“          In November 2004, we confirmed our commitment to this commu-
              nity by signing a partnership agreement with the Inter-Neighbour-




                                                                                               ”
              hood Coalition. Not only does this agreement ensure open dialogue
              with the community, but it also promotes potential employability,
              environmental protection, economic development and accessibility.                                2

               – MUHC on its work to strengthen ties with the communities around the new
               Glen Campus.




THE SAINT-HENRI ANNEX PROJECT PROPOSAL

Alex Carruthers - Taleen Der Haroutiounian - Etienne Faucher - Megan Rolph	   	     	      	



                                                                                               February 2010
3
PROJECT OVERVIEW


      The Saint-Henri Annex is a semi-public, non-profit, training facility designed to create a social and eco-
      nomic connection between the Saint-Henri community and the new McGill University Health Centre
      (MUHC) Glen Campus. Made possible through a close collaboration between the Commission scolaire
      de Montreal (CSDM), the Regroupement économique et social du Sud-Ouest (RESO) and the MUHC, it
      capitalizes on its physical proximity to the Glen Campus by providing complementary uses that will serve
      both the community and the hospital.

                                                                                                                    4
      This 4-storey, 80,000 sq. ft public training centre will become a dynamic pole for educational, business
      and leisure activities. It will include:


      •     21,000 sq. ft of classrooms and offices for a training facility geared to providing instruction for a
            variety of occupations in the health care sector.

      •     23,000 sq. ft of ground-level retail, which will have grocers, cafes and other shops geared to the
            local community.

      •     34,000 sq. ft of open floor space for conferences, community use, and open concept office space.



      The project is expected to cost an estimated $16 million, with a third of the costs to be covered by the
      government and other public agencies. The public investment will be used to help subsidize the training
      facility and community space, while the office and retail space will be charged market rates. The rents
      from the non-public uses, as well as from advertising on the structure will be the primary sources of rev-
      enue for the Saint-Henri Annex.
5


                    Saint-Henri




    Les Tanneries
ThE bIg PICTuRE

  This project is located on the Island of Montreal along the western edge of Saint-Henri at the corner of rue de Courcelle and rue
  Saint-Jacques Ouest. Saint-Henri was an active factory town where an industrial land use prevailed. Today, it has grown into a
  quiet community that contains traces of its industrial past within a current mix of residential, commercial and institutional build-
  ings. The project’s immediate surroundings reflect the crossing point between the different types of uses present in Saint-Henri.

  An appreciation of the neighborhood’s requirements and concerns was critical for conceiving of a project that helps to link the
  Hospital and the community. The following is a list of considerations from the community surrounding the Annex project.



        MUHC                                                           Home Depot                                                        6
               A Growing healthcare sector                                    Continued operation of their store
               Health care personnel shortfalls                               Good neighbourhood relations
               Integrating with surrounding Community                         Retention of highway visibility



        Tanneries Village                                              RCA Complex
               Between two Megaprojects                                       Heritage property development
               Lack of quality public space                                   Creating a link to the hospital
               Lacking amenities Food local cafe                              A market for new back-lot construction



        Province                                                       St	Henri
               Highway awkwardly dividing neighbours                          Under employed local population
               FTQ Development plans on the corner                            Local heritage
               Integrating 500 new low income residents                       Stewardship of healthy local community
Employment

        ac
          ce
             ssib           greening
                 ilit
                        y
                                                                    ty
                                                                i vi
                                                            ec t
             greening                               con n


7


    Community involvement


                                                              Partnerships
COnCEPT



   The Saint-Henri Annex is a development that will meet the needs of the community and the demands of the MUHC. The
   proposed training facility will open up new employment opportunities for the residents of Saint-Henri while satisfying
   the increasing demand for health care workers at the hospital. The development of a multi-purpose training facility seeks
   to address the social and economic disparities existing in the neighbourhood. It will also provide much needed amenities,
   community space, and social services for the area’s residents. The following is a list of considerations for the Annex’s
   neighbours.

   The Annex aspires to create new physical, social and economic connections to the hospital through the education and em-        8
   ployment of Saint-Henri residents.

