© 2011 Bancroft | All rights reserved

HEADQUARTERS
425 Kings Highway East | P.O. Box 20
Haddonfield, NJ 08033-0018 | USA
856 429 0010
www.bancroft.org
Our Mission
Bancroft’s mission is to ensure that every person is
given opportunities for lifelong learning and fulfillment.
We do this by altering perceptions, and by supporting

TOGETHER... we are transforming lives
For 128 years, Bancroft has helped people make extraordinary gains. We’ve enabled people
who were once confined to institutions to blossom and live full lives in the community.
We’ve helped children with severe behavior problems learn to control their outbursts – and
open themselves to worlds of possibilities for happy, productive lives.
Such transformations occur every day at Bancroft. And that only inspires us to do more.
But to do so, we too must transform. We must strengthen ourselves in various ways.
During the last year, we developed a comprehensive “vision” for our future, with input from
those we support, families, staff, board members and others.
This exciting new vision is designed to guide us toward the brightest possible future, on
behalf of those we support:

those with intellectual and developmental challenges

By 2014 our distinct ability to deliver high-quality, individualized services in modern living, learning
and working environments will exceed stakeholder expectations and secure Bancroft as the
region’s elite provider of services to people with intellectual disabilities, autism and brain injuries.

and acquired brain injuries in achieving their life goals

We will take great care to move our mission forward in a way that preserves those qualities that
continue to make Bancroft an extraordinary community.

as valued and respected members of our world.

In fact, such changes have already begun – and lives are transforming! For instance, we’re
creating modern environments through new, fully accessible homes on our Mullica Hill
Campus, and bringing state-of-the-art learning and communication technology into our
classrooms. The result: people are gaining greater independence and a better quality of life.
In addition, we ended the year with positive financial results, and continued to expand our
services to provide greater options for people who need our help.

ON THE COVER: Members of the Bancroft “family”

From the people we support and their loved ones, to our staff, board members and donors, we
are the Bancroft family – dedicated to the organization’s mission and our shared future.
IN PORTRAIT PHOTO, FROM LEFT:
Back row: Caroline Eggerding (staff), Randee Rubenstein (parent), Ray Welsh (parent,
board member), Ari Rubenstein, Kia Dreggs (staff), Bill Wills (parent), Sharmina Ransome.
Middle row: Jeffrey Swartz (board member), Peter Fisher, Wayne Hefner (staff), Valerie
Carmack (staff), Addison Carmack. Front: Jaden Ambroise, Eddie Smith.

Of course, there is still much work to do.
As you read through these pages, I hope you will be inspired by these stories of
transformation, just as I am. Each person we help is a living reminder of how important
our mission truly is. Please know that you play a vital role in these successes. We can only
change lives if we work together!
On behalf of each person and family we help, thank you for your support.

TONI PERGOLIN, PRESIDENT, CHIEF EXECUTIVE

1
Transformations
…in students with autism and other
developmental disabilities

“

Jaden is learning communication
and social skills, which will
help him in all aspects of life –
including in the workplace
one day.

”

– Kara Roman, Jaden’s teacher

Jaden (left) and classmate Edgar
Santos-Borges are pals.

2

Nine-year-old Jaden Ambroise is
happy and easy-going, according to
his dad. But just a few years ago –
before Jaden came to Bancroft – he
was often unhappy and upset. With
limited ways to communicate his
needs and desires, he would scream
and bite his finger in frustration.
At The Bancroft School, Jaden has
learned many words and can tell
people what he wants. He even won
an award for most-improved student.

Moreover, due to his autism, Jaden
once had little tolerance for new
people and places.
“Now he’s fine when we take him
somewhere new and he’s around other children,” says Jaden’s dad, Schiller.
“He definitely has a brighter future.”
“Jaden has transformed,” says his
teacher, Kara Roman. “He can now
ask for things, and say if he doesn’t
like something. He’s really come out
of his shell.”

Transformations at The Bancroft School

JADEN AMBROISE: NEW SKILLS MEAN A BRIGHTER FUTURE

3
Transformations
EDDIE SMITH: POSITIVE BEHAVIOR BRINGS REWARDING LIFE

“

Eddie was in and out of different

As an adolescent on the autism

special-needs schools because of

spectrum, Eddie Smith had spiraled

his behaviors. Now he maintains
a job; he follows instructions and
maintains his independence.
– Eddie’s dad, Ed Smith

”

out of control. When he didn’t get
his way, he would punch, kick, bite
and throw things. He even refused
to go to school most days.
But in 2007 Eddie entered the Lindens, Bancroft’s residential program
for youth with both developmental
disabilities and severe behavioral

Eddie (right) with staff member
Brandon Saunders.

4

challenges. And today, Eddie has
transformed so much that he’s able

to live in a Bancroft-supervised
home in the community. He attends
The Bancroft School and works in
the campus convenience store.
“I like going to school,” says 17-yearold Eddie, who also enjoys bikeriding and playing the card game
Uno. “I feel good about my life.”
“Eddie has come a long way,” says
his mom, Suzanne Clemente-Smith.
“Bancroft has done a very wonderful job for him.”

Transformations in the Pediatric Residential continuum

…in students with severe
behavioral challenges

5
Transformations
…in parents with intellectual
and developmental disabilities
“

Sharmina has changed drastically

For Sharmina Ransome, it’s all about
the kids.

since she came to Bancroft. She’s
calmer and more proactive; she
seeks out information to make
sure her children’s needs are met.
– Staff member Virgia Lemon

Sharmina and children Anaje (left) and Jiyon.

6

”

“My children and my family are the
most important things in my life,”
says the mom with developmental
disabilities.
Still, Sharmina needed guidance to
help both herself and her young
son and daughter. She found it
at Bancroft’s unique parenting
program, at The Walker Center in
suburban Philadelphia.

Today, Sharmina is “more confident
and more vocal in advocating for
her kids,” says staff member Virgia
Lemon. She’s taking classes to get
her high-school diploma while
aggressively looking for a job.
She says she’s transformed, and is
learning to be a better mom.
“I’m making goals for myself,”
states Sharmina, who dreams of
being a nurse. “I’m striving for
where I want to go in life… I can’t
wait to be more successful.”

Transformations at the Walker Center

SHARMINA RANSOME: LEARNING TO HELP HERSELF AND HER CHILDREN

7
Transformations
…in adults with
acquired brain injuries
“

Doctors said Lee would never walk
again. Today he’s winning races at
Special Olympics! He has a great
perspective on life, and now works
to help others.

”

– Staff member Bill Lewis

Lee (right) with his Special Olympics medals
and staff member Jeanne Bozicek.

8

After a 1990 car crash, Lee Miller
was left with a brain injury and a
wide range of challenges. He was
unable to walk, and was angry and
withdrawn.
But today, Lee is a new man: he’s
an advocate and public speaker on
brain-injury issues, an athlete and
more. He’s gained a positive outlook, and enjoys socializing again.
While Lee continues to need assis-

tance and rehabilitation, “it doesn’t
mean my life has to stop,” he says.
Lee started out on Bancroft’s Mullica Hill Campus, and has continued
to progress to more independent
settings. Today, he lives by himself
in a Bancroft-supervised apartment,
and is an active and productive
member of his community.
Says Lee: “Bancroft has always
been there if I’ve needed support.”

Transformations in Brain Injury Services

LEE MILLER: A NEW LIFE AFTER A BRAIN INJURY

9
DONORS

“

We recognize and thank our donors for their contributions made during fiscal year 2011 (July 1, 2010 – June 30, 2011).

I give to Bancroft because
I know that it makes a
difference in someone’s life.
–anonymous donor

”

The individuals, corporations and organizations
named have generously supported Bancroft by
sponsoring or attending a special event, making
a gift to the annual fund or responding to a
special request with a grant.
CORPORATE & ORGANIZATIONAL SUPPORT
over $50,000
The Lebensfeld Foundation
Wawa Food Markets, Inc.
$25,000-$49,999
The Connelly Foundation
Kanalstein Danton Associates P.A.
TD Charitable Foundation
The Walmart Foundation
$10,000-$24,999
B.E. Smith, Inc.
Conner Strong Companies, Inc.
Costanza Builders Inc.
The Graham Company
Medical Data Management, Inc.
Stewart Business Systems
$5,000-$9,999
Adler’s Pharmacy LTC. Inc.
Archer & Greiner
Carlisle and Associates, LLC
Hatfield Quality Meats
Pepsi Beverages Company
The Philadelphia Coca Cola Bottling Company
The Philadelphia Foundation
The Phillies
The Prudential Foundation
Voorhees Pediatric Facility
$1,000-$4,999
Advocare, LLC
All Risk Property Damage Experts
Bank of America Matching Gifts Program
Birdsall Services Group
Bristol-Myers Squibb Foundation
Brownstein Group
Catalyst Air Management, Inc.
Coastal Spine
The Comegno Law Group, P.C.

Continuum Health Alliance, LLC
Education Facility Management LLC
Ernst & Young, LLP
Hoeganaes Corporation
Holman Enterprises
Holy Redeemer Health System
Kennedy Health System
Med-Link Co.
Miele, Inc.
Miller Transportation Group
New Road Construction Management Company
NJM Insurance Group
Orthofix Spinal Implants
Parkhill Memorial Trust
Philadelphia Insurance Companies
Pinnacle Taxx
Powerplant Technologies Inc.
PricewaterhouseCoopers
Radwell International, Inc.
Retail Sites
Salerno & Son
Salmon Ventures Limited
Shipshape Landscape, Inc.
South Jersey Gas Company
Stradley, Ronon, Stevens & Young
TD Bank
Thompson Becker and Bothwell LLC
Virtua Health
Volunteers of America Delaware Valley
Waters Corporation
Xerox Corporation
$500-$999
Allied Beverage Group, LLC
Attolon Partners LLC
Ballard Spahr Andrews & Ingersoll, LLP
The Bank
Beneficial Mutual Bancorp, Inc.
Boynton & Boynton
Bromley Health Center
Center for Family Guidance, PC
Chelten House Products Inc.
Comcast Corporation
Cooper Neurological Institute
The Evergreens
Friends of Bancroft
General Mills Box Tops for Education Program
Grant Thornton LLP
Hinkle, Fingles and Prior
The Leader’s Edge/Leaders By Design
Linton’s Managed Services, Inc.
Nifty Packaging Products
Paparone Homes of Florida, Inc.
Platt Memorial Chapels Inc.
Princeton Weight Loss Program LLC
Quaker Valley Foods, Inc.
Ragone, Lacatena, Fairchild & Beppel, PC

