3. BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
FOREWORD //
54
The size and complexity in construction today has a substantial influence primarily
through the capital increase in infrastructures, building and real estate. Furthermore,
owners and developers in any field have challenges to overcome. New tools and
processes can help the owner and developer to become successful by streamlining
project delivery. BIM is a comprehensive process, as it is found in every phase of a
construction project and involves all parties – from idea to delivery – as a holistic, end-
to-end information-rich approach to the building lifecycle.
In order to maintain control in owner organizations, which is a crucial need, vital
decisions have to be made when initiating a project. Owners and developers must
prioritize working closely with designers, technicians, contractors, suppliers, and
facility and asset managers to build the information connectors that allow all
stakeholders to work more closely as a collaborative team. Owners and developers
must also embrace and understand emerging technologies and IT systems in order to
support effective project delivery.
The online program created by Zigurat and BIM Academy is focused on studying
these challenges to help lead the way while providing solutions. The “BIM for Owners
Developers Global Executive Program” links capital project delivery to total
lifecycle costs and leverages emerging technologies, new IT processes and industry
standards. The professors and professionals in the global executive program ensure
that information management, cost control, smooth data handovers and enhanced
productivity are prime objectives.
The “10 Dimension BIM Project” examines everything from tools to processes. It
demonstrates how building information modeling – BIM – can be used for checking
code compliance, tracking capabilities, managing library materials, and exchanging
supplier information through case studies that cover all kinds of managed projects.
One of the main challenges for an owner is enhancing productivity while ensuring
capacity at engineering, architecture, and construction sites where new materials,
equipment, and hardware are used daily. New software applications aid the program-
design-build-operate-renovate spectrum by linking 3D models, project execution and
supplier information while enabling owners and developers to visualize construction
progress related to costs over time. Additionally, these 5D cost-related, virtual specific
applications are contextualized to resolve issues early in the process – prompt enough
so they will be identified before initiating construction. Introducing mobile apps can
also enhance productivity, by bringing the same 4.0 Digital Industry characteristics to
the building sector.
All of us want to grow our assets, and new digital technologies in our sector are playing
a big role. As a matter of fact, our future depends on them, as does the industry’s.
Zigurat and BIM Academy have created an opportunity for owners and developers
in the building projects industry to effectively identify issues and overcome
overwhelming challenges. The real-world objectives of meeting cost, schedule
and execution benchmarks while providing improved safety measures, quality and
reliability to the world’s infrastructure are the goals of this executive program.
This is our commitment.
This executive program is the first program designed and created for Owners and
Developers with sponsorships from buildingSMART
FOREWORD
IGNASI PÉREZ ARNAL
CEO of BIM Academy
5. BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
WHO ARE WE? //
9
WHO
ARE WE?
Zigurat is a global institute for architects,
engineers, owners and developers. We
teach key skills to professionals in the AECO
(Architecture, Engineering, Construction and
Operations) industry. We have been offering
certified qualifications, Master’s degrees and
postgraduate courses for the past 15 years.
Our strategic plan is focused on three key
points: providing the best online education
designed according to the needs of the
industry, further developing of our training
programs for the international market, and
launching a strategy to help professionals to
attain top job positions at a global level.
Zigurat’s mission is to promote continued
progress in the practices of architecture,
engineering, construction and building
development. We have more than 120
professionals from over 15 different
countries who are dedicated to sharing their
knowledge and experiences, which have
become international benchmarks, with
students who wish to achieve professional
success through certified programs.
6. 15 YEARS
40+ PROGRAMS
3 LANGUAGES
200+ PROFESSORS
60,000+ STUDENTS
55+ COUNTRIES
10+ INDUSTRY CERTIFICATIONS
50+ BUSINESS PARTNERSHIPS
500+ JOB OPPORTUNITIES PER YEAR
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
WHO ARE WE? //WHO ARE WE? //
1110
CONCEPTUALIZE
· Demanding market
· Exponential
technological
advancement
· Specialized industry
· Digital world
· Global business
EXPERTISE
· Industry skills
· Real projects
· Collaborative
teamwork
· Methodology / Processes
· Global networking
ESTABLISH
· Leadership skills
· Management skills
· Business knowledge
· Professional growth
· Global partners
SOLUTION
HOW TO GUARANTEE THE PROFESSIONAL APPROACH
ACCOMPLISHMENT
· International companies
· Certification
· Recruitment
· Business opportunities
· Global institution
· Professional programs
· Internationally recognized
professors
PROFESSIONAL OUTREACH
BIM implementation is the unpaved road to a better, faster,
more cost-effective practice in the AECO industry. Through
our partnership with BIM Academy, we have professors from
London, Barcelona, Melbourne, Paris, Helsinki, Brescia, Porto,
Cape Town, Munich, Portland, Mexico DF, Lima, Buenos Aires and
other cosmopolitan cities, who collectively train professionals
and students to be the best certified BIM professionals. The BIM
for Owners Developers Global Executive program has been
cultivating professionals in the industry, leaving a trail of highly
established references in the sector.
BIM creates value from the combined efforts of professionals,
processes and technologies. The future of construction is
to target lower costs, faster delivery and improved safety
measures on each project. For over three years, we have been
active members of buildingSMART. Through our numerous
professional qualifications, our institute enhances employability
and empowers professionals to work anywhere around the
globe. Today there is far more integration and collaboration,
and more engagement is happening at a faster, more productive
speed. All stakeholders are now more than ever capable
of establishing common standards, and can cooperatively
share viable data amongst one another. The BIM for Owners
and Developers Global Executive Program can guide the way
by increasing BIM expertise and adoption amongst AECO
collaborators. Therefore, we offer a structured approach to
digitally augmented studies that formally train individuals to
attain success in the AECO Industry.
FACTS
RESEARCH AND INNOVATION
Zigurat nurtures innovation and embraces possibility. We believe in the ongoing
development of ingenious processes in e-learning under collaborative cloud platforms,
which allow students to recreate real-world workflows around the globe. Our R D
team has developed a number of platforms in different languages that reach more than
56 different countries.
NETWORK
Zigurat’s capacities and standards have enabled us to collaborate with companies,
associations and governments globally, which is essential to professional growth.
Our aim is to bring both students and professionals to a global business world by
developing and training them professionally. For this reason, we collaborate with
numerous architectural firms, general contractors, engineering firms, government
agencies, professional associations and human resources departments.
7. WE CURRENTLY HAVE 60,000+
PARTICIPANTS WORLDWIDE
FROM APPROXIMATELY 11,000
COMPANIES RELEVANT TO
THE AECO INDUSTRY
8. OUR ACADEMIC PARTNER //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
15
BIM ACADEMY
OUR
ACADEMIC
PARTNER
BIM Academy is powered by WITS Institute (What Is The
Situation Institute). WITS is an organization that understands
what happens today in society and pays close attention to
our development, transforming people through training and
education.
Their mission is to help improve the world by programming
a new way of training with “transdisciplinary” content. The
ultimate goal is to enable learning as an experimental, positive
and conscious act.
BIM Academy was founded by Ignasi Pérez Arnal and Marc
Binefa in 2012. In addition to the team’s involvement in the BIM
community, they helped establish other ventures, including
Biomimetic Summit®, Crea HOUSE and European BIM Summit.
9. OUR ACADEMIC PARTNER //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
17
SOLUTION
INNOVATION
CONSULTING
TRAINING
VERSATILITY
PUBLICITY
BIM Academy provides corporate
solutions that optimize the planning,
construction, maintenance and
renovation of real estate assets.
The Academy is committed to BIM, and
has been teaching this methodology in
classrooms since 2012. This qualifies
them as groundbreaking leaders in BIM.
Any company, public institution or private
owner that manages facilities and assets
can benefit from BIM.
