Dimensions and torque specifications are provided to ensure proper assembly and installation of the final drive.
Caterpillar cat 336 d l excavator (prefix ptb) service repair manual (ptb0000...fksjksmmde
This document provides assembly instructions for an excavator transmission. It lists required tools and parts. It then provides 29 steps to assemble the transmission housing and install bearings. It provides 19 additional steps to assemble the first planetary gear carrier. It then provides 11 more steps to assemble the second planetary gear carrier and install components. Dimensional specifications are provided for press fitting shafts into the carriers. Cleanliness is stressed throughout assembly.
Caterpillar cat 345 c l hydraulic excavator (prefix pjw) service repair manua...hhfjksekmm
The document provides assembly instructions for a 345C excavator final drive system in 3 steps:
1. Adjust the bearing preload of the final drive by measuring dimensions and determining the correct shim thickness.
2. Assemble the carrier assemblies, which include installing planetary gears, bearings, shafts, and pins into housings.
3. Install the assembled carrier assemblies into the sprocket and ring gears in the correct order.
Caterpillar cat 329 d l excavator (prefix bfc) service repair manual (bfc0000...ufdjjsjefkkkemm
1) The document provides instructions for servicing the transmission of a 329D L and 329D LN excavator by removing and disassembling the final drive, then reassembling it.
2) 37 steps are outlined for disassembly, which include removing gears, shafts, seals, and other components using various tools.
3) 35 steps are provided for reassembly, including pressing in bearings, measuring clearances, installing seals and pins, and refitting components in reverse order of disassembly. Cleanliness and applying lubricants are emphasized throughout.
Caterpillar cat 330 d l excavator (prefix t2y) service repair manual (t2y0000...fjjskdmnenemm
This document provides assembly instructions for a 330D L excavator final drive. It lists the required tools and parts, and provides step-by-step instructions to assemble the final drive housing, install bearings and seals, attach planetary gears and carriers, and secure the final drive cover. Precise measurements and torque specifications are included to ensure proper assembly and bearing preload. Cleanliness is emphasized throughout the process.
Caterpillar cat 316 e l excavator (prefix dzw) service repair manual (dzw0000...fjskekdmjekm
This document provides instructions for disassembling and assembling the final drive of an excavator model 316E L. The disassembly process involves removing over 30 individual parts from the final drive assembly including gears, shafts, housings, seals, and bearings. Cleanliness is important during disassembly and assembly to prevent dirt from entering internal mechanisms. The assembly process requires precise installation of parts in the correct order and orientation, with several steps requiring the use of specific tools and lifting devices due to heavy component weights. Bearing preload is adjusted during assembly using shim packs to achieve the proper clearance.
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix mdg) service...fjjsjeskkekem
This document provides assembly instructions for a final drive on a D11T track-type tractor. It lists 37 steps and required tools to assemble the final drive components which include installing bearings and seals using specialized tools, torquing bolts to specified values, and checking clearances with feeler gauges. Pictures accompany each step to illustrate the assembly process.
Caterpillar cat 330 d excavator (prefix mey) service repair manual (mey00001 ...hhjsekmdmm
1) The document provides assembly instructions for excavator final drive components in 60 steps, requiring various tools and following cleanliness procedures.
2) Key steps include pressing bearings into housings, installing seals, assembling planetary gear carriers, and attaching the final drive housing, cover, and sprocket.
3) Proper bearing preload is set using shims and measurements, and seal integrity is tested with air pressure before installation is complete.
Caterpillar cat 330 d l hydraulic excavator (prefix gge) service repair manua...jfdskekdmme
This document provides assembly instructions for excavator final drive models 330D L, 330D N, and 330D LN in 3 sentences:
The instructions list 59 steps and required tools to assemble the final drive components, including installing bearings and seals, assembling carrier assemblies, and testing the final seal. Cleanliness is important during assembly and O-rings, gaskets, and seals should always be replaced with new parts. Dimensions and torque specifications are provided to ensure proper assembly and installation of the final drive.
Caterpillar cat 336 d l excavator (prefix ptb) service repair manual (ptb0000...fksjksmmde
This document provides assembly instructions for an excavator transmission. It lists required tools and parts. It then provides 29 steps to assemble the transmission housing and install bearings. It provides 19 additional steps to assemble the first planetary gear carrier. It then provides 11 more steps to assemble the second planetary gear carrier and install components. Dimensional specifications are provided for press fitting shafts into the carriers. Cleanliness is stressed throughout assembly.
Caterpillar cat 345 c l hydraulic excavator (prefix pjw) service repair manua...hhfjksekmm
The document provides assembly instructions for a 345C excavator final drive system in 3 steps:
1. Adjust the bearing preload of the final drive by measuring dimensions and determining the correct shim thickness.
2. Assemble the carrier assemblies, which include installing planetary gears, bearings, shafts, and pins into housings.
3. Install the assembled carrier assemblies into the sprocket and ring gears in the correct order.
Caterpillar cat 329 d l excavator (prefix bfc) service repair manual (bfc0000...ufdjjsjefkkkemm
1) The document provides instructions for servicing the transmission of a 329D L and 329D LN excavator by removing and disassembling the final drive, then reassembling it.
2) 37 steps are outlined for disassembly, which include removing gears, shafts, seals, and other components using various tools.
3) 35 steps are provided for reassembly, including pressing in bearings, measuring clearances, installing seals and pins, and refitting components in reverse order of disassembly. Cleanliness and applying lubricants are emphasized throughout.
Caterpillar cat 330 d l excavator (prefix t2y) service repair manual (t2y0000...fjjskdmnenemm
This document provides assembly instructions for a 330D L excavator final drive. It lists the required tools and parts, and provides step-by-step instructions to assemble the final drive housing, install bearings and seals, attach planetary gears and carriers, and secure the final drive cover. Precise measurements and torque specifications are included to ensure proper assembly and bearing preload. Cleanliness is emphasized throughout the process.