RBC Royal Bank
Rowan University
T&M Landscaping & Lawn Service, Inc.
Target, Take Charge of Education
Taylor Wiseman & Taylor
USI MidAtlantic
WellNet Healthcare
under $500
$1.99 Any Garment Cleaners
1st Colonial Bank
ACE Group
Amon Associates, LLC
Anu Medical Spa
The Arc of Camden County Occupational
Training Center
Banisch Associates, Inc.
Beifeld Jewelers, Inc.
Benefit Consultants Group, Inc.
CBC & Son Inc.
The Club at Main Street
Consulting Engineer Services
The Cotswold Group
Crane Specialists, Inc.
Diener Brick Company
Dreyfuss Speech Services, Inc.
DuBell Lumber Company
East Greenwich Board of Education
Environmental Resolutions, Inc.
Fit For Life PT, Inc.
Five Below, Inc.
The Fraser Charitable Foundation
Funding Factory
Garden Club of Marlton
General Floor
Gertrude Hawk Chocolates
Glendale Builders, Inc.
Grotto Engineering Associates, LLC
Health Village
Henry D. Bean & Sons
Highway Equipment & Supply Co.
iGive.com Holdings LLC
Intercontinental Truck Brokerage, Corp.
Interocean American Shipping Corporation
Jaclyn Hoffman, Ed.D. & Associates
Johnson & Johnson
Kaplan Industries Inc.
Kingsway Learning Center
Knights of Columbus: Bishop Eustace
Assembly 652
Knights of Columbus: New Jersey State Council
Knights of Columbus: Queenship of Mary
Council 12004
Kulzer & Dipadova, PA
Larc School
Laureate Eta Chapter/Beta Sigma Phi
LECESSE Construction Services, LLC

Lindenwold Moose Lodge #548
Louis T. Roth Foundation
Lutheran Social Ministries of New Jersey
M3 Studios
Marathon Engineering & Environmental Services, Inc.
Marshall & Ilsley Trust Company
McAllister, The Service Company
Merck Partnership for Giving
Metropolitan Acoustics, LLC
MH Financial
Mother of Divine Providence Catholic School
Mustang Expediting, Inc.
Palermo Heart to Heart Foundation
Pathcom Incorporated
Pension Actuarial Consultants Inc.
Pilgrim Construction Corporation
Princeton Wealth Advisors of
Raymond James & Associates
ProMutual Group
Proxus, LLC
Quad Three Group, Inc.
Radiant Skin Care Center
Res-Kem LLC
Robert Wood Johnson Medical School
Rotary Club of Mullica Hill
Seashore Garden Living Center
Shamrock Heating and A.C., Inc.
South Jersey Eye Center
South Wilkes-Barre Little League
St. James Catholic Church
Stellar Machine Inc.
Sutcliffe Supply, LLC
Triple Threat Combat Sports
Varsity Pizza and Subs
VIP Auto Outlet, Inc.
Wilkes-Barre Fire Department
Athletic Association
Winning Strategies
The Woolard Family Foundation
Zallie Supermarkets, Inc.
INDIVIDUAL SUPPORT
over $50,000
The Foley Family
Elizabeth R. Moran
Joanne and Raymond Welsh
$25,000-$49,999
Karen and Jeff Harris
Laird Norton Company LLC / The Taylor Family
Lynda and Stewart Resnick
$10,000-$24,999
Barbara and Dr. Sheldon S. Berkman
Nola and Bob Farley
Flicker Family Fund
Mary Pat Meyer

Toni and John Pergolin
William W. Rooke
Lindsay and Evan Roth
Randee and Dr. Kenneth Rubenstein
$5,000-$9,999
Laura and Joseph Atkinson
Lillian and Thomas Burke
Suzanne and James Dwyer
Joseph Holman
Eleanor and Fred Meyer
Elena Petronio
Suzanne and Samuel Pignatelli
Virginia Rushmore
Anthony Schlesinger
Selena and Paul Tropea
JoAnne and Ron Williams
$1,000-$4,999
Lisa and Stephen Albanese
Lisa and Dr. Gregory B. Alberts
Henry Bean
Rosalyn and Laurence Belgin
Susan and Joshua Bennett
Michele and Martin Bieber
Dr. Enrico Bombieri
Susan Bombieri
Dr. Cynthia L. Boyer
Sue and Stephen Bruce
Kathy and Chris Capritti
Danielle Carroll
Virginia and Jim Carson
George D. Chant, Jr.
Nicky and Ted Chapin
Joseph Collins
Claudia Connolly and Thomas Hayevy
Alison and Vincent Conti
Diane and Kevin Corrigan
Karen and Anthony D’Ambrosio
Sally and Robert Danley
Dr. Caroline Eggerding and Lawrence D. Berger
Benjamin Ellis
William Fay
Joanna and Clem Fiori
Debbie and Joe Flamini
Dr. Kathleen and F. Gilday Freeman
Susan and Robert Freeman
Sandra Fromm
Michelle Habingreither
Harry Hayman
Joseph Hodakowski
Carolee Humphrey
Tracee and Benjamin Hunt
Donna and Michael Icovino
Dr. Michael Kahn
Elizabeth Kalellis
Kathleen and Dr. Daniel Keating

Joan and Gary King
Lorraine and Wayne Kobular
Brian Kovacs
Maureen and John Krihwan
Elene and Marshall Kurtzman
The Estate of Walter J. Levy
Colleen and David Macalino
Jo Ann and Thomas Mara
Patricia and Bob Mate
Jill and Stacy McDowell
Henry E. McGrorry, Jr.
Drs. Pnina and Mark Mintz
Michael and Karen Mitchell
Elsie Nelson
Marsha and John Parker
Janet and Allen Pawling
Joy and Dr. Bernard Pekala
Maryellen and Rich Raymond
Michael Recine
Shirley and Thomas Reilly
Sharon and Seymour Reiter
Linda and Jeffrey Reuter
Frederick J. Rohloff, Esq.
Kathy and Wayne Ross
Barbara Stern
Sandy and Gary Stura
Kathleen R. Sutcliffe
Amy and Jeffrey Swartz
Barbara and Jack Tarditi
Tom and Colleen Rowan Valentino
Carol and John Van Orden
Linda Wasilchick
Dr. Howard M. Weinberg
Susan Weisman and Andrew Howard
Melissa Wheatcroft and Blair Talty
Gale and Bill Wills
Julie and Leon Zimmerman
$500-$999
Rita and Robert Beardsley
Sherry and Dr. Mark Bezzek
Holly and Michael Blackiston
Elissa and Eric Boory
Lois and Dr. William H. Bromley
Isabela and George Buff
Dolores and Raymond Burczyk
Martha Campbell
Susan Catherwood
Louise and Andy Cross
Gerald A. Davis
Anne and Tony DiBartolo
Nancy and Chuck Felmlee
Pam Fenner and Michael McLaughlin
Judy and Norman Ferber
Colleen and Edwin Ferren
Anni Fisher
Deborah and Theodore Flick

Carin and John Foster
Pamela and Edward Goldberg
Mariann Granrath
Julie Hansell
Margaret and Thomas Heer
Rebecca and Eric Hinderliter
Arnold and Sandra Kaminer
Ellene and Thomas Kowal
Peggy and Glenn Manochi
Natalie Marcon
John Martinsen
Jim McKeon
Patricia and Charles McLister
Marcie L.H. Merz, Esq.
Ann and Judge Herman Michels
Kathy and Patrick Mindas, Esq.
Brigette Neafsey
Rob Nestore
Nancy and William Patrick
Patricia Paul-Bakley
Dorothy and Don Praiss
Michael Rogers
Clair and Dean Rohrer
Jeremy W. Ryan, Esq.
Mary Salpas
Ardeen and Scott Schaefer
Karen Thoreson Schlesinger
Paula and Dr. Lawrence Siegel
Stuart Sobin
Susan and Daniel Swett
Kathleen M. Thompson
Lynn and Dr. Alfred Tomaio
Pat and John Turzanski
Renee Vala
Allan and Cookie Weinberg
Kathy and James Wheatcroft
Teresa White
Steven Yocum
under $500
Howard and Harriet Abel
Joseph Abrams
Megan Abrams
James and Carol Adams
Donna and Dean Adinolfi
Pam and Mark Adler
Rose Agostini
Maureen and Christian Aha
Mark Alessandrini
Sister Eileen Algeo, SHCJ
Clint Allen
Ethan C. Allen
Linda and Miles Allieri
Jeanne Allison
Nancy and Rick Alovis
Geanatta Alston
William and Mary Helen Altimairo

Carlo Amilcare
Renee and Charles Anderson
Elizabeth and George Angelo
Christine Antoine
Eileen Arentz
Margaret and Robert Atkinson
Deborah and Richard Auerbach
Daniel Bailey
Letitia Bailey
Mimi Baker
Phoebe Baker
Beth A. Bamberger and
Matthew A. Himmelstein
Gertrude Bampi-Nelson
Bernard and Joann Banks
Patricia and Douglas Barber
David and Alberta Baril
Edward and Marie Barnes
Andrea Baron
Nancy and James Barth
Thomas Bartus
Alice and Charles Bastien
Jennifer Bates
James Batruch
Tim Battista
Glennys and Thomas Battle
Dorothy Bauer and Alan Stein
Holly Bean
Judy Bean
Renee Beck
John M. Becker, Jr.
Mary and Michael Beckett
Patrick Beers
Elinor and Ernest Beier
Barbara Bell
Christin Bell
Janis W. Bell
Nancy Ben
Neil and Joy Ben-Isvy
Conchetta Benjamin
Karen Benjamin
Christine Benner
Denise and Richard Bennett
Linda Bennett
Mary Lou and Peter Bennett
Patricia and Clair Benson
Jillian Berkman
Rachelle and Dr. Douglas Berkman
Joan Berman
Sammy Bermudez
Myra Bernardin
Howard and Shirley Bernstein
David and Cecilia Bertone
Henry Betcher
Dolores Bianco
Bernard and Barbara Bieg
Ma Binas

Eileen Binstock
Peter Birbilis
Anne and Ronald Bird
Steven Bisgaier
Jim Bisignaro
Janeli Bitor
Evelyne and Zoubir Bittout
Jane and Lynn Biuckie
Arthur Black
Dr. Robert J. Blair, Jr.
Jessica Blessing
Joseph and Carol Bloch
Solomon Blocker
Eric Bluestone
Barbara T. Boguslaw
Kim and Martin Bohley
Beth and Gerald Bokunewicz
Theresa Boland
Carolyn and John Boliek
Kathy Boone
Joy Ellen Booth
Kevin Bothwell
Antonia Bottoms
Rosemarie Botts
Arlene Boutin and Bob Meinzer
Cherry Boyce
Lewis Boyer
Donna Boyle
Timothy and Patricia Boyle
Jeanne Bozicek
Michelle Bradshaw
Gawain Bragg
Philip and Iris Brater
David Bravo
Dianne and Daniel Breininger
Irene Brennan
Michael Brennan
Leo Brescia
Jennifer Breslin
Jennifer Brisbin
Ann Britton
Robert Brode
Adrienne and Dennis Brody
Lois and Dr. William H. Bromley
Dr. Steven Bromley
Ann and Gregory Bronczyk
Carol R. Brooks-Murphy
Christine Brown
David Brown
Debra Brown
Donna and Ronald Brown
Mecca Brown
Sandra Brown
Stephen Brown
Dawan Browning
Dr. Mary G. Brownsberger
Chris and Pat Bucco

