MOISTURE MANAGEMENT IN SIDEWALL CONSTRUCTION  ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
LEARNING OBJECTIVES   ,[object Object],[object Object],[object Object]
AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1  “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency).  The design and construction of durable, efficient walls requires consideration of  climate loads  to which these building components will be exposed.  A wall assembly that is trouble-free in one area of country may  not  perform adequately in another.  This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of  redundancy  for different climate conditions.  The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies.  Understanding the climate loads acting on building components is an important step towards effective design of  moisture management strategies .” (1)
AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1  “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency).  The design and construction of durable, efficient walls requires consideration of  climate loads  to which these building components will be exposed.  A wall assembly that is trouble-free in one area of country may  not  perform adequately in another.  This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of  redundancy  for different climate conditions.  The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies.  Understanding the climate loads acting on building components is an important step towards effective design of  moisture management strategies .” (1)
AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1  “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency).   The design and construction of durable, efficient walls requires consideration of  climate loads  to which these building components will be exposed.  A wall assembly that is trouble-free in one area of country may  not  perform adequately in another.  This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of  redundancy  for different climate conditions.  The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies.  Understanding the climate loads acting on building components is an important step towards effective design of  moisture management strategies .” (1)
AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1  “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency).  The design and construction of durable, efficient walls requires consideration of  climate loads  to which these building components will be exposed.   A wall assembly that is trouble-free in one area of country may  not  perform adequately in another.  This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of  redundancy  for different climate conditions.  The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies.  Understanding the climate loads acting on building components is an important step towards effective design of  moisture management strategies .” (1)
AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1  “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency).  The design and construction of durable, efficient walls requires consideration of  climate loads  to which these building components will be exposed.  A wall assembly that is trouble-free in one area of country may  not  perform adequately in another.   This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of  redundancy  for different climate conditions.  The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies.  Understanding the climate loads acting on building components is an important step towards effective design of  moisture management strategies .” (1)
AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1  “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency).  The design and construction of durable, efficient walls requires consideration of  climate loads  to which these building components will be exposed.  A wall assembly that is trouble-free in one area of country may  not  perform adequately in another.   This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of  redundancy  for different climate conditions.   The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies.   Understanding the climate loads acting on building components is an important step towards effective design of  moisture management strategies .” (1)
AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1  “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency).  The design and construction of durable, efficient walls requires consideration of  climate loads  to which these building components will be exposed.  A wall assembly that is trouble-free in one area of country may  not  perform adequately in another.   This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of  redundancy  for different climate conditions.  The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies.  Understanding the climate loads acting on building components is an important step towards effective design of  moisture management strategies .” (1)
HOW DOES MOISTURE INFILTRATE THE BUILDING?
HOW DOES MOISTURE INFILTRATE THE BUILDING? ,[object Object],[object Object]
HOW DOES MOISTURE INFILTRATE THE BUILDING? ,[object Object]
WIND & RAIN ACTING TOGETHER CAUSE WATER INFILTRATION ,[object Object],[object Object],[object Object],.
WHAT ARE THE RESULTS OF MOISTURE INFILTRATION?
WHAT ARE THE RESULTS OF MOISTURE INFILTRATION? ,[object Object],[object Object],[object Object],[object Object]
SHORTENED SERVICE LIFE OF PAINT
EXTRACTIVE BLEED (CEDAR)
EXTRACTIVE BLEED (CEDAR)
EXTRACTIVE BLEED (CEDAR)
EXAMPLE OF SURFACTANT MIGRATION ONTO WRB (STUCCO)
WHAT ARE THE RESULTS OF MOISTURE INFILTRATION? ,[object Object],[object Object]
 
TWO & THREE COAT STUCCO FAILURES
WHAT ARE THE RESULTS OF MOISTURE INFILTRATION? ,[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object]
WHAT MAKES MOLD? ,[object Object],[object Object]
MOISTURE MANAGEMENT METHODS
MOISTURE MANAGEMENT METHODS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
RAINSCREEN TECHNOLOGY ,[object Object],[object Object]
PRESSURE EQUALIZED RAINSCREEN WALL PRINCIPLES ,[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object]
WHERE TO USE RAINSCREENS Rainscreen systems  (drainage planes with ventilated air spaces)  should be used whenever average rainfall is greater than 40 inches.” Joseph Lstiburek, Ph.D,, P.Eng.  Building Science Corp.
TRADITIONAL RAINSCREEN ASSEMBLY ,[object Object],[object Object],[object Object]
TRADITIONAL RAINSCREEN ASSEMBLY ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
IMPROVEMENTS IN MOISTURE MANAGEMENT METHODS ,[object Object]
MOISTURE MANAGEMENT METHODS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
MOISTURE MANAGEMENT METHODS ,[object Object]
FLASHING DETAIL AROUND WINDOWS
OTHER MOISTURE MANAGEMENT METHODS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
SPECIFICATION CONSIDERATIONS ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Thank you for your time! ,[object Object],[object Object],Questions? 800-523-5261 www.benjaminobdyke.com

More Related Content

Viewers also liked

Forvaltningsreformen - Hovedtrekk, Prosesser, Gjennomføring, Organisasjon - M...
Forvaltningsreformen - Hovedtrekk, Prosesser, Gjennomføring, Organisasjon - M...Forvaltningsreformen - Hovedtrekk, Prosesser, Gjennomføring, Organisasjon - M...
Forvaltningsreformen - Hovedtrekk, Prosesser, Gjennomføring, Organisasjon - M...Sør-Trøndelag fylkeskommune
 