Caterpillar cat 316 e l excavator (prefix dzw) service repair manual (dzw0000...fjskekdmjekm
This document provides instructions for disassembling and assembling the final drive of an excavator model 316E L. The disassembly process involves removing over 30 individual parts from the final drive assembly including gears, shafts, housings, seals, and bearings. Cleanliness is important during disassembly and assembly to prevent dirt from entering internal mechanisms. The assembly process requires precise installation of parts in the correct order and orientation, with several steps requiring the use of specific tools and lifting devices due to heavy component weights. Bearing preload is adjusted during assembly using shim packs to achieve the proper clearance.
Caterpillar cat d11 t track type tractor dozer bulldozer (prefix mdg) service...fjjsjeskkekem
This document provides assembly instructions for a final drive on a D11T track-type tractor. It lists 37 steps and required tools to assemble the final drive components which include installing bearings and seals using specialized tools, torquing bolts to specified values, and checking clearances with feeler gauges. Pictures accompany each step to illustrate the assembly process.
Caterpillar Cat 336D L Excavator (Prefix PTB) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission housing, installing planetary gears and carriers, and attaching the transmission cover, and notes that cleanliness is important during assembly and O-rings and seals should always be replaced.
Caterpillar Cat 336D L Excavator (Prefix PTB) Service Repair Manual Instant D...fijsekkdmdm2w
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission components which include gears, carriers, shafts, seals, and housing, and notes that cleanliness is important during assembly and O-rings and seals should always be replaced.
Caterpillar Cat 336D L Excavator (Prefix PTB) Service Repair Manual Instant D...fskekkdmdmdm3e
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission components which include gears, carriers, shafts, seals, and housing, and specifies torque values and measurements to ensure proper assembly and bearing clearance is achieved.
Caterpillar cat 336 d l excavator (prefix ptb) service repair manual (ptb0000...dueikdkmem
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission components which include gears, carriers, shafts, seals, and housing, and notes that cleanliness is important during assembly and O-rings and seals should always be replaced.
Caterpillar cat 336 d l excavator (prefix ptb) service repair manual (ptb0000...cdfzxs
This document provides the assembly procedure for an excavator final drive. It lists the required tools and parts. The procedure has 45 steps and includes illustrations of each step. Key steps include pressing bearings into housings, installing seals, assembling the planetary gear carriers, and setting the bearing preload using shims and measurements. Cleanliness is emphasized throughout assembly.
Caterpillar cat 336 d l excavator (prefix ptb) service repair manual (ptb0000...ikdkdmdm
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission components which include gears, carriers, shafts, seals, and housing, and notes that cleanliness is important during assembly and O-rings and seals should always be replaced.
Caterpillar Cat 336D L Excavator (Prefix PTB) Service Repair Manual Instant D...ze3xiandiao
This document provides the assembly procedure for an excavator final drive. It lists the required tools and parts. The procedure has 45 steps and includes illustrations of each step. Key steps include pressing bearings into housings, installing seals, assembling the planetary gear carriers, and setting the bearing preload using shims and measurements. Cleanliness is emphasized throughout assembly.
Caterpillar cat 336 d l excavator (prefix ptb) service repair manual (ptb0000...fjskekxcddmmme
This document provides the assembly procedure for an excavator final drive. It lists the required tools and parts. The procedure has 45 steps and includes illustrations of each step. Key steps include pressing bearings into housings, installing seals, assembling planetary gear carriers, and setting the final bearing preload using shims and measurements. Cleanliness is emphasized throughout assembly.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...jdkskmdmdm
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear sets within carrier assemblies.
3) Cleanliness is emphasized throughout the assembly process to prevent contamination. Measurements are taken and used to set proper bearing preloads.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual Instant D...fijsekkdmdm2w
1) The document provides the assembly procedure for a 325D L excavator final drive. It lists the required tools and parts and provides detailed steps and illustrations for assembling the final drive components.
2) Key steps include pressing bearings into housings, measuring bearing preload, installing gears and planetary carrier assemblies, and securing the assembly with bolts.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts before installation to prevent corrosion and ease future maintenance.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual Instant D...fskekkdmdmdm3e
1) The document provides the assembly procedure for a 325D L excavator final drive. It lists the required tools and parts and provides detailed steps and illustrations for assembling the final drive components.
2) Key steps include pressing bearings into housings, measuring bearing preload, installing gears and planetary carrier assemblies, and securing the assembly with bolts.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts before installation to prevent corrosion and ease future maintenance.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual Instant D...zan2736ban
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear sets within carrier assemblies before installing them into larger transmission components.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts to facilitate installation and prevent corrosion.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...f8sejdkdmdijd
1) The document provides the assembly procedure for a 325D L excavator final drive. It lists the required tools and parts and provides detailed steps and illustrations for assembling the final drive components.
2) Key steps include pressing bearings into housings, measuring bearing preload, installing gears and planetary carrier assemblies, and securing the assembly with bolts.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts before installation to prevent corrosion and ease future maintenance.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...f8uesjdkdmdm
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear sets within carrier assemblies.
3) Cleanliness is emphasized throughout the assembly process to prevent contamination. Measurements are taken and used to set proper bearing preloads.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...ufs89eodkdmdm
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear carriers.
3) Cleanliness is important during assembly and anti-seize compound should be applied to components before installation.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...jdkskmmdmd1
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear carriers.
3) Cleanliness is important during assembly and anti-seize compound should be applied to components before installation.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...pwg56547003
1) The document provides the assembly procedure for a 325D L excavator final drive. It lists the required tools and parts and provides detailed steps and illustrations for assembling the final drive components.
2) Key steps include pressing bearings into housings, measuring bearing preload, installing gears and planetary carrier assemblies, and securing the assembly with bolts.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts before installation to prevent corrosion and ease future maintenance.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual Instant D...fujkskemdmdm4r
1) The document provides the assembly procedure for a 325D L excavator final drive. It lists the required tools and parts and provides detailed steps and illustrations for assembling the final drive components.