During 2015, BIM Academy trained more
than 4.000 students. Their staff was
responsible, in total, for more than 2,000
hours of teaching.
BIM Academy trains students in a
variety of positions: architects, builders,
contractors, civil engineers, maintenance
operators, designers, builders, owners,
developers and public administrators.
One of BIM Academy’s priorities is
to publicize BIM. For this reason, the
Academy spreads the word among AECO
industry agents and decision makers.
4.000 +
STUDENTS
9 PARTNER
INSTITUTIONS
2.000 +
TEACHING
HOURS
10. BIM OUTLINE //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
19
BIM
OUTLINE
BIM (Building Information Modeling) is an integrated process that is supported by a range of software. This reliable
information enables professionals to coordinate data about a project from design through construction and
operations. A BIM project models all data related to design, costs, safety, clash detection, scheduling, sustainability
and efficient facilities management. It operates on a cloud-based platform that can be shared between owners,
developers, architects, engineers, contractors, manufacturers, builders and facility managers.
BIM
This is referred to as the “building
lifecycle.” In BIM, we are able to
control the different life stages of
a project: the pre-construction,
construction and post construction
phases.
A model is created by incorporating data
that represents various factors that make
up a project: urban planning, architecture,
safety, structure, sustainability, assets and
viability, among others.
BIM facilitates the exchange of
information amongst all parties involved
in a project. Therefore, BIM will impact
business management and operations.
It will change the way we work and
create closer collaborations between
all construction professionals. It will
also bring design teams together with
construction teams.
BUILDING MODELING
INFORMATION
Information such as 3D views, drawings,
construction details, technical
specifications, structural calculations,
facilities calculations, energy efficiency,
measurements, budgets, planning, and
maintenance is generated throughout the
life cycle of a building,
11. BIM OUTLINE //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
21
EFFICIENCY
-
MANAGEMENT
-
CONTROL
-
QUALITY
-
INTERNATIONAL DEMAND
-
Changing the workflow of a company and optimizing a building model with BIM
software enables the end user to increase productivity by 25-35%. Traditional
modeling can no longer compete against a company that adopts BIM in a holistic way.
Working collaboratively on a project allows for quicker execution and
communication in real time, without the need to repeat an infinite number of tasks
that, until now, have been necessary when changes to the project occur.
The interoperability between software programs allows us to link our BIM models
with specialized tools in the areas of mathematics and management, to assist with
estimates and budgets, infrastructures, installations, energy efficiency and more.
BIM models allow the user to reach a high level of development while performing
faster and working more consistently.
Today’s global market increasingly demands the delivery of projects in BIM
format. It is anticipated that, by 2020, it will be a mandate in most countries.
Today, governments and financial institutions highly value public projects
delivered in this format. It is preferred because it is the only valid system for
growth. Governments in the UK, Singapore and South Korea have made it
mandatory to use BIM in all construction, and this is expected to boost the
growth of the BIM market in those countries.
AECO industry stakeholders indicate that using BIM results in time and cost savings. The development and
execution of a building information model for the purposes of project planning involve design, pre-construction
and construction phases, with advantages for each of them.
WHAT ARE BIM’S ADVANTAGES?
BIM IS A HOLISTIC
PROCESS, TOUCHING
EVERY PHASE OF A
CONSTRUCTION
PROJECT AND ALL OF
THE PARTIES INVOLVED,
FROM PLANNING TO
COMPLETION AND
COMMISSIONING
TO HANDOVER
12. BIM OUTLINE //BIM OUTLINE //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
2322
BIM
EXPERT
BIM
MANAGER
A BIM expert will learn the management
of advanced BIM systems and their
interoperability. The expert will also
demonstrate IT manager skills, and will
manage and develop libraries.
The BIM Manager has the skills necessary
for the management of collaborative teams
and the implementation of BIM systems
across all workstations.
Owners and developers need a BIM team that is able to manage the various phases of a construction
project and its operation.
The owner or developer requires an integrated project delivery (IPD) approach for their projects, a
method of collaboration that uses the talent, experience and input of all team members right from
the start of the project.
The objective is to optimize the entire BIM process, to enhance the project during its life cycle.
BIM
INTERIOR
ARCHITECT
-
BIM
ARCHITECT
-
BIM MEP/
STRUCTURE
ENGINEER
-
BIM
PROJECT
MANAGER
-
BIM
CONTRACTOR
BUILDER
-
BIM
BIOCLIMATIC
DESIGNER
-
BIM FM
FACILITIES
MANAGER
-
A1 B1 A1 A3 B1 A1 A2 A3 B1 A1 B1 B3 A1 B1 B2 A1 B1 B2 B3 A1 B1 B2 A1 B1 A1 A2 A3 B1 B2 B3 C1 C2 C3 A1 A2 A3 B1 B2 B3 C1 C2 C3
Digital Model Digital Model Digital Model Digital Model Digital Model Digital Model Digital Model Digital Model Digital Model Digital Model
Collaborative Teamwork Advanced Modeling Model Documentation
Collaborative
Teamwork
Collaborative
Teamwork
Collaborative
Teamwork
Collaborative
Teamwork
Collaborative
Teamwork
Model Documentation Model Documentation
Collaborative
Teamwork
Advanced Modeling
MEP/ Struct.
Interoperability
4D, 5D, 6D ,7D
Interoperability
4D, 5D, 6D ,7D
Interoperability
4D, 5D, 6D ,7D
Interoperability
Asset
Management
Advanced Modeling Advanced Modeling
Collaborative Teamwork
MEP/ Struct.
Interoperability
Collaborative Teamwork Collaborative Teamwork
4D, 5D, 6D ,7D Interoperability 4D, 5D, 6D ,7D Interoperability
MEP/ Struct. Interoperability MEP/ Struct. Interoperability
BIM Objects Development
BIM Libraries Management
BIM Objects Development
BIM Libraries Management
BIM Style Guide BIM Style Guide
IT Management IT Management
BIM Systems Implementation
BIM Systems Management
BIM
SPECIALIST
OWNERS
DEVELOPERS
BIM
COORDI
NATOR
A BIM specialist contributes to a project by using
advanced software modeling throughout the project’s full
lifecycle.
The BIM coordinator has the
skills necessary to manage and
coordinate users and teams on a
BIM project.
BIM PROFILES
A1: Digital Model
A2: Model Documentation
A3: Advanced Modeling
B1: Collaborative Teamwork
B2: 4D, 5D, 6D Interoperability
B3: MEP/Struct. Interoperability
C1: BIM Objects Development. BIM Libraries Management
C2: BIM Style Book
C3: Information Management
13. BIM OUTLINE //BIM OUTLINE //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
2524
BIM ACCORDING
TO DIFFERENT PROFILES
European Directive 2014/24/EU,
implemented in 2016, requires European
public administrators to use digital
systems in their design and bidding
processes.
MANAGER
(PUBLIC SECTOR)
Currently a project manager specializing
in BIM is a key figure in businesses. There
is growing demand in the AECO industry
for professionals who can excel at this
profession.
PROJECT
MANAGER
66% of developers believe that architects
and contractors should provide their
projects in BIM format.
PROMOTER
Owners in the UK are using “BIM for
Facility Management,” capitalizing
on the benefits of BIM to reduce cost
not only in design and construction,
but also throughout the life cycle of
building.
FACILITY
MANAGER
75% of construction companies recognize
that their investment in BIM has earned a
positive return on investment.
ARCHITECT,
ENGINEER AND
BUILDER
One-third of building owners require BIM
for all new projects.