“

My family is so very lucky we
found Bancroft. And I should
know – I visited more than 60
other programs before choosing
Bancroft for my daughter.
– Carolyn Hodakowski
Sara Buch
Doris and Howard Buchanan
Sally Buckalew
David Budd
Sudie Burbage, RN
Mary E. Burczyk
Sally Burns and David Marcus
Marijke and Peter Businger
Mike Cakavecchia
Lachlan and June Cameron
Kathryn Campbell
Nancy Canally
Grace Cannon
Carrie Canuso
Thelma Jeanne Capell
Ellen Caplan
Claudia Capritti and Robert Slimm
Kimberly and Stephen Caputo
Tammy Carbone
John Cardillo
Lisa Carle
Cheryl Carlson
Babette and Thomas Carnwath
Nancy and Edward Carr
Paula and Stephen Carroll
Amy Carter
Cheryl Carter
Michael Carter
Peter A. Cartwright
Linda and Patrick Casey
Shawn Casey
Dwight Castellanos
Edith Catling
Anthony and Roberta Ceci
Pat Chambers
Lalitha Harish Chandra
Bruce Chapin
Dolcey Chaplin
Carol Chapman
Anthony Charlton
Jean and William Chew
Marion Chorley
Maria Chornobroff
Patricia Churchill
Delores H. Churry
Colleen and Joseph Ciampoli

”

MILESTONES

}
10

JULY 2010
Bancroft teamed with the Phillies for a special
night at Citizens Bank Park. More than 100
of us attended, thanks to board member and
former Phillies player Greg Dobbs.

} SEPTEMBER 2010

Planning began for the Bancroft Transition Program at
Camden County College, which launched the following
September. The program helps students with intellectual and
developmental disabilities transition to adult lives and jobs.

} OCTOBER 2010

We launched the reconstruction of our
Mullica Hill Campus. The project – slated for
completion in 2012 – is creating modern, fully
accessible residential and vocational facilities.

} NOVEMBER 2010

Philadelphia-based Art-Reach recognized
Bancroft for helping people with disabilities
to access the arts and cultural activities.
NBC10 news anchor Dawn Timmeney
presented the prestigious award.

11
DONORS (continued)

“

The mission of Bancroft
perfectly aligns with TD Bank’s
values, and we are proud to
support their good work.
–Rob Curley

”

South Jersey Market President, TD Bank
Aaron Clark
Robin and Bruce Clark
John Clayton
Lorraine Clayton
Niesha Coar
Wendy and Michael Coffman
Howard and Shara Cohen
Michelle Cohen
Rona Cohen
Pam and John Coletti
Mary Ann and David Collins
Maureen and Bernard Collins
James Comose
Timothy Coneby
Ramona Congdon
Nancy Conley
Jerome and Barbara Connell
Patricia and Lawrence Connell
Debra and Donald Conner
Mary Anne and John Connolly
Jacqueline Conover-Rogers
Joanne and William Conrad
Amelia Conte
Thomas Conte
Wayne and Myrna Cook
Alan and Ruth Cooper
Maurice Copeland
Daniel and Ellen Corn
Sam Cortella
Joanne Cortese
Katherine Costigan and Jacalyn Wintling
Matthew Costolo
Nakiya Cox
J.D. and S.E. Coyle
Joe Coyne
Mary and Alan Craig
Michael and Silvia Crociata
Sue and Dana Crouse
Juan Cruz
Dorothy Curran
Elizabeth and J. Edwin Cusack
Frances and Ludomir Czynski
Morvarid Dadgari
Linda Daley
Richard Dana, Jr.

Eileen and Vincent Danielenko
Naomi and Joseph Daniels
Susan and David Danton
Carole and Michael Dascenzo
Meg and Brian Davies
Ceil and Craig Davis
Crystal Davis
Perceen Davis
Sonya Deason-Barnes
Christine Decker
Joseph DeFalco
Kathleen Delaney
Anne and Kevin Deluca
Noreen DeMarco
Joanne and Augustine DeMedio
Diane DeSantis
Milford and Zita Desenberg
Arleen DeStefano
Dr. Lawrence Deutsch
Andrea Devereux
Laura Devine
Roy Di Maria
Maria Di Pipi
Chris Di Renzo
Mike Di Veto
Christopher Dickert
Leola Dicks
Ronald and Renne Dictrow
Pam Diehl
Robert Dimattia
Marie Dimatties
Kenneth Dineen
Silvia Dingfeld
Diana and Paul Dintino
Bernadette and Gaetano DiPasquale
Susan and Dr. Robert DiRenzo
Nora and Chuck Dissinger
Richard Dodd
Timothy M. Dodd
Robert C. Dohrenwend
Martha Joan and Eugene Donohoe
Mary Angela Donohoe
Ellen Donohue
Kathryn Donohue
Michael Donohue
Amy Dorfmeister
Diana and William Dorris
Nicole Doss
Irene and John Dougherty
Rosemarie Dougherty
Robert and Karen Dragani
Lakia Dreggs
Karen and Edward Drennen
Cherylin Ducille
John Dugan
Lisa and Jeffrey Dunn
Eugenie and Joseph Dunphy
Joseph Dunphy

Elizabeth and Francis DuVernois
Joan Dwyer
Deborah and Joseph Ebling
Jeffrey Edwards
Barbara A. Edwardson
Deborah Eiserman and Eddie Newsome
Kanayo Ekweonu
Rob Elder
Ebony Ellis
Mary G. Ellis
Rachel Ellis
Mary Ann and Richard Enchura
Kelly Engel
George Engle
Audrey Erickson
Kathy and Mikael Eriksson
Michele Ermi
Joanna and George Erwin
Albert Eshun
Alan and Barbara Esserman
Nikki Esserman and Joel Wolpe
Bernice and Vance Evans
Karen McDowell Fair
Anna and Gregory Fanelli
Maia and Dr. Donald Farish
Jerniva Faulkner
Gregory Fayer
Chris Fazio
Jessica Fedezko
Sveltlana and Roman Feldblum
Amy Feldman
Ellyn and Robert Feldman
Stacey and Mark Feldman
Shawn Feniello
Mary Amelia and Brian Fennell
Noelynne Fentress
Robert and Colleen Ferara
Elizabeth and Robert Feriozzi
Charles Fertonardo
JoAnn and Charles Fest
Laurie and James Finkenauer
Alexandra and Robert Finley
Crystal Finnegan
Sabina Finnegan
Dianne and William Fisher
Nancy and Lew Fishman
Eileen and Brian Fletcher
Faith Foreman
Linda and Michael Foreman
Betty Forgerson
Jessica and Russell Forman
Pamela Forzley
Amy and David Fowles
Ann Frambes
Patti Franco
Michelle Franks
George Freisleben
Lia Friel

Rachel Friel
Steven Frizzie
Esther Frydenberg
Kevin Fullerton
Kim Funkhouser
Joyce Furgiuele
Elizabeth Fuzy
Anthony Gadaleta
Bill Gaehring
Brittany Gafas
Michael and Suzanne Gaglianone
Anne Marie Galinas
Monica and Ted Gallagher
Mary Gallo
Lena Gallotti
Jonathan Ganiaris
Brian Gantt
Jennifer Sells Garcia
Louie Garcia
Janine Gardner
Paula Garrison
Marianne and Norman Gaskill
James and Christine Gaydos
Marie Gaylert
Michael Geary
Nancy and Joseph Gendron
Theresa Gentile
Darnely Gerard
Christine Germano
Dominique Getka
Gregory and Colleen Gewirtz
Sarah Gharbi
Beth Giaccardo
Theresa Gibbs
Lucille and Richard Gilkey
Anna Gillespie
Dawn Gilmore
Jaymi Gilmore
Toni Gilmore
Dana Giordano
Denise Giorgianni
Meredith Glansberg
Carol Glassman
Jan Goan
Judi Godor
Bryan Godshall
Bettie and Henry Goehring
Shauna Goetz
Wendy Jane and Bernard Gold
Jennifer Goldman
Shelby Goldman
Allison Goldsborough
James Goldschmidt
Elaine and Herschel Goldstein
Katherine Golembiewski
Katherine Goodwin
Cathy and Richard Gordon
Cynthia and Barry Gould

Kay and LeGrand Gould
Jennifer Grabbe
Annette M. Granato
Judith and Charles Graser
Renee and Frederick Gray
Barbara and Robert Greco
Brenda Green
Evelyn Green
Regina Green
Roberta Green
Velma Green
Paul Greenamoyer
Jaclyn Greenberg
Assemblyman Louis D. Greenwald, District 6
Beth and Ronald Greer
Paula Griesel
Tandra Griffin and Daniel Schwartz
Norma and Greg Grimaldi
Ann Marie Grimes
Michele and Robert Groody
Colleen Gross
Phyllis Grossman
Joan Gussak
Peter Gutekunst
John and Sandra Gutowski
Jeff Haas
Patricia Habingreither
Darlene and Douglas Haines
Larry Halfin
Hazel Hall
Carol Hallman
Marcus Hampton
Gail and Hugh Hansell
Beth Hanson
Nancy and Edmund Hardy
Linda and John Hargreaves
Tammy Harkless
Judy Harper
Kelly and Brett Harrington
Rachel Harrington
Abby Harris
Gwenn Harris
Zachary Harrison
Christina Harrop
Charles Hart
Renee Hart
Phyllis Harter
Virginia and Ralph Hartman
Cynthia Hathaway
Jo Ann Hathazi
Amelia Haubenstein
Sylvia and Ronald Hauser
Elizabeth Hawk
Joan Hayes
Mary and Donald Healy
Patrick Healy
Mindi Heckendurn
Helen Heffler