Sustainability_ Lecture by TUAS - Finland
Sustainability_ Lecture by TUAS - FinlandSustainability_ Lecture by TUAS - Finland
Sustainability_ Lecture by TUAS - Finlandforteip
 
Bygge- og eiendomstjenesten kavalkade prosjekt okt 2013
Bygge- og eiendomstjenesten kavalkade prosjekt okt 2013Bygge- og eiendomstjenesten kavalkade prosjekt okt 2013
Bygge- og eiendomstjenesten kavalkade prosjekt okt 2013
Sør-Trøndelag fylkeskommune
 
Introduction To Elearning 2008 1205491916934560 3
Introduction To Elearning 2008 1205491916934560 3Introduction To Elearning 2008 1205491916934560 3
Introduction To Elearning 2008 1205491916934560 3targue
 
7th Grade Sem 2 H Hour 2009
7th Grade Sem 2 H Hour 20097th Grade Sem 2 H Hour 2009
7th Grade Sem 2 H Hour 2009monarchpride
 
Forvaltningsreformen - De nye fylkesveiene, Landbruk og Miljø - Tore Kiste
Forvaltningsreformen - De nye fylkesveiene, Landbruk og Miljø - Tore KisteForvaltningsreformen - De nye fylkesveiene, Landbruk og Miljø - Tore Kiste
Forvaltningsreformen - De nye fylkesveiene, Landbruk og Miljø - Tore KisteSør-Trøndelag fylkeskommune
 
Allmøte 14. desember
Allmøte 14. desemberAllmøte 14. desember
Allmøte 14. desember
Sør-Trøndelag fylkeskommune
 
FORTE_FLORIDA UNIVERSITY
FORTE_FLORIDA UNIVERSITYFORTE_FLORIDA UNIVERSITY
FORTE_FLORIDA UNIVERSITY
forteip
 
Lecture LOCAL DEVELOPMENT by Violeta- Kaunas College
Lecture LOCAL DEVELOPMENT by Violeta- Kaunas CollegeLecture LOCAL DEVELOPMENT by Violeta- Kaunas College
Lecture LOCAL DEVELOPMENT by Violeta- Kaunas Collegeforteip
 
ILIS project SPA sector in SPAIN
ILIS project SPA sector in SPAINILIS project SPA sector in SPAIN
ILIS project SPA sector in SPAIN
forteip
 
如何用RSS订阅PubMed检索结果
如何用RSS订阅PubMed检索结果如何用RSS订阅PubMed检索结果
如何用RSS订阅PubMed检索结果anywei_yw
 
Personas v3
Personas v3Personas v3
2009 IBS - High Performance Masonry Walls
2009 IBS - High Performance Masonry Walls2009 IBS - High Performance Masonry Walls
2009 IBS - High Performance Masonry Walls
benjaminobdyke
 
CPHS Executive Summary
CPHS Executive SummaryCPHS Executive Summary
CPHS Executive Summary
crescentprephs
 
FORTE_KAUNAS UNIVERSITY
FORTE_KAUNAS UNIVERSITYFORTE_KAUNAS UNIVERSITY
FORTE_KAUNAS UNIVERSITYforteip
 
Presentation corporate id design brief - penneylaneonline
Presentation   corporate id design brief - penneylaneonlinePresentation   corporate id design brief - penneylaneonline
Presentation corporate id design brief - penneylaneonlineSacred Cow Enterprises
 

Viewers also liked (17)

Forvaltningsreformen - Hovedtrekk, Prosesser, Gjennomføring, Organisasjon - M...
Forvaltningsreformen - Hovedtrekk, Prosesser, Gjennomføring, Organisasjon - M...Forvaltningsreformen - Hovedtrekk, Prosesser, Gjennomføring, Organisasjon - M...
Forvaltningsreformen - Hovedtrekk, Prosesser, Gjennomføring, Organisasjon - M...
 
Sustainability_ Lecture by TUAS - Finland
Sustainability_ Lecture by TUAS - FinlandSustainability_ Lecture by TUAS - Finland
Sustainability_ Lecture by TUAS - Finland
 
Bygge- og eiendomstjenesten kavalkade prosjekt okt 2013
Bygge- og eiendomstjenesten kavalkade prosjekt okt 2013Bygge- og eiendomstjenesten kavalkade prosjekt okt 2013
Bygge- og eiendomstjenesten kavalkade prosjekt okt 2013
 
Introduction To Elearning 2008 1205491916934560 3
Introduction To Elearning 2008 1205491916934560 3Introduction To Elearning 2008 1205491916934560 3
Introduction To Elearning 2008 1205491916934560 3
 
7th Grade Sem 2 H Hour 2009
7th Grade Sem 2 H Hour 20097th Grade Sem 2 H Hour 2009
7th Grade Sem 2 H Hour 2009
 
Forvaltningsreformen - De nye fylkesveiene, Landbruk og Miljø - Tore Kiste
Forvaltningsreformen - De nye fylkesveiene, Landbruk og Miljø - Tore KisteForvaltningsreformen - De nye fylkesveiene, Landbruk og Miljø - Tore Kiste
Forvaltningsreformen - De nye fylkesveiene, Landbruk og Miljø - Tore Kiste
 
Body Of Work
Body Of WorkBody Of Work
Body Of Work
 
Allmøte 14. desember
Allmøte 14. desemberAllmøte 14. desember
Allmøte 14. desember
 
