RESUME
BASUDEV MONDAL
Contact Information:
Permanent Address:
C/O:- Biren Mondal,
81, Ramkrishna Pally,
P.O.:- Morepukur, Rishra,
Dist. Hooghly, Pin:- 712250
(W.B.)
Corresponding Address
Walong,Walong City,
Arunachal Pradesh
E-Mail:
mbasudev99@gmail.com
Contact No.
Mobile :
+919681500068 (W.B.)
Personal Data:
Date of Birth : 02-01-1986
Father's Name :
Biren Mondal
Sex : Male.
Nationality : Indian.
Marital Status : Married.
Languages Known :
Bengali, English, Hindi.
Interests and Hobbies :
Playing Football,
Carrom, Listening music.
APPLYING FOR THE POST OF CIVIL ENGINEER
WORKING EXPERIENCE : 05 Years 02 Months
OBJECTIVE
I want to be an asset for the organization and wish to apply innovative
techniques by using skills and knowledge and grow with the organization.
PROFESSIONAL QUALIFICATION
• Diploma in civil engineering from DON BOSCO SELF
EMPLOYMENT RESEARCH INSTITUTE Affiliated by Government.
• AutoCAD known.
ACADEMIC QUALIFICATION
COURSE ΒΟΑRD INSTITUTION YEAR OF
PASSING
MADHYAMIK W.B.B.S.E. ΝΑΒΑGRAM HIGH
SCHOOL
2 3
HIGHER SECONDARY
(10+2)
W.B.C.H.S.E. ΝΑΒΑGRAM
VIDYAPITH
2 5
ACHIVEMENTS
• Prepared ALG-WALONG under CCE(NEP)AF.
• Prepared 202 MW POWER PLANT under TATA POWER.
• Prepared 1.5 MTPA CEMENT GRINDING UNIT under A
DIVISION OF CENTURY TEXTILE & INDUSTRIES LTD.
(B.K. BIRLA GROUP OF COMPANIES).
• Prepared 18 MLD Capacity WATER TREATMENT PLANT
under PUBLIC HELTH ENGINEERING DIVISION.
NAME OF EXAMINATION BOARD YEAR OF
PASSING
MARKS
OBTAINED
CIVIL ENGINEERING
DIPLOMA
DON BOSCO
S.E.R.I.
2010 72.29 %
(1st
Division)
AUTO CAD W.B.S.C.T.E. 2009 77.60 %
SITE SUPERVISOR ‘ A ‘ LEVEL W.B.S.C.T.E. 2010 60.80 %
AMIN SURVEY W.B.S.C.T.E. 2010 80.00%
PROFESSIONAL EXPERIENCE :
1. Currently working in NAGARJUNA CONSTRUCTION COMPANY LTD. from Dec, 2013
to till now.
• PROJECT : AIR LANDING GROUND at Walong, Arunachal Pradesh.
WORK NATURE : RUNWAY (600m x 45.72m),
ROAD (2.100km x 3.750m),
Army Officers' Buildings,
Boundary Walls, etc.
CLIENT : MILITERY ENGINEERING SERVICE.
WORKING PERIOD: Dec, 2013 to till date.
POSITION : Junior Engineer.
2. I worked in GANNON DUNKERLEY & CO. LTD. from Aug, 2010 to Dec, 2013.
• PROJECT : RELIANCE J3 PETROCHEMICAL PROJECT at Jamnagar, Gujarat.
WORK NATURE : Cooling Tower, Pipe Rack.
CLIENT : RELIANCE INDUSTRIES LTD.
WORKING PERIOD: Aug 2013 to till date
POSITION : Junior Engineer.
• PROJECT : TATA POWER PLANT at Kalinganagar, Jajpur, Orissa.
WORK NATURE : TG DECK (20.000m x 9.000m x 3.140m)(02nos.),
Chimney Raft (29.500m dia, 2.500m ht.)(01no.),
Pile Caps, Pedestals with Bolts (various dia), etc.
CLIENT : TATA POWER, TATA STEEL
WORKING PERIOD: Dec 2012 to Aug 2013
POSITION : Junior Engineer.