Wayne Hefner
Elizabeth and John Heinz
Barbara and Joseph Heitman
William Hendricks
Edwin Hensle
Jeffrey and Judith Heppard
Jacqueline C. Herens
Diane and Gary Herman
Trudi and Irwin Herman
Denise Higginbotham
Louise and Harry Hill
Paul Hinderliter
Phyllis and Bruce Hinderliter
Susan and Callie Hinderliter
Catherine and Dr. Philip N. Hineline
Donna and Bob Hoey
James Hoff
Doris and Joseph Hoffman
Dorothea Hoffman
Nancy Hollingsworth
Jeffrey Holman
Barbara and Jeffery Holt
Patricia Holton
Linda and Michael Holtz
Maribeth and Kenneth Horn
Linda and Arthur Horneff
Michele Horner
Susan and Lawrence Horwitz
Peter Hovnanian
Elana Howard
David and Pamela Hozie
Francois Jean Huby
Sandra Huffman
Janet Huss
Patricia and Richard Hyde
Darma Ie
Christopher Ilconich
Karen and Anthony Ingenito
Dr. George O. Isaacson
Stacielee Isaacson
Steve Isackson
Sondra Jacob
Alice Jacobs
Daniel Jacobs
Mary Jacobs
Patricia and Carl Jacobs
Estelle Jacobson
Peggy and Dr. Allyn Jacobson
Kenneth Jadlowiec
Tina and Eric Jago
Laura James
Mary Janes
Carolyn and Dr. Scott Jarmain
Alicia Jarvis
Maryann and Charles Jarvis
Elizabeth and Ronald Jaworski
Robin Jay
Carolyn and Almond Jellison

JoAnna Jenkins
William and Lynn Jennings
Elaine and Dimitri Jeon
Derrick Jeter
Dean Johnson
Heather Johnson
Latasha Johnson
Lucas Johnson
Margaret Johnson
Mary Martha Johnson
Rina and John Johnson
Terrance Johnson
Tina Johnson
Michael Johnston
Patrick Johnston
Dawn and Kenneth Jones
Roman Jones
Howard and Marilyn Jost
Sydney Judah
Desiree and Walter Juraniec
Veronica and Zeljko Jurjevic
Sharon Jurman
Genevieve and John Juzaitis
Vincent Kabbeko
Laura Kalck
Barbara and Robert Kalinski
Fred Kamara
Sheku Kamara
Albert Kanach
Gary and Barbara Kanalstein
Joy Kapeghian and Richard Carlin
Milton Karten
Shelly and Mark Kasrel
Julia and Charles Kass
Virginia Kassa
Nazira Kazakbaeua
Scott Kegler
Curtis Keller
Marie and Thomas Kelley
Madge and Hugh Kelly
Mark Kelly
Maureen Kelly
Jack Kennedy
Nancy Kennedy
Tracey Lynn Kennedy
Thomas Kent
Wendy Keppe
Jospeh Kernen
Susan Kerr
Isabel Kerwin
Dr. Mary Louise E. Kerwin, BCBA
Christine Kienzle
Quinton Kindon
Nicole King
Joan Kingsland
Elizabeth Kinney
Kathleen Kirk
Karen Kirkhope

Jessica Kirkland
Megan Kirsch
John and Laurie Kirschner
Kristin Kisal
Mindy Klarin
Barak Klein
Janice and Martin Klein
Anne and Ralph Kohart
Michael and Rosalie Kohn
Jan Kolchinsky
Paula and Thomas Kole
Jennifer and Jason Kolinsky
Marlene and Marvin Korff
Frances Kozub
Heather and Mark Kramer
Dr. Judith A. Kramer
Roberta and Harold Kramer
Martha Krasne
Stacy and Russell Krauss
Heather Kriesman
Neera Kuckreja
Jeffrey Kueny
John and Rochelle Kugler
Rich Kukla
Laura Kuntz and Edmund Mikalauskas
Jodi Kurtzman
Joseph Kushnerick
Bridget and Gene Lambey
Hugh LaMonaca
Dani Lamothe
Eleanor and Beth Lampe
Max and June Lang
Alix and Mark Langer
Rennae Langley
Darren Larsen
Marcia Larson
Janis Lauer
Terry Laurelli
Dawn Law
Kathleen Law
Mireille Lawrence
Mary and Kenneth Layre
Benjamin Lee
Michelle Lee
Rita and Michael Lee
Angela and Richard Lees
Janet Leinbach
Robert Lenherr
Allison Leung
John and Loisann Levicchi
Claire Levitt
Arthur and Marie Lewandowski
Dolly Lewis
Sue Lewis
Dr. Karen Lindgren and Kyran Hurley
George Lindstrom
Cathy and Dr. Robert Lipshutz
Robbin Lobue

Stephen Locastro
Nancy Londres
Donnell Long
Sandra and John Lonia
Jacquelynn and Thomas Lott
Pierre Louis
Nicasio and Monica Lovecchio
Fred and Joanne Lubker
Joan Lucas
Patricia Lukas and Philip Friedensohn
Kristin Lukianovich
Kevin Lynch
Madeleine and Richard MacDonald
Ann Marie Machion
Robin and David Macken
Donald Mackowski
Maureen Mackowski
Joseph and Maxine Macnow
Megan Mahan
Thomas and Catherine Maheady
Shahriar Mahmud
Rachelle Malat
Dianne and James Malley
Christina and Edward Maloney
James Maloney
Abu Mansaray
Jessica Marchese
Edwin and Carol Marder
Randi Marder
John M. Mardirosian
Victor Y. Marfo
April Marino
Joseph and Carol Marrazzo
Carol and Joseph Martella
Marjorie S. Martin
Melissa Martin
Diane and Joseph Martino
Steve Marusky
Dottie and Rudolph Mascellino
Barbara Masino
Helene Matkowski
Kathy and Edwin Matos
Mark Matteson
Karen Maucher
Linda and Kevin Maull
David May
Selina May-Harris
Jamie McAllister
Amanda McAlpin
James McBride
Thomas McCann
Kathryn McCarthy
Terrence McCarty
Colleen and Peter McCauley
Louis McCauley
Mary and Joseph McCauley
Elizabeth McCleary
Amy McClintock

“

Our partnership with Bancroft
and our understanding of the
people they serve has made us
better architects.

”

Gary Kanalstein, AIA

Principal, KDA Architects, P.A.
Karen McCunney
Ed McDonnell
Mary McDonough
Linda McEady
Frances A. McElhill, Esq.
Megan McGinnis
Nicolette McGlashan
Christina McHale
Kelliann McHugh
Anne McKernan
Dana McLaughlin
Marian and Thomas McLaughlin
Lorraine McLeod
Sara McMahon
Carole McManus
Timothy McManus
Dorothy McMillian
Darlene McNeil
Matt McNicholas
Michele and Timothy McShea
Andrea and Samuel McWhirt
Helena Meade
Karl Medley
Jaclyn and Gary Melchiano
Kathy Mellish
Shelley Mendias
George Mess
Frank Messina
Terri Meytrott
Christian Michels
Annie Miele
Marcia Milazzo
Jan Miles
Joanne Miles
Arlene and Thomas Milich
Eva and George Milko
Dean and Brenda Miller
Gerald Miller
Linda Miller and Dennis Duffy
Timothy Miloshevsky
Derek Minner
Manuel Miranda
Nicholas Mirkay
Myrlie Misskelly
Theresa Molettiere
Steve Molzon

MILESTONES (continued)

}
12

NOVEMBER 2010
Our annual Butterfly Ball was a hit, with nearly 300
guests. Hosted by TV sports personality and Eagles
football legend Ron Jaworski, it honored KDA architects
and neurologist Steven Bromley, M.D.

} MARCH 2011

Our inaugural “Bancroft Unplugged” events
celebrated Brain Injury Awareness Month. People
supported by our brain-injury programs gave
poignant and inspiring speeches to appreciative
audiences in Cherry Hill, Brick and Plainsboro, N.J.

} MARCH 2011

Visitors previewed Little Butterflies, Bancroft’s
inclusive daycare center, which opened in July.
The innovative program serves children both
with and without developmental delays.

} APRIL 2011

Leading healthcare executive Martin A. Bieber
(right) was named chairman of the Bancroft
Board of Trustees, succeeding Joseph Atkinson
(center). Mr. Bieber is president and CEO of
Kennedy Health System.

13
DONORS (continued)

Kamaldeep Momi
Corinne Lloyd Moody
Steven Mooney
Beth and Paul Mora
Erin and Paul Morales
Mary and Eileen Moran
Sylvie Moran
Tamara and Todd Moreland
Dennis Morgan
Marlene Morgan
Pete Morisco
Frank Morreale
Ilene Morris and Sheldon Oxenberg
James and Roberta Morris
Melanie Morrow
Harriet B. Moskowitz
Lynnda Mosley
Kimberlie and Barry Mostyn
Wayne P. Mozzo
Steve Mozzon
Mike Muccie
Virginia Mulhatten
Mary Munroe
Elizabeth and Stephen Murawski
Judy Murphy
Pat Murphy
Nancy and Stephen Murray
Phylis Musser
Judy Musto
Stephanie Muth
Violet Mwangi
Christine and Larry Myers
Lorraine Myro
Diane and Raymond Nabb
Lily and George Najim
Mary and Paul Nantz
Ayse Narinlik
Veda Naylor
Kathleen and Glenn Nazarok
Barbara Nealis
Nicole Nelms
Angie and Charlie Newman
Joyce Nicolo
Tinamarie Nicolo-Dorfner
Christina Nieves
James E. Nigro, Sr.
Kristin Nilsen
Rodney Nixon
Daniel Nulton
Jean and John Nuneville
Luann O’Brien
Joan and John O’Connor
Brian Odenath
Linda Odenath
James O’Dowd
Oluyemisi Oladele
Dr. Frances and David E. Olar

Lisa Oliver
Margaret Ollis-Leon
Joseph and Robin O’Malley
Edward Onyekachukwu
Elizabeth and Peter Orlando
Yuliana Ortiz
Robert Osgood
Sherri Ann and James Ouimette
Betsy Paisley
Mary and John Palma
Kathryn Palmerchuck
Susan Papadopoulos
Thomas Paparone
Dr. Anna Mamalakis Pappas
Nikos Pappas
Karen Parenti
Judith Parker
Nora and Frank Parker
Regina and William Parker
Chris Partridge
Jo Lynn and Robert Passarelli
Rachel Pastore
Donna and Itshack Peer
Elizabeth and Anthony Pell
Marti and Frank Pelosi
Rachelle and Joseph Pendleton
William C. Peoples
Lisa and Joseph Perez
Bill Perla
Barbara and Richard Perlman
Shelly Perna
Frances Perrin
Pamela Perry and Scott Buchheit
Joseph and Patrice Persico
Deborah Peters
Pat and Fred Peterson
Audrey Warne Peyton
Anne Pfaff
Donna and Curtis Phillips
Karen and Steve Phillips
Suzanne Phillips
Orion Anita Pie
Alfred J. Pierce, III
Alvin and Grace Pierce
Michael Pierce
Greg and Elsa Pine
Andrea Pinkston
Diana Pinzon
Michelle Pisaturo
Darryl Pitt
Judith and Bernard Platt
Mike Platt
Pedro Plaza
Barbara and Francis Pollack
Karen Pollard
Melissa Pontecorvo
Jodi and Sean Porrini
Keith A. Pote, II