FORTE_FLORIDA UNIVERSITY
FORTE_FLORIDA UNIVERSITYFORTE_FLORIDA UNIVERSITY
FORTE_FLORIDA UNIVERSITY
 
Lecture LOCAL DEVELOPMENT by Violeta- Kaunas College
Lecture LOCAL DEVELOPMENT by Violeta- Kaunas CollegeLecture LOCAL DEVELOPMENT by Violeta- Kaunas College
Lecture LOCAL DEVELOPMENT by Violeta- Kaunas College
 
ILIS project SPA sector in SPAIN
ILIS project SPA sector in SPAINILIS project SPA sector in SPAIN
ILIS project SPA sector in SPAIN
 
如何用RSS订阅PubMed检索结果
如何用RSS订阅PubMed检索结果如何用RSS订阅PubMed检索结果
如何用RSS订阅PubMed检索结果
 
Personas v3
Personas v3Personas v3
Personas v3
 
2009 IBS - High Performance Masonry Walls
2009 IBS - High Performance Masonry Walls2009 IBS - High Performance Masonry Walls
2009 IBS - High Performance Masonry Walls
 
CPHS Executive Summary
CPHS Executive SummaryCPHS Executive Summary
CPHS Executive Summary
 
FORTE_KAUNAS UNIVERSITY
FORTE_KAUNAS UNIVERSITYFORTE_KAUNAS UNIVERSITY
FORTE_KAUNAS UNIVERSITY
 
Presentation corporate id design brief - penneylaneonline
Presentation   corporate id design brief - penneylaneonlinePresentation   corporate id design brief - penneylaneonline
Presentation corporate id design brief - penneylaneonline
 

Similar to Benjamin Obdyke AIA Ceu Presentation 10 01 09

A review of the study of the fundamental natural time period of the AAC block...
A review of the study of the fundamental natural time period of the AAC block...A review of the study of the fundamental natural time period of the AAC block...
A review of the study of the fundamental natural time period of the AAC block...
IRJET Journal
 
Let talk about home, hosing and buildings
Let talk about home, hosing and buildingsLet talk about home, hosing and buildings
Let talk about home, hosing and buildingsJasmine John
 
Analysis of Wind Load Effects on R.C Structure Resting on Flat and Sloping Gr...
Analysis of Wind Load Effects on R.C Structure Resting on Flat and Sloping Gr...Analysis of Wind Load Effects on R.C Structure Resting on Flat and Sloping Gr...
Analysis of Wind Load Effects on R.C Structure Resting on Flat and Sloping Gr...
IRJET Journal
 
Study on Effect of Wind Load and Earthquake Load on Multi-storey RC Framed Bu...
Study on Effect of Wind Load and Earthquake Load on Multi-storey RC Framed Bu...Study on Effect of Wind Load and Earthquake Load on Multi-storey RC Framed Bu...
Study on Effect of Wind Load and Earthquake Load on Multi-storey RC Framed Bu...
IJSRD
 
Inves‌tigating the Impact of Exterior Window Shutters on Indoor Climate Condi...
Inves‌tigating the Impact of Exterior Window Shutters on Indoor Climate Condi...Inves‌tigating the Impact of Exterior Window Shutters on Indoor Climate Condi...
Inves‌tigating the Impact of Exterior Window Shutters on Indoor Climate Condi...
Milad Karimi
 
Performance based seismic design of the multi-storied reinforced concrete bui...
Performance based seismic design of the multi-storied reinforced concrete bui...Performance based seismic design of the multi-storied reinforced concrete bui...
Performance based seismic design of the multi-storied reinforced concrete bui...
IRJET Journal
 
The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...
IJRESJOURNAL
 
Analysis and connection designs of precast load bearing wall
Analysis and connection designs of precast load bearing wallAnalysis and connection designs of precast load bearing wall
Analysis and connection designs of precast load bearing wall
eSAT Publishing House
 
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
IRJET Journal
 
Climatic architectural
Climatic architecturalClimatic architectural
Climatic architectural
Christian Flores
 
Ac34176185
Ac34176185Ac34176185
Ac34176185
IJERA Editor
 
Susd0001 Nicolas Carbone Individual Assignment (2)
Susd0001   Nicolas Carbone   Individual Assignment (2)Susd0001   Nicolas Carbone   Individual Assignment (2)
Susd0001 Nicolas Carbone Individual Assignment (2)Nicolas Carbone Gamarra
 
Comparative Study of SMRF Structure in the Different Conditions of Soil: A Re...
Comparative Study of SMRF Structure in the Different Conditions of Soil: A Re...Comparative Study of SMRF Structure in the Different Conditions of Soil: A Re...
Comparative Study of SMRF Structure in the Different Conditions of Soil: A Re...
IRJET Journal
 
A Review on Comparative Analysis of Raft Foundation, Raft with Drop & Pile Ra...
A Review on Comparative Analysis of Raft Foundation, Raft with Drop & Pile Ra...A Review on Comparative Analysis of Raft Foundation, Raft with Drop & Pile Ra...
A Review on Comparative Analysis of Raft Foundation, Raft with Drop & Pile Ra...
IRJET Journal
 
Seismic pounding effects on adjacent Tall buildings – A Review
Seismic pounding effects on adjacent Tall buildings – A ReviewSeismic pounding effects on adjacent Tall buildings – A Review
Seismic pounding effects on adjacent Tall buildings – A Review
IRJET Journal
 