OWNER
BUILDING OWNERS’ DEVELOPERS’ OBJECTIVES
BIM enables an organization to compose virtual representations
of the building or infrastructure as it would be constructed on-
site, before the actual development has started. As information
is updated at each step of the BIM process, it is conveyed to the
next phase without any loss or repetition of information. Any
stakeholder can access the model to enter, update, or extract
information at any point during the construction lifecycle. When
the tasks are completed, the model can be delivered to the
owner or facility manager. Owners can see and track resources
over time. There are specific instances, such as insurance claims
or dispute resolutions, in which it is important for an owner to
be able to reproduce the building’s appearance prior to any
refurbishments or expansions. Additionally, the owner’s BIM
model and database can be linked to facility management
software to schedule any kind of maintenance on the equipment.
Thus, the progressive model can be used to operate the building
through its entire life.
BIM MODEL FOR OWNERS
Owners have a unique perspective on the value of BIM for their
projects. BIM tools and processes for owners can be integrated
with other digital tools, and are flexible when it comes to
focusing on facility operations and related data for completion.
An owner should outline a strategy for implementation within
the BIM operations; it should consist of a combination of the
designers’, contractors’, and building product manufacturers’
contributions to the BIM model that includes information
about the building, from planning to completion, and from
commissioning to handover.
An owner’s BIM model serves not only as a virtual model but
also as a database that contains all of the information about
a building’s space, equipment, furnishings, installations and
critical warranties, in both a graphical and non-graphical
format. Ideally, the architect’s BIM model will be used by the
contractor, who will analyze the practicality of the design and
add information using the product manufacturer’s models. After
the construction is completed on-site, the model will be updated
with all of the as-built information. The model will then include
all of the necessary information on design and construction,
enabling the contractors to update the model as equipment is
installed and new information is available.
IPD – INTEGRATED PROJECT DELIVERY
Each team member has personal interests and goals in regards
to the project. Owners must engage the entire team to work
in unison with a common vision, adopting new and more
efficient methods of project delivery. In order to improve this
kind of efficiency, the entire process must maintain a high
level of coordination. Good integration is vital for optimizing
information and process. Many owners require an integrated
project delivery (IPD) approach to their projects, which is a
method of project collaboration that incorporates the talent,
experience and input of all of the team members right from
the beginning of the project. Owners who implement IPD must
think ahead to leverage BIM for its maximum capabilities. In an
IPD arrangement, all project members must collectively work
toward one common goal – the success of the project.
COMMUNICATION
The need for communication is essential to any organization.
Automated systems such as web collaboration have added
value to the equation. Technological advances and mobile
devices have improved the ability to communicate, but have not
necessarily improved the quality of communication. BIM has the
potential to bring a new level of quality communication to an
owner. Due to the volume of data generated, it can help provide
control during all building or infrastructural operations.
BIMPROGRAMMING
BUILDING INFORMATION
MODELING
CONCEPTUAL
DESIGN
DETAILED
DESIGN
ANALYSIS
DOCUMENTATION
FABRICATION
CONSTRUCTION
4D / 5D
CONSTRUCTION
LOGISTICS
OPERATION
MAINTENANCE
RENOVATION
14. BIM OUTLINE //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
26
20%
REDUCTION OF
OVERALL COSTS
IN CONSTRUCTION
47% - 65%
REDUCTION OF CONFLICTS
AND REPEATED ERRORS
DURING CONSTRUCTION
33%
REDUCTION OF
MAINTENANCE
COSTS DURING THE
BUILDING’S LIFE CYCLE
44% - 59%
INCREASED
PROJECT QUALITY
35% - 43%
RISK REDUCTION,
IMPROVED
PREDICTABILITY
34% - 40%
BETTER PERFORMANCE
FOR THE ENTIRE
INFRASTRUCTURE
32% - 38%
IMPROVEMENT
IN CONTROL AND
SUPERVISION
THE BUSINESS VALUE OF BIM
FOR OWNERS AND DEVELOPERS
Interoperability between software programs allows the
link between specific BIM model calculation, analysis and
management tools.
Seeing a project in three dimensions brings greater
understanding of the design proposal to all agents involved at
any stage of a building’s life cycle.
GREATER CONTROL OVER
THE PROJECT
3D DISPLAY
REDUCTION OF COST AND
TIME OF CONSTRUCTION
GLOBAL DEMAND
EFFICIENCY
COORDINATION
COLLABORATION BETWEEN
PROFESSIONALS
A virtual model allows you to know if there are conflicts in the
design and to resolve them before starting work. This saves time
and project costs, and helps to optimize the actual construction.
There is a growing demand in the market for delivering projects
in BIM format. It is anticipated that by 2020 it will be mandated
by most western countries.
Companies that deal with BIM software see increases in
productivity between 25% and 35%, making them more
competitive in the market.
BIM facilitates team operations in real time, with greater agility
and communication between professionals, in addition to
ensuring compliance with scheduled delivery deadlines.
* Project developed in the International BIM Management Certification program
Olympic Tower | Maputo (Mozambique)
Atelier Nuno Lacerda Lopes
15. BIM OUTLINE //BIM OUTLINE //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
2928
Note: This is a basic graphic, the complete chart is too complex to simplify
OWNERS DEVELOPERS
PROJECT BIM MANAGER
BIM COORDINATOR
TECHNICAL BIM MANAGER CONSTRUCTION BIM MANAGER
COMMON DATA ENVIRONMENT
INFORMATION MANAGER
INTERNAL BIM MANAGER INTERNAL BIM MANAGERTECHNICIANS TECHNICIANS
MODELS
DESIGN
SIMULATION
ASSEMBLING
DRAWINGS
MODEL CHECKING
SEQUENCING
FABRICATION
COSTING
OPERATION RENOVATION
BIM can be used for creating as-built documentation, space
reporting, spatial management, and tenant management
for existing buildings, as well as evaluate how well a
proposed design meets the program requirements.
IPD (INTEGRATED PROJECT DELIVERY)
Owners can protect their own interests and achieve their
goals by adopting new methods of project delivery that
engage the entire team to work outside the norm.
LEAN PROCESS
Lean construction is the process of reducing waste (time,
material, and labor) and increasing value.
Typically, the waste that is reduced in the Lean process consists
of change orders, poor information flow and rework. The
objective is to create value from the new asset.
OPPORTUNITIES
FOR BIM OWNERS DEVELOPERS
BIM’s role in the future for owners and developers is on the rise
as more companies come to understand its uses as even more
manufacturing takes place. Job training is gaining importance,
and software-based fabrication engineers are better informed.
Factors such as increasing ROI are providing positive feedback.
The top project-related benefits that contractors enjoy thanks
to BIM are reduced errors, fewer omissions and less reworking,
all of which have immediate positive impacts and contribute to
stronger ROI.
Contractors cite BIM’s ability to enhance collaboration amongst
key team members as its most important contribution to
improving the project delivery process. The more deeply
construction companies are becoming engaged with BIM, the
greater their ability to receive its benefits and to generate a very
high ROI.
· Three quarters of construction companies report a positive ROI
on their BIM program investment, and have clear ideas about
how to further improve ROI.
· Fewer errors and omissions, less rework and lower construction
costs are among the top five BIM benefits cited by contractors.
PROPERTY OWNER
One-third of property owners are required to implement BIM in
all new projects.
DEVELOPER
65% of developers ask all contractors and architects to
implement BIM.
PUBLIC ADMINISTRATIVE MANAGER – FACILITY
MANAGER
Facility managers in the UK are using BIM to capitalize on
benefits, like cost efficiency and an improved lifecycle for
building projects.
ENGINEER, ARCHITECT AND BUILDER
75% of construction companies believe that their investments in
BIM has increased their ROI, which in many cases exceeds 25%.
PROJECT MANAGER
A Project Manager who specializes in BIM is a key figure for
business. There is growing demand in the AECO industry for
professionals who can excel at this profession.
· Over the next two years, contractors expect the percentage of
their work that involves BIM will increase by an average of 50%.