Thomas and Nancy Pote
Jennifer Potter
Josephine and Franklin Potts
Patricia and Glenn Potts
William Potts
Carla Powell
Sean Powell
Lisa and Daniel Prangler
Buck Price
Kevin Priest
Dr. Eugene R. Principato
Anne Marie Proctor
Mary Quaranta
Donna Quigley
Sharon and Donald Quigley
Anna Marie Quinn
Doris Rabasca
Lillian and Daniel Ragone
Carol Rahner
Margaret Reaves
Steven C. Reback
Josephine Reese
Patricia and Wayne Reid
Katherine Reilly
Karen L. Reiss
Catherine and Dr. James Reuter
Paul Reyes
Maya Ribas
John and Tracy Riccetti
Rick Ricciardi
Maria and Patrick Rich
Mary Ann and Wayne Richardson
Gwendolyn S. Riggs
Margaret and William Righter
Jane and Steven Riley
Margot and Norman Rimbey
Doreen and Steve Ripa
Scott Ritter
Hedwidge Rivas
Willie Rivera
Heidi and Todd Rixman
Haksoo and Soonog Ro
Joanne and Don Roberts
Linda and William Robertson
Muriel Robinson
Sherry Berman Robinson
William Robinson
Mary Roche
Deborah and Roger Rocque
Christine Rodriguez
Christa and Magnus Rodums
Ruth-Ann Rohrman
Angela and Michael Rollison
Sandra Roluga
Kara Roman
Jessica Rosh
Mary Rosica
Carol Ross

Heather Ross
Amy Rossdale
Hazel Rossdale
Diane and Otto Rossmeyer
Babe Roth
Emmett Roth
Jackson Roth
Phoebe Roth
Reiko Rotzell
André Roualet
Thomas and Catherine Rovito
Kerry Ann Rowe
Laurette Rowe
Marie Rowe
MaCal Roy
Cheryl Rubba
Drs. Denise and Arthur Rubenstein
Marci and Paul Rubin
Lorna and Robert Runkle
Joseph and Suzanne Ruotolo
Christine Russell
Nancy and Harold Russell
Dorothy and Herman Saatkamp
Nancy and Edward Sadler
Fatima Sakarya
Anne-Marie and Mark Salerno
Anthony and Susan Salerno
Marilyn and Dr. Edward H. Salmon
Diane Salter
Thomas Sandfort
Amanda Sandoval
Nicholas Sanfilippo
Loyda Santiago
Rick Santiago
Stanley and Cynthia Saperstein
Gloria Sapurstein
Samantha Sarin
Mario and Donna Sartori
Dot Sattler
Pamela and Dennis Saunders
Regina Savage
Debbie and Joseph Scanlon
Dr. Karen Scardigli
Mark Schaeer
Julie Schaekel
Robin and James Schaffner
Gregg and Kathleen Scharnagl
Judith Schermer
Jay Schleifenheimer
Debra and Howard Schlesinger
Paul Schmincke
Mark Schmitz
Rachel and Walter Schnee
Antoinette and John Schnitzius
Monica and William Schramm
Renee Schreiber
Victoria Schriver
Martha and Ted Schroeder

Cheryl Schumacher
Ella Mae Schussler
Alan and Karen Schwartz
Rose and Sol Schwartz
Jean Scornaienchi
Colleen Scrimenti
Lynne Scully
Jim Seasholtz
Jean Sedar
Denise Sellers
Patrick Senft
Arleen Severino
John Seymour
Patricia and Jesse Shafer
Dr. Harriet M. Sharlin
Micole Sharlin and Christopher Thatcher
Matthew Sharp
Mildred Sharp
Susan Sheer
Almas and Asif Sheikh
Deborah Shemeley
Marion Shepeski
Paul Shepherd
Mary Sheridan
Carolyn Sherman
Leigh Sherwood
Ana and Kevin Shields
Carol Shields
Susan Shilcrat and Harry Mazurek
Beatriz Shipley
Mary Shull
Janeen Shumaker
Amy Shute
John Sieminski
Shirley Silberstein
Debbi and Michael Silverman
Patricia and Robert Simalchik
Wayne Simcox
Rune Simeonsson
Dorothy and Craig Simpson
Thelma and Jesse Sintikakis
Traci and Christopher Slate
Meagan Sloan
Jean Small and Terry Handley
Michael Smelson
Barbara and Russell Smith
Carol Smith
Dawn Smith
Dorothy A. Smith
Gustave Smith
Kirk Smith
Nicole Smith
Renee Smith
Suzanne and Edward Smith
Nancy and Clete Snavely
Allison Snyder
Barbara and Robert Snyder-Rigney
Louise and Theodore Soddy

Sally Solis-Cohen
Denise Sommerville
Albert and Marilyn Sonsini
Raymond and Maryann Sooy
Oscar Soriano
Kathy and Arthur Spangenberg
Mary Spence
Serina Spitzer
Myrna and Harvey Springel
Doris Stabingas
Barbara Stadalman
Camille Stahl
Raymond and Karen Stang
Christine and John Stefankiewicz
Nancy Steinmetz
Aaron Sternberg
Joann Stevens
Wanda Stevenson
James and Joyce Stigliano
Michelle and Scott Stilts
Karen Stone
Reverend Richard Straughn
Carol and Richard Stravach
Sue Strawbridge
Charles Streeper
Nicole Streeper
Timothy Streeper
Margaret Strong
Merilyn Styles
Mary Kat Sundahl
Averil and Claude Sutphen
Roy and Diedra Swanson
Victoria Sweeney
Karen Swett
Winifred and Ralph Swift
Amtul and Salim Syed
Marie Sykes
Frances Tailey
Drs. Esther and James Taitsman
Veronica Talbot
Raymond Talty
Stephen Tarnoff
Donald Tatham
Chris and Charlie Taylor
Joanne Taylor
Lauren and Paul Taylor
Will Taylor
Mary G. Tedesco
Daniel and Nan Teplitz
David Tesch
Dr. Mark Testaiuti
Dawn and John Thein
Mary Tholen
Michael Thomas
Tara Thompson
Evette and Steve Tiger
Fran and Alvin Tiger
Colleen and John Tighe

Patrice and Jeffrey Timm
Annette Tolbert-Ellis
Theresa Tolotta
Cara and Christopher Tomasco
Shaina Torres
Cookie Totka
Maurice Towns
Maryann Tracey
Rose and Frank Tripicchio
Robert Trombley
Joseph and Michelle Tropea
Valerie Trueax
Martha Tsampis
Spencer Tucker
Isatu Turay
Donna Turley
LaTanya Turner
Joann and Paul Tyer
William and Judith Uricher
Anna Vadino
Cheri Valko
Clem VanZelst
Karen and Todd Veneziano
Joanne and Frank Vesci
Myrna and James Vest
Michelle Villalobos
Ronda Vitale
Allison Vogdes
Michael and Nancy Vogelstein
Kathy and John Von Thaden
Maureen VonStetina
Dr. Christina Vorndran
Donna and Gary Vukicevich
Marge and John Vytowich
Joseph and Mary Ann Wadzin
Regina and Donald Wagner
Arlene Wahrmann
Kathleen and William Waldron
Dorothy and Donald Walls
Julie Walsh
Michelle and Robert Walsh
Alexton Walters
Jeannie Warren
Kathleen Warren
Allan and Cynthia Wasserlauf
Denise and Edward Waters
Rodney Watson
Tamelia Watson-Harris
Charles Waugh
Sarah Way
Karen Weaver
Megan Webb
Thomas and Kathleen Weber
Deborah and David Webster
Judy Wechsler
Bobbie and Ted Weeks
Gail and Dr. Barry M. Weichman
Joe Weinlick, Jr.

David Weiser
Susan Weisman and Andrew Howard
Barbara and Gary Weissenberger
April and Scott Weitz
Larry Weitzner
Gail and Doran Welch
Elizabeth Welker
Eva and Claudia West
Gabriel Wetmore
Bryant Wezner
Franklin and Dolores Wezner
Richard Wezner
Wendy and Marc Wezner
Shelly and Brent White
Susan Whited
John and Lillian Wilkins
Breanna Williams
Deyshia Williams
Janet Williams
Randy and Sherry Williams
Sue Williams
David Willis
Joan and Keith Willoughby
Ronald and Lisa Willoughby
Elizabeth Wills
Rosemary and James Wills
Carla Wilson
Dolores Wilson
Jennifer Wilson
Lillian Wilson
June and John Winchester
Jane Windle
Christine and Robert Winn
Jo Winslow
Tracy and Bob Wolak
Terrence Wolfe
Daniel and Roni Wolfson
Joseph Wolfson
Paul Wolfson
Jennifer Wolinetz
Mindy and Dr. Larry A. Wolk
Leslie and Mark Wood
Laura Wooding
Stephen and Maureen Woods
Brad Wool
Elizabeth and Frederick Wright
William and Robin Wright
William and Valerie Wynne
Charlie Yedlin
Donna Young
Wendy Young
Donna and Philip Yturbe
Megan Zahler
Amy Zambotti
Robert Zampella
Robert Zimmerman
Alfred Zulu
Hanna Zyruk and Dr. James Hainer

The Jacob Schaefer Legacy Society
The Jacob Schaefer Legacy Society honors those
who have made planned gifts to Bancroft.
Bruce Baker
Linda Bennett
Kathy and Chris Capritti
Virginia and James Carson
Estate of Helen Davis
Jaqueline and Leonard Faupel
Susan and Bob Freeman
Judith Harper
Abby Harris on behalf of Danny Harris
Justin Israel
Geraldine Knudsen
Patricia and Bob Mate
Wayne and Kathy Ross
Virginia Rushmore
Rita Waranch
Susan Weisman and Andrew Howard
Joanne and Raymond Welsh
IN-KIND GIFTS
In-kind giving allows donors to have an immediate
impact by providing much-needed equipment and
supplies, reducing Bancroft’s need to purchase the
items and have them shipped.
Allied Beverage Group, LLC
Gertrude Bampi-Nelson
Barry’s Bistro
Rosalyn and Laurence Belgin
Erin Bereheiko
Dr. Mary G. Brownsberger
Carrie Cafiero
Kimberly and Stephen Caputo
Catherine Carchidi
David Checchio
Cherry Hill Skating Center
Cinemark
Nancy Costello
Couples Resorts
Molly Coyle
Jean D’Ambrosio
Gregory Davis
Thomas Deeney
Jennifer Deluca
Jeremy Duncan
Christina and Eric Eberman
Robert Escheman
Bernice and Vance Evans
Maryann and Colin Farrell
Jacqueline Faupel
Pam Fenner and Michael McLaughlin
Colleen and Edwin Ferren
Joanna Fiori
Jenna Forziati
The Funplex