2) Key steps include pressing bearings into housings, measuring bearing preload, installing gears and planetary carrier assemblies, and securing the assembly with bolts.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts before installation to prevent corrosion and ease future maintenance.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...f7usuejkdkddm3
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear sets within carrier assemblies.
3) Cleanliness is emphasized throughout the assembly process to prevent contamination. Measurements are taken and used to set proper bearing preloads.
Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...jfdjskmdmme
The document provides instructions for disassembling the piston pump of a M315C wheeled excavator. It describes removing 31 individual parts from the pump in a specific sequence, including the servo valve, charge pump, gears, head, relief valves, pistons, barrel assembly, swashplate assembly, and other components. Cleanliness is important during disassembly to prevent dirt from entering the internal mechanisms. Personal injury can result from hydraulic pressure still remaining in the system, so precautions are described.
Caterpillar cat m315 c wheeled excavator (prefix bdm) service repair manual (...jfdjskmdmme
This document provides instructions for disassembling and assembling the main hydraulic pump of a M315C wheeled excavator. It lists 42 steps to disassemble the pump by removing components like valves, springs, seals, pistons, and bearings. It then lists the assembly steps in reverse order, noting to clean parts and apply new thread lock before reinstalling components. Precautions are provided to mark parts for orientation and contain fluids during maintenance.
Caterpillar cat 330 d2 l excavator (prefix xdr) service repair manual (xdr000...jfdjskmdmme
The document provides instructions for removing and installing various engine components on a Caterpillar 330D2 excavator, including the engine oil pump, water pump, water temperature regulator, and flywheel. The procedures note required tools and safety precautions. Components must be clean and free of damage, with replacement of worn parts. Proper torque values are specified for reinstallation of components.
More Related Content
Similar to Caterpillar cat 330 d l excavator (prefix ffk) service repair manual (ffk00001 and up)
Caterpillar Cat 336D L Excavator (Prefix PTB) Service Repair Manual Instant D...fujkskemdmdm4r
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission housing, installing planetary gears and carriers, and attaching the transmission cover, and notes that cleanliness is important during assembly and O-rings and seals should always be replaced.
Caterpillar Cat 336D L Excavator (Prefix PTB) Service Repair Manual Instant D...fijsekkdmdm2w
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission components which include gears, carriers, shafts, seals, and housing, and notes that cleanliness is important during assembly and O-rings and seals should always be replaced.
Caterpillar Cat 336D L Excavator (Prefix PTB) Service Repair Manual Instant D...fskekkdmdmdm3e
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission components which include gears, carriers, shafts, seals, and housing, and specifies torque values and measurements to ensure proper assembly and bearing clearance is achieved.
Caterpillar cat 336 d l excavator (prefix ptb) service repair manual (ptb0000...dueikdkmem
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission components which include gears, carriers, shafts, seals, and housing, and notes that cleanliness is important during assembly and O-rings and seals should always be replaced.
Caterpillar cat 336 d l excavator (prefix ptb) service repair manual (ptb0000...cdfzxs
This document provides the assembly procedure for an excavator final drive. It lists the required tools and parts. The procedure has 45 steps and includes illustrations of each step. Key steps include pressing bearings into housings, installing seals, assembling the planetary gear carriers, and setting the bearing preload using shims and measurements. Cleanliness is emphasized throughout assembly.
Caterpillar cat 336 d l excavator (prefix ptb) service repair manual (ptb0000...ikdkdmdm
This document provides assembly instructions for a 336D L excavator transmission in 3 sentences:
It lists the required tools and parts, gives step-by-step instructions for assembling the transmission components which include gears, carriers, shafts, seals, and housing, and notes that cleanliness is important during assembly and O-rings and seals should always be replaced.
Caterpillar Cat 336D L Excavator (Prefix PTB) Service Repair Manual Instant D...ze3xiandiao
This document provides the assembly procedure for an excavator final drive. It lists the required tools and parts. The procedure has 45 steps and includes illustrations of each step. Key steps include pressing bearings into housings, installing seals, assembling the planetary gear carriers, and setting the bearing preload using shims and measurements. Cleanliness is emphasized throughout assembly.
Caterpillar cat 336 d l excavator (prefix ptb) service repair manual (ptb0000...fjskekxcddmmme
This document provides the assembly procedure for an excavator final drive. It lists the required tools and parts. The procedure has 45 steps and includes illustrations of each step. Key steps include pressing bearings into housings, installing seals, assembling planetary gear carriers, and setting the final bearing preload using shims and measurements. Cleanliness is emphasized throughout assembly.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...jdkskmdmdm
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear sets within carrier assemblies.
3) Cleanliness is emphasized throughout the assembly process to prevent contamination. Measurements are taken and used to set proper bearing preloads.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual Instant D...fijsekkdmdm2w
1) The document provides the assembly procedure for a 325D L excavator final drive. It lists the required tools and parts and provides detailed steps and illustrations for assembling the final drive components.
2) Key steps include pressing bearings into housings, measuring bearing preload, installing gears and planetary carrier assemblies, and securing the assembly with bolts.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts before installation to prevent corrosion and ease future maintenance.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual Instant D...fskekkdmdmdm3e
1) The document provides the assembly procedure for a 325D L excavator final drive. It lists the required tools and parts and provides detailed steps and illustrations for assembling the final drive components.
2) Key steps include pressing bearings into housings, measuring bearing preload, installing gears and planetary carrier assemblies, and securing the assembly with bolts.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts before installation to prevent corrosion and ease future maintenance.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual Instant D...zan2736ban
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear sets within carrier assemblies before installing them into larger transmission components.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts to facilitate installation and prevent corrosion.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...f8sejdkdmdijd
1) The document provides the assembly procedure for a 325D L excavator final drive. It lists the required tools and parts and provides detailed steps and illustrations for assembling the final drive components.
2) Key steps include pressing bearings into housings, measuring bearing preload, installing gears and planetary carrier assemblies, and securing the assembly with bolts.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts before installation to prevent corrosion and ease future maintenance.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...f8uesjdkdmdm
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear sets within carrier assemblies.
3) Cleanliness is emphasized throughout the assembly process to prevent contamination. Measurements are taken and used to set proper bearing preloads.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...ufs89eodkdmdm
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear carriers.
3) Cleanliness is important during assembly and anti-seize compound should be applied to components before installation.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...jdkskmmdmd1
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear carriers.
3) Cleanliness is important during assembly and anti-seize compound should be applied to components before installation.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...pwg56547003
1) The document provides the assembly procedure for a 325D L excavator final drive. It lists the required tools and parts and provides detailed steps and illustrations for assembling the final drive components.
2) Key steps include pressing bearings into housings, measuring bearing preload, installing gears and planetary carrier assemblies, and securing the assembly with bolts.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts before installation to prevent corrosion and ease future maintenance.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual Instant D...fujkskemdmdm4r
1) The document provides the assembly procedure for a 325D L excavator final drive. It lists the required tools and parts and provides detailed steps and illustrations for assembling the final drive components.
2) Key steps include pressing bearings into housings, measuring bearing preload, installing gears and planetary carrier assemblies, and securing the assembly with bolts.
3) Cleanliness is emphasized throughout assembly and anti-seize compounds are applied to parts before installation to prevent corrosion and ease future maintenance.
Caterpillar Cat 325D L Excavator (Prefix A3R) Service Repair Manual (A3R00001...f7usuejkdkddm3
1) The document provides the assembly procedure for a 325D L excavator transmission. It lists the required tools and parts and provides detailed steps and illustrations for assembling the transmission components.
2) The procedure involves pressing bearings into housings, installing seals, measuring clearances, and assembling planetary gear sets within carrier assemblies.
3) Cleanliness is emphasized throughout the assembly process to prevent contamination. Measurements are taken and used to set proper bearing preloads.
Similar to Caterpillar cat 330 d l excavator (prefix ffk) service repair manual (ffk00001 and up) (19)
Caterpillar cat m315 c wheeled excavator (prefix h2b) service repair manual (...jfdjskmdmme
The document provides instructions for disassembling the piston pump of a M315C wheeled excavator. It describes removing 31 individual parts from the pump in a specific sequence, including the servo valve, charge pump, gears, head, relief valves, pistons, barrel assembly, swashplate assembly, and other components. Cleanliness is important during disassembly to prevent dirt from entering the internal mechanisms. Personal injury can result from hydraulic pressure still remaining in the system, so precautions are described.
Caterpillar cat m315 c wheeled excavator (prefix bdm) service repair manual (...jfdjskmdmme
This document provides instructions for disassembling and assembling the main hydraulic pump of a M315C wheeled excavator. It lists 42 steps to disassemble the pump by removing components like valves, springs, seals, pistons, and bearings. It then lists the assembly steps in reverse order, noting to clean parts and apply new thread lock before reinstalling components. Precautions are provided to mark parts for orientation and contain fluids during maintenance.
Caterpillar cat 330 d2 l excavator (prefix xdr) service repair manual (xdr000...jfdjskmdmme
The document provides instructions for removing and installing various engine components on a Caterpillar 330D2 excavator, including the engine oil pump, water pump, water temperature regulator, and flywheel. The procedures note required tools and safety precautions. Components must be clean and free of damage, with replacement of worn parts. Proper torque values are specified for reinstallation of components.
Caterpillar cat 330 d2 l excavator (prefix hsp) service repair manual (hsp000...jfdjskmdmme
The document provides instructions for disassembling a 330D2 excavator travel motor. It is a 28 step process that includes removing components like the motor head, brake piston, rotating assembly, cam plate, piston assemblies and seals. Special tools are required for tasks like removing retaining rings and bearing races. Technicians are advised to mark components for proper reinstallation and contain any fluids during disassembly.
Caterpillar cat 330 d2 l excavator (prefix her) service repair manual (her000...jfdjskmdmme
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves using various tools to remove 37 individual parts from the final drive assembly. The assembly process similarly uses tools to reinstall the parts in the reverse order, ensuring proper installation of seals and adjusting bearing preload through precise shimming.
Caterpillar cat 330 d2 l excavator (prefix fex) service repair manual (fex000...jfdjskmdmme
The document provides instructions for disassembling a final drive assembly in 3 steps:
1. Remove the final drive assembly and disassemble it by removing the cover, gears, carrier assembly, planetary gears, and ring gear.
2. Disassemble the planetary carrier by removing the planetary shafts, washers, and gears.
3. Remove the ring gear from the sprocket housing and disassemble the motor housing by removing coupling gear, shims, and seals.
Caterpillar cat 330 d2 l excavator (prefix ex7) service repair manual (ex7000...jfdjskmdmme
The document provides instructions for disassembling and assembling a travel motor. It is a service repair manual for Caterpillar 330D2 and 330D2 L excavators. The disassembly procedure involves removing 28 different parts from the travel motor in 27 steps. The assembly procedure involves installing the parts in the reverse order over 23 steps. Precise alignment and cleanliness of parts is emphasized to ensure proper function of the travel motor.
Caterpillar cat 330 d2 l excavator (prefix ebp) service repair manual (ebp000...jfdjskmdmme
The document provides instructions for disassembling an excavator travel motor. It begins by having the technician remove the travel motor from the excavator. The disassembly instructions then detail 27 steps to fully disassemble the travel motor. These include removing components like the motor head, brake piston, barrel assembly, cam plate, and shaft assembly. Throughout the process, technicians are warned to take care with components and contain any fluids.
Caterpillar cat 330 d2 l excavator (prefix dtg) service repair manual (dtg000...jfdjskmdmme
The document provides the disassembly procedure for a 330D2 excavator travel motor in 28 steps. It begins by instructing the technician to clean and secure the travel motor vertically, then remove the head by taking out bolts and marking parts for reassembly. Several internal components are then removed, including brake pistons, plates, and seals. The rotating assembly is separated from the housing using a prybar. Bearings and seals are removed from the shaft. Finally, the cam plate, pistons, seals and other remaining parts are disassembled from the housing. Throughout, precise steps and illustrations are provided to guide disassembly while maintaining part orientation.