· ROI increases directly with a contractor’s level of BIM
engagement, as represented by BIM experience, skill level and
commitment to doing a high percentage of their work in BIM.
· Contractors in all markets are planning significant investments
to expand their BIM programs over the next two years, including
an increasing focus on internal and external collaborative
procedures, as well as on mobile hardware and BIM software.
Owners’ demand for BIM has had a two-fold increase over the
last few years, and is currently being mandated by federal
agencies in the US, as well as governments in Europe, Singapore,
Australia and other countries around the world. This is due
to improvements needed in the traditional construction
process, saving a tremendous amount of time and money while
mitigating risk for the project stakeholders involved.
Note: ROI = Return on Investment
16. “BIM IS A TRANSFORMATIVE TECHNOLOGY, VERY SIMILAR
TO THE INTERNET. MUCH LIKE INTERNET ADOPTION, IT IS
INITIALLY BEING USED TO AUTOMATE KNOWN WORKFLOWS
AND LEGACY INFORMATION. AS THIS TECHNOLOGY BECOMES
BETTER UNDERSTOOD, IT WILL SOON BE USED TO CHANGE
AND IMPROVE CONSTRUCTION PROCESSES. FUNDAMENTALLY,
THE OWNER COMMUNITY HAS NOT BENEFITED FROM THE
INFORMATION AGE, WHILE THE ADVENT OF TECHNOLOGY
HAS CREATED A HIGH LEVEL OF TRANSPARENCY TO THE
CONSUMER. BIM IS CHANGING THE OWNER’S PROCESSES
AND SHAPING THE WAY THEY DO BUSINESS.”
K. Pramod Reddy, co-director of the program, “BIM for Building Owners and Developers”
OVERVIEW //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
31
OVERVIEW
17. OVERVIEW //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
33
COMPANY PROFILE
45% Small companies
less than 50 employees
40% medium companies
less than 250 employees
15% large companies
more than 250 employees
RANGE AGE:
35 - 55 years old
PROFESSIONAL EXPERIENCE:
10+
COMPANY MEDIAN NETWORK:
USD 20M+
PARTICIPANT PROFILE
PROFESSIONAL PROFILES:
· General Managers
· General contractors and civil workers
· Design and engineering
· Maintenance, Operators
· Manufacturers, Production, Quality assurance
· Software developers
· Managers, Administrators, Financiers
· Analyzers, Researchers Developers, Innovators
· Lawyers
· Marketing, Sales, Customer relations
ORIGIN
EUROPE
ASIA
N. AMERICA
AFRICA
S. AMERICA
OCEANIA
MIDDLE EAST
30%
25%
10%
1%
10%
4%
20%
ENROLLMENT BY PROFILES
Owners / Developers 34,87%
Facility Managers 23,09%
Construction Managers / General Contractors 23,47%
Lawyers 16,04%
Others 2,53%
BUSINESS SECTOR PROFILES:
· Architectural firms, design engineering firms, audit
certification firms, design agencies
· General Contractors, builders, civil works engineers, property
developers, planners
· Public administration, property managers, operators, real estate
service providers
· Software developers, providers of digital services
· Manufacturers
· Investors, banks, insurers, law firms
· Lawyers
· Marketing, Sales, Customer relations
BUILD A
CAREER
DEVELOPMENT
PROGRAM
AROUND YOUR
PROFESSIONAL
LIFE
18. OVERVIEW //OVERVIEW //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
3534
CONCEPTUALIZING
YOUR STUDY:
FROM A METHODOLOGY
STANDPOINT
Software applications are
presented during program
studies.
SOFTWARES
Training programs meet the standards of
North America, South America,
Asia-Pacific, Europe and Africa.
INTERNATIONAL
CODES
Explore an online environment
with forums, downloadable
content, live streams and
customized teaching assistance.
VIRTUAL
CAMPUS
Allows access to
multimedia content
from a tablet or
mobile device.
QR CODES
Professionals in the AECO industry
develop in-depth topics on
the study program regarding
questions participants may have.
VIDEO
CONFERENCES
WITH INDUSTRY
EXPERTSRecognized experts around the
world have developed case studies
that are easily extrapolable to day-
to-day business.
WORKING WITH REAL
CASES EXPERTS
You can print the notes or
study directly from your
tablet or mobile devices.
NOTES
Twice a year,
participants are invited
to visit a BIM Hot Point
around the world to
get real contact with
relevant projects.
The participant has
different BIM approaches
- software hardware -.
VISIT TO BIM
PROJECTS
BIM SERVICE
LEARNING METHODOLOGY
-
Zigurat utilizes a virtual platform where you will find
documentation for your Executive Program, composed
of interactive notes and explanatory videos. There, you
can regularly interact with other participants, board
members and tutors through online forums. Our tutors
are responsible for posting study materials for any and all
classes there.
Tests, projects and case studies are reviewed and
corrected by the professors. Once corrected, all
explanations and solutions will be given to the participant
personally. In addition to this, seminars will be held online
and live presentations will be retransmitted through
online videoconferences.
WHO IS THE EXECUTIVE
PROGRAM FOR?
This program is aimed at all professionals – owners and
developers – in the AECO industry who want to specialize or
expand their knowledge in BIM. Owners and developers who
complete the program will understand and learn to manage
the BIM stages in the life cycle of a project or asset. At the
same time, the participant will obtain broad discretion in the
implementation and management of BIM in large and small
companies (Big BIM and Little BIM).
WHY COMPLETE OUR
EXECUTIVE PROGRAM?
BIM Academy helps participants develop a variety of skills
through the BIM for Owners Developers Global Executive
Program:
· Advanced management across any platform of BIM
· Advanced management for BIM tools: planning and
management, measurements, budgets and energy analysis,
financial follow-up
· Advanced knowledge in the interoperability of various
programs prescribed in each phase of a project
· Knowledge of the advantages, disadvantages and limitations
on the use of these programs and processes
· Training for project coordination
· Training for the implementation of systems and BIM processes
· The ability to analyze the physical and functional aspects of
a project, to make successful decisions more quickly
· The ability to meet the international standard of work that is
imposed in the construction sector.
This program is endorsed by buildingSMART
DIGITAL LEARNING ADVANTAGES
· Learning is student-centered
· Content is updated on a daily basis
· Professors and learning materials are always at the participant’s
disposal
· Archival capability allows knowledge reuse and sharing
· Learning happens at a comfortable pace
· Platform is accessible worldwide
· Learning is applicable on day one
· On-site, real meetings with alumni are possible
· Participants network with other professionals all over the world
19. OVERVIEW //OVERVIEW //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
3736
CS SECTORS
· Public Administration Buildings
· Offices
· Hospitals
· Public Infrastructure
· Building Supplies and Materials
· Real Estate
· Universities
· Culture Centers
· Hotels
· Sport Facilities
· Residences
· Highways
· Water Channels
· Ports
· Airports Underground
· Factories
· Landscaping and Public Spaces
· Amusement Parks
· Prisons
· Health and Wellness Facilities
· Banks
· Tourist Attractions
EACH CASE MUST:
· Be specific
· Be focused on an item (specify the nature of the item being studied:
building, person, event, decision, period, project, policy, institution or
system)
· Set a specific context (describe the history and environment where the
item being studied is set)
· Describe a specific situation (an issue or problem to solve)
· Set a specific period of time (the timeline of the situation)
· Be real (but do not specify a name of a company) Use given data
EACH CASE WILL BE EVALUATED THROUGH ITS:
· Validity – well-founded and corresponds accurately to the real world
· Reliability – the results are consistent and real
· Deliverable – the complexity of the implementation
· Operability – the potential for both short and long-term operation
· Innovation – the creativity and efficiency of the solution
The following is a list of example case study topics that encompass the whole industry. Participants must choose
four case studies to develop during the course, dedicating a minimum of ten hours to each.