Amy Garfinkel
Theresa Gibbs
Jan Goan
Beth and Ronald Greer
Diane and Gary Herman
Diane and Jim Higgins
Bob Hoban
Joseph Hodakowski
Sandra Huffman
Patricia Hurka
Sondra Jacob
Johnson’s Corner Farm
Knights of Columbus: Bishop Eustace Assembly 652
Komfort & Kare
Heather Kriesman
Maureen and John Krihwan
Laurel Lanes
Michelle Lee
Jennifer and Chris Lucania
Magnum Computer Recycling
Mindy and Daniel Maranon
Esther Miller
Linda Miller and Dennis Duffy
Teresa and John Moffett
Sylvie Moran
NELSON Technology Services
Daina Norman
Janet and Allen Pawling
Philly Pretzel Factory
Playdrome Cherry Hill
Pump It Up
Lynda and Stewart Resnick
Valerie Ridgway-Carter
Rita’s Water Ice
Heidi and Todd Rixman
Ross Concrete
Kathy and Wayne Ross
Harry Serad
ShopRite
Kirk Smith
Stewart Business Systems
Karen Stone
Carol and Richard Stravach
Mary Stringfellow
Kevin Sullivan
T & L Transportation
Mary G. Tedesco
Diane and Carl Thomas
Kathleen M. Thompson
Tina’s Hallmark
Selena and Paul Tropea
United by Autism
Julie Walsh
Dale Williams
Gale and Bill Wills
Hanna Zyruk and Dr. James Hainer

MILESTONES (continued)

}
14

MAY 2011
The U.S. Department of Veterans Affairs
approved Bancroft to provide brain-injury
rehabilitation services to veterans through a
new pilot program. As a result, VA funding is
now available for these vital supports.

} JUNE 2011

Bancroft’s Golf Outing featured two twists
this year: a new site – Galloway National
Golf Course; and special messages to each
foursome from their “team captain” – a
student or adult served by Bancroft.

} JUNE 2011

David Weiser (left) ran with the Special Olympics
torch to help kick off New Jersey’s Summer
Games. He and staff member Shaun Erwin (right)
compete in community road races, too.

} JUNE 2011

Thirty-one students graduated from
The Bancroft School this year. Of those,
93 percent went on to jobs and/or
adult programs provided by Bancroft
or other organizations.

15
Financial Overview
REVENUE AND EXPENSES

DONATIONS

Year Ended

Year Ended

JUNE 30, 2010

JUNE 30, 2011

Total Revenue

1,308

14

12

$95,588

Interest and other income

$97,926

873

$99,246

EXPENSES WERE INCURRED FOR:
Salaries, wages and fringe benefits

AMOUNT IN THOUSANDS

$94,701

Donations

$1,000

Bancroft is an incredible organization and, after serving three years as a board
member, I’m honored to have been named board chairman in April.
As president and CEO of Kennedy Health System, one of the region’s largest healthcare
providers, I was already familiar with Bancroft and the excellent work it does.

$1,200

REVENUE WAS PROVIDED FROM:
Program revenue

1,308

$

$1,400

Transforming for a strong future

Since I’ve become more directly involved, I’m even more impressed. And one of the
most impressive aspects of the organization is its constant quest to improve.

873

$

$800

At the board level, we continually strive to challenge each other’s thinking, as well as
to challenge management, in order to assure that we’re well-prepared for the future.
For example, how do our families and other “stakeholders” define quality? And what
is the board’s specific role in achieving Bancroft’s vision, in support of our mission? (For
our new vision statement, please see Toni Pergolin’s message on page 1.)

$600

$76,516

$78,238

Facilities and transportation

9,179

10,292

Supplies and other expenses

5,367

6,251

644

624

1,717

1,623

$93,423

$97,028

$2,165

$2,218

$3,375

$4,023

Restricted gifts

46

129

Gifts released from restriction

(2)

(502)

¢ Corporate/Organization Support

3,419

3,650

¢ Special Events

$9,615

$13,034

$13,034

$16,684

Interest
Depreciation
Total Expenses
Net Operating Income
NET ASSET ACTIVITY:
Increase in unrestricted net assets

Increase in net assets
Net Assets beginning of year
Net Assets end of year

ABOVE NUMBERS ARE IN THOUSANDS

16

$400
$200
$0
FY 10

FY 11

¢ Other income
¢ Individual Support

As an organization, our sole purpose is to better the lives of those who seek our help.
Each of us – from board members to administrators, clinicians to direct-care staff –
must understand our responsibilities, and hold ourselves and one another accountable
for achieving our goals. That’s the only way to assure Bancroft will be here in the
future, for the families who rely on us today and those who will need us tomorrow.
I’m confident that we’re on our way to achieving our vision to become the region’s
elite service-provider in our field. As an elite provider, we are motivated to do our very
best, each and every day, to provide the most effective services. We hope this vision
will also inspire you to continue supporting us for many years to come.
Through the use of best practices and a solid commitment to each person who comes to
us for services, we are transforming lives. And we are transforming our world. Join us!

MARTIN A. BIEBER, CHAIRMAN, BANCROFT BOARD OF TRUSTEES

17
Transforming to achieve our vision
PERSON-CENTERED

modern facilities

Our Promise
Together, we are moving toward an exciting future
for Bancroft and the people we support.
Our vision is clear: By 2014, we will be the
region’s elite provider of services to people
with neurological disabilities. We will achieve
this vision by providing high-quality, individualized
services in modern living, learning and working
environments; services that exceed the expectations
of our stakeholders, from the people we support
and their families to funding agencies.
At the same time, we will preserve the qualities
that make the Bancroft community so special:
passion; caring; commitment.
We are well on our way: We’ve begun transforming
our Mullica Hill Campus (pictured) to a fully
accessible, modern facility; we’re implementing
the use of assistive technologies – which instill
greater independence – at a rapid pace; and we’re
focusing more than ever on the individual needs
and desires of the people we support.

employer
of choice

Together, we can achieve this transformative vision
for a strong and rewarding future, for all of those
who need us.

PA S S I O N

COMMITMENT
CARING

CREATING MODERN ENVIRONMENTS The empty field pictured in last year’s annual report has
been transformed into this state-of-the-art residence on our Mullica Hill (N.J.) Campus. The campus
is undergoing a complete renovation to create leading-edge facilities, to help people reach their full
potential for fulfilling and productive lives.

ASSISTIVE TECHNOLOGY

18

clinical excellence

ACCESSIBILITY

BEST PRACTICES

elite provider

BANCROFT “FAMILY” MEMBERS, from left:
Sharmina Ransome, Wayne Hefner (staff),
Bill Wills (parent), Ray Welsh (parent, board
member), Martin Bieber (board chairman), Kia
Dreggs (staff), Toni Pergolin (president), Eddie
Smith, Caroline Eggerding (staff)

19
Bancroft at a Glance
BANCROFT IN NUMBERS

WE’RE PROUD THAT:

EXECUTIVE STAFF

• 501(c)(3) nonprofit organization

• 98% of the children served in our Early Intervention Program went on to public school.

• Most services are provided 24 hours a day,
365 days a year

• 93% of Bancroft School students who took a New Jersey state assessment* scored
“proficient” or higher in mathematics, and 86% earned the same rating in language-arts
literacy. 97% of students who took the science tests achieved a “proficient” or higher score.

Toni Pergolin, President, Chief Executive
Stephen Bruce, Vice President of Strategic Planning
Thomas J. Burke, Chief Financial Officer
Caroline Eggerding, M.D., Vice President of Clinical Services, Chief Medical Officer
Joseph Flamini, Chief Operating Officer
Tracee Hunt, Chief Human Resouces Officer
Daniel J. Keating, Ph.D., Vice President of Family Services
Joan Galon King, Chief Advancement Officer
Colleen Macalino, C.P.A., Vice President of Finance
Kathy M. Ross, Vice President of Communications and Community Relations
Melissa Wheatcroft, Esq., Vice President of Program Operations

• 1,424 individuals served in 25
separate programs
> 554 Children
> 870 Adults
• 198 homes and supervised apartments
• Programs are located in six counties in
New Jersey, Delaware, and Pennsylvania
(Philadelphia area)
• 1,996 employees
• $100 million operating budget
• 5th largest employer in Camden County, N.J.
• 128 years of making a difference—Bancroft
was founded in 1883!

THE NEED
• 1 in 94 New Jersey children show signs of
autism – more than pediatric cancer, diabetes
and AIDS combined.
• An estimated 2.5 million people in the United
States have an intellectual disability – about
1% of the population.
• 2 million people sustain a brain injury every
year. In New Jersey alone, over 9,000 people
sustain a traumatic brain injury each year,
450 of whom will have long-term disabilities.

20

• 93% of graduating students at age 21 were effectively transitioned to post-educational
opportunities.
• 90% of the individuals we support in Community Vocational Services for Adults (CVSA)
participate in paid employment and/or volunteer work opportunities.
• 73% of those working (with supports through CVSA) have maintained their employment
for at least 12 months.
• 73% of the children who completed the Lindens program (for severe behavioral challenges)
in 2010 decreased target behavior by 70% or greater.

Our programs and supports for children and adults with intellectual and
developmental disabilities, autism, and acquired brain injuries include:
•
•
•
•
•
•
•
•
•
•
•
•

Early Intervention and Inclusive Daycare Program
Early Education Program for Children on the Autism Spectrum
Elementary and Secondary Special Education School
Transition Education Program on a College Campus
Vocational Training, Transitional and Supported Employment Programs
Structured Day Programs for Adults
Home and Community Services for Adults with Acquired Brain Injuries
Campus and Community Living Programs
Programs for Veterans with Acquired Brain Injuries
Campus-based Behavioral Stabilization Program for Children/Youth
Specialized Community-based Program for Older Adults
Professional Training and Consultation Services

*The New Jersey Alternate Proficiency Assessment, a state-required assessment for students
who are unable to take typical standardized tests.

VOLUNTEER LEADERSHIP
BANCROFT BOARD OF TRUSTEES
Martin A. Bieber, Chair
Lisa Bean Alberts, APN, BC
Scott Bannett
Greg Dobbs
James P. Dwyer, D.O.
Kenneth L. Ewell
Jeffrey R. Harris
Samuel A. Pignatelli
Jeremy W. Ryan, Esq.
Jeffrey S. Swartz
Howard M. Weinberg, D.O.
Raymond H. Welsh
Ronald L. Williams
Leon J. Zimmerman

EMERITUS TRUSTEES
Theodore Beringer
James Carson
Leonard B. Faupel
Robert J. Freeman
Justin Israel
Dimitri T. Jeon
Robert F. Mate
Clarence N. York, Ed.D.