“ Study of Sesmic Analysis of Masonry Wall Structure”
“ Study of Sesmic Analysis of Masonry Wall Structure”“ Study of Sesmic Analysis of Masonry Wall Structure”
“ Study of Sesmic Analysis of Masonry Wall Structure”
IJERA Editor
 
De32662675
De32662675De32662675
De32662675
IJERA Editor
 
Study of Comparison Between Static and Dynamic Analysis Subjected to Wind and...
Study of Comparison Between Static and Dynamic Analysis Subjected to Wind and...Study of Comparison Between Static and Dynamic Analysis Subjected to Wind and...
Study of Comparison Between Static and Dynamic Analysis Subjected to Wind and...
IRJET Journal
 
Blast resistant structure
Blast resistant structureBlast resistant structure
Blast resistant structureLoga Raja
 
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
IRJET Journal
 

Similar to Benjamin Obdyke AIA Ceu Presentation 10 01 09 (20)

A review of the study of the fundamental natural time period of the AAC block...
A review of the study of the fundamental natural time period of the AAC block...A review of the study of the fundamental natural time period of the AAC block...
A review of the study of the fundamental natural time period of the AAC block...
 
Let talk about home, hosing and buildings
Let talk about home, hosing and buildingsLet talk about home, hosing and buildings
Let talk about home, hosing and buildings
 
Analysis of Wind Load Effects on R.C Structure Resting on Flat and Sloping Gr...
Analysis of Wind Load Effects on R.C Structure Resting on Flat and Sloping Gr...Analysis of Wind Load Effects on R.C Structure Resting on Flat and Sloping Gr...
Analysis of Wind Load Effects on R.C Structure Resting on Flat and Sloping Gr...
 
Study on Effect of Wind Load and Earthquake Load on Multi-storey RC Framed Bu...
Study on Effect of Wind Load and Earthquake Load on Multi-storey RC Framed Bu...Study on Effect of Wind Load and Earthquake Load on Multi-storey RC Framed Bu...
Study on Effect of Wind Load and Earthquake Load on Multi-storey RC Framed Bu...
 
Inves‌tigating the Impact of Exterior Window Shutters on Indoor Climate Condi...
Inves‌tigating the Impact of Exterior Window Shutters on Indoor Climate Condi...Inves‌tigating the Impact of Exterior Window Shutters on Indoor Climate Condi...
Inves‌tigating the Impact of Exterior Window Shutters on Indoor Climate Condi...
 
Performance based seismic design of the multi-storied reinforced concrete bui...
Performance based seismic design of the multi-storied reinforced concrete bui...Performance based seismic design of the multi-storied reinforced concrete bui...
Performance based seismic design of the multi-storied reinforced concrete bui...
 
The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...The Articulation of the High-Rise Residential Building Envelope: A Review fro...
The Articulation of the High-Rise Residential Building Envelope: A Review fro...
 
Analysis and connection designs of precast load bearing wall
Analysis and connection designs of precast load bearing wallAnalysis and connection designs of precast load bearing wall
Analysis and connection designs of precast load bearing wall
 
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
 
Climatic architectural
Climatic architecturalClimatic architectural
Climatic architectural
 
Ac34176185
Ac34176185Ac34176185
Ac34176185
 
Susd0001 Nicolas Carbone Individual Assignment (2)
Susd0001   Nicolas Carbone   Individual Assignment (2)Susd0001   Nicolas Carbone   Individual Assignment (2)
Susd0001 Nicolas Carbone Individual Assignment (2)
 
Comparative Study of SMRF Structure in the Different Conditions of Soil: A Re...
Comparative Study of SMRF Structure in the Different Conditions of Soil: A Re...Comparative Study of SMRF Structure in the Different Conditions of Soil: A Re...
Comparative Study of SMRF Structure in the Different Conditions of Soil: A Re...
 
A Review on Comparative Analysis of Raft Foundation, Raft with Drop & Pile Ra...
A Review on Comparative Analysis of Raft Foundation, Raft with Drop & Pile Ra...A Review on Comparative Analysis of Raft Foundation, Raft with Drop & Pile Ra...
A Review on Comparative Analysis of Raft Foundation, Raft with Drop & Pile Ra...
 
Seismic pounding effects on adjacent Tall buildings – A Review
Seismic pounding effects on adjacent Tall buildings – A ReviewSeismic pounding effects on adjacent Tall buildings – A Review
Seismic pounding effects on adjacent Tall buildings – A Review
 
“ Study of Sesmic Analysis of Masonry Wall Structure”
“ Study of Sesmic Analysis of Masonry Wall Structure”“ Study of Sesmic Analysis of Masonry Wall Structure”
“ Study of Sesmic Analysis of Masonry Wall Structure”
 
De32662675
De32662675De32662675
De32662675
 
Study of Comparison Between Static and Dynamic Analysis Subjected to Wind and...
Study of Comparison Between Static and Dynamic Analysis Subjected to Wind and...Study of Comparison Between Static and Dynamic Analysis Subjected to Wind and...
Study of Comparison Between Static and Dynamic Analysis Subjected to Wind and...
 
Blast resistant structure
Blast resistant structureBlast resistant structure
Blast resistant structure
 
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
IRJET- A Review on R.C.C. Structure with Fully, Partially and without Infille...
 

Recently uploaded

Rams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkeyRams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkey
Listing Turkey
 
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docxHawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
anothershaneroberts
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
simpolosparkteam
 
Dynamics 365 Bid Management for Construction Projects
Dynamics 365 Bid Management for Construction ProjectsDynamics 365 Bid Management for Construction Projects
Dynamics 365 Bid Management for Construction Projects
Dynamic Netsoft
 
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Joseph Lewis Aguirre
 
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop AG
 
Biography and career about Lixin Azarmehr
Biography and career about Lixin AzarmehrBiography and career about Lixin Azarmehr
Biography and career about Lixin Azarmehr
Lixin Azarmehr
 
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Volition Properties
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
z5h13yqc
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
GVRenting
 
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
JagadishKR1
 
Sense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing TurkeySense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing Turkey
Listing Turkey
 
Omaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive GuideOmaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive Guide
omaxesportscitydwark
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
Tom Blefko
 
Riverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune BrochureRiverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune Brochure
kishor21012022
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
hawifitumaed
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
Vinra Construction
 
Revenue Keys- Begur Village Survey-Sketch
Revenue Keys- Begur Village Survey-SketchRevenue Keys- Begur Village Survey-Sketch
Revenue Keys- Begur Village Survey-Sketch
revenuekeys
 
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
VickyAulakh1
 

Recently uploaded (20)

Rams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkeyRams Garden Bahcelievler - Istanbul - ListingTurkey
Rams Garden Bahcelievler - Istanbul - ListingTurkey
 
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docxHawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
Hawthorn Module 1 Coverted to Slide Show - 04.06.2024.docx
 
Simpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate LogoSimpolo Company Profile & Corporate Logo
Simpolo Company Profile & Corporate Logo
 
Dynamics 365 Bid Management for Construction Projects
Dynamics 365 Bid Management for Construction ProjectsDynamics 365 Bid Management for Construction Projects
Dynamics 365 Bid Management for Construction Projects
 
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...Presentation to Windust Meadows HOA Board of Directors June 4, 2024:  Focus o...
Presentation to Windust Meadows HOA Board of Directors June 4, 2024: Focus o...
 
Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24Deutsche EuroShop | Company Presentation | 06/24
Deutsche EuroShop | Company Presentation | 06/24
 
Biography and career about Lixin Azarmehr
Biography and career about Lixin AzarmehrBiography and career about Lixin Azarmehr
Biography and career about Lixin Azarmehr
 
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
Investing In The US As A Canadian… And How To Do It RIGHT!! (feat. Erwin Szet...
 
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
制作(ucr毕业证书)加州大学河滨分校毕业证学历学位证书原版一模一样
 
Serviced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For RentalServiced Apartment Ho Chi Minh For Rental
Serviced Apartment Ho Chi Minh For Rental
 
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
Total Environment Tangled Up In The Green - Residential Plots Where Nature an...
 
Sense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing TurkeySense Levent Kagithane Catalog - Listing Turkey
Sense Levent Kagithane Catalog - Listing Turkey
 
Omaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive GuideOmaxe Sports City Dwarka A Comprehensive Guide
Omaxe Sports City Dwarka A Comprehensive Guide
 
Things to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 EditionThings to Consider When Selling Your House - Summer 2024 Edition
Things to Consider When Selling Your House - Summer 2024 Edition
 
Riverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune BrochureRiverview City Loni Kalbhor Pune Brochure
Riverview City Loni Kalbhor Pune Brochure
 
G+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdfG+10 apartment 1- Sustainable apartment building.pdf
G+10 apartment 1- Sustainable apartment building.pdf
 
Listing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri IstanbulListing Turkey - Yeni Eyupevleri Istanbul
Listing Turkey - Yeni Eyupevleri Istanbul
 
How to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and WarmHow to keep your Home naturally Cool and Warm
How to keep your Home naturally Cool and Warm
 
Revenue Keys- Begur Village Survey-Sketch
Revenue Keys- Begur Village Survey-SketchRevenue Keys- Begur Village Survey-Sketch
Revenue Keys- Begur Village Survey-Sketch
 
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdfHollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
HollandRow_17x11_Insert_Floorplan_Feature sheet.pdf
 