LEARNING MANAGEMENT SYSTEM
SCHEMATIC PHASE DIAGRAM 1
BEFORE APPLYING CASE STUDY
METHODOLOGY.
SCHEMATIC PHASE DIAGRAM 2
AFTER APPLYING CASE STUDY
METHODOLOGY.
An owner manages a contract as the single point of responsibility, with the designer and contractor on the
same team. The process is chosen by a design-build entity or a design-build-operate organization.
5. Experienced Empowered
4. Multidisciplinary
3. Distributed Team
2. Single Analyst
1. Project Approach
0. No dedicated Resources
5. Competing on Analytics
4. Business Optimization
3. eBusiness Optimization
2. eMarketing Optimization
1. Resquest List
0. Undefined
5. Strategic
4. CRM
3. eMarketing
2. Behavior
Optimization
1. Web Metrics
0. No Web Analytics
5. Competing on Analytics
4. Online Ecosystem
3. Single Website
2. Specific Activity/Sector
1. Improvisation
5. Competing on Analytics
4. Culture
3. Senior Management
2. Director
1. A Project
0. No Champion
A. MANAGEMENT
GOVERNANCE ADOPTION
D. TEAM EXPERTISE
B. OBJECTIVES
F. TOOLS, TECHNOLOGY
DATA INTEGRATION
5. Agile Approach
4. Agile Methodology (Online)
3. Continous Improvement
Process
2. Department / Team Method
1. Analyst’s Own
0. No Methodology
E. CONTINOUS
IMPROVEMENT PROCESS
C. SCOPE
A
B
C
D
E
F
20. THE AIM OF THE BIM FOR OWNERS AND
DEVELOPERS GLOBAL EXECUTIVE PROGRAM
IS TO DEMONSTRATE HOW TO DEVELOP
STRATEGIES, EXECUTE PROJECTS, IMPROVE
OUTCOMES AND SAVE MONEY.
21. OVERVIEW //OVERVIEW //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
4140
LEARNING STAGES
- Identify the problem.
- Suggest solutions.
- Choose the best option.
- Detail the implementation plan and
prepare the presentation.
- Communicate your solution.
· Consult
· Identify
· Choose a solution
· Justify
· Confirm
· Recommendations
· Solutions
· Audience
· Format
· Communication
· Task
· Benefits
Plan
ExecuteConclusion
Implementation
· Justifications
· Recommendations
· Conclusions
REPORT DRAW
ACTION PLAN
WRITE GUIDELINES
MEDIA 4 MEDIA 5 MEDIA 6
3RD STAGE
RECOMMENDED
SOLUTION
4TH STAGE
DETAILED
IMPLEMENTATION
5TH STAGE
COMMUNICATE
YOUR SOLUTION
Our case study methodology will help you achieve your goals to
improve your processes so your company can keep up with the
changes that are revolutionizing the global market.
CASE STUDY METHODOLOGY
Our case studies are developed with an innovative and effective
new methodology. This system is facilitated by an intuitive
process that guides the participant from the first breakdown of
ideas to the presentation of results.
This unique method, characterized as a mixture of proactive
analysis systems used in different universities, has been developed
to attack real world problems. Its effectiveness and quality of
content has been proven time and again. The system is based on
videos and specific focus activities, to help define the goals step-
by-step.
Overview + Abstract
(Title / Problem / Location / Sector)
Why BIM
Quiz / Define Quiz / Capture· Item of Study
· Sectors
· Others
· Eco-system
signs
· Context
Context + Data
1ST STAGE
IDENTIFY
THE PROBLEM
MEDIA 2MEDIA 1
ASSESSMENT ACTIVITY
WRITTEN REPORT
Pros Cons Method
MEDIA 3
DATA COLLECTION
PROS CONS
EVALUATION TABLE
2ND STAGE
SUGGEST
SOLUTIONS
Project Participants + / -
+ / -
+ / -
+ / -
+ / -
Risk
Process
Compensation
Technology
Solutions Actions Pros / Cons End Results
22. OVERVIEW //OVERVIEW //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
4342
ACADEMIC PROGRAMS
MSC RESEARCH
INVESTIGATION
TRADITIONAL UNIVERSITIES
-
PROFESSIONAL
EXECUTIVE PROGRAM
CAREER DEVELOPMENT
The purpose of our professional global executive program is to prepare the participant
and teach them how to overcome new challenges through the use of practical cases.
In the chart above, the contents are organized according to the various professional
disciplines. The first delves into the science of investigation and related research,
while the professional programs focus on working with real projects in an international
and collaborative environment. It helps develop the skills necessary for working in an
engineering firm and applying new technologies such as BIM. Many of the participants
in our Executive Program are owners, developers and other working industry
professionals, so the knowledge and skills we teach must be compatible across all
those fields.
Fundamentals Work related
case studies
Professional
software and
technologies
Theoretical
and practical
knowledge
applied
Scientific
investigation,
research and
aspects
Concurrent
material
THE LEARNING CURVE
-
The learning curve describes the degree of success achieved in learning over a period
of time. This diagram has two axes: the vertical represents the elapsed time, and the
horizontal, the volume of knowledge and skills achieved during that time.
When the participant completes the program and specializes through our executive
program, they acquire 80% of the knowledge needed in a specific area, allowing them
to tackle most of a project single-handedly.
Participants soon realize that the course studies are not simple theoretical content.
Rather, it’s a valuable research-based program developed from the actual experiences
of a cast of experts in the sector.
The current market requires many agents, managers and stakeholders who are capable
from the outset to develop safe, efficient and productive projects. Zigurat’s aim is to
provide the knowledge and skills that the participant needs to achieve full professional
development.
APPRENTICESHIP
Graduates
In this area of
expertise, more
time is needed for
effective learning
Time (T)
Specialization programs,
seminars, congresses and
academic conferences
Professional
Master’s Degree
Undergraduate studies
BENCHMARK
PROFESSIONAL
EXPERTISE AND
OCCUPATIONAL SKILLS
Skill acquisition
and expertise
development with
optimized time
management
Fundamental skills
and knowledge
obtained during
professional career
Senior
Stakeholders
Licensed
Professional
Stakeholders
Undergraduates
Volume of
knowledge (V)
23. OUR PROFESSORS FROM
ALL OVER THE WORLD ARE
INFLUENTIAL THOUGHT
LEADERS IN BIM
BOARD MEMBERS //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
45
BOARD
MEMBERS
24. BOARD MEMBERS //BOARD MEMBERS //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
46 47
University of Salford, Sri Lanka
Solibri, Australia
Arup, Germany
Università Degli Studi di Brescia, Italy
Teesside University, Egypt
VTT Research, Finland
University of Liverpool, Finland
MOHAMMED ARIF
ANDREW LOPEZ
ILKA MAY
ANGELO CIRIBINI
MOHAMMAD KASSEM
TARJA HÄKKINEN
ARTO KIVINIEMI
BIM Excellence, Australia
BILAL SUCCAR
BIM Academy, Spain
IESE Business School, Spain
BIM Forum, USA
Map-Aria Lab, France
Newton, Portugal
GeorgiaTech, USA
RICS, UK
IGNASI PÉREZ ARNAL
CARLOS VERGARA IESE
BRIAN SKRIPAC
JOSÉ ANTONIO CUBA
JOSÉ CARLOS LINO
KP REDDY
AMANDA CLARK
BOARD MEMBERS
EU BIM Task Group, UK
ADAM MATTHEWS
25. K. PRAMOD REDDY
CO FOUNDER – THE COMBINE, LLC
CEO – SOFTWEAR AUTOMATION, INC
Author of “BIM for Building Owners and Developers: Making
a Business Case for Using BIM on Projects”, edited by the
prestigious John Wiley Sons, K.P. is a recognized expert in
advanced construction technologies, including BIM, semantic
database development, mobile applications and cloud
computing.