BANCROFT REHABILITATION SERVICES
BOARD OF TRUSTEES
Howard M. Weinberg, D.O., Chair
Barbara Berkman
Philip N. Hineline, Ph.D.
Donna Icovino
Mary Louise Kerwin, Ph.D.
Charles S. McLister
Mark Mintz, M.D.
Donald Roberts, Immediate Past Chairman

Joseph C. Atkinson, Immediate Past Chairman

21

Bancroft Annual Report 2011

  • 1.
    © 2011 Bancroft| All rights reserved HEADQUARTERS 425 Kings Highway East | P.O. Box 20 Haddonfield, NJ 08033-0018 | USA 856 429 0010 www.bancroft.org
  • 2.
    Our Mission Bancroft’s missionis to ensure that every person is given opportunities for lifelong learning and fulfillment. We do this by altering perceptions, and by supporting TOGETHER... we are transforming lives For 128 years, Bancroft has helped people make extraordinary gains. We’ve enabled people who were once confined to institutions to blossom and live full lives in the community. We’ve helped children with severe behavior problems learn to control their outbursts – and open themselves to worlds of possibilities for happy, productive lives. Such transformations occur every day at Bancroft. And that only inspires us to do more. But to do so, we too must transform. We must strengthen ourselves in various ways. During the last year, we developed a comprehensive “vision” for our future, with input from those we support, families, staff, board members and others. This exciting new vision is designed to guide us toward the brightest possible future, on behalf of those we support: those with intellectual and developmental challenges By 2014 our distinct ability to deliver high-quality, individualized services in modern living, learning and working environments will exceed stakeholder expectations and secure Bancroft as the region’s elite provider of services to people with intellectual disabilities, autism and brain injuries. and acquired brain injuries in achieving their life goals We will take great care to move our mission forward in a way that preserves those qualities that continue to make Bancroft an extraordinary community. as valued and respected members of our world. In fact, such changes have already begun – and lives are transforming! For instance, we’re creating modern environments through new, fully accessible homes on our Mullica Hill Campus, and bringing state-of-the-art learning and communication technology into our classrooms. The result: people are gaining greater independence and a better quality of life. In addition, we ended the year with positive financial results, and continued to expand our services to provide greater options for people who need our help. ON THE COVER: Members of the Bancroft “family” From the people we support and their loved ones, to our staff, board members and donors, we are the Bancroft family – dedicated to the organization’s mission and our shared future. IN PORTRAIT PHOTO, FROM LEFT: Back row: Caroline Eggerding (staff), Randee Rubenstein (parent), Ray Welsh (parent, board member), Ari Rubenstein, Kia Dreggs (staff), Bill Wills (parent), Sharmina Ransome. Middle row: Jeffrey Swartz (board member), Peter Fisher, Wayne Hefner (staff), Valerie Carmack (staff), Addison Carmack. Front: Jaden Ambroise, Eddie Smith. Of course, there is still much work to do. As you read through these pages, I hope you will be inspired by these stories of transformation, just as I am. Each person we help is a living reminder of how important our mission truly is. Please know that you play a vital role in these successes. We can only change lives if we work together! On behalf of each person and family we help, thank you for your support. TONI PERGOLIN, PRESIDENT, CHIEF EXECUTIVE 1
  • 3.
    Transformations …in students withautism and other developmental disabilities “ Jaden is learning communication and social skills, which will help him in all aspects of life – including in the workplace one day. ” – Kara Roman, Jaden’s teacher Jaden (left) and classmate Edgar Santos-Borges are pals. 2 Nine-year-old Jaden Ambroise is happy and easy-going, according to his dad. But just a few years ago – before Jaden came to Bancroft – he was often unhappy and upset. With limited ways to communicate his needs and desires, he would scream and bite his finger in frustration. At The Bancroft School, Jaden has learned many words and can tell people what he wants. He even won an award for most-improved student. Moreover, due to his autism, Jaden once had little tolerance for new people and places. “Now he’s fine when we take him somewhere new and he’s around other children,” says Jaden’s dad, Schiller. “He definitely has a brighter future.” “Jaden has transformed,” says his teacher, Kara Roman. “He can now ask for things, and say if he doesn’t like something. He’s really come out of his shell.” Transformations at The Bancroft School JADEN AMBROISE: NEW SKILLS MEAN A BRIGHTER FUTURE 3
  • 4.
    Transformations EDDIE SMITH: POSITIVEBEHAVIOR BRINGS REWARDING LIFE “ Eddie was in and out of different As an adolescent on the autism special-needs schools because of spectrum, Eddie Smith had spiraled his behaviors. Now he maintains a job; he follows instructions and maintains his independence. – Eddie’s dad, Ed Smith ” out of control. When he didn’t get his way, he would punch, kick, bite and throw things. He even refused to go to school most days. But in 2007 Eddie entered the Lindens, Bancroft’s residential program for youth with both developmental disabilities and severe behavioral Eddie (right) with staff member Brandon Saunders. 4 challenges. And today, Eddie has transformed so much that he’s able to live in a Bancroft-supervised home in the community. He attends The Bancroft School and works in the campus convenience store. “I like going to school,” says 17-yearold Eddie, who also enjoys bikeriding and playing the card game Uno. “I feel good about my life.” “Eddie has come a long way,” says his mom, Suzanne Clemente-Smith. “Bancroft has done a very wonderful job for him.” Transformations in the Pediatric Residential continuum …in students with severe behavioral challenges 5
  • 5.
    Transformations …in parents withintellectual and developmental disabilities “ Sharmina has changed drastically For Sharmina Ransome, it’s all about the kids. since she came to Bancroft. She’s calmer and more proactive; she seeks out information to make sure her children’s needs are met. – Staff member Virgia Lemon Sharmina and children Anaje (left) and Jiyon. 6 ” “My children and my family are the most important things in my life,” says the mom with developmental disabilities. Still, Sharmina needed guidance to help both herself and her young son and daughter. She found it at Bancroft’s unique parenting program, at The Walker Center in suburban Philadelphia. Today, Sharmina is “more confident and more vocal in advocating for her kids,” says staff member Virgia Lemon. She’s taking classes to get her high-school diploma while aggressively looking for a job. She says she’s transformed, and is learning to be a better mom. “I’m making goals for myself,” states Sharmina, who dreams of being a nurse. “I’m striving for where I want to go in life… I can’t wait to be more successful.” Transformations at the Walker Center SHARMINA RANSOME: LEARNING TO HELP HERSELF AND HER CHILDREN 7
  • 6.
    Transformations …in adults with acquiredbrain injuries “ Doctors said Lee would never walk again. Today he’s winning races at Special Olympics! He has a great perspective on life, and now works to help others. ” – Staff member Bill Lewis Lee (right) with his Special Olympics medals and staff member Jeanne Bozicek. 8 After a 1990 car crash, Lee Miller was left with a brain injury and a wide range of challenges. He was unable to walk, and was angry and withdrawn. But today, Lee is a new man: he’s an advocate and public speaker on brain-injury issues, an athlete and more. He’s gained a positive outlook, and enjoys socializing again. While Lee continues to need assis- tance and rehabilitation, “it doesn’t mean my life has to stop,” he says. Lee started out on Bancroft’s Mullica Hill Campus, and has continued to progress to more independent settings. Today, he lives by himself in a Bancroft-supervised apartment, and is an active and productive member of his community. Says Lee: “Bancroft has always been there if I’ve needed support.” Transformations in Brain Injury Services LEE MILLER: A NEW LIFE AFTER A BRAIN INJURY 9
  • 7.
    DONORS “ We recognize andthank our donors for their contributions made during fiscal year 2011 (July 1, 2010 – June 30, 2011). I give to Bancroft because I know that it makes a difference in someone’s life. –anonymous donor ” The individuals, corporations and organizations named have generously supported Bancroft by sponsoring or attending a special event, making a gift to the annual fund or responding to a special request with a grant. CORPORATE & ORGANIZATIONAL SUPPORT over $50,000 The Lebensfeld Foundation Wawa Food Markets, Inc. $25,000-$49,999 The Connelly Foundation Kanalstein Danton Associates P.A. TD Charitable Foundation The Walmart Foundation $10,000-$24,999 B.E. Smith, Inc. Conner Strong Companies, Inc. Costanza Builders Inc. The Graham Company Medical Data Management, Inc. Stewart Business Systems $5,000-$9,999 Adler’s Pharmacy LTC. Inc. Archer & Greiner Carlisle and Associates, LLC Hatfield Quality Meats Pepsi Beverages Company The Philadelphia Coca Cola Bottling Company The Philadelphia Foundation The Phillies The Prudential Foundation Voorhees Pediatric Facility $1,000-$4,999 Advocare, LLC All Risk Property Damage Experts Bank of America Matching Gifts Program Birdsall Services Group Bristol-Myers Squibb Foundation Brownstein Group Catalyst Air Management, Inc. Coastal Spine The Comegno Law Group, P.C. Continuum Health Alliance, LLC Education Facility Management LLC Ernst & Young, LLP Hoeganaes Corporation Holman Enterprises Holy Redeemer Health System Kennedy Health System Med-Link Co. Miele, Inc. Miller Transportation Group New Road Construction Management Company NJM Insurance Group Orthofix Spinal Implants Parkhill Memorial Trust Philadelphia Insurance Companies Pinnacle Taxx Powerplant Technologies Inc. PricewaterhouseCoopers