The document provides instructions for removing and installing various engine components on a Caterpillar 330D2 excavator, including the engine oil pump, water pump, water temperature regulator, and flywheel. The procedures note required tools and safety precautions. Components must be clean and free of damage, with replacement of worn parts. Proper torque values are specified for reinstallation of components.
The document provides instructions for disassembling a 330D2 excavator travel motor. It is a 28 step process that includes removing components like the motor head, brake piston, rotating assembly, cam plate, piston assemblies and seals. Special tools are required for tasks like removing retaining rings and bearing races. Technicians are advised to mark components for proper reinstallation and contain any fluids removed from the motor.
This document provides instructions for disassembling and assembling the final drive of a 330D2 excavator. The disassembly process involves removing 37 individual parts in a specific sequence using various tools. The assembly process reverses the disassembly steps and provides additional details on setting the bearing preload and installing seals correctly.
The document provides instructions for disassembling a final drive assembly in 3 steps:
1. Remove the final drive assembly and disassemble it by removing the cover, gears, carrier assembly, planetary gears, and ring gear.
2. Disassemble the planetary carrier by removing the planetary shafts, washers, and gears.
3. Remove the ring gear from the sprocket housing and disassemble the motor housing by removing coupling gear, shims, and seals.
The document provides instructions for disassembling and assembling a travel motor. It is a service repair manual for Caterpillar 330D2 and 330D2 L excavators. The disassembly procedure involves removing 28 different parts from the travel motor in 27 steps. The assembly procedure reverses this process and puts the travel motor back together in 25 steps, reinstalling the parts in the reverse order that they were removed. Precise instructions are given for each step to ensure correct reassembly.
The document provides disassembly instructions for a 330D2 and 330D2 L excavator travel motor in 28 steps. It begins by having the technician thoroughly clean and secure the travel motor vertically before disassembling. The steps then carefully describe removing components like the head, brake piston, plates, seals, bearings, and more. Pictures accompany each step to illustrate the proper procedure. Safety notices are included to handle fluids and springs carefully.
The document provides the disassembly procedure for a 330D2 excavator travel motor. It lists 28 steps to fully disassemble the travel motor, including removing the head, brake piston, plates and discs, rotating assembly, seals, and other internal components. Tools required are also listed. The procedure aims to clearly identify each part and ensure proper reinstallation of components in their original positions and orientations.
Caterpillar cat 330 d l mobile hydraulic excavator (prefix h3d) service repai...jfdjskmdmme
This document provides instructions for removing and installing the rear gear group and crankshaft rear seal on a 330D L excavator. The removal procedure involves using various tools to remove bolts, gears, bushings, bearings, and covers. Precautions are listed to keep parts clean and prevent damage. The installation procedure specifies how to position gears, bearings, seals and other components, applying threadlock and noting torque specifications. Dimensions and angles are provided to ensure proper installation of bearings.
Caterpillar cat 330 d l excavator (prefix thj) service repair manual (thj0000...jfdjskmdmme
The document provides disassembly instructions for a final drive on an excavator model 330D L. It outlines 32 steps to fully disassemble the final drive. This includes removing covers, gears, shafts, bearings, seals and other components. Special tools are required to remove some parts, and safety notes are provided about cleanliness and part weights which require multiple people to handle. The overall goal is to break the final drive down into all of its individual parts for repair or replacement.
Caterpillar cat 330 d l excavator (prefix r2d) service repair manual (r2d0000...jfdjskmdmme
1. The document provides removal and installation instructions for the rear gear group, flywheel, and crankshaft rear seal of a 330D L excavator powered by a C9 engine.
2. Detailed step-by-step instructions are given, including the required tools and torque specifications. Illustrations supplement the written instructions.
3. Proper cleaning and application of sealant or retaining compound is emphasized to prevent contamination and ensure proper component life.
Caterpillar cat 330 d l excavator (prefix nbd) service repair manual (nbd0000...jfdjskmdmme
The document provides disassembly instructions for a final drive on an excavator model 330D L excavator. It involves removing 32 components in 31 steps, starting with removing the final drive and travel motor. Key steps include removing the cover, gears, plates, plugs, seals, carrier assembly, planetary gear assembly, shafts, springs, and bearings. Cleanliness is important during disassembly to prevent dirt from entering internal mechanisms.
Dahua provides a comprehensive guide on how to install their security camera systems. Learn about the different types of cameras and system components, as well as the installation process.
Charging Fueling & Infrastructure (CFI) Program Resources by Cat PleinForth
Cat Plein, Development & Communications Director of Forth, gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Implementing ELDs or Electronic Logging Devices is slowly but surely becoming the norm in fleet management. Why? Well, integrating ELDs and associated connected vehicle solutions like fleet tracking devices lets businesses and their in-house fleet managers reap several benefits. Check out the post below to learn more.
Charging and Fueling Infrastructure Grant: Round 2 by Brandt HertensteinForth
Brandt Hertenstein, Program Manager of the Electrification Coalition gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Understanding Catalytic Converter Theft:
What is a Catalytic Converter?: Learn about the function of catalytic converters in vehicles and why they are targeted by thieves.
Why are They Stolen?: Discover the valuable metals inside catalytic converters (such as platinum, palladium, and rhodium) that make them attractive to criminals.
Steps to Prevent Catalytic Converter Theft:
Parking Strategies: Tips on where and how to park your vehicle to reduce the risk of theft, such as parking in well-lit areas or secure garages.
Protective Devices: Overview of various anti-theft devices available, including catalytic converter locks, shields, and alarms.
Etching and Marking: The benefits of etching your vehicle’s VIN on the catalytic converter or using a catalytic converter marking kit to make it traceable and less appealing to thieves.
Surveillance and Monitoring: Recommendations for using security cameras and motion-sensor lights to deter thieves.
Statistics and Insights:
Theft Rates by Borough: Analysis of data to determine which borough in NYC experiences the highest rate of catalytic converter thefts.
