1. BNZ – Gen-I Server
Replacement
National - 2007
Client:
Gen-I (Direct)
BNZ Bank (Indirect)
Location
National Services
Type of Service
Removal and Installation of Server
Cabinets
Scope of Services
Downer Engineering's services
include:
• Risk Mitigation (via Dry Runs)
• Removal of existing cabinets
• Installation of new hardware
Overview
Downer Engineering recently secured
and implemented the removal and
installation of BNZ branch server
cabinets through a joint service
delivery, in contract with Gen-I.
To successfully provide a results
focused solution for our client and
meet the high demand requirements,
Downer Engineering and Gen-I
completed “dry runs” to document a
strategic implementation plan to allow
suitable risk mitigation prior to service
delivery.
Downer Engineering took ownership
of removing the existing server
cabinets and the installation of new
hardware. From this point, Gen-I
completed software upgrades/testing,
resulting in an end to end solution for
BNZ.
With BNZ’s IT business continuity
sustained by the operation of the
servers involved with this project,
resulted in a high demand mission
critical environment involving multiple
parties and open channels of
communication between Downer
Engineering, Gen-I and BNZ IT staff.
Downer Engineering provided a
central point of contact for all
project management, providing
consistent high levels of service
delivery.
This project was completed over
several months with the utilisation
of a core team operating via our
Wellington operation.
Total value of the project $359k