Radwell International, Inc. Retail Sites Salerno & Son Salmon Ventures Limited Shipshape Landscape, Inc. South Jersey Gas Company Stradley, Ronon, Stevens & Young TD Bank Thompson Becker and Bothwell LLC Virtua Health Volunteers of America Delaware Valley Waters Corporation Xerox Corporation $500-$999 Allied Beverage Group, LLC Attolon Partners LLC Ballard Spahr Andrews & Ingersoll, LLP The Bank Beneficial Mutual Bancorp, Inc. Boynton & Boynton Bromley Health Center Center for Family Guidance, PC Chelten House Products Inc. Comcast Corporation Cooper Neurological Institute The Evergreens Friends of Bancroft General Mills Box Tops for Education Program Grant Thornton LLP Hinkle, Fingles and Prior The Leader’s Edge/Leaders By Design Linton’s Managed Services, Inc. Nifty Packaging Products Paparone Homes of Florida, Inc. Platt Memorial Chapels Inc. Princeton Weight Loss Program LLC Quaker Valley Foods, Inc. Ragone, Lacatena, Fairchild & Beppel, PC RBC Royal Bank Rowan University T&M Landscaping & Lawn Service, Inc. Target, Take Charge of Education Taylor Wiseman & Taylor USI MidAtlantic WellNet Healthcare under $500 $1.99 Any Garment Cleaners 1st Colonial Bank ACE Group Amon Associates, LLC Anu Medical Spa The Arc of Camden County Occupational Training Center Banisch Associates, Inc. Beifeld Jewelers, Inc. Benefit Consultants Group, Inc. CBC & Son Inc. The Club at Main Street Consulting Engineer Services The Cotswold Group Crane Specialists, Inc. Diener Brick Company Dreyfuss Speech Services, Inc. DuBell Lumber Company East Greenwich Board of Education Environmental Resolutions, Inc. Fit For Life PT, Inc. Five Below, Inc. The Fraser Charitable Foundation Funding Factory Garden Club of Marlton General Floor Gertrude Hawk Chocolates Glendale Builders, Inc. Grotto Engineering Associates, LLC Health Village Henry D. Bean & Sons Highway Equipment & Supply Co. iGive.com Holdings LLC Intercontinental Truck Brokerage, Corp. Interocean American Shipping Corporation Jaclyn Hoffman, Ed.D. & Associates Johnson & Johnson Kaplan Industries Inc. Kingsway Learning Center Knights of Columbus: Bishop Eustace Assembly 652 Knights of Columbus: New Jersey State Council Knights of Columbus: Queenship of Mary Council 12004 Kulzer & Dipadova, PA Larc School Laureate Eta Chapter/Beta Sigma Phi LECESSE Construction Services, LLC Lindenwold Moose Lodge #548 Louis T. Roth Foundation Lutheran Social Ministries of New Jersey M3 Studios Marathon Engineering & Environmental Services, Inc. Marshall & Ilsley Trust Company McAllister, The Service Company Merck Partnership for Giving Metropolitan Acoustics, LLC MH Financial Mother of Divine Providence Catholic School Mustang Expediting, Inc. Palermo Heart to Heart Foundation Pathcom Incorporated Pension Actuarial Consultants Inc. Pilgrim Construction Corporation Princeton Wealth Advisors of Raymond James & Associates ProMutual Group Proxus, LLC Quad Three Group, Inc. Radiant Skin Care Center Res-Kem LLC Robert Wood Johnson Medical School Rotary Club of Mullica Hill Seashore Garden Living Center Shamrock Heating and A.C., Inc. South Jersey Eye Center South Wilkes-Barre Little League St. James Catholic Church Stellar Machine Inc. Sutcliffe Supply, LLC Triple Threat Combat Sports Varsity Pizza and Subs VIP Auto Outlet, Inc. Wilkes-Barre Fire Department Athletic Association Winning Strategies The Woolard Family Foundation Zallie Supermarkets, Inc. INDIVIDUAL SUPPORT over $50,000 The Foley Family Elizabeth R. Moran Joanne and Raymond Welsh $25,000-$49,999 Karen and Jeff Harris Laird Norton Company LLC / The Taylor Family Lynda and Stewart Resnick $10,000-$24,999 Barbara and Dr. Sheldon S. Berkman Nola and Bob Farley Flicker Family Fund Mary Pat Meyer Toni and John Pergolin William W. Rooke Lindsay and Evan Roth Randee and Dr. Kenneth Rubenstein $5,000-$9,999 Laura and Joseph Atkinson Lillian and Thomas Burke Suzanne and James Dwyer Joseph Holman Eleanor and Fred Meyer Elena Petronio Suzanne and Samuel Pignatelli Virginia Rushmore Anthony Schlesinger Selena and Paul Tropea JoAnne and Ron Williams $1,000-$4,999 Lisa and Stephen Albanese Lisa and Dr. Gregory B. Alberts Henry Bean Rosalyn and Laurence Belgin Susan and Joshua Bennett Michele and Martin Bieber Dr. Enrico Bombieri Susan Bombieri Dr. Cynthia L. Boyer Sue and Stephen Bruce Kathy and Chris Capritti Danielle Carroll Virginia and Jim Carson George D. Chant, Jr. Nicky and Ted Chapin Joseph Collins Claudia Connolly and Thomas Hayevy Alison and Vincent Conti Diane and Kevin Corrigan Karen and Anthony D’Ambrosio Sally and Robert Danley Dr. Caroline Eggerding and Lawrence D. Berger Benjamin Ellis William Fay Joanna and Clem Fiori Debbie and Joe Flamini Dr. Kathleen and F. Gilday Freeman Susan and Robert Freeman Sandra Fromm Michelle Habingreither Harry Hayman Joseph Hodakowski Carolee Humphrey Tracee and Benjamin Hunt Donna and Michael Icovino Dr. Michael Kahn Elizabeth Kalellis Kathleen and Dr. Daniel Keating Joan and Gary King Lorraine and Wayne Kobular Brian Kovacs Maureen and John Krihwan Elene and Marshall Kurtzman The Estate of Walter J. Levy Colleen and David Macalino Jo Ann and Thomas Mara Patricia and Bob Mate Jill and Stacy McDowell Henry E. McGrorry, Jr. Drs. Pnina and Mark Mintz Michael and Karen Mitchell Elsie Nelson Marsha and John Parker Janet and Allen Pawling Joy and Dr. Bernard Pekala Maryellen and Rich Raymond Michael Recine Shirley and Thomas Reilly Sharon and Seymour Reiter Linda and Jeffrey Reuter Frederick J. Rohloff, Esq. Kathy and Wayne Ross Barbara Stern Sandy and Gary Stura Kathleen R. Sutcliffe Amy and Jeffrey Swartz Barbara and Jack Tarditi Tom and Colleen Rowan Valentino Carol and John Van Orden Linda Wasilchick Dr. Howard M. Weinberg Susan Weisman and Andrew Howard Melissa Wheatcroft and Blair Talty Gale and Bill Wills Julie and Leon Zimmerman $500-$999 Rita and Robert Beardsley Sherry and Dr. Mark Bezzek Holly and Michael Blackiston Elissa and Eric Boory Lois and Dr. William H. Bromley Isabela and George Buff Dolores and Raymond Burczyk Martha Campbell Susan Catherwood Louise and Andy Cross Gerald A. Davis Anne and Tony DiBartolo Nancy and Chuck Felmlee Pam Fenner and Michael McLaughlin Judy and Norman Ferber Colleen and Edwin Ferren Anni Fisher Deborah and Theodore Flick Carin and John Foster Pamela and Edward Goldberg Mariann Granrath Julie Hansell Margaret and Thomas Heer Rebecca and Eric Hinderliter Arnold and Sandra Kaminer Ellene and Thomas Kowal Peggy and Glenn Manochi Natalie Marcon John Martinsen Jim McKeon Patricia and Charles McLister Marcie L.H. Merz, Esq. Ann and Judge Herman Michels Kathy and Patrick Mindas, Esq. Brigette Neafsey Rob Nestore Nancy and William Patrick Patricia Paul-Bakley Dorothy and Don Praiss Michael Rogers Clair and Dean Rohrer Jeremy W. Ryan, Esq. Mary Salpas Ardeen and Scott Schaefer Karen Thoreson Schlesinger Paula and Dr. Lawrence Siegel Stuart Sobin Susan and Daniel Swett Kathleen M. Thompson Lynn and Dr. Alfred Tomaio Pat and John Turzanski Renee Vala Allan and Cookie Weinberg Kathy and James Wheatcroft Teresa White Steven Yocum under $500 Howard and Harriet Abel Joseph Abrams Megan Abrams James and Carol Adams Donna and Dean Adinolfi Pam and Mark Adler Rose Agostini Maureen and Christian Aha Mark Alessandrini Sister Eileen Algeo, SHCJ Clint Allen Ethan C. Allen Linda and Miles Allieri Jeanne Allison Nancy and Rick Alovis Geanatta Alston William and Mary Helen Altimairo Carlo Amilcare Renee and Charles Anderson Elizabeth and George Angelo Christine Antoine Eileen Arentz Margaret and Robert Atkinson Deborah and Richard Auerbach Daniel Bailey Letitia Bailey Mimi Baker Phoebe Baker Beth A. Bamberger and Matthew A. Himmelstein Gertrude Bampi-Nelson Bernard and Joann Banks Patricia and Douglas Barber David and Alberta Baril Edward and Marie Barnes Andrea Baron Nancy and James Barth Thomas Bartus Alice and Charles Bastien Jennifer Bates James Batruch Tim Battista Glennys and Thomas Battle Dorothy Bauer and Alan Stein Holly Bean Judy Bean Renee Beck John M. Becker, Jr. Mary and Michael Beckett Patrick Beers Elinor and Ernest Beier Barbara Bell Christin Bell Janis W. Bell Nancy Ben Neil and Joy Ben-Isvy Conchetta Benjamin Karen Benjamin Christine Benner Denise and Richard Bennett Linda Bennett Mary Lou and Peter Bennett Patricia and Clair Benson Jillian Berkman Rachelle and Dr. Douglas Berkman Joan Berman Sammy Bermudez Myra Bernardin Howard and Shirley Bernstein David and Cecilia Bertone Henry Betcher Dolores Bianco Bernard and Barbara Bieg Ma Binas Eileen Binstock Peter Birbilis Anne and Ronald Bird Steven Bisgaier Jim Bisignaro Janeli Bitor Evelyne and Zoubir Bittout Jane and Lynn Biuckie Arthur Black Dr. Robert J. Blair, Jr. Jessica Blessing Joseph and Carol Bloch Solomon Blocker Eric Bluestone Barbara T. Boguslaw Kim and Martin Bohley Beth and Gerald Bokunewicz Theresa Boland Carolyn and John Boliek Kathy Boone Joy Ellen Booth Kevin Bothwell Antonia Bottoms Rosemarie Botts Arlene Boutin and Bob Meinzer Cherry Boyce Lewis Boyer Donna Boyle Timothy and Patricia Boyle Jeanne Bozicek Michelle Bradshaw Gawain Bragg Philip and Iris Brater David Bravo Dianne and Daniel Breininger Irene Brennan Michael Brennan Leo Brescia Jennifer Breslin Jennifer Brisbin Ann Britton Robert Brode Adrienne and Dennis Brody Lois and Dr. William H. Bromley Dr. Steven Bromley Ann and Gregory Bronczyk Carol R. Brooks-Murphy Christine Brown David Brown Debra Brown Donna and Ronald Brown Mecca Brown Sandra Brown Stephen Brown Dawan Browning Dr. Mary G. Brownsberger Chris and Pat Bucco “ My family is so very lucky we found Bancroft. And I should know – I visited more than 60 other programs before choosing Bancroft for my daughter. – Carolyn Hodakowski Sara Buch Doris and Howard Buchanan Sally Buckalew David Budd Sudie Burbage, RN Mary E. Burczyk Sally Burns and David Marcus Marijke and Peter Businger Mike Cakavecchia Lachlan and June Cameron Kathryn Campbell Nancy Canally Grace Cannon Carrie Canuso Thelma Jeanne Capell Ellen Caplan Claudia Capritti and Robert Slimm Kimberly and Stephen Caputo Tammy Carbone John Cardillo Lisa Carle Cheryl Carlson Babette and Thomas Carnwath Nancy and Edward Carr Paula and Stephