Big Dry Creek Trail
An Urban Greenway Corridor
                      S. Platte
    S. Platte River
                      Windermere St.
    Bridge


                          Belleview Park


                               Progress Park



                                           Phase 1 Progress
                                           Park to Lehow
                              Funding
                              Challenges
                                   •Urbanized Area
                              South Suburban Park &Phase 3 Point District
                                                    Recreation
                                                   Greenwood
                                        •Multiple Jurisdiction to Foundation
                                       •South Suburban Park Washington St.
                                          City of Englewood
                                         City of Englewood
                                          City of Littleton
             Phase 2B Lehow              City of Littleton
             Ave. to Broadway             City of Greenwood Village
                                         City of Greenwood Village
                                    •Constricted/encroached corridor
  Phase 2A Broadway to Greenwood Point   City of Cherry Hills Village Arapahoe County
                                    •Private land acquisitions
                                         Urban Drainage & Flood Control
                                    •Numerous roadway & railway crossings
Bridge Span Across South Platte
        River Connection to Mary Carter
                  Greenway
Challenges
    Cross Channelized River with little
    freeboard available.


Solutions
    Design free span bridge (200ft) with
    minimal deck thickness.


Total Cost
    $385,000
    Completed 2002

Completed
    2002
Bridge Span Across South Platte
River Connection to Mary Carter
    Greenway - Construction
Bridge Span Across South Platte River
Connection to Mary Carter Greenway -
              Completion
S. Platte River to S. Windermere
                         Street

Challenges
    Underpass designs for 5 crossings
         BNRR
         RTD
         BNRR SPUR
         Santa Fe Drive
         S. Windermere

Total Cost
    $592,530


Trail Length
    2,500 LF

Completed
    2001
S. Platte River to S. Windermere
Street – Pre Construction & Construction
S. Platte River to S. Windermere
     Street – Post Construction
Belleview Park City of Englewood
Progress Park City of Littleton
Phase 1
             Progress Park to Lehow Avenue City of
                          Englewood

Challenges
    Eroding channel
    Creek crossing solution
    100-yr floodplain


Total Cost
    $417,600

Total Length
    1,100 LF


Completed
    2004
Phase 1
Progress Park to Lehow Avenue City of Englewood
       – Pre Construction and Construction
Phase 1
Progress Park to Lehow Avenue City of Englewood
                  – Completed
Phase 2A
                    Broadway to Greenwood Point


Challenges
    Narrow/encroached channel
    Steep channel banks
    Limited access
    Broadway underpass
Total Cost
    $518,388

Total Length
    1,000 LF


Completed
    2007
Phase 2A
Broadway to Greenwood Point– Pre Construction
Phase 2A
Broadway to Greenwood Point– Construction
Phase 2A
Broadway to Greenwood Point– Path with Wall
               Construction
Phase 2A
Broadway to Greenwood Point– Tributary
          Drainage Rundown
Phase 2A
Broadway to Greenwood Point– Completed
Phase 3
             Greenwood Point to Washington Street
                       City of Littleton

Challenges
    Narrow encroached channel
    Steep channel banks
    Limited access
    Eroding channel
Total Cost
    $680,000

Total Length
    2,500 LF

Completed
    2006
Phase 3
Greenwood Point to Washington Street
  City of Littleton – Pre Construction
Phase 3
Greenwood Point to Washington Street
    City of Littleton – Construction
Phase 3
Greenwood Point to Washington Street
    City of Littleton – Completed
Phase 2B
                     Lehow Ave. to Broadway



Challenges
    Eroding channel
    Two Crossings
    Ramp to Broadway
    Unsuitable soils

Total Cost
    $631,577 (bid)

Total Length
    1,200 LF


Est. Completion
    2009
Phase 2B
Lehow Ave. to Broadway– Pre Construction and
                Construction
Big Dry Creek Trail
An Urban Greenway Corridor




  Total Cost: $3.2 million
  Federal Enhancement Funds : $600,000

More Related Content

What's hot

Nsc Gi Talk Nov 2007
Nsc Gi Talk Nov 2007Nsc Gi Talk Nov 2007
Nsc Gi Talk Nov 2007
ncormier
 
Use it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our citiesUse it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our cities
Martin O'Dea
 
Waterlooregionsdrainedponds 120920170138-phpapp01
Waterlooregionsdrainedponds 120920170138-phpapp01Waterlooregionsdrainedponds 120920170138-phpapp01
Waterlooregionsdrainedponds 120920170138-phpapp01
Louisette Lanteigne
 
2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona
2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona
2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona
Post-Bulletin Co.
 
2012 City Bond Referendum Presentation
2012 City Bond Referendum Presentation2012 City Bond Referendum Presentation
2012 City Bond Referendum Presentationhispac
 
Blue Rock, a lost Cleveland place
Blue Rock, a lost Cleveland placeBlue Rock, a lost Cleveland place
Blue Rock, a lost Cleveland place
Bluestone Heights
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14
MCDEP
 
Water Resources in Delaware
Water Resources in DelawareWater Resources in Delaware
Water Resources in Delawarebill_wallace
 
Brewerton, Ny A Community At A Crossroads
Brewerton, Ny A Community At A CrossroadsBrewerton, Ny A Community At A Crossroads
Brewerton, Ny A Community At A Crossroadsdyates1670
 
Lindholm rose hill redevelopment project css
Lindholm   rose hill redevelopment project cssLindholm   rose hill redevelopment project css
Lindholm rose hill redevelopment project cssBrian Bochner
 
Bridge & Environmental Construction
Bridge & Environmental ConstructionBridge & Environmental Construction
Bridge & Environmental ConstructionRobert Hopewell
 
Help Restore Dell Place Ravine
Help Restore Dell Place RavineHelp Restore Dell Place Ravine
Help Restore Dell Place Ravine
Cathy Grisham
 
Green City... Clean Water
Green City... Clean WaterGreen City... Clean Water
Quilliams Creek walking tour
Quilliams Creek walking tourQuilliams Creek walking tour
Quilliams Creek walking tour
Bluestone Heights
 
Upper Stony Creek Diversions
Upper Stony Creek DiversionsUpper Stony Creek Diversions
Upper Stony Creek Diversions
Tony Smith
 
Bath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) ProjectBath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) Project
American Institute of Architects
 
Truckee River Restoration
Truckee River RestorationTruckee River Restoration
Truckee River Restoration
Michael Josselyn
 

What's hot (20)

Nsc Gi Talk Nov 2007
Nsc Gi Talk Nov 2007Nsc Gi Talk Nov 2007
Nsc Gi Talk Nov 2007
 
Use it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our citiesUse it or loose it. The value of urban stormwater in cooling our cities
Use it or loose it. The value of urban stormwater in cooling our cities
 
Waterlooregionsdrainedponds 120920170138-phpapp01
Waterlooregionsdrainedponds 120920170138-phpapp01Waterlooregionsdrainedponds 120920170138-phpapp01
Waterlooregionsdrainedponds 120920170138-phpapp01
 
2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona
2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona
2011 MnDOT projects, including District 6, Rochester-Owatonna-Winona
 
2012 City Bond Referendum Presentation
2012 City Bond Referendum Presentation2012 City Bond Referendum Presentation
2012 City Bond Referendum Presentation
 
Blue Rock, a lost Cleveland place
Blue Rock, a lost Cleveland placeBlue Rock, a lost Cleveland place
Blue Rock, a lost Cleveland place
 
Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14Woodrock retrofit 11-13-14
Woodrock retrofit 11-13-14
 
Jacobs Final Presentation for the Green Mobility Challenge
Jacobs Final Presentation for the Green Mobility ChallengeJacobs Final Presentation for the Green Mobility Challenge
Jacobs Final Presentation for the Green Mobility Challenge
 
Water Resources in Delaware
Water Resources in DelawareWater Resources in Delaware
Water Resources in Delaware
 
Brewerton, Ny A Community At A Crossroads
Brewerton, Ny A Community At A CrossroadsBrewerton, Ny A Community At A Crossroads
Brewerton, Ny A Community At A Crossroads
 
Lindholm rose hill redevelopment project css
Lindholm   rose hill redevelopment project cssLindholm   rose hill redevelopment project css
Lindholm rose hill redevelopment project css
 
Portfolio
PortfolioPortfolio
Portfolio
 
Bridge & Environmental Construction
Bridge & Environmental ConstructionBridge & Environmental Construction
Bridge & Environmental Construction
 
Help Restore Dell Place Ravine
Help Restore Dell Place RavineHelp Restore Dell Place Ravine
Help Restore Dell Place Ravine
 
Mayor's Message 84
Mayor's Message 84Mayor's Message 84
Mayor's Message 84
 
Green City... Clean Water
Green City... Clean WaterGreen City... Clean Water
Green City... Clean Water
 
Quilliams Creek walking tour
Quilliams Creek walking tourQuilliams Creek walking tour
Quilliams Creek walking tour
 
Upper Stony Creek Diversions
Upper Stony Creek DiversionsUpper Stony Creek Diversions
Upper Stony Creek Diversions
 
Bath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) ProjectBath, Maine Design And Resiliency Team (DART) Project
Bath, Maine Design And Resiliency Team (DART) Project
 
Truckee River Restoration
Truckee River RestorationTruckee River Restoration
Truckee River Restoration
 

Viewers also liked

Railwayto greenwayfinalpresentation
Railwayto greenwayfinalpresentationRailwayto greenwayfinalpresentation
Railwayto greenwayfinalpresentationcander014
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2
Chris Carson
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMI
Chris Carson
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
Chris Carson
 
Baseline Schedules 1
Baseline Schedules 1Baseline Schedules 1
Baseline Schedules 1
Chris Carson
 
Schedule Review PMI
Schedule Review PMISchedule Review PMI
Schedule Review PMI
Chris Carson
 
Time Impact Analysis
Time Impact AnalysisTime Impact Analysis
Time Impact Analysis
Chris Carson
 
Project scheduling and tracking
Project scheduling and trackingProject scheduling and tracking
Project scheduling and trackingyenohhoney
 
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay Analysis
Chris Carson
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
Rajesh Sharma
 
Project Scheduling & Controls
Project Scheduling & ControlsProject Scheduling & Controls
Project Scheduling & Controls
Procept Associates
 
Methods of delay analysis
Methods of delay analysisMethods of delay analysis
Methods of delay analysis
katrin enders
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
M Maged Hegazy, LLM, MBA, CCP, P3O
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
Ajeesh Mk
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
ALI HYDER GADHI
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
Ciprian Rusen
 

Viewers also liked (16)

Railwayto greenwayfinalpresentation
Railwayto greenwayfinalpresentationRailwayto greenwayfinalpresentation
Railwayto greenwayfinalpresentation
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2
 
Schedule Design PMI
Schedule Design PMISchedule Design PMI
Schedule Design PMI
 
Schedule Development
Schedule DevelopmentSchedule Development
Schedule Development
 
Baseline Schedules 1
Baseline Schedules 1Baseline Schedules 1
Baseline Schedules 1
 
Schedule Review PMI
Schedule Review PMISchedule Review PMI
Schedule Review PMI
 
Time Impact Analysis
Time Impact AnalysisTime Impact Analysis
Time Impact Analysis
 
Project scheduling and tracking
Project scheduling and trackingProject scheduling and tracking
Project scheduling and tracking
 
Update Delay Analysis
Update Delay AnalysisUpdate Delay Analysis
Update Delay Analysis
 
Construction Claims
Construction ClaimsConstruction Claims
Construction Claims
 
Project Scheduling & Controls
Project Scheduling & ControlsProject Scheduling & Controls
Project Scheduling & Controls
 
Methods of delay analysis
Methods of delay analysisMethods of delay analysis
Methods of delay analysis
 
FIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshopFIDIC variation, claim & dispute - CYLFEx workshop
FIDIC variation, claim & dispute - CYLFEx workshop
 
PROJECT SCHEDULE
PROJECT SCHEDULEPROJECT SCHEDULE
PROJECT SCHEDULE
 
Analysis of rates for labour and material
Analysis of rates for labour and materialAnalysis of rates for labour and material
Analysis of rates for labour and material
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 

Similar to Big Dry Creek Greenway 2008

Greensboro regional realtors assoc 06 08-10
Greensboro regional realtors assoc 06 08-10Greensboro regional realtors assoc 06 08-10
Greensboro regional realtors assoc 06 08-10
Greensboro Regional REALTORS Association
 
Lake2Bay
Lake2Bay Lake2Bay
Lake2Bay
Lee Warnecke
 
Current Trail Projects in Bellingham
Current Trail Projects in BellinghamCurrent Trail Projects in Bellingham
Current Trail Projects in Bellingham
wprf
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
Fairfax County
 
American Leak Detection - American Waterworks Association
American Leak Detection - American Waterworks AssociationAmerican Leak Detection - American Waterworks Association
American Leak Detection - American Waterworks Association
Joshua Butler
 

Similar to Big Dry Creek Greenway 2008 (6)

Greensboro regional realtors assoc 06 08-10
Greensboro regional realtors assoc 06 08-10Greensboro regional realtors assoc 06 08-10
Greensboro regional realtors assoc 06 08-10
 