K.P. Reddy served on the BIM Task Force of the National Council
of Architectural Registration Boards (NCARB), and as an adjunct
professor at the Georgia Institute of Technology. A graduate of
the Georgia Institute of Technology with a Bachelor of Science
degree in civil engineering, he currently serves as a board
member for AMPIRIX. More recently, K.P. has been featured
in Wired Magazine because of his dedication to focusing new
start-ups on what business really means. He advocates BIM
with a purpose, necessary for an owner’s advancement in the
implementation of BIM.
He brings to the program key points such as the organizational
impact of a paradigm shift, the importance of the velocity of
technology adoption, the three Ps, the four approaches, and
the process of establishing accurate Key Performance Indicators
(KPIs).
A civil engineer by education, Reddy worked for an engineering
consulting firm straight out of Georgia Tech. He recognized that
many developers were not taking advantage of a new technology
– BIM – that could facilitate the number of professionals that
come together to build a building, such as architects, engineers,
contractors, subcontractors and developers.
IGNASI PÉREZ ARNAL
CONTENT DIRECTOR AND CO-FOUNDER – EUROPEAN BIM SUMMIT
FOUNDER AND CEO – BIM ACADEMY
DIRECTORS
Ignasi is the Founder and CEO of BIM Academy, a consulting,
training and event-planning based company. He has directed
and taught in more than 20 institutions specializing in BIM
implementation and learning methodologies. His experience
in the creation, development, internationalization and
communication of learning materials, products and BIM services
has brought him to create the very first international BIM event,
European BIM Summit, an annual event attended by more than
500 industry strategists, decision-makers and researchers from
six continents.
After a history of studying at ETSAB (Barcelona), Tong Ji (Shanghai)
and I’Usine (Switzerland), Ignasi made his first contact with 3D
modeling in 1984. Ten years later, he designed kit-factories and
commercial spaces to be sent around the world. Making the first
five modules offsite home in 2013. Along the way, he came to
understand the building process as a ”process,” which had to be
lean and industrialized.
Ignasi is the author of the 10 BIM Dimensions Theory, which will
be described in his new book, “BIM BANG”. It was developed
after his experience directing BIM implant learning programs
at the Area Metropolitana de Barcelona, Fundación Laboral de
la Construcción, Association of Public Works Engineers, UBU
University, UNICAN University and Builders Guild, among many
others.
As an influencer in the industry, Ignasi has been invited to speak
and lecture at a variety of universities, including Darmstadt
(Germany), ENSA Montpellier (France), Clemson University (USA),
Texas AM (USA), ITESM (Mexico), Pontificia Universidad Javeriana
(Colombia), Universidad Rio Piedras (Puerto Rico), Institutions
as Santa Fe Art Institute (USA), Fondation pour I’Architecture
(Belgium), Haus der Architektur (Austria), DAZ (Croatia), Casa da
Vizinha (Portugal), Rotary Club (Italy) and others.
BOARD MEMBERS //BOARD MEMBERS //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
4948
26. VAUGHAN HARRIS
EXECUTIVE DIRECTOR
Vaughan’s career with construction computer software gave
him the opportunity to work closely with most of South
Africa’s largest contractors in defining their systems and
processes, and in implementing their information management
systems. He has lectured in the Department of Construction
and Economics Management at the University of Cape Town,
transferring knowledge learned on new generation technology
for the construction industry. In addition to his roles within the
construction industry, he has been named editor for the new
“Construction Software IT” journal in South Africa. He was also
recently appointed the Director of the BIM Institute for Africa,
and will serve on the executive advisory council formed to look
at the future of BIM within Africa.
ILKA MAY
MANAGING DIRECTOR
DR. CARLOS VERGARA-ALERT
PROFESSOR OF FINANCIAL MGMT.
Ilka is the Managing Director at planen-bauen 4.0, the
German BIM national platform, a center of excellence and the
coordinating body for research, standardization and market
implementation. Its mission is to guide the process for digital
design and construction across the entire industry. At the same
time, she is Associate Director at Arup. Her work on projects
ranges from BIM/GIS strategy and business case development
to hands-on implementation of bespoke solutions for BIM, GIS,
data and information management. Her experience includes
major projects for clients such as Crossrail, Olympics 2012, High
Speed 2 and Network Rail in the UK, Fehmarnbelt Fixed Link in
Denmark and Deutsche Bahn in Germany.
Assistant Professor at the IESE’s Financial Management
Department, Carlos earned his PhD in Business
Administration (Finance and Real Estate) from the University
of California at Berkeley, Haas School of Business. He holds
an M.S. in Finance (Business Administration) and a Master
of Financial Engineering (MFE) both from the University of
California, Berkeley. He has also earned a B.A. and an M.S.
in Civil Engineering from the Universitat Politècnica de
Catalunya. He has worked at Allianz Hedge Fund Partners,
Allianz Group, the Center for Transport Innovation, and the
European Investment Bank. He has consulting experience in
the finance, real estate, engineering, pharmaceutical, retail
and public sectors. His research interests include real estate
finance and asset pricing.
BRIAN SKRIPAC
VISION PRESIDENT
ADAM MATTHEWS
CHAIR AT EU BIM TASK GROUP
DR. TARJA HÄKKINEN
SENIOR PRINCIPAL RESEARCH SCIENTIST
Brian is a leader within CannonDesign’s BIM and Digital Practice
team who continually drives innovation by merging technology
and practice. He has 20 years of industry experience, focusing
for the last ten on integrating BIM to transform the design and
project delivery process. In addition, he specializes in the use
of BIM to capture and structure relevant facility data, bringing
value to facility owners through an interoperable lifecycle
management strategy. A thought leader in this field, Brian is
an advisory group member and past-chair of the AIA National
Technology in Architectural Practice Knowledge Community,
and serves on the BIMForum committee responsible for
authoring the LOD Specification.
Adam is Head of International Affairs for the UK Government’s
BIM Task Group, an initiative supported by the UK Government’s
Department for Business, Innovation Skills (BIS). Since 2013,
he has led the formation of a public sector network, the EU BIM
Task Group, and is Chair of the group following the European
Commission’s award of co-funding for the project. As Head of
Departmental Rollout for the UK BIM Task Group from 2012-
13, Adam developed a training and engagement strategy to
introduce BIM into central government departments. During this
period, public projects using BIM increased from £100 million
to approximately £1 billion. The EU BIM Task Group is a group
of European public sector clients and policy advisers that have
joined forces to introduce BIM into Europe’s public works.
Tarja is the Senior Principal Research Scientist at the leading
research and technology center in Nordic countries, VTT. She is
in charge of a series of research programs – such as Holisteec,
Susref, Mecoren, Tissue, Moder, NewBee, Crisp, ECO2 and
Presco – that study the interaction of sustainable building and
BIM in construction. She developed the concept SuPerBuildings
by studying the collaborative potential of BIM to construct
buildings that minimize adverse environmental impacts in a way
that meets the needs of all people involved.
ADVISORY BOARD
BOARD MEMBERS //BOARD MEMBERS //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
5150
27. DR. MOHAMMAD KASSEM
TEESSIDE UNIVERSITY
DR. BILAL SUCCAR
UNIVERSITY OF NEWCASTLE
MOHAMMED ARIF
UNIVERSITY OF SALFORD
JOSÉ ANTONIO CUBA
MAP-ARIA / ENSAL / CSTB
STEFAN MORDUE
NBS
JOSÉ CARLOS LINO
NEWTON
Senior Lecturer and Enterprise Fellow at
Teesside University (UK), Dr. Kassem is
an expert researcher in BIM. He was the
appointed EU BIM consultant to the Brazilian
government, with the responsibility of
advising about a strategic BIM roadmap,
in collaboration with key national
stakeholders.
After working in the construction industry
for more than twelve years in Australia and
the Middle East, in 2004 Bilal established
Change Agents AEC, a consultancy focused on
strategic BIM implementation. In 2009, Change
Agents developed BIM Excellence (www.
BIMexcellence.com), a set of online tools and
on-site methods to measure and improve the
performance of individuals, organizations,
projects and teams. He is also joint senior
lecturer at the University of Newcastle.
Mohammed is a full member of the
Research Centre for Built Environment
Sustainability and Transformation after
his time at the Centre for Construction,
Property Management and Economics. He is
Director of the Centre for Built Environment
Sustainability and Transformation (BEST),
and Professor of Sustainability and
Process Management in the School of Built
Environment. His areas of research are
green construction and offsite construction.
The University of Salford is a leader in
research in the UK, and ranks top ten in
research GPAs over the last 20 years.
Researcher at the Map-Aria Lab, José is the
author of various books about BIM, and an
expert on how to drive a construction project
with the help of BIM. Already well established
in the fields of aerospace and automotive,
the digital model is considered the likely
solution to boost the construction sector,
where professionals are now encouraged to
adopt this new way of thinking. His purpose
is to support the construction industry in this
change.
Stefan has been with the National
Building Specification since 2012 in two
roles: originally as a technical content
author and currently as a business
solutions consultant. In his current
role, he implements NBS products
and services as part of best practice
BIM process to design, manufacture
and maintain safely built assets. He
is the author of the “NBS BIM Object
Standard,” and the co-author of “BIM
for Construction Health and Safety” and
“BIM for Dummies,” part of the world’s
bestselling Wiley reference series.
José Carlos Lino is the owner of Newton, an
engineering consultants bureau that was
established more than 20 years ago. The
company has a reputation for many successful
contracting projects, some of which are
considered international engineering
reference works. They include shopping malls,
industrial buildings, water treatment and solid
waste plants, sports buildings, auditoriums
and cultural buildings, hospital buildings,
overpasses, geotechnical works, and bridges.
ANDREW LOPEZ
SOLIBRI
ANGELO CIRIBINI
ISTEA
ARTO KIVINIEMI
UNIVERSITY OF LIVERPOOL
Director of Validation Services at Solibri,
Andrew is an expert on BIM model validation
for quality assured data and design
management. He has previous experience as
a real estate investment consultant, adding
value to existing sites and redeveloping
existing buildings. This included feasibility
analysis, financial assessment, product
development, tenanting and the final sale to
investors.
Professor of Construction Management,
Angelo is also a BIM Researcher and
Chairman of ISTeA, the Italian Society
of Science, Technology, Engineering
and Architecture. He has considerable
experience in design and management, and
is considered a master in building process
management, project management and
health and safety management.
Professor of Digital Architectural Design,
Arto is one of the world’s leading experts in
Integrated BIM, which he helped to develop
in Finland and internationally since 1996.
From 1997 to 2002, Arto led the Finnish
national RD program, which created the
foundation for Finland’s position as one of
the first countries to adopt BIM.
THEORY PROFESSORS
BOARD MEMBERS //BOARD MEMBERS //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
5352
28. ACADEMIC CONTENT //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
55
ACADEMIC
CONTENT
This executive program focuses on the challenges and opportunities that
BIM offers to Owners and Developers.
The first module of the program focuses on theory delivered by the most
respected professionals and researchers. The second module is all about real
life case studies, explained in-person by their main characters. Concepts from
the first module will be applied in the case studies of the second module, to
demonstrate the benefits of different types of projects in different situations on
various continents. Finally, during the third module, participants create their own
case studies.
At the completion of the program, an optional on-site networking event will
be held which will provide you with the perfect opportunity to meet with the
directors, advisory board members, professors and other participants of the
program in person.
29. 1ST: INTRODUCTION TO BIM
2ND: BIM IMPLEMENTATION
3RD: THE 3D MODEL
4TH: VIRTUAL PLANNING
5TH: BUDGET
6TH: ENERGY MODEL
7TH: MODEL FOR MAINTENANCE
8TH: BIM FOR HEALTH AND SAFETY
9TH: LEAN CONSTRUCTION
10TH: INDUSTRIALIZED CONSTRUCTION
MODULE 1
18+ SOFTWARE
THEORY – 10 OWNER’S BIM DIMENSIONS
ACADEMIC CONTENT //ACADEMIC CONTENT //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
5756
After the first theory module, where ten BIM Dimensions
are dissected, and the second practical module, applying
concepts to real case studies, it is time for you to create
your own case study and simulate the decision making
process.
This last 40-hour module is designed to help you to decide
on your own needs while working with a personal advisor.
There are two possibilities: to create a BIM Implementation
Plan (BIP) or to create a BIM Execution Plan (BEP).
A BIM Implentation Plan is the set of specific actions
necessary to successfully implement BIM both in public
and private companies. We will help you to set your own
BIP action plan for your organization.
A BIM Execution Plan is the main protocol document for
a BIM project. A BEP can be used to create a financial
proposal for the delivery of a building or infrastructure
with all of the necessary documentation.You can choose to
execute this plan with one of your own existing projects.
MODULE 2 MODULE 3REAL CASE STUDIES - BIM IMPLEMENTATION PERSONAL BIM IMPLEMENTATION PROJECT
We have benchmarked the best case study methodologies
used in business schools (such as Harvard, Aalborg
University, and IESE) and have translated them for the
construction sector.
We have asked 50 professionals and experts to create their
own case studies, based on their own experiences. Each
one presents the conceptual framework of a company
or a project and the solution generated to solve it. Case
studies cover all building sectors, and are divided into two
sections, buildings and infrastructures.
You will be able to choose any case study, based on your
professional interests.
· Public Administration Buildings
· Hospitals
· Smart City
· Hotels
· Offices
· Public Infrastracture
· Airports
· Ports
· Block Housing
· Water Channels
· Roads, Highways
· Underground
This 40-hour module is divided into ten BIM Dimensions for
owners and developers. It is a structured way to present the
full potential of this technology and tooling process.
These topics are covered in ten units:
30. MUNICH
PARTICIPANT SUMMIT //PARTICIPANT SUMMIT //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
5958
PARTICIPANT
SUMMIT
Networking and generating business opportunities are a primary focus of the course
studies. Therefore, an International Participants Summit is organized multiple times every
year with all of the participants who have completed their program with us.
Join teachers, professionals, businesspeople and students for the celebration. Hear from
world-renowned keynote speakers, attend expert-led workshops, and collaborate in
international teams to talk about the challenges and advancements in the BIM community
and the AECO industry sector.
SUMMIT 1ST EDITION
European BIM Summit
· Where: Barcelona, Spain
· When: May 25-26, 2017
BARCELONA
SUMMIT 2ND EDITION
BIM World Munich
· Where: Munich, Germany
· When: November 28-30, 2017
31. MAKE THE WORLD
YOUR WORKPLACE
REGISTRATION //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
61
REGIS-
TRATION
32. REGISTRATION //REGISTRATION //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
6362
HOW TO APPLY
Make sure to ask any questions before
getting started with your program.
Obtain your acceptance admission
and prepare for your studies.
Send your curriculum vitae along with a
cover letter to the Enrollment Advisor.
Be organized, follow an agenda
and complete your education.
Your Enrollment Advisor
will get in contact with you personally and
guide you through the process.
Confirm your enrollment application
and begin processing your tuition fees.
Have a one on one online interview
with your Enrollment Advisor.