Benjamin Obdyke AIA Ceu Presentation 10 01 09

  • 1. Pressure-equalized rainscreen wall system design for light-frame construction. Course # BOI 101 Learning Units: 1 (HS&W) Provider: J740
  • 2.
  • 3.
  • 4.
  • 5.
  • 6. AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1 “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency). The design and construction of durable, efficient walls requires consideration of climate loads to which these building components will be exposed. A wall assembly that is trouble-free in one area of country may not perform adequately in another. This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of redundancy for different climate conditions. The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies. Understanding the climate loads acting on building components is an important step towards effective design of moisture management strategies .” (1)
  • 7. AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1 “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency). The design and construction of durable, efficient walls requires consideration of climate loads to which these building components will be exposed. A wall assembly that is trouble-free in one area of country may not perform adequately in another. This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of redundancy for different climate conditions. The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies. Understanding the climate loads acting on building components is an important step towards effective design of moisture management strategies .” (1)
  • 8. AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1 “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency). The design and construction of durable, efficient walls requires consideration of climate loads to which these building components will be exposed. A wall assembly that is trouble-free in one area of country may not perform adequately in another. This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of redundancy for different climate conditions. The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies. Understanding the climate loads acting on building components is an important step towards effective design of moisture management strategies .” (1)
  • 9. AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1 “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency). The design and construction of durable, efficient walls requires consideration of climate loads to which these building components will be exposed. A wall assembly that is trouble-free in one area of country may not perform adequately in another. This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of redundancy for different climate conditions. The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies. Understanding the climate loads acting on building components is an important step towards effective design of moisture management strategies .” (1)
  • 10. AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1 “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency). The design and construction of durable, efficient walls requires consideration of climate loads to which these building components will be exposed. A wall assembly that is trouble-free in one area of country may not perform adequately in another. This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of redundancy for different climate conditions. The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies. Understanding the climate loads acting on building components is an important step towards effective design of moisture management strategies .” (1)
  • 11. AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1 “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency). The design and construction of durable, efficient walls requires consideration of climate loads to which these building components will be exposed. A wall assembly that is trouble-free in one area of country may not perform adequately in another. This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of redundancy for different climate conditions. The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies. Understanding the climate loads acting on building components is an important step towards effective design of moisture management strategies .” (1)
  • 12. AN INDUSTRY PERSPECTIVE (1) Cornick, S. and Rousseau, M.Z., “ Understanding the Severity of Climate Loads for Moisture-related Design of Walls ”, IRC Building Science Insight 2003 Seminar Series, Toronto, CA, Oct. 2003, pp.1 “ The fundamental function of the building envelope is its separation of the outside and the inside environments so that indoor conditions can be controlled to meet many requirements (for example, comfort and energy efficiency). The design and construction of durable, efficient walls requires consideration of climate loads to which these building components will be exposed. A wall assembly that is trouble-free in one area of country may not perform adequately in another. This is because although the building physics do not change, the heat, air, and moisture control strategies may need to integrate different levels of redundancy for different climate conditions. The severity of the climate for a building site cannot be changed, but it needs to be integrated in the design of the wall assemblies. Understanding the climate loads acting on building components is an important step towards effective design of moisture management strategies .” (1)
  • 13. HOW DOES MOISTURE INFILTRATE THE BUILDING?
  • 14.
  • 15.
  • 16.
  • 17. WHAT ARE THE RESULTS OF MOISTURE INFILTRATION?
  • 18.
  • 23. EXAMPLE OF SURFACTANT MIGRATION ONTO WRB (STUCCO)
  • 24.
  • 25.  
  • 26. TWO & THREE COAT STUCCO FAILURES
  • 27.
  • 28.
  • 29.
  • 31.
  • 32.
  • 33.
  • 34.
  • 35. WHERE TO USE RAINSCREENS Rainscreen systems (drainage planes with ventilated air spaces) should be used whenever average rainfall is greater than 40 inches.” Joseph Lstiburek, Ph.D,, P.Eng. Building Science Corp.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 43.
  • 44.
  • 45.

Editor's Notes

  1. Welcome Personal introduction Recognition / acknowledgement of host Express appreciation of their taking time from their busy schedule to attend this CEU (Continuing Education Unit) focused on “Moisture Management in Sidewall Construction”. Reiterate that their attendance this is good for 1 credit in the Health Safety & Welfare [HS&W] category. No test is necessary. Pass around a “sign-in” sheet (available on-line from AIA). Ask them to please PRINT their name and, if they would like credit to be recorded with AIA for Continuing Ed, please provide their AIA number as well. Inform them that for those in attendance who are NOT members but who would still like to receive a certificate of completion, please ask them to indicate as such on the sign-in sheet.
  2. It is NOT necessary to say anything about this slide. ( I often skip past this altogether.)
  3. Read these S-L-O-W-L-Y. Although they seem elementary, by reading them slowly it will help the attendees disengage themselves from the busyness of their day and to focus on the topic at hand. To the end of the 3 rd bullet point, add “where warranted”.
  4. (Ask for permission of the attendees to read this quote. Read the paragraph slowly to allow the info to stick) : “ Permit me to READ this first important slide. It is an except from a study published by the IRC which is the research arm of CMHC---The Canadian Mortgage & Housing Corporation---the leading code body in Canada. It will help to establish a common point of reference that will be foundational to our understanding as the presentation evolves.” Once you’ve read it through completely, call their attention to this important sentence… “ A wall assembly that is trouble-free in one area of the country may not perform adequately in another”. Make the following statement: “To illustrate the importance of this, let me ask the following question”: What does Reno, Nevada and Baton Rouge, Louisiana, have in common?” (Allow them 5-10 seconds to think. Some may offer an answer or two.) Answer: CASINOS. However, one thing they DON’T have in common is RAIN ! Reno receives about 4” of rain per year, whereas Baton Rouge often receives 4” of rain per hour! Yet the casinos built in Baton Rouge in the last 7 years were almost identical to the ones built in Reno a decade before. And excessive moisture intrusion severely compromised the structural integrity of much of the assemblies of those casinos resulting in failure long before the brunt of the Katrina’s fury hit !
  5. (Ask for permission of the attendees to read this quote. Read the paragraph slowly to allow the info to stick) : “ Permit me to READ this first important slide. It is an except from a study published by the IRC which is the research arm of CMHC---The Canadian Mortgage & Housing Corporation---the leading code body in Canada. It will help to establish a common point of reference that will be foundational to our understanding as the presentation evolves.” Once you’ve read it through completely, call their attention to this important sentence… “ A wall assembly that is trouble-free in one area of the country may not perform adequately in another”. Make the following statement: “To illustrate the importance of this, let me ask the following question”: What does Reno, Nevada and Baton Rouge, Louisiana, have in common?” (Allow them 5-10 seconds to think. Some may offer an answer or two.) Answer: CASINOS. However, one thing they DON’T have in common is RAIN ! Reno receives about 4” of rain per year, whereas Baton Rouge often receives 4” of rain per hour! Yet the casinos built in Baton Rouge in the last 7 years were almost identical to the ones built in Reno a decade before. And excessive moisture intrusion severely compromised the structural integrity of much of the assemblies of those casinos resulting in failure long before the brunt of the Katrina’s fury hit !
  6. (Ask for permission of the attendees to read this quote. Read the paragraph slowly to allow the info to stick) : “ Permit me to READ this first important slide. It is an except from a study published by the IRC which is the research arm of CMHC---The Canadian Mortgage & Housing Corporation---the leading code body in Canada. It will help to establish a common point of reference that will be foundational to our understanding as the presentation evolves.” Once you’ve read it through completely, call their attention to this important sentence… “ A wall assembly that is trouble-free in one area of the country may not perform adequately in another”. Make the following statement: “To illustrate the importance of this, let me ask the following question”: What does Reno, Nevada and Baton Rouge, Louisiana, have in common?” (Allow them 5-10 seconds to think. Some may offer an answer or two.) Answer: CASINOS. However, one thing they DON’T have in common is RAIN ! Reno receives about 4” of rain per year, whereas Baton Rouge often receives 4” of rain per hour! Yet the casinos built in Baton Rouge in the last 7 years were almost identical to the ones built in Reno a decade before. And excessive moisture intrusion severely compromised the structural integrity of much of the assemblies of those casinos resulting in failure long before the brunt of the Katrina’s fury hit !
  7. (Ask for permission of the attendees to read this quote. Read the paragraph slowly to allow the info to stick) : “ Permit me to READ this first important slide. It is an except from a study published by the IRC which is the research arm of CMHC---The Canadian Mortgage & Housing Corporation---the leading code body in Canada. It will help to establish a common point of reference that will be foundational to our understanding as the presentation evolves.” Once you’ve read it through completely, call their attention to this important sentence… “ A wall assembly that is trouble-free in one area of the country may not perform adequately in another”. Make the following statement: “To illustrate the importance of this, let me ask the following question”: What does Reno, Nevada and Baton Rouge, Louisiana, have in common?” (Allow them 5-10 seconds to think. Some may offer an answer or two.) Answer: CASINOS. However, one thing they DON’T have in common is RAIN ! Reno receives about 4” of rain per year, whereas Baton Rouge often receives 4” of rain per hour! Yet the casinos built in Baton Rouge in the last 7 years were almost identical to the ones built in Reno a decade before. And excessive moisture intrusion severely compromised the structural integrity of much of the assemblies of those casinos resulting in failure long before the brunt of the Katrina’s fury hit !
  8. (Ask for permission of the attendees to read this quote. Read the paragraph slowly to allow the info to stick) : “ Permit me to READ this first important slide. It is an except from a study published by the IRC which is the research arm of CMHC---The Canadian Mortgage & Housing Corporation---the leading code body in Canada. It will help to establish a common point of reference that will be foundational to our understanding as the presentation evolves.” Once you’ve read it through completely, call their attention to this important sentence… “ A wall assembly that is trouble-free in one area of the country may not perform adequately in another”. Make the following statement: “To illustrate the importance of this, let me ask the following question”: What does Reno, Nevada and Baton Rouge, Louisiana, have in common?” (Allow them 5-10 seconds to think. Some may offer an answer or two.) Answer: CASINOS. However, one thing they DON’T have in common is RAIN ! Reno receives about 4” of rain per year, whereas Baton Rouge often receives 4” of rain per hour! Yet the casinos built in Baton Rouge in the last 7 years were almost identical to the ones built in Reno a decade before. And excessive moisture intrusion severely compromised the structural integrity of much of the assemblies of those casinos resulting in failure long before the brunt of the Katrina’s fury hit !