   The Annex will help to address the looming labour shortages in the healthcare sector due to the “greying of the population.”
   The imminent retirement of many healthcare professionals in combination with swelled demand for health care services
   from our aging demographic will cause a major strain on Quebec’s healthcare system. Action must be taken quickly to
   ensure there are enough trained healthcare workers to meet these future needs. Furthermore, the changing structure of the
   health care system has led to more specialized occupations and the downloading of work to lower level occupations, creat-
   ing demand for workers such as beneficiaries, assistant nurses, pharmaceutical assistants and medical secretaries. RESO,
   whose responsibility is to develop strategies to promote job creation in the South-West Borough, should work closely with
   the Saint-Henri Annex to create opportunities for the residents of the Borough from the forthcoming challenges that face
   the Quebec healthcare sector.
PART I – SITE FACTS


        The project site is situated on a 31,000 square foot   The	 Saint-Henri	 Annex	 project	 maximizes	 the	
        triangular-shaped plot of land at the corner of rue    potential of the site while conforming to all of
        de Courcelle and rue Saint-Jacques. Its third edge     the zoning by-laws and requirements set by the
        is bound by both the Hwy. 720 overpass and the         Sud-Ouest borough (see Table 1), other than a
        Saint-Jacques Escarpment.                              minor variance to include institutional uses on
                                                               the site.
        The land is currently divided into eight lots. Of
        these, two are owned by a private landowner,
9       while the remaining lots are owned by the City of
        Montreal. Existing structures on the land include
        a small, vacant, 2-storey building on the private
        landowner’s property, and a large billboard pole
        that contains two advertising sides facing the ve-
        hicular traffic on the Hwy. 720 overpass.
PART II – ThE buILDIng

   The design of the proposed building reflects the role     of the building and serve as a sustainable technical
   of the Saint-Henri Annex as the point of interaction      remedy to absorb stormwater and reduce the heat is-
   between Saint-Henri and the MUHC Glen Campus.             land effect of the immediate area.

   The portion of the building that fronts rue de
   Courcelle is a 4-storey (approximately 12.5m) rect-
   angular building designed in a traditional style with
   brick and steel to pay homage to Saint-Henri’s ex-
   isting built heritage and industrial past.

   The 4-storey glass and
   steel structure fronting                                                                                         10
   rue Saint-Jacques follows
   the triangular shape of
   the lot’s remaining area.
   Its street facade takes full
   advantage of the site’s
   southern exposure, and its
   wavy shape invites pedestrians to
   the Villages des Tanneries and a path
   leading up to the MUHC Glen Campus. A
   one-storey, below-grade parking lot with ap-
   proximately 50 parking spaces is located directly
   underneath the building.

   As a building for the people of Saint-Henri, the build-
   ing is designed to maximize the pedestrian-friendly
   environment and minimize its environmental impact.
   The top two storeys are set back from the property
   line to create a comfortable environment for pedes-
   trians while integrating with the facade height of the
   surrounding buildings. Extensive green roofs will
   contribute to create more pleasant views
DIVISIOn OF SPACE

       TRAINING FACILITY                                                     GROUND FLOOR RETAIL

       The top three storeys fronting on rue de Courcelle will contain       A cafe, bakery, small grocer and pharmacy – these are the types
       classrooms and laboratories exclusively for job training in health    of retail the Saint-Henri Annex project is designed to attract on
       care related services. One possible tenant is a nurse training pro-   the ground level of the building to serve both the MUHC and
       gram currently offered by the Centre de Saint-Raymond, which is       Saint-Henri. The project’s location, and the density of the sur-
       managed in partnership with the City of Montreal and the CSDM,        rounding area, makes the addition of retail very feasible and
       located in Notre-Dame-De-Grâce. The nursing program current-          attractive. The configuration of the road network puts the Saint-
       ly occupies three classrooms and one computer lab but they have       Henri Annex project at the crossroads of important arteries
       expressed an interest to enlarge their facilities. The ample class-   which ensure strong accessibility of the site to potential clients.
11     room and office space offered in this building, and its proximity     Storefronts facing both rue Saint-Jacques and rue de Courcelle
       to the MUHC Glen Campus, would provide a suitable option for          will benefit from the MUHC employees and residents of the Vil-
       their expansion.                                                      lages des Tanneries passing by throughout the day. Development
                                                                             at the RCA building and the affordable housing project across
                                                                             the street will increase pedestrian and vehicular activity. More-
                                                                             over, there is a current demand for small-scale retail to serve the
                                                                                                             community residents in this area
                                                                                                                             of Saint-Henri.
DIVISIOn OF SPACE

