BEHRE DOLBEAR TECHNICAL ADVISOR TO THE MA'ADEN PHOSPHATE PROJECT

The Ma'aden Phosphate Company’s (MPC) phosphate project in Saudi Arabia operation is one of the
world’s largest fully integrated phosphate fertilizer producers, and cost approximately $5.5 billion to
develop. Behre Dolbear has been the Technical Advisor since 2006 for a consortium of banks that are the
lenders to the project. Behre Dolbear initially conducted a detailed technical analysis of the project for the
lenders before the loan agreements were consummated. When construction began, Behre Dolbear was
responsible for monitoring the project for the lenders, including the construction progress and capital
budget, and for certifying the completion and sustainable production tests required in the loan agreements.
Behre Dolbear will continue to be responsible for monitoring the project for the lenders throughout the
life of the loans which have a term of 14 years.

Behre Dolbear was also responsible to the lenders for monitoring the construction progress of the railway
that transports phosphate concentrate from the mine to the industrial site where the concentrate is
converted into fertilizer, and the port located at the Ras Al Khair industrial site that exports the fertilizer
products. The Railway is operated by the Saudi Arabian Railway, and the port is operated by the Saudi
Ministry of Transport’s Sea Ports Authority (SEAPA). The three combined projects cost over $10 billion.

The phosphate project included the development of a phosphate mine, a beneficiation plant, and ancillary
facilities at Al Jalamid in northwestern Saudi Arabia. The surface mine produces approximately 12
million tonnes per year of mine ore, and 12 million tonnes per year of waste, using blast-hole drills,
hydraulic shovels, trucks, and ancillary equipment. The ore will be delivered to a beneficiation plant
being constructed adjacent to the mine. The beneficiation plant will process the ore and produce a
phosphate concentrate, which is one of the feed-stocks used to produce phosphate based fertilizer. The
major ancillary facilities at Al Jalamid include a gas turbine powered generating plant that supplies all of
the power to operate the Al Jalamid operations, a well field that supplies process and potable water to the
operations, offices, warehouse, maintenance shops, and a village thet houses about 300 employees.

The phosphate concentrate is transported approximately 1,500 kilometers (km) by unit trains from the Al
Jalamid beneficiation plant on the North-South Railway (NSR) to Saudi Arabia’s east coast where MPC
has constructed a chemical complex at the Ras Al Khair industrial site on the Arabian Gulf.

The MPC’s Ras Az Zawr chemical complex includes four major chemical plants to convert the phosphate
concentrate to a fertilizer product, diammonium phosphate (DAP), and their ancillary facilities. The four
chemical plants include:
     a sulfuric acid plant that produces sulfuric acid from raw sulfur supplied by Aramco;
     a phosphoric acid plant that produces phosphoric acid from the phosphate concentrates in a
        process that utilizes the sulfuric acid;
     an ammonia plant that produces ammonia from natural gas supplied by Aramco for the
        production fertilizer, and for export; and
     a DAP fertilizer plant that produces diammonium phosphate (DAP) fertilizer utilizing the
        phosphoric acid and ammonia.
The major ancillary facilities also include a cogeneration power plant and desalination plant that utilizes
excess steam from the sulfuric acid and ammonia plants, a sea water intake and outfall system that
supplies sea water for cooling, processing, and potable water, as well as a natural gas line from Aramco, a
power transmission line to tie the cogeneration plant to the Saudi Arabian electrical grid, offices,
warehouse, maintenance shops, and villages to house approximately 1800 employees.

MPC has over 2,000 employees, and it will export 2.9 million tonnes of DAP per year and ammonia
production in excess of the DAP requirements, though the port facility.