  9. (Ask for permission of the attendees to read this quote. Read the paragraph slowly to allow the info to stick) : “ Permit me to READ this first important slide. It is an except from a study published by the IRC which is the research arm of CMHC---The Canadian Mortgage & Housing Corporation---the leading code body in Canada. It will help to establish a common point of reference that will be foundational to our understanding as the presentation evolves.” Once you’ve read it through completely, call their attention to this important sentence… “ A wall assembly that is trouble-free in one area of the country may not perform adequately in another”. Make the following statement: “To illustrate the importance of this, let me ask the following question”: What does Reno, Nevada and Baton Rouge, Louisiana, have in common?” (Allow them 5-10 seconds to think. Some may offer an answer or two.) Answer: CASINOS. However, one thing they DON’T have in common is RAIN ! Reno receives about 4” of rain per year, whereas Baton Rouge often receives 4” of rain per hour! Yet the casinos built in Baton Rouge in the last 7 years were almost identical to the ones built in Reno a decade before. And excessive moisture intrusion severely compromised the structural integrity of much of the assemblies of those casinos resulting in failure long before the brunt of the Katrina’s fury hit !
  10. (Ask for permission of the attendees to read this quote. Read the paragraph slowly to allow the info to stick) : “ Permit me to READ this first important slide. It is an except from a study published by the IRC which is the research arm of CMHC---The Canadian Mortgage & Housing Corporation---the leading code body in Canada. It will help to establish a common point of reference that will be foundational to our understanding as the presentation evolves.” Once you’ve read it through completely, call their attention to this important sentence… “ A wall assembly that is trouble-free in one area of the country may not perform adequately in another”. Make the following statement: “To illustrate the importance of this, let me ask the following question”: What does Reno, Nevada and Baton Rouge, Louisiana, have in common?” (Allow them 5-10 seconds to think. Some may offer an answer or two.) Answer: CASINOS. However, one thing they DON’T have in common is RAIN ! Reno receives about 4” of rain per year, whereas Baton Rouge often receives 4” of rain per hour! Yet the casinos built in Baton Rouge in the last 7 years were almost identical to the ones built in Reno a decade before. And excessive moisture intrusion severely compromised the structural integrity of much of the assemblies of those casinos resulting in failure long before the brunt of the Katrina’s fury hit !
  11. This Detail Shows: Principles of Moisture Movement dictate that moisture migrates from areas of HIGH HUMIDITY to areas of LOW HUMIDITY, from WARM to COLD. In some areas of the country, such as the South, this may be a bigger issue problem than in others, such as New England for example. However, it has often been said by leading Building Scientists that moisture intrusion as a result of vapor diffusion can best be measured in spoonfuls. Whereas moisture intrusion as the result of…(advance to next slide)
  12. … Wind Driven Rain can best be measured in BUCKET-FULLS ! Wind driven rain is the real culprit in most cases. “ In addition to joints and laps, hose bibs, utility cutouts, and dryer vents can be a major source of entry where the caulk has failed under the UV (Ultra-violet) load or the settling of the house. All that is needed is a gap 1/64” inch for rain to be driven in.
  13. So not only do we have a wind-load driving water into the wall, we also have simple physics actually siphoning or drawing the water in.
  14. A break-down in the surface is often only an outward manifestation of larger problem inside the wall assembly.
  15. This photo shows when a problem is no longer a “punch-list” item. Now it’s often a “Health, Safety and Welfare” problem! Mold claims have driven insurance premiums for builders through the roof. For every $1.00 in premiums collected, insurers have had to pay out $3.00 in claims as of the end of 2005. It is projected to climb to $7.00 by 2007. Hence the reason for the huge increases in premiums witnessed by contractors in the last 36 months.
  16. Read through the bullet points on the slide. After reading thru this, Add mold needs a food source and moisture to grow. The cellulose in the wood and paper faced gypsum provides the food and the moisture is present in the relative humidity. An Rh of 70% provides a perfect petri-dish.
  17. Again, read these slowly. Often referred to as the “4-D’s of Moisture Management.” An example of deflections : over-hangs Drying (add): “and a mechanism whereby the rate of drying exceeds the rate of wetting . If the rate of wetting exceeds the rate of drying, accumulation occurs. This is a basic principle of moisture management which leading building scientists subscribe to.
  18. No speaker notes.
  19. In simplest terms, when you create an 1/8” airspace (or 125 mil) between the cladding and the shear wall you create a capillary break that neutralizes the ability of the wall to siphon water in during a rain event. That’s what differentiates a rainscreen from a drain-screen . Enhanced WRBs with ribs, crinkles or dimples may provide better drainage compared to a regular WRB however they don’t provide the minimum air-space necessary to create a capillary break. The greatest thickness of any WRB only measures only 15 - 18 mils in height!
  20. This map shows rain fall regions across North America. Leading Building Scientists recommend that rainscreen assemblies be used wherever the annual rain fall exceeds 40” Point out the region the viewer is in, noting how much rainfall occurs in their locale The basic difference between a vented rainscreen and a fully ventilated drain-screen is that a vented drainscreen is only open at the bottom, to weep out accumulated water. A fully ventilated drain-screen is open at the bottom as well as the top allowing for air to enter in thru the top opening and flush the system in a convective fashion providing the maximum air for drainage & drying. Remember, the basic principle cited earlier that “ the rate of drying must exceed the rate of wetting”. Air movement is required for drying to take place.
  21. Ask audience about the disadvantages of installing a rainscreen wall in this way
  22. Make note of the disadvantages above Another downsides of this practice is that 15 – 18 % of the wall is not ventilated as a result of the 1x3 furring 16” o.c. Even though the cost of the furring is relatively cheap, because of the labor to properly install the system, it typically costs around $1.25 The cost goes up significantly when ripped-down pressure treated CDX is used. $2.00 per sq ft is a common figure used by contractors when you figure the cost of anti-corrosive fasteners and labor into the equation
  23. Shown here is Home Slicker. A product by Benjamin Obdyke and an example of “void space technology”. (Omit if presenting a true AIA presentation) It is proven to provide greater drainage & drying capability than wood strapping Installs in a fraction of the time Typical cost <$0.75 / sq ft 50 year warranty
  24. Discuss the general installation sequence described in this illustration of a stucco application. Call exception to the use of a 2 nd layer of building paper used in this cutaway illustration to prevent clogging of channels by scratch-coat. (for stucco only)
  25. Call attention to the use of fiberglass screen cloth used to prevent bugs / spiders from nesting in behind siding. This is a practice used with rain screen walls that are strapped out as well. Utilize HS display board for close-up
  26. No speaker notes.
  27. This is “boiler-plate” language found in CSI Manu-spec format. It is self-explanatory. After this slide ask if there are any questions.
  28. After the Q&A, I often walk the attendees through our product literature packet and use it as an opportunity to present the other additions of the HS product line. If so, open up AIA CEU Presentation – PART 2 6-04-07