   OPEN-CONCEPT OFFICE SPACE

   Flexible, open-concept office spaces that can be
   transformed to meet the needs of the community and
   the MUHC are located on the top three storeys of the
   portion of the building fronting rue Saint-Jacques.
   The generous floor space provides enough room
   to meet the needs of companies that are seeking an
   open-concept work space. The MUHC is also antici-
   pating a need for a large space located off the Glen
   Campus grounds that can be rented occasionally for      12
   conferences or job recruitment fairs, the proposed
   open-concept floor plan will easily accommodate
   these activities. These flexible and adaptable office
   spaces could also be used for other social services,
   such as an employment centre or a day care facility
   for the residents of Saint-Henri.
OuTDOOR PubLIC SPACE

       The remaining space on the Saint-Henri Annex lot will serve as       Saint-Jacques Escarpment situated behind the building un-
       an attractive interface between the building and its surround-       der the Hwy. 720 overpass. This escarpment has a history of
       ings while providing both environmental and social benefits.         eroding and causing mudslides, and unless the escarpment
       There will be a landscaped public space with seating, bike racks     is landscaped with erosion-prevention methods this prob-
       and a public fountain on the corner of rue Saint-Jacques and rue     lem will only get worse with the stormwater runoff from the
       de Courcelle. Bollards and other traffic-calming design features     MUHC Glen Campus. Landscaping the escarpment will also
       will be located along rue Saint-Jacques to protect and insulate      create a connecting corridor between the Saint-Henri Annex
       people using this space from the high volume of speeding traf-       project site and the green space on the MUHC Glen Cam-
       fic that exists along this corridor. This public space will form a   pus.
       connection with the public community garden found across rue
       Saint-Jacques in the Village des Tanneries and with the open         Development of open space areas can also benefit from a
13
       space across the intersection.                                       partnership with Home Depot to assist in the landscaping.
                                                                            Home Depot’s previous work in the Village des Tanneries
       Although outside the Saint-Henri Annex project boundaries, it        demonstrates its com
       is highly recommended that landscaping take place on the
OuTDOOR PubLIC SPACE

  mitment to community involvement. Funding is al-          Saint-Jacques to help buffer pedestrians from the
  ready available through the Home Depot’s “Building        traffic along the busy corridor. On street parking
  Healthy Communities” grants which are awarded             would also help support the retail businesses lo-
  to registered non-profit organizations. One of these      cated on the ground-floor of the Annex.
  grants was used in a similar project to landscape and
  incorporate a mountain bike trail under the Interstate
  5 Highway in Seattle, Washington. Most important-
  ly, a partnership to landscape the Saint-Henri Annex
  project will give Home Depot the opportunity to be-
  come involved in the process of connecting the com-
  munity and MUHC on this site.                                                                                  14
  Underground parking for 50 cars will be provided
  underneath the Saint-Henri Annex, free of charge.
  Parking will be provided for the teachers and stu-
  dents of the training facility, for the office tenants,
  and for those wishing to park in order to shop at the
  various retail outlets. It is also recommended that on
  street parking be considered on the north side of rue
mercial space to be rented, allowing for a variety
                                                       of retail opportunities in the Saint-Henri Annex.
                                                       There is also a significant amount of space for of-
                                                       fices, with 34,000 square feet, allowing for ap-
                                                       proximately 153 office units at $21 a square foot.
PART III – FINANCIAL FEASABILITY                       Classrooms have also been included as a small
                                                       revenue source. They are charged the lowest
COSTS                                                  rents, at $12 a square foot, with an area to allow
                                                       for 30 classrooms in the building. Based on these
The total cost of the Saint-Henri Annex is rough-      revenue streams, the building will need to charge
ly $16 million. A third of the principle costs will    on average $23 a square foot in order to ensure a
be covered by the government, which is approxi-        positive net present value. A final revenue source
mately $5.5 million. Due to the public nature          will come from advertising, which presently ex-
and potential social benefits of the Saint-Henri       ists on the site. Advertising draws $240,000 in
Annex, a government grant will be the primary          revenue every year which will be used to help
source of equity. Beyond the costs of land ac-         subsidize the training facility.
quisition, construction, and demolition, costs
have been incorporated for soil decontamination        PRO FORMA
for the entire site, up to two metres deep. Also
included is green roofing for the portion of the       Based on the costs and revenues discussed above,
building facing rue Saint-Jacques. Furthermore,        a financial feasibility study was conducted. Inter-
the project includes one level of underground          est rates have been set at 5%, amortized over a
parking for up to 50 cars. The cost table shows        20 year period. Inflation has been included at 3%
the cost per square foot, the area, total costs, and   and applied to both rents and advertising revenue.
the weighted average per square foot of $146 (not      Based on these assumptions this plan will have a
including land acquisition), which is used in the      Net Present Value of $826,271, a Return on In-
final pro forma.                                       vestment of 8%, a Return on Equity of 12% and
                                                       an Internal Rate of Return of 10%. With these re-
REVENUES                                               turns, the Saint-Henri is financially feasible and
                                                       a worthwhile investment for the long-term eco-
Revenue sources include ground floor commer-           nomic health of the community.
cial: which is charged the highest rents at $36/
square foot, to help fund the building’s other
uses. There is roughly 23,000 square feet of com-
Brochure 0217