PLAN AHEAD
AND APPLY EARLY
RECEIVE YOUR
LETTER OF ADMISSION
SEND CV
START YOUR ONLINE STUDIES
RECEIVE YOUR
INFORMATION
WHAT TO DO AFTER YOUR
ADMISSION LETTER ARRIVES
INTERVIEW
1
5
3
7
2
6
4
PROGRAM APPLICATION
This field is mandatory
PROGRAM APPLICATION DOCUMENTS
To apply to the program, please submit (1) your CV, (2) a cover letter
explaining your objectives and expectations in joining the program,
(3) the program application document, (4) the payment application
document, and (5) proof of the negotiated down payment to secure
your place in the program. All documents are required in order
to begin processing your application and may be sent to info@e-
zigurat.com or directly to your Enrollment Advisor. If you are missing
any of the program application documents, please contact your
Enrollment Advisor.
GENERAL GUIDELINE
Combine all documents into A SINGLE PDF FILE and submit it via
email to your Enrollment Advisor or info@e-zigurat.com.
Please use the following naming format: “[Name of Applicant]_
[Name of Program]” (e.g. John Jones_Global BIM Management).
ENROLLMENT ADVISORS
Our Enrollment Advisors can help you with the application process
and answer any questions you may have. You can reach Zigurat
through the Contact page on our website, by emailing info@
ezigurat.com and asking for an Enrollment Advisor to contact you,
or by calling our head office in Barcelona.
MINIMUM LANGUAGE REQUIREMENT
English Language Proficiency Program: Adequate command
of spoken and written English is required for admission. It is
mandatory that participants can read and write in English at an
advanced intermediate proficiency level. If you do not meet any
of the prerequisites listed on this page, you can ask your local
institution for an English Language Placement Advisory Test.
I. Native Language
II. IELTS: 6,5 | TOEFL iBT: 88 | International
Baccalaureate: Standard Level (Grade 5) | Hong Kong
use of English AS level: C | India Standard XII: 70% |
WAEC C4-6
III. Minimum 1 year working experience in a English
speaking country
In the case that you have completed any of the above
mentioned English tests, you should upload print
screens or scans of test reports ensuring the following
information is included:
IELTS
· Test Report Form (TRF) number
· The scores for each element.
TOEFL
· Registration Number (e.g. 0000 0000 1111 1111)
· Date of birth
· The scores for each element.
Please note we do not process test reports sent to us
directly from IELTS or TOEFL.
It is not possible to combine language test certificates;
you must meet the minimum requirements for all
elements in the same sitting.
Recommendations: Certified University degree with a
career in architecture, engineering and/or construction
· Proven track record of 5+ years in the AECO industry.
Please contact your Enrollment Advisor if you have any
questions or concerns regarding your application
33. REGISTRATION //REGISTRATION //
BIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAMBIM FOR OWNERS DEVELOPERS GLOBAL EXECUTIVE PROGRAM
6564
WHAT MINIMUM SYSTEM REQUIREMENTS
DOES MY COMPUTER NEED, AND DO I NEED TO
INSTALL ANY SPECIAL PROGRAMS?
There is no need to install any additional software before
starting the Executive Program.
HOW MANY HOURS DO I HAVE TO SPEND A
WEEK STUDYING?
An average of ten to twelve study hours per week are
recommended for the Global Executive Program.
HOW IS THE EVALUATION SYSTEM?
The Executive Programs are completely practical course
studies, in which all is taught through exercises, advanced
tutorials and projects. The evaluation system is based on
the deliverables and methodology of case studies.
ARE THE PROGRAMS COMPLETELY ONLINE?
Yes. You can complete the program from anywhere you
have an internet connection. You also have the option to
participate in an on-site networking summit.
DO I HAVE TO BE ONLINE AT SPECIFIC TIMES?
Rarely. In a few cases a professor may ask you to log on at a
certain time, but they will work with you to schedule a time that
is convenient for you.
WHEN I COMPLETE THE EXECUTIVE PROGRAM,
WILL MY DIPLOMA SAY ZIGURAT?
Your diploma will say you have completed your studies program
with Zigurat with a qualification met by buildingSMART, all of
the licenses approved and recognition by all of the program
professors. You will be a full-fledged Zigurat graduate, which
will mean that you can join the Alumni Association and network
with other fellow participants. You will also have benefits and
support from the Canada BIM Council (CanBIM).
Q A | QUESTIONS ANSWERS
If you haven’t studied online in the past, you may have some questions before getting started.
We provide you with the most popular questions and answers below. If you need further information, you can contact an Enrollment
Advisor, who will serve as your admissions counselor.
WHAT SKILLS DOES ONLINE LEARNING
REQUIRE?
Zigurat lets you study when and where you want. With
that freedom comes the responsibility to schedule your
time wisely. Live online conferences are held periodically,
where participants can ask questions directly to the board
members. Participants are expected to attend them
(although they are recorded and uploaded to the virtual
campus for participants who can not attend them for
personal or professional reasons).
WHAT IF I CAN NOT ATTEND A CLASS OR
PRESENTATION?
The program is presented entirely online, so you will never
have to travel except by choice. This convenience is taken
into account when an event or seminar takes place, which
is why we periodically hold virtual summits and online
conferences throughout the year, in which participants can
ask questions directly to the lecturers. What’s more, these
sessions are recorded and uploaded to our virtual campus,
so you can watch them whenever it is convenient for you.
WHAT IS THE AVAILABILITY OF THE TUTORS
FOR THE EXECUTIVE PROGRAMS? WILL
ONE SPECIFIC TUTOR BE ASSIGNED PER
INDIVIDUAL, OR WILL AN INDIVIDUAL HAVE
ACCESS TO ALL OF THE TUTORS AT ONCE?
All program tutors and participants will be fully available
to one another to resolve issues that take place. Questions
and queries will be answered in a timely manner,
and issues will be resolved in a maximum of 48 hours
(accounting for weekends).
Office hours are 9:00 a.m. – 8:00 p.m. (Central Europe time)
ARE THREE MONTHS NEEDED TO COMPLETE
THE PROGRAM, OR CAN THE PARTICIPANT
FINISH EARLY BY PUTTING IN MORE EFFORT?
The Global Executive Program has a start date and final
date, allowing everyone to pursue the same agenda at the
same time. It follows a firm curriculum that ensures the
participant will understand the procedures as the program
progresses. In this way, they will have enough time to meet
expectations from day one without being left behind. This
methodology also encourages professionals to collaborate
with each other and finish the program at the same time.
HOW DO I ENROLL WITH ZIGURAT?
To enroll in one of our programs, you must contact one
of our Enrollment Advisors, who will provide the program
registration documentation.
WHAT IS THE PAYMENT PROCEDURE?
peerTransfer
Note: Additional forms of payment may be added.
WHAT ARE THE OPTIONS FOR PAYMENTS OR
FINANCING?
You can discuss your options for payments with your
Enrollment Advisor, who will advise you on what financial
options you may have.
ARE THERE ANY EXTRA COSTS WHEN
OBTAINING MY CERTIFICATION?
No. There are no extra costs for obtaining your
certification.
WHAT KIND OF CERTIFICATION DO THE
EXECUTIVE PROGRAMS CONFER AND WHAT
RECOGNITION DOES THAT HAVE AT NATIONAL
AND INTERNATIONAL LEVELS?
The Executive Programs are based on the further
advancement of professional studies in the AECO
sector. Completing each one brings an internationally
recognized buildingSMART endorsement, along with
certifications and licenses that provide you with the
necessary tools to perform in a company. Your title will
signify that you are a leading proponent in the AECO
industry.
DO I NEED PREVIOUS EXPERIENCE WITH BIM
SOFTWARE OR ANY OTHER?
No previous experience is required, although we
recommend that you meet the enrollment requirements.