Recent Trends: Current trends and patterns in catalytic converter thefts to help you stay aware of emerging hotspots and tactics used by thieves.
Benefits of This Presentation:
Awareness: Increase your awareness about catalytic converter theft and its impact on vehicle owners.
Practical Tips: Gain actionable insights and tips to effectively prevent catalytic converter theft.
Local Insights: Understand the specific risks in different NYC boroughs, helping you take targeted preventive measures.
This presentation aims to equip you with the knowledge and tools needed to protect your vehicle from catalytic converter theft, ensuring you are prepared and proactive in safeguarding your property.
Charging Fueling & Infrastructure (CFI) Program by Kevin MillerForth
Kevin Miller, Senior Advisor, Business Models of the Joint Office of Energy and Transportation gave this presentation at the Forth and Electrification Coalition CFI Grant Program - Overview and Technical Assistance webinar on June 12, 2024.
Expanding Access to Affordable At-Home EV Charging by Vanessa WarheitForth
Vanessa Warheit, Co-Founder of EV Charging for All, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
EV Charging at MFH Properties by Whitaker JamiesonForth
Whitaker Jamieson, Senior Specialist at Forth, gave this presentation at the Forth Addressing The Challenges of Charging at Multi-Family Housing webinar on June 11, 2024.
2. Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 1P-2420 Transmission Repair Stand 1
B 138-7573 Link Bracket 2
C 1P-1863 Retaining Ring Pliers 1
D
208-6033 Spanner Socket As 1
208-6034 Spacer 1
E 138-7574 Link Bracket 2
H 6V-7030 Micrometer Depth Gauge Group 1
J FT-2770 Leak Down Test Tool 1
K 1U-6396 O-Ring Assembly Compound 1
L 5P-3931 Anti-Seize Compound 1
M 1U-8846 Gasket Sealant 1
N 8T-9206 Duo-Cone Seal Installer As 1
P 5P-3931 Anti-Seize Compound 1
Q 235-4848 Drill Fixture Gp 1
R 9S-3263 Thread Lock Compound 1
Note: Cleanliness is an important factor. Before assembly, all parts should be thoroughly cleaned
in cleaning fluid. Allow the parts to air dry. Wiping cloths or rags should not be used to dry parts.
Lint may be deposited on the parts which may cause later trouble. Inspect all parts. If any parts are
worn or damaged, use new parts for replacement. All disassembly and all assembly procedures
must be performed on a clean work surface and in a clean hydraulic area. Keep cleaned parts
covered and protected at all times.
Note: O-ring seals, gaskets, and seals should always be replaced. A used O-ring seal may not have
the same sealing properties as a new O-ring. Use Tooling (K) during the assembly procedure.
Note: Apply a light film of hydraulic oil to all components before assembly.
Note: Some of the images that are in this procedure do not show the sprocket assembly that is
attached to the final drive housing. If necessary, the weights that are given include the weight of
the sprocket assembly.
2/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
3. Illustration 1 g01147975
1. Apply Tooling (P) to the outer diameter of the bearings.
2. Use a suitable press to Install bearings (40) and (41). Make sure that bearing (41) and
bearing (40) contact the counterbore in housing (36).
3. Use Tooling (N) to install Duo-Cone seal (39B).
Illustration 2 g01147981
4. Use Tooling (N) to install Duo-Cone seal (39A) onto housing (38).
Illustration 3 g01147930
3/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
4. 5. Use Tooling (E) and a suitable lifting device to install housing (36) onto housing (38). The
weight of housing (36) is approximately 100 kg (220 lb).
6. Remove Tooling (E) from housing (36).
Illustration 4 g01147724
7. Install stopper plate (35). Do not tighten stopper plate assembly (35) at this time.
Note: Stopper plate (35) will secure housing (36) to housing (38).
8. Install Tooling (E) and a suitable lifting device to housing (36). The combined weight of
housing assembly (36) and (38) is approximately 120 kg (265 lb). Install housing assembly
(36) and (38) in a suitable press.
9. Remove stopper plate (35).
Illustration 5 g01147727
10. Assemble Tooling (D), as shown.
4/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
5. Illustration 6 g01147731
11. Install Tooling (D) into housing (36), as shown.
12. Apply a force of 4000 kg (8818 lb) to the top of Tooling (D). Rotate housing (36) to seat the
bearings.
13. Reduce the force on the top of Tooling (D) to 3000 kg (6615 lb).
Illustration 7 g01147737
14. Use Tooling (H) to take a measurement in three locations. Average the three measurements
and record the average measurement as Dimension (W).
15. Remove Tooling (D).
16. Separate Tooling (D).
5/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
6. Illustration 8 g01147743
17. Use a micrometer to measure the thickness at three locations of the spacer from Tooling
(D). Record the average measurement as Dimension (X).
Illustration 9 g01147742
18. Use a micrometer to measure the thickness at three locations of stopper plate (35). Record
the average measurement as Dimension (Y).
19. Subtract Dimension (X) from Dimension (Y) and record this figure as Dimension (Z).
Illustration 10 g01147724
6/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
7. 20. Install stopper plate (35) onto housing (38). Do not tighten stopper plate (35) at this time.
Stopper plate (35) will secure the final drive assembly while the final drive assembly is
repositioned onto Tooling (A).
21. Use Tooling (E) and a suitable lifting device to reposition the final drive assembly onto
Tooling (A). The combined weight of housing assembly (36) and (38) is approximately
120 kg (265 lb).
22. Secure the final drive assembly to Tooling (A).
Illustration 11 g01148004
23. Secure the spanner socket from Tooling (D) to stopper plate (35).
24. to determine the final bearing preload, add Dimension (W) to Dimension (Z) and record this
figure as Dimension (V).
25. Use Tooling (H) to measure the distance in three locations.
26. Tighten stopper plate (35) until the average of the measurements is equal to Dimension (V).
27. Remove Tooling (D).
Illustration 12 g01372092
28. Install Tooling (Q) and a suitable vacuum onto stopper plate (35).
7/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
8. Illustration 13 g01147789
29. Use a suitable drill and Tooling (Q) to drill a hole to the depth of 15 mm (0.6 inch) in the
stopper plate and in housing (38).