More Related Content

Similar to Brochure 0217

Sue Foster Presentation - Active by Design
Sue Foster Presentation - Active by DesignSue Foster Presentation - Active by Design
Sue Foster Presentation - Active by Design
Design Council
 
Introduction to the GALRI group--Transformative Concepts for Haiti Regeneration
Introduction to the GALRI group--Transformative Concepts for Haiti RegenerationIntroduction to the GALRI group--Transformative Concepts for Haiti Regeneration
Introduction to the GALRI group--Transformative Concepts for Haiti Regeneration
chrisrandrews
 
Design Studio-Integrated Technology
Design Studio-Integrated TechnologyDesign Studio-Integrated Technology
Design Studio-Integrated Technology
Jenine Bunko
 
EPCALpaper
EPCALpaperEPCALpaper
EPCALpaper
Disha Gupta
 
Land 601 f15 burgeoning.1.0
Land 601 f15 burgeoning.1.0Land 601 f15 burgeoning.1.0
Land 601 f15 burgeoning.1.0
Macharia Waruingi, MD, DHA
 
Focus area Highway 5
Focus area Highway 5Focus area Highway 5
Focus area Highway 5
TomSchroeder20
 
Meanin of urban Population Density
Meanin of urban Population DensityMeanin of urban Population Density
Meanin of urban Population Density
Naasir Usmaan
 
Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8
kieran rose
 
Urban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim Hays
Tim Hays
 
March 15 Growth Management Strategy Open House - Presentation
March 15 Growth Management Strategy Open House - PresentationMarch 15 Growth Management Strategy Open House - Presentation
March 15 Growth Management Strategy Open House - Presentation
Town of High River
 
Strategic plan poster final
Strategic plan poster finalStrategic plan poster final
Strategic plan poster final
Vanessa Baratta
 
Design alternatives -landscape integration (1).ppsx
Design alternatives -landscape integration (1).ppsxDesign alternatives -landscape integration (1).ppsx
Design alternatives -landscape integration (1).ppsx
suneetabapat
 
Gardening Cyberspace Dan Keech
Gardening Cyberspace Dan KeechGardening Cyberspace Dan Keech
Gardening Cyberspace Dan Keech
Countryside and Community Research Institute
 
Toufic jreije portfolio
Toufic jreije portfolioToufic jreije portfolio
Toufic jreije portfolio
tkjreije
 
buttress masterplanning lr
buttress masterplanning lrbuttress masterplanning lr
buttress masterplanning lr
Gavin Sorby
 
L'Urbanisme
L'UrbanismeL'Urbanisme
HDAF Jacmel Prototype Village
HDAF Jacmel Prototype VillageHDAF Jacmel Prototype Village
HDAF Jacmel Prototype Village
stlouismichel
 
feb2014 3
feb2014 3feb2014 3
feb2014 3
David Higgens
 
finalpresentation
finalpresentationfinalpresentation
finalpresentation
Matthew Soble
 
Hettien camp
Hettien camp Hettien camp
Hettien camp
University of Jordan
 

Similar to Brochure 0217 (20)

Sue Foster Presentation - Active by Design
Sue Foster Presentation - Active by DesignSue Foster Presentation - Active by Design
Sue Foster Presentation - Active by Design
 
Introduction to the GALRI group--Transformative Concepts for Haiti Regeneration
Introduction to the GALRI group--Transformative Concepts for Haiti RegenerationIntroduction to the GALRI group--Transformative Concepts for Haiti Regeneration
Introduction to the GALRI group--Transformative Concepts for Haiti Regeneration
 
Design Studio-Integrated Technology
Design Studio-Integrated TechnologyDesign Studio-Integrated Technology
Design Studio-Integrated Technology
 
EPCALpaper
EPCALpaperEPCALpaper
EPCALpaper
 
Land 601 f15 burgeoning.1.0
Land 601 f15 burgeoning.1.0Land 601 f15 burgeoning.1.0
Land 601 f15 burgeoning.1.0
 