• PROJECT : 1.5 MTPA CEMENT GRINDING UNIT
at Sagardighi, Murshidabad, W.B.
WORK NATURE : Construction of various industrial RCC Structures like
Cement Silo (18.400m dia, 63.604m ht.) & its Cone,
Fly Ash Silo (18.400m dia, 44.100m ht.) & its Cone,
Clinker Silo (42.400m dia, 28.700m ht.),
Mill Building (60m x 40m, 39.300m ht.),
Load Centre Building (40.100m x 29.500m, 10.500m),
Office Building (3 storeyed), etc.
CLIENT : A DIVISION OF CENTURY TEXTILES & INDUSTRIES LTD.
WORKING PERIOD: Aug 2011 to Dec 2012
POSITION : Junior Engineer.
• PROJECT : 18 MLD Capacity WATER TREATMENT PLANT
at Raghunathganj, Murshidabad, W.B.
WORK NATURE : Construction of various industrial RCC Structures like
Over head Water Reservoir (02nos.),
Staff Quarter (02nos.),
Office Building (02nos.), etc.
CLIENT : M.N. Dastur Co. (P) Ltd.
WORKING PERIOD: Aug 2010 to July 2011.
POSITION : Junior Engineer.
2. I have taken training under PASUBA CONSTRUCTION, almost six months on
different civil engineering works Like Surveying, Plumbing And Sanitary System & Low
Cost Building Manufacturing, etc.
CONSTRUCTION SKILL:
• Site Supervision
• Office Management
• Material and Man power Management
• Coordination with client
• Planning of work according to target
• Preparation of Bar Bending Schedule
• Preparing contractors bill & MB Works
• Survey works [Total Station (Sokkia, Topcon),Theodolite, Auto level machine]
PERSONAL PROFILE:
• Self motivated & endorsed with leadership quality.
• Enjoys working in a team environment.
EXPECTED SALARY : Negotiable.
DECLARATION
I hereby declare that all the above given factors are true and correct to the best of
my knowledge.
Place:-
Date :- (BASUDEV MONDAL)

BASUDEV- Aug,10

  • 1.
    RESUME BASUDEV MONDAL Contact Information: PermanentAddress: C/O:- Biren Mondal, 81, Ramkrishna Pally, P.O.:- Morepukur, Rishra, Dist. Hooghly, Pin:- 712250 (W.B.) Corresponding Address Walong,Walong City, Arunachal Pradesh E-Mail: mbasudev99@gmail.com Contact No. Mobile : +919681500068 (W.B.) Personal Data: Date of Birth : 02-01-1986 Father's Name : Biren Mondal Sex : Male. Nationality : Indian. Marital Status : Married. Languages Known : Bengali, English, Hindi. Interests and Hobbies : Playing Football, Carrom, Listening music. APPLYING FOR THE POST OF CIVIL ENGINEER WORKING EXPERIENCE : 05 Years 02 Months OBJECTIVE I want to be an asset for the organization and wish to apply innovative techniques by using skills and knowledge and grow with the organization. PROFESSIONAL QUALIFICATION • Diploma in civil engineering from DON BOSCO SELF EMPLOYMENT RESEARCH INSTITUTE Affiliated by Government. • AutoCAD known. ACADEMIC QUALIFICATION COURSE ΒΟΑRD INSTITUTION YEAR OF PASSING MADHYAMIK W.B.B.S.E. ΝΑΒΑGRAM HIGH SCHOOL 2 3 HIGHER SECONDARY (10+2) W.B.C.H.S.E. ΝΑΒΑGRAM VIDYAPITH 2 5 ACHIVEMENTS • Prepared ALG-WALONG under CCE(NEP)AF. • Prepared 202 MW POWER PLANT under TATA POWER. • Prepared 1.5 MTPA CEMENT GRINDING UNIT under A DIVISION OF CENTURY TEXTILE & INDUSTRIES LTD. (B.K. BIRLA GROUP OF COMPANIES). • Prepared 18 MLD Capacity WATER TREATMENT PLANT under PUBLIC HELTH ENGINEERING DIVISION. NAME OF EXAMINATION BOARD YEAR OF PASSING MARKS OBTAINED CIVIL ENGINEERING DIPLOMA DON BOSCO S.E.R.I. 2010 72.29 % (1st Division) AUTO CAD W.B.S.C.T.E. 2009 77.60 % SITE SUPERVISOR ‘ A ‘ LEVEL W.B.S.C.T.E. 2010 60.80 % AMIN SURVEY W.B.S.C.T.E. 2010 80.00%
  • 2.