Lake2Bay
Lake2Bay Lake2Bay
Lake2Bay
 
Current Trail Projects in Bellingham
Current Trail Projects in BellinghamCurrent Trail Projects in Bellingham
Current Trail Projects in Bellingham
 
Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022Long Branch Public Meeting - FINAL - 04-11-2022
Long Branch Public Meeting - FINAL - 04-11-2022
 
American Leak Detection - American Waterworks Association
American Leak Detection - American Waterworks AssociationAmerican Leak Detection - American Waterworks Association
American Leak Detection - American Waterworks Association
 
W Wright Sess8 102709
W Wright Sess8 102709W Wright Sess8 102709
W Wright Sess8 102709
 

Big Dry Creek Greenway 2008

  • 1. Big Dry Creek Trail An Urban Greenway Corridor S. Platte S. Platte River Windermere St. Bridge Belleview Park Progress Park Phase 1 Progress Park to Lehow Funding Challenges •Urbanized Area South Suburban Park &Phase 3 Point District Recreation Greenwood •Multiple Jurisdiction to Foundation •South Suburban Park Washington St. City of Englewood City of Englewood City of Littleton Phase 2B Lehow City of Littleton Ave. to Broadway City of Greenwood Village City of Greenwood Village •Constricted/encroached corridor Phase 2A Broadway to Greenwood Point City of Cherry Hills Village Arapahoe County •Private land acquisitions Urban Drainage & Flood Control •Numerous roadway & railway crossings
  • 2. Bridge Span Across South Platte River Connection to Mary Carter Greenway Challenges Cross Channelized River with little freeboard available. Solutions Design free span bridge (200ft) with minimal deck thickness. Total Cost $385,000 Completed 2002 Completed 2002
  • 3. Bridge Span Across South Platte River Connection to Mary Carter Greenway - Construction
  • 4. Bridge Span Across South Platte River Connection to Mary Carter Greenway - Completion
  • 5. S. Platte River to S. Windermere Street Challenges Underpass designs for 5 crossings BNRR RTD BNRR SPUR Santa Fe Drive S. Windermere Total Cost $592,530 Trail Length 2,500 LF Completed 2001
  • 6. S. Platte River to S. Windermere Street – Pre Construction & Construction
  • 7. S. Platte River to S. Windermere Street – Post Construction
  • 8. Belleview Park City of Englewood
  • 9. Progress Park City of Littleton
  • 10. Phase 1 Progress Park to Lehow Avenue City of Englewood Challenges Eroding channel Creek crossing solution 100-yr floodplain Total Cost $417,600 Total Length 1,100 LF Completed 2004
  • 11. Phase 1 Progress Park to Lehow Avenue City of Englewood – Pre Construction and Construction
  • 12. Phase 1 Progress Park to Lehow Avenue City of Englewood – Completed
  • 13. Phase 2A Broadway to Greenwood Point Challenges Narrow/encroached channel Steep channel banks Limited access Broadway underpass Total Cost $518,388 Total Length 1,000 LF Completed 2007
  • 14. Phase 2A Broadway to Greenwood Point– Pre Construction
  • 15. Phase 2A Broadway to Greenwood Point– Construction
  • 16. Phase 2A Broadway to Greenwood Point– Path with Wall Construction
  • 17. Phase 2A Broadway to Greenwood Point– Tributary Drainage Rundown
  • 18. Phase 2A Broadway to Greenwood Point– Completed
  • 19. Phase 3 Greenwood Point to Washington Street City of Littleton Challenges Narrow encroached channel Steep channel banks Limited access Eroding channel Total Cost $680,000 Total Length 2,500 LF Completed 2006
  • 20. Phase 3 Greenwood Point to Washington Street City of Littleton – Pre Construction
  • 21. Phase 3 Greenwood Point to Washington Street City of Littleton – Construction
  • 22. Phase 3 Greenwood Point to Washington Street City of Littleton – Completed
  • 23. Phase 2B Lehow Ave. to Broadway Challenges Eroding channel Two Crossings Ramp to Broadway Unsuitable soils Total Cost $631,577 (bid) Total Length 1,200 LF Est. Completion 2009
  • 24. Phase 2B Lehow Ave. to Broadway– Pre Construction and Construction
  • 25. Big Dry Creek Trail An Urban Greenway Corridor Total Cost: $3.2 million Federal Enhancement Funds : $600,000