Focus area Highway 5
Focus area Highway 5Focus area Highway 5
Focus area Highway 5
 
Meanin of urban Population Density
Meanin of urban Population DensityMeanin of urban Population Density
Meanin of urban Population Density
 
Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8Placemaking, Innovation, and Planning: Dublin 8
Placemaking, Innovation, and Planning: Dublin 8
 
Urban Design Portfolio Tim Hays
Urban Design Portfolio Tim HaysUrban Design Portfolio Tim Hays
Urban Design Portfolio Tim Hays
 
March 15 Growth Management Strategy Open House - Presentation
March 15 Growth Management Strategy Open House - PresentationMarch 15 Growth Management Strategy Open House - Presentation
March 15 Growth Management Strategy Open House - Presentation
 
Strategic plan poster final
Strategic plan poster finalStrategic plan poster final
Strategic plan poster final
 
Design alternatives -landscape integration (1).ppsx
Design alternatives -landscape integration (1).ppsxDesign alternatives -landscape integration (1).ppsx
Design alternatives -landscape integration (1).ppsx
 
Gardening Cyberspace Dan Keech
Gardening Cyberspace Dan KeechGardening Cyberspace Dan Keech
Gardening Cyberspace Dan Keech
 
Toufic jreije portfolio
Toufic jreije portfolioToufic jreije portfolio
Toufic jreije portfolio
 
buttress masterplanning lr
buttress masterplanning lrbuttress masterplanning lr
buttress masterplanning lr
 
L'Urbanisme
L'UrbanismeL'Urbanisme
L'Urbanisme
 
HDAF Jacmel Prototype Village
HDAF Jacmel Prototype VillageHDAF Jacmel Prototype Village
HDAF Jacmel Prototype Village
 
feb2014 3
feb2014 3feb2014 3
feb2014 3
 
finalpresentation
finalpresentationfinalpresentation
finalpresentation
 
Hettien camp
Hettien camp Hettien camp
Hettien camp
 

Recently uploaded

CocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdfCocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdf
PabloMartelLpez
 
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
ijk38lw
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
881evgn0
 
一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样
k4krdgxx
 
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
kuapy
 
Getting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by NeontribeGetting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by Neontribe
Harry Harrold
 
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
9lq7ultg
 
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
67n7f53
 
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdfADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
GregMichaelTapawan
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
Kyungeun Sung
 
LGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation TemplateLGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation Template
DakshGudwani
 
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Designforuminternational
 
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
yufen5
 
定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样
qo1as76n
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NishantRathi18
 
modular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdfmodular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdf
RashmitaSwain3
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
lhtvqoag
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
qo1as76n
 
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build  Your Online Presence 2024.pptxBest Digital Marketing Strategy Build  Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
pavankumarpayexelsol
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
Jaime Brown
 

Recently uploaded (20)

CocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdfCocaCola_Brand_equity_package_2012__.pdf
CocaCola_Brand_equity_package_2012__.pdf
 
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
一比一原版(Vancouver毕业证书)温哥华岛大学毕业证如何办理
 
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
一比一原版美国哥伦比亚大学毕业证Columbia成绩单一模一样
 
一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样一比一原版马来西亚世纪大学毕业证成绩单一模一样
一比一原版马来西亚世纪大学毕业证成绩单一模一样
 
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
按照学校原版(UIUC文凭证书)伊利诺伊大学|厄巴纳-香槟分校毕业证快速办理
 
Getting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by NeontribeGetting Data Ready for Culture Hack by Neontribe
Getting Data Ready for Culture Hack by Neontribe
 
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
一比一原版马里兰大学毕业证(UMD毕业证书)如何办理
 
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
一比一原版(CSU毕业证书)查尔斯特大学毕业证如何办理
 
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdfADESGN3S_Case-Study-Municipal-Health-Center.pdf
ADESGN3S_Case-Study-Municipal-Health-Center.pdf
 
International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4International Upcycling Research Network advisory board meeting 4
International Upcycling Research Network advisory board meeting 4
 
LGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation TemplateLGBTQIA Pride Month presentation Template
LGBTQIA Pride Month presentation Template
 
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
Discovering the Best Indian Architects A Spotlight on Design Forum Internatio...
 
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
一比一原版(soton毕业证书)英国南安普顿大学毕业证在读证明如何办理
 
定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样定制美国西雅图城市大学毕业证学历证书原版一模一样
定制美国西雅图城市大学毕业证学历证书原版一模一样
 
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHINHR Engineers Portfolio 2023 2024 NISHANT RATHI
NHR Engineers Portfolio 2023 2024 NISHANT RATHI
 
modular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdfmodular-kitchen home plan civil engineering.pdf
modular-kitchen home plan civil engineering.pdf
 
NHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree TranscriptNHL Stenden University of Applied Sciences Diploma Degree Transcript
NHL Stenden University of Applied Sciences Diploma Degree Transcript
 
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
哪里办理美国中央华盛顿大学毕业证双学位证书原版一模一样
 
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build  Your Online Presence 2024.pptxBest Digital Marketing Strategy Build  Your Online Presence 2024.pptx
Best Digital Marketing Strategy Build Your Online Presence 2024.pptx
 
Heuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdfHeuristics Evaluation - How to Guide.pdf
Heuristics Evaluation - How to Guide.pdf
 

Brochure 0217

  • 1.
  • 2. 1
  • 3. In November 2004, we confirmed our commitment to this commu- nity by signing a partnership agreement with the Inter-Neighbour- ” hood Coalition. Not only does this agreement ensure open dialogue with the community, but it also promotes potential employability, environmental protection, economic development and accessibility. 2 – MUHC on its work to strengthen ties with the communities around the new Glen Campus. THE SAINT-HENRI ANNEX PROJECT PROPOSAL Alex Carruthers - Taleen Der Haroutiounian - Etienne Faucher - Megan Rolph February 2010
  • 4. 3
  • 5. PROJECT OVERVIEW The Saint-Henri Annex is a semi-public, non-profit, training facility designed to create a social and eco- nomic connection between the Saint-Henri community and the new McGill University Health Centre (MUHC) Glen Campus. Made possible through a close collaboration between the Commission scolaire de Montreal (CSDM), the Regroupement économique et social du Sud-Ouest (RESO) and the MUHC, it capitalizes on its physical proximity to the Glen Campus by providing complementary uses that will serve both the community and the hospital. 4 This 4-storey, 80,000 sq. ft public training centre will become a dynamic pole for educational, business and leisure activities. It will include: • 21,000 sq. ft of classrooms and offices for a training facility geared to providing instruction for a variety of occupations in the health care sector. • 23,000 sq. ft of ground-level retail, which will have grocers, cafes and other shops geared to the local community. • 34,000 sq. ft of open floor space for conferences, community use, and open concept office space. The project is expected to cost an estimated $16 million, with a third of the costs to be covered by the government and other public agencies. The public investment will be used to help subsidize the training facility and community space, while the office and retail space will be charged market rates. The rents from the non-public uses, as well as from advertising on the structure will be the primary sources of rev- enue for the Saint-Henri Annex.
  • 6. 5 Saint-Henri Les Tanneries
  • 7. ThE bIg PICTuRE This project is located on the Island of Montreal along the western edge of Saint-Henri at the corner of rue de Courcelle and rue Saint-Jacques Ouest. Saint-Henri was an active factory town where an industrial land use prevailed. Today, it has grown into a quiet community that contains traces of its industrial past within a current mix of residential, commercial and institutional build- ings. The project’s immediate surroundings reflect the crossing point between the different types of uses present in Saint-Henri. An appreciation of the neighborhood’s requirements and concerns was critical for conceiving of a project that helps to link the Hospital and the community. The following is a list of considerations from the community surrounding the Annex project. MUHC Home Depot 6 A Growing healthcare sector Continued operation of their store Health care personnel shortfalls Good neighbourhood relations Integrating with surrounding Community Retention of highway visibility Tanneries Village RCA Complex Between two Megaprojects Heritage property development Lack of quality public space Creating a link to the hospital Lacking amenities Food local cafe A market for new back-lot construction Province St Henri Highway awkwardly dividing neighbours Under employed local population FTQ Development plans on the corner Local heritage Integrating 500 new low income residents Stewardship of healthy local community
  • 8. Employment ac ce ssib greening ilit y ty i vi ec t greening con n 7 Community involvement Partnerships