    PROFESSIONAL EXPERIENCE : 1.Currently working in NAGARJUNA CONSTRUCTION COMPANY LTD. from Dec, 2013 to till now. • PROJECT : AIR LANDING GROUND at Walong, Arunachal Pradesh. WORK NATURE : RUNWAY (600m x 45.72m), ROAD (2.100km x 3.750m), Army Officers' Buildings, Boundary Walls, etc. CLIENT : MILITERY ENGINEERING SERVICE. WORKING PERIOD: Dec, 2013 to till date. POSITION : Junior Engineer. 2. I worked in GANNON DUNKERLEY & CO. LTD. from Aug, 2010 to Dec, 2013. • PROJECT : RELIANCE J3 PETROCHEMICAL PROJECT at Jamnagar, Gujarat. WORK NATURE : Cooling Tower, Pipe Rack. CLIENT : RELIANCE INDUSTRIES LTD. WORKING PERIOD: Aug 2013 to till date POSITION : Junior Engineer. • PROJECT : TATA POWER PLANT at Kalinganagar, Jajpur, Orissa. WORK NATURE : TG DECK (20.000m x 9.000m x 3.140m)(02nos.), Chimney Raft (29.500m dia, 2.500m ht.)(01no.), Pile Caps, Pedestals with Bolts (various dia), etc. CLIENT : TATA POWER, TATA STEEL WORKING PERIOD: Dec 2012 to Aug 2013 POSITION : Junior Engineer. • PROJECT : 1.5 MTPA CEMENT GRINDING UNIT at Sagardighi, Murshidabad, W.B. WORK NATURE : Construction of various industrial RCC Structures like Cement Silo (18.400m dia, 63.604m ht.) & its Cone, Fly Ash Silo (18.400m dia, 44.100m ht.) & its Cone, Clinker Silo (42.400m dia, 28.700m ht.), Mill Building (60m x 40m, 39.300m ht.), Load Centre Building (40.100m x 29.500m, 10.500m), Office Building (3 storeyed), etc. CLIENT : A DIVISION OF CENTURY TEXTILES & INDUSTRIES LTD. WORKING PERIOD: Aug 2011 to Dec 2012 POSITION : Junior Engineer.
  • 3.
    • PROJECT :18 MLD Capacity WATER TREATMENT PLANT at Raghunathganj, Murshidabad, W.B. WORK NATURE : Construction of various industrial RCC Structures like Over head Water Reservoir (02nos.), Staff Quarter (02nos.), Office Building (02nos.), etc. CLIENT : M.N. Dastur Co. (P) Ltd. WORKING PERIOD: Aug 2010 to July 2011. POSITION : Junior Engineer. 2. I have taken training under PASUBA CONSTRUCTION, almost six months on different civil engineering works Like Surveying, Plumbing And Sanitary System & Low Cost Building Manufacturing, etc. CONSTRUCTION SKILL: • Site Supervision • Office Management • Material and Man power Management • Coordination with client • Planning of work according to target • Preparation of Bar Bending Schedule • Preparing contractors bill & MB Works • Survey works [Total Station (Sokkia, Topcon),Theodolite, Auto level machine] PERSONAL PROFILE: • Self motivated & endorsed with leadership quality. • Enjoys working in a team environment. EXPECTED SALARY : Negotiable. DECLARATION I hereby declare that all the above given factors are true and correct to the best of my knowledge. Place:- Date :- (BASUDEV MONDAL)