More Related Content

Similar to Behre dolbear ma'aden phosphate project 2012

Galfar construction contribution to various sectors
Galfar construction contribution to various sectorsGalfar construction contribution to various sectors
Galfar construction contribution to various sectorsP Mohamed Ali
 
New base special 13 may 2014
New base special  13 may  2014New base special  13 may  2014
New base special 13 may 2014Khaled Al Awadi
 
New base special 07 january 2014
New base special  07 january 2014New base special  07 january 2014
New base special 07 january 2014Khaled Al Awadi
 
New base special 07 january 2014 khaled al awadi
New base special  07 january 2014 khaled al awadiNew base special  07 january 2014 khaled al awadi
New base special 07 january 2014 khaled al awadiKhaled Al Awadi
 
New base special 07 january 2014 li khaled alawadi
New base special  07 january 2014 li khaled alawadiNew base special  07 january 2014 li khaled alawadi
New base special 07 january 2014 li khaled alawadiKhaled Al Awadi
 
New base special 07 january 2014 li
New base special  07 january 2014 liNew base special  07 january 2014 li
New base special 07 january 2014 liKhaled Al Awadi
 
New base special 07 january 2014 for lin
New base special  07 january 2014 for linNew base special  07 january 2014 for lin
New base special 07 january 2014 for linKhaled Al Awadi
 
New base 562 special 17 march 2015
New base 562 special 17 march  2015New base 562 special 17 march  2015
New base 562 special 17 march 2015Khaled Al Awadi
 
New base special 15 july 2014
New base special  15 july 2014New base special  15 july 2014
New base special 15 july 2014Khaled Al Awadi
 
New base 584 special 16 April 2015
New base 584 special  16 April  2015New base 584 special  16 April  2015
New base 584 special 16 April 2015Khaled Al Awadi
 
New base special 03 april 2014
New base special  03  april 2014New base special  03  april 2014
New base special 03 april 2014Khaled Al Awadi
 
Saudi aramco presentation
Saudi aramco presentationSaudi aramco presentation
Saudi aramco presentationbukeivan
 
New base energy news october 15 2018 no-1206 by khaled al awadi
New base energy news october 15   2018 no-1206  by khaled al awadiNew base energy news october 15   2018 no-1206  by khaled al awadi
New base energy news october 15 2018 no-1206 by khaled al awadiKhaled Al Awadi
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Edward Byrne
 
Secutor Capital Management: Commerce Resources Corp. (October 2014)
Secutor Capital Management:  Commerce Resources Corp. (October 2014)Secutor Capital Management:  Commerce Resources Corp. (October 2014)
Secutor Capital Management: Commerce Resources Corp. (October 2014)Rare Earths / Rare Metals
 
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...oilandgas
 
New base 05 december 2019 energy news issue 1301 by khaled al awadi
New base 05 december 2019 energy news issue   1301  by khaled al awadi New base 05 december 2019 energy news issue   1301  by khaled al awadi
New base 05 december 2019 energy news issue 1301 by khaled al awadi Khaled Al Awadi
 
New base special 03 june 2014
New base special  03 june 2014New base special  03 june 2014
New base special 03 june 2014Khaled Al Awadi
 
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014Ibrahim Al-Hudhaif
 

Similar to Behre dolbear ma'aden phosphate project 2012 (20)

Galfar construction contribution to various sectors
Galfar construction contribution to various sectorsGalfar construction contribution to various sectors
Galfar construction contribution to various sectors
 
New base special 13 may 2014
New base special  13 may  2014New base special  13 may  2014
New base special 13 may 2014
 
New base special 07 january 2014
New base special  07 january 2014New base special  07 january 2014
New base special 07 january 2014
 
New base special 07 january 2014 khaled al awadi
New base special  07 january 2014 khaled al awadiNew base special  07 january 2014 khaled al awadi
New base special 07 january 2014 khaled al awadi
 
New base special 07 january 2014 li khaled alawadi
New base special  07 january 2014 li khaled alawadiNew base special  07 january 2014 li khaled alawadi
New base special 07 january 2014 li khaled alawadi
 
New base special 07 january 2014 li
New base special  07 january 2014 liNew base special  07 january 2014 li
New base special 07 january 2014 li
 
New base special 07 january 2014 for lin
New base special  07 january 2014 for linNew base special  07 january 2014 for lin
New base special 07 january 2014 for lin
 