  • 9. COnCEPT The Saint-Henri Annex is a development that will meet the needs of the community and the demands of the MUHC. The proposed training facility will open up new employment opportunities for the residents of Saint-Henri while satisfying the increasing demand for health care workers at the hospital. The development of a multi-purpose training facility seeks to address the social and economic disparities existing in the neighbourhood. It will also provide much needed amenities, community space, and social services for the area’s residents. The following is a list of considerations for the Annex’s neighbours. The Annex aspires to create new physical, social and economic connections to the hospital through the education and em- 8 ployment of Saint-Henri residents. The Annex will help to address the looming labour shortages in the healthcare sector due to the “greying of the population.” The imminent retirement of many healthcare professionals in combination with swelled demand for health care services from our aging demographic will cause a major strain on Quebec’s healthcare system. Action must be taken quickly to ensure there are enough trained healthcare workers to meet these future needs. Furthermore, the changing structure of the health care system has led to more specialized occupations and the downloading of work to lower level occupations, creat- ing demand for workers such as beneficiaries, assistant nurses, pharmaceutical assistants and medical secretaries. RESO, whose responsibility is to develop strategies to promote job creation in the South-West Borough, should work closely with the Saint-Henri Annex to create opportunities for the residents of the Borough from the forthcoming challenges that face the Quebec healthcare sector.
  • 10. PART I – SITE FACTS The project site is situated on a 31,000 square foot The Saint-Henri Annex project maximizes the triangular-shaped plot of land at the corner of rue potential of the site while conforming to all of de Courcelle and rue Saint-Jacques. Its third edge the zoning by-laws and requirements set by the is bound by both the Hwy. 720 overpass and the Sud-Ouest borough (see Table 1), other than a Saint-Jacques Escarpment. minor variance to include institutional uses on the site. The land is currently divided into eight lots. Of these, two are owned by a private landowner, 9 while the remaining lots are owned by the City of Montreal. Existing structures on the land include a small, vacant, 2-storey building on the private landowner’s property, and a large billboard pole that contains two advertising sides facing the ve- hicular traffic on the Hwy. 720 overpass.
  • 11. PART II – ThE buILDIng The design of the proposed building reflects the role of the building and serve as a sustainable technical of the Saint-Henri Annex as the point of interaction remedy to absorb stormwater and reduce the heat is- between Saint-Henri and the MUHC Glen Campus. land effect of the immediate area. The portion of the building that fronts rue de Courcelle is a 4-storey (approximately 12.5m) rect- angular building designed in a traditional style with brick and steel to pay homage to Saint-Henri’s ex- isting built heritage and industrial past. The 4-storey glass and steel structure fronting 10 rue Saint-Jacques follows the triangular shape of the lot’s remaining area. Its street facade takes full advantage of the site’s southern exposure, and its wavy shape invites pedestrians to the Villages des Tanneries and a path leading up to the MUHC Glen Campus. A one-storey, below-grade parking lot with ap- proximately 50 parking spaces is located directly underneath the building. As a building for the people of Saint-Henri, the build- ing is designed to maximize the pedestrian-friendly environment and minimize its environmental impact. The top two storeys are set back from the property line to create a comfortable environment for pedes- trians while integrating with the facade height of the surrounding buildings. Extensive green roofs will contribute to create more pleasant views
  • 12. DIVISIOn OF SPACE TRAINING FACILITY GROUND FLOOR RETAIL The top three storeys fronting on rue de Courcelle will contain A cafe, bakery, small grocer and pharmacy – these are the types classrooms and laboratories exclusively for job training in health of retail the Saint-Henri Annex project is designed to attract on care related services. One possible tenant is a nurse training pro- the ground level of the building to serve both the MUHC and gram currently offered by the Centre de Saint-Raymond, which is Saint-Henri. The project’s location, and the density of the sur- managed in partnership with the City of Montreal and the CSDM, rounding area, makes the addition of retail very feasible and located in Notre-Dame-De-Grâce. The nursing program current- attractive. The configuration of the road network puts the Saint- ly occupies three classrooms and one computer lab but they have Henri Annex project at the crossroads of important arteries expressed an interest to enlarge their facilities. The ample class- which ensure strong accessibility of the site to potential clients. 11 room and office space offered in this building, and its proximity Storefronts facing both rue Saint-Jacques and rue de Courcelle to the MUHC Glen Campus, would provide a suitable option for will benefit from the MUHC employees and residents of the Vil- their expansion. lages des Tanneries passing by throughout the day. Development at the RCA building and the affordable housing project across the street will increase pedestrian and vehicular activity. More- over, there is a current demand for small-scale retail to serve the community residents in this area of Saint-Henri.