Illustration 14 g01147796
30. Install dowel (37).
Illustration 15 g01147650
31. Apply Tooling (R) to bolts (35A). Install plate (35B) and bolts (35A).
32. Repeat Steps 28 through 31 for the opposite side of stopper plate (35).
8/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
9. Illustration 16 g00781807
33. Install O-ring seal (34) on housing (36).
Illustration 17 g00781730
34. Install gear (33) on housing (36).
Illustration 18 g00781719
35. Assemble carrier assembly (27), as follows.
9/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
10. Illustration 19 g00781607
a. Use a deburring tool to remove the metal burr from the openings in the carrier.
b. Install two bearings (31) in planetary gear (32).
c. Install thrust washers (30) and planetary gear (32) in the carrier assembly.
d. Install planetary shaft (28) in the carrier assembly.
e. Align the split in spring pin (29) to the top or to the bottom. Make a stake mark on
each side of the spring pin hole in the carrier. Each stake mark should be
approximately 1.50 mm (0.059 inch) from the outside diameter of the spring pin hole.
Illustration 20 g00903073
f. Drive spring pin (29) into planetary shaft (28) with a hammer and a punch.
36. Repeat Steps 35.a through 35.e to install the other two planetary gears in the carrier.
10/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
11. Illustration 21 g00781559
37. Use two people to install carrier assembly (27) in gear (33). The weight of carrier assembly
(27) is approximately 38 kg (85 lb).
Illustration 22 g00781529
38. Install spacer (26). Install gear (25).
Illustration 23 g01148010
39. Assemble carrier assembly (19), as follows.
11/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
12. Illustration 24 g00781516
a. Use a deburring tool to remove the metal burr from the openings in the carrier.
b. Install bearing (23) in planetary gear (24).
c. Install thrust washers (22) and planetary gear (24) in the carrier assembly.
d. Install planetary shaft (21) in the carrier assembly.
Illustration 25 g00903073
e. Drive spring pin (20) into planetary shaft (21) with a hammer and a punch.
12/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
13. Illustration 26 g00879368
f. Align the split in the spring pin to the top or to the bottom. Make a stake mark on
each side of the spring pin hole in the carrier. Each stake mark should be
approximately 1.50 mm (0.059 inch) from the outside diameter of the spring pin hole.
g. Repeat Steps 39.a through 39.f to install the other two planetary gears in the carrier.
Illustration 27 g01148011
40. Install carrier assembly (19) into gear (33).
41. Install retaining ring (18).
Illustration 28 g00781412
13/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
14. 42. Install spacer (17). Install gear (16).
Illustration 29 g01389598
Note: Make sure that the oil passages in the shafts are oriented toward the center of carrier
assembly (15).
43. Raise the temperature of carrier assembly (15). Lower the temperature of the shafts. Install
the shafts into carrier assembly (15) until the groove of the shafts is at Dimension (A).
Dimension (A) equals 25.00 ± 0.10 mm (0.984 ± 0.004 inch).
44. Make eight stake marks at distance of Dimension (C) from each shaft. Dimension (C)
equals 2.0 ± 1.0 mm (0.08 ± 0.04 inch). The width of each stake mark should be equal to
Dimension (B). Dimension (B) equals 4.0 ± 1.0 mm (0.16 ± 0.04 inch).
14/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
15. Illustration 30 g00781407
45. Assemble carrier assembly (15), as follows.
a. Install carrier assembly in position on gear (16).
Illustration 31 g00781401
b. Install retaining ring (14) onto gear (16).
Illustration 32 g00780432
c. Install washer (11). Install bearing assembly (13). Install gear (12). Install washer
(11). Install retaining ring (10) with Tooling (C).
15/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
16. d. Repeat Steps 45.a through 45.c for the other two planetary gears.
Illustration 33 g00780428
46. Install spacer (9). Install gear (8).
Illustration 34 g00879365
47. Install O-ring seal (7) on plugs (4).
Illustration 35 g00879362
48. Install plugs (4) and spacer (6) in cover (2).
16/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
17. 49. Position gear (5). Install bolts (3).
Illustration 36 g00708090
Illustration 37 g00708089
50. Place a piece of solder in the center of gear (8).
Note: You may need to apply some grease to the solder to keep the solder in position on
gear (8).
51. Use Tooling (B) and a suitable lifting device to Install cover (2). The weight of cover (2) is
approximately 32 kg (70 lb).
52. Install four bolts (1) at 90 degrees from each other. Tighten bolts (1) in a crisscross pattern
to a torque of 420 ± 60 N·m (310 ± 44 lb ft). Turn bolts (1) anadditional60 ± 5 degrees.
53. Remove bolts (1).
54. Use Tooling (B) and a suitable lifting device to remove cover (2). The weight of cover (2) is
approximately 32 kg (70 lb).
55. Use a micrometer to measure the thickness of the solder. Record this measurement to
determine the thickness of the shims for plate (6). Adjust the shims to obtain a clearance of
1.000 + 1.000 mm (0.0394 + 0.0394 inch) between plate (6) and gear (8).
56. Apply Tooling (M) to the mating surfaces of cover (2) and the housing.
17/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
18. 57. Use Tooling (B) and a suitable lifting device to Install cover (2). The weight of cover (2) is
approximately 32 kg (70 lb).
58. Apply Tooling (R) to bolts (1). Install bolts (1) and the washers. Tighten bolts (1) in a
crisscross pattern to a torque of 900 ± 100 N·m (664 ± 74 lb ft).
Illustration 38 g00783362
59. Remove plug (4) (not shown). Attach Tooling (J) to cover (2). Reduce the air pressure at the
source to 103 kPa (15 psi). Apply air pressure to Tooling (J). This air will test the Duo-Cone
seals.
60. Use the ball valve on Tooling (J) to eliminate the air pressure to the final drive. A pressure
of 98 kPa (14.2 psi) must be maintained for 30 seconds.
61. Remove Tooling (J). Install plug (6). Torque plug (6) to 80 ± 10 N·m (59 ± 7 lb ft).
62. Remove the final drive from Tooling (A). The weight of the final drive assembly is
approximately 310 kg (683 lb).
End By:
a. If necessary, install the final drive sprocket. Refer to Disassembly and Assembly, "Final
Drive Sprocket - Remove and Install".
b. Install the final drive. Refer to Disassembly and Assembly, "Final Drive - Install".
Copyright 1993 - 2020 Caterpillar Inc.
All Rights Reserved.
Private Network For SIS Licensees.
Sat Aug 15 15:17:43 UTC+0800 2020
18/18(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
19. Shutdown SIS
Previous Screen
Product: EXCAVATOR
Model: 330D L EXCAVATOR FFK
Configuration: 330D & 330D L Excavators FFK00001-UP (MACHINE) POWERED BY C9 Engine
Disassembly and Assembly
330D, 336D, 336D2, 340D and 340D2 Excavators and 336D MHPU Mobile Hydraulic
Power Unit Machine Systems
Media Number -RENR8648-30 Publication Date -01/03/2015 Date Updated -15/08/2018
i06252857
Final Drive - Assemble - Type-Two
SMCS - 4050-016
S/N - B6H568-UP
S/N - DTS1-UP
S/N - EAH1-UP
S/N - EDX1-UP
S/N - EFT1-UP
S/N - ERN275-UP
S/N - FAR1-UP
S/N - FFK1-UP
S/N - GGE1-UP
S/N - GGH1-UP
S/N - HHK1-UP
S/N - J2F1-UP
S/N - JBT1-UP
S/N - JLP299-UP
S/N - JTN1-UP
S/N - JWR1-UP
1/27(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
21. S/N - XBH1-UP
S/N - YCF1-UP
S/N - ZCT1-UP
S/N - ZML1-UP
Assembly Procedure
Table 1
Required Tools
Tool Part Number Part Description Qty
A 439-3940 Link Bracket 3
B 439-3939 Link Bracket 2
D
8T-9206 Duo-Cone Seal Installer As 1
169-0503 Installation Kit 1
E 1U-9895 Crossblock 1
F - Loctite Copper Anti Seize -
G - Loctite 243 -
H - Loctite RTV Silicone Clear -
J FT-2770 Leak Down Test Tool 1
K 6V-2012 Depth Micrometer 1
L 6V-7059 Micrometer 1
1. Make sure that all parts of the final drive are thoroughly clean and free of dirt and debris
prior to assembly. Check the condition of all O-ring seals that are used in the final drive. If
any of the seals are damaged, use new parts for replacement.
3/27(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
22. Illustration 1 g03873123
2. Use Tooling (D) to install Duo-Cone seal (45) .
Illustration 2 g03873131
3. Apply Tooling (F) to the surface of dowels (46) . Install dowels (46) .
4. Raise the temperature of lower bearing cone (47) . Install lower bearing cone (47) on motor
housing (48) .
Illustration 3 g03873115
5. Lower the temperature of bearing cups (43) . Install bearing cups (43) in sprocket housing
(41) .
4/27(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
23. Illustration 4 g03873145
6. Use Tooling (D) to install Duo-Cone seal (44) .
Illustration 5 g03873151
7. Attach Tooling (B) and a suitable lifting device to sprocket housing (41) . The weight of
sprocket housing (41) is approximately 110 kg (243 lb). Install sprocket housing (41) .
8. Raise the temperature of upper bearing cone (42) . Install upper bearing cone (42) .
5/27(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
24. Thank you very much for
your reading. Please Click
Here. Then Get COMPLETE
MANUAL. NO WAITING
NOTE:
If there is no response to
click on the link above,
please download the PDF
document first and then
click on it.
25. Illustration 6 g03873237
Illustration 7 g03873187
9. Use Tooling (E) and a suitable press in order to apply force to upper bearing cone (42) .
Apply a force of 4000 kg (8818 lb) to the top of Tooling (E) . Rotate sprocket housing (41)
in order to seat the roller bearings.
10. Reduce the force on top of Tooling (E) to 3000 ± 300 kg (6614 ± 661 lb). Use Tooling (K)
in order to measure Dimension (X) . Record Dimension (X) .
6/27(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
26. Illustration 8 g03873199
11. Remove Tooling (E) .
12. Use Tooling (K) in order to measure Dimension (W) on coupling gear (39) . Record
Dimension (W) .
Illustration 9 g03873204
Illustration 10 g03873207
7/27(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...
27. 13. Subtract Dimension (X) from Dimension (W) and record the difference as Dimension (V) .
The correct shim thickness is Dimension (V) . Use Tooling (L) in order to measure the
correct thickness of shims (40) . The tolerance of Dimension (V) is 0 ± 0.05 mm (0.0 ±
0.002 inch).
Note: Use a maximum of two shims (40) . If two shims (40) are used to achieve the proper
dimension, install the thinner of the two shims toward coupling gear (39) .
14. Install shims (40) .
15. Apply Tooling (G) to the threads of bolts (38) . Install coupling gear (39) and bolts (38) .
Tighten bolts (38) to a torque of 900 ± 100 N·m (665 ± 75 lb ft).
Illustration 11 g03873246
16. Install O-ring seal (37) in sprocket housing (41) .
17. Thoroughly clean the mating surface of sprocket housing (41) that makes contact with ring
gear (36) .
18. Attach Tooling (A) and a suitable lifting device to ring gear (36) . Put ring gear (36) in
position on sprocket housing (41) . The weight of ring gear (36) is approximately 65 kg
(143 lb). Make sure that the alignment marks on sprocket housing (38) and ring gear (36)
are lined up with each other.
8/27(W)
w
2020/8/15
https://127.0.0.1/sisweb/sisweb/techdoc/techdoc_print_page.jsp?returnurl=/sisweb/sisw...