New base 562 special 17 march 2015
New base 562 special 17 march  2015New base 562 special 17 march  2015
New base 562 special 17 march 2015
 
New base special 15 july 2014
New base special  15 july 2014New base special  15 july 2014
New base special 15 july 2014
 
New base 584 special 16 April 2015
New base 584 special  16 April  2015New base 584 special  16 April  2015
New base 584 special 16 April 2015
 
New base special 03 april 2014
New base special  03  april 2014New base special  03  april 2014
New base special 03 april 2014
 
Saudi aramco presentation
Saudi aramco presentationSaudi aramco presentation
Saudi aramco presentation
 
New base energy news october 15 2018 no-1206 by khaled al awadi
New base energy news october 15   2018 no-1206  by khaled al awadiNew base energy news october 15   2018 no-1206  by khaled al awadi
New base energy news october 15 2018 no-1206 by khaled al awadi
 
Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16Eddie Byrne CV 1.06.16
Eddie Byrne CV 1.06.16
 
Secutor Capital Management: Commerce Resources Corp. (October 2014)
Secutor Capital Management:  Commerce Resources Corp. (October 2014)Secutor Capital Management:  Commerce Resources Corp. (October 2014)
Secutor Capital Management: Commerce Resources Corp. (October 2014)
 
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
Salah wahbi's presentation slides from the 2010 World National Oil Companies ...
 
Port.pptx
Port.pptxPort.pptx
Port.pptx
 
New base 05 december 2019 energy news issue 1301 by khaled al awadi
New base 05 december 2019 energy news issue   1301  by khaled al awadi New base 05 december 2019 energy news issue   1301  by khaled al awadi
New base 05 december 2019 energy news issue 1301 by khaled al awadi
 
New base special 03 june 2014
New base special  03 june 2014New base special  03 june 2014
New base special 03 june 2014
 
Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014Saudi Railway Company Presentation - Railways Projects 2014
Saudi Railway Company Presentation - Railways Projects 2014
 

More from Tim Alch

CTMF 2017 Registration Form and Invitation
CTMF 2017 Registration Form and InvitationCTMF 2017 Registration Form and Invitation
CTMF 2017 Registration Form and InvitationTim Alch
 
3rd Annual Current Trends in Mining Finance Conference Program 26 29 April 2015
3rd Annual Current Trends in Mining Finance Conference Program 26 29 April 2015 3rd Annual Current Trends in Mining Finance Conference Program 26 29 April 2015
3rd Annual Current Trends in Mining Finance Conference Program 26 29 April 2015 Tim Alch
 
4th Current Trends in Mining Finance Conference Program 24 27 April 2016 NYC
4th Current Trends in Mining Finance Conference Program 24 27 April 2016 NYC4th Current Trends in Mining Finance Conference Program 24 27 April 2016 NYC
4th Current Trends in Mining Finance Conference Program 24 27 April 2016 NYCTim Alch
 
Exploration and Mining Trends in the Digital Age: Global Outlook and Issues i...
Exploration and Mining Trends in the Digital Age: Global Outlook and Issues i...Exploration and Mining Trends in the Digital Age: Global Outlook and Issues i...
Exploration and Mining Trends in the Digital Age: Global Outlook and Issues i...Tim Alch
 
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects Tim Alch
 
Challenges, Risks & Opportunities For the Mining Industry in the Americas
Challenges, Risks & Opportunities For the Mining Industry in the Americas Challenges, Risks & Opportunities For the Mining Industry in the Americas
Challenges, Risks & Opportunities For the Mining Industry in the Americas Tim Alch
 
Importance of Independent Due Diligence in Mining IPMI Conference Presentatio...
Importance of Independent Due Diligence in Mining IPMI Conference Presentatio...Importance of Independent Due Diligence in Mining IPMI Conference Presentatio...
Importance of Independent Due Diligence in Mining IPMI Conference Presentatio...Tim Alch
 
SME Current Trends in Mining Finance Program April 29, 30, 2013 in New York
SME Current Trends in Mining Finance Program April 29, 30, 2013 in New YorkSME Current Trends in Mining Finance Program April 29, 30, 2013 in New York
SME Current Trends in Mining Finance Program April 29, 30, 2013 in New YorkTim Alch
 
Platt's Coal Properties & Investments Presentation by Tim Alch from Behre Dol...
Platt's Coal Properties & Investments Presentation by Tim Alch from Behre Dol...Platt's Coal Properties & Investments Presentation by Tim Alch from Behre Dol...
Platt's Coal Properties & Investments Presentation by Tim Alch from Behre Dol...Tim Alch
 
SME's Current Trends in Mining Finance Conference on 29, 30 April in New York...
SME's Current Trends in Mining Finance Conference on 29, 30 April in New York...SME's Current Trends in Mining Finance Conference on 29, 30 April in New York...
SME's Current Trends in Mining Finance Conference on 29, 30 April in New York...Tim Alch
 
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...Tim Alch
 
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...Tim Alch
 
Steel Change may be ahead by Tim Alch May 16 2008
Steel Change may be ahead by Tim Alch May 16 2008 Steel Change may be ahead by Tim Alch May 16 2008
Steel Change may be ahead by Tim Alch May 16 2008 Tim Alch
 

More from Tim Alch (13)

CTMF 2017 Registration Form and Invitation
CTMF 2017 Registration Form and InvitationCTMF 2017 Registration Form and Invitation
CTMF 2017 Registration Form and Invitation
 
3rd Annual Current Trends in Mining Finance Conference Program 26 29 April 2015
3rd Annual Current Trends in Mining Finance Conference Program 26 29 April 2015 3rd Annual Current Trends in Mining Finance Conference Program 26 29 April 2015
3rd Annual Current Trends in Mining Finance Conference Program 26 29 April 2015
 
4th Current Trends in Mining Finance Conference Program 24 27 April 2016 NYC
4th Current Trends in Mining Finance Conference Program 24 27 April 2016 NYC4th Current Trends in Mining Finance Conference Program 24 27 April 2016 NYC
4th Current Trends in Mining Finance Conference Program 24 27 April 2016 NYC
 
Exploration and Mining Trends in the Digital Age: Global Outlook and Issues i...
Exploration and Mining Trends in the Digital Age: Global Outlook and Issues i...Exploration and Mining Trends in the Digital Age: Global Outlook and Issues i...
Exploration and Mining Trends in the Digital Age: Global Outlook and Issues i...
 
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects
Geotechnical and Business Issues and Risks when Evaluating Mineral Prospects
 
Challenges, Risks & Opportunities For the Mining Industry in the Americas
Challenges, Risks & Opportunities For the Mining Industry in the Americas Challenges, Risks & Opportunities For the Mining Industry in the Americas
Challenges, Risks & Opportunities For the Mining Industry in the Americas
 
Importance of Independent Due Diligence in Mining IPMI Conference Presentatio...
Importance of Independent Due Diligence in Mining IPMI Conference Presentatio...Importance of Independent Due Diligence in Mining IPMI Conference Presentatio...
Importance of Independent Due Diligence in Mining IPMI Conference Presentatio...
 
SME Current Trends in Mining Finance Program April 29, 30, 2013 in New York
SME Current Trends in Mining Finance Program April 29, 30, 2013 in New YorkSME Current Trends in Mining Finance Program April 29, 30, 2013 in New York
SME Current Trends in Mining Finance Program April 29, 30, 2013 in New York
 
Platt's Coal Properties & Investments Presentation by Tim Alch from Behre Dol...
Platt's Coal Properties & Investments Presentation by Tim Alch from Behre Dol...Platt's Coal Properties & Investments Presentation by Tim Alch from Behre Dol...
Platt's Coal Properties & Investments Presentation by Tim Alch from Behre Dol...
 
SME's Current Trends in Mining Finance Conference on 29, 30 April in New York...
SME's Current Trends in Mining Finance Conference on 29, 30 April in New York...SME's Current Trends in Mining Finance Conference on 29, 30 April in New York...
SME's Current Trends in Mining Finance Conference on 29, 30 April in New York...
 
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...
 
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...
Sme current trends in mining finance april 29, 30 2013 in nyc preliminary age...
 
Steel Change may be ahead by Tim Alch May 16 2008
Steel Change may be ahead by Tim Alch May 16 2008 Steel Change may be ahead by Tim Alch May 16 2008
Steel Change may be ahead by Tim Alch May 16 2008
 

Behre dolbear ma'aden phosphate project 2012

  • 1. BEHRE DOLBEAR TECHNICAL ADVISOR TO THE MA'ADEN PHOSPHATE PROJECT The Ma'aden Phosphate Company’s (MPC) phosphate project in Saudi Arabia operation is one of the world’s largest fully integrated phosphate fertilizer producers, and cost approximately $5.5 billion to develop. Behre Dolbear has been the Technical Advisor since 2006 for a consortium of banks that are the lenders to the project. Behre Dolbear initially conducted a detailed technical analysis of the project for the lenders before the loan agreements were consummated. When construction began, Behre Dolbear was responsible for monitoring the project for the lenders, including the construction progress and capital budget, and for certifying the completion and sustainable production tests required in the loan agreements. Behre Dolbear will continue to be responsible for monitoring the project for the lenders throughout the life of the loans which have a term of 14 years. Behre Dolbear was also responsible to the lenders for monitoring the construction progress of the railway that transports phosphate concentrate from the mine to the industrial site where the concentrate is converted into fertilizer, and the port located at the Ras Al Khair industrial site that exports the fertilizer products. The Railway is operated by the Saudi Arabian Railway, and the port is operated by the Saudi Ministry of Transport’s Sea Ports Authority (SEAPA). The three combined projects cost over $10 billion. The phosphate project included the development of a phosphate mine, a beneficiation plant, and ancillary facilities at Al Jalamid in northwestern Saudi Arabia. The surface mine produces approximately 12 million tonnes per year of mine ore, and 12 million tonnes per year of waste, using blast-hole drills, hydraulic shovels, trucks, and ancillary equipment. The ore will be delivered to a beneficiation plant being constructed adjacent to the mine. The beneficiation plant will process the ore and produce a phosphate concentrate, which is one of the feed-stocks used to produce phosphate based fertilizer. The major ancillary facilities at Al Jalamid include a gas turbine powered generating plant that supplies all of the power to operate the Al Jalamid operations, a well field that supplies process and potable water to the operations, offices, warehouse, maintenance shops, and a village thet houses about 300 employees. The phosphate concentrate is transported approximately 1,500 kilometers (km) by unit trains from the Al Jalamid beneficiation plant on the North-South Railway (NSR) to Saudi Arabia’s east coast where MPC has constructed a chemical complex at the Ras Al Khair industrial site on the Arabian Gulf. The MPC’s Ras Az Zawr chemical complex includes four major chemical plants to convert the phosphate concentrate to a fertilizer product, diammonium phosphate (DAP), and their ancillary facilities. The four chemical plants include:  a sulfuric acid plant that produces sulfuric acid from raw sulfur supplied by Aramco;  a phosphoric acid plant that produces phosphoric acid from the phosphate concentrates in a process that utilizes the sulfuric acid;  an ammonia plant that produces ammonia from natural gas supplied by Aramco for the production fertilizer, and for export; and  a DAP fertilizer plant that produces diammonium phosphate (DAP) fertilizer utilizing the phosphoric acid and ammonia. The major ancillary facilities also include a cogeneration power plant and desalination plant that utilizes excess steam from the sulfuric acid and ammonia plants, a sea water intake and outfall system that supplies sea water for cooling, processing, and potable water, as well as a natural gas line from Aramco, a power transmission line to tie the cogeneration plant to the Saudi Arabian electrical grid, offices, warehouse, maintenance shops, and villages to house approximately 1800 employees. MPC has over 2,000 employees, and it will export 2.9 million tonnes of DAP per year and ammonia production in excess of the DAP requirements, though the port facility.