  • 13. DIVISIOn OF SPACE OPEN-CONCEPT OFFICE SPACE Flexible, open-concept office spaces that can be transformed to meet the needs of the community and the MUHC are located on the top three storeys of the portion of the building fronting rue Saint-Jacques. The generous floor space provides enough room to meet the needs of companies that are seeking an open-concept work space. The MUHC is also antici- pating a need for a large space located off the Glen Campus grounds that can be rented occasionally for 12 conferences or job recruitment fairs, the proposed open-concept floor plan will easily accommodate these activities. These flexible and adaptable office spaces could also be used for other social services, such as an employment centre or a day care facility for the residents of Saint-Henri.
  • 14. OuTDOOR PubLIC SPACE The remaining space on the Saint-Henri Annex lot will serve as Saint-Jacques Escarpment situated behind the building un- an attractive interface between the building and its surround- der the Hwy. 720 overpass. This escarpment has a history of ings while providing both environmental and social benefits. eroding and causing mudslides, and unless the escarpment There will be a landscaped public space with seating, bike racks is landscaped with erosion-prevention methods this prob- and a public fountain on the corner of rue Saint-Jacques and rue lem will only get worse with the stormwater runoff from the de Courcelle. Bollards and other traffic-calming design features MUHC Glen Campus. Landscaping the escarpment will also will be located along rue Saint-Jacques to protect and insulate create a connecting corridor between the Saint-Henri Annex people using this space from the high volume of speeding traf- project site and the green space on the MUHC Glen Cam- fic that exists along this corridor. This public space will form a pus. connection with the public community garden found across rue Saint-Jacques in the Village des Tanneries and with the open Development of open space areas can also benefit from a 13 space across the intersection. partnership with Home Depot to assist in the landscaping. Home Depot’s previous work in the Village des Tanneries Although outside the Saint-Henri Annex project boundaries, it demonstrates its com is highly recommended that landscaping take place on the
  • 15. OuTDOOR PubLIC SPACE mitment to community involvement. Funding is al- Saint-Jacques to help buffer pedestrians from the ready available through the Home Depot’s “Building traffic along the busy corridor. On street parking Healthy Communities” grants which are awarded would also help support the retail businesses lo- to registered non-profit organizations. One of these cated on the ground-floor of the Annex. grants was used in a similar project to landscape and incorporate a mountain bike trail under the Interstate 5 Highway in Seattle, Washington. Most important- ly, a partnership to landscape the Saint-Henri Annex project will give Home Depot the opportunity to be- come involved in the process of connecting the com- munity and MUHC on this site. 14 Underground parking for 50 cars will be provided underneath the Saint-Henri Annex, free of charge. Parking will be provided for the teachers and stu- dents of the training facility, for the office tenants, and for those wishing to park in order to shop at the various retail outlets. It is also recommended that on street parking be considered on the north side of rue
  • 16. mercial space to be rented, allowing for a variety of retail opportunities in the Saint-Henri Annex. There is also a significant amount of space for of- fices, with 34,000 square feet, allowing for ap- proximately 153 office units at $21 a square foot. PART III – FINANCIAL FEASABILITY Classrooms have also been included as a small revenue source. They are charged the lowest COSTS rents, at $12 a square foot, with an area to allow for 30 classrooms in the building. Based on these The total cost of the Saint-Henri Annex is rough- revenue streams, the building will need to charge ly $16 million. A third of the principle costs will on average $23 a square foot in order to ensure a be covered by the government, which is approxi- positive net present value. A final revenue source mately $5.5 million. Due to the public nature will come from advertising, which presently ex- and potential social benefits of the Saint-Henri ists on the site. Advertising draws $240,000 in Annex, a government grant will be the primary revenue every year which will be used to help source of equity. Beyond the costs of land ac- subsidize the training facility. quisition, construction, and demolition, costs have been incorporated for soil decontamination PRO FORMA for the entire site, up to two metres deep. Also included is green roofing for the portion of the Based on the costs and revenues discussed above, building facing rue Saint-Jacques. Furthermore, a financial feasibility study was conducted. Inter- the project includes one level of underground est rates have been set at 5%, amortized over a parking for up to 50 cars. The cost table shows 20 year period. Inflation has been included at 3% the cost per square foot, the area, total costs, and and applied to both rents and advertising revenue. the weighted average per square foot of $146 (not Based on these assumptions this plan will have a including land acquisition), which is used in the Net Present Value of $826,271, a Return on In- final pro forma. vestment of 8%, a Return on Equity of 12% and an Internal Rate of Return of 10%. With these re- REVENUES turns, the Saint-Henri is financially feasible and a worthwhile investment for the long-term eco- Revenue sources include ground floor commer- nomic health of the community. cial: which is charged the highest rents at $36/ square foot, to help fund the building’s other uses. There is roughly 23,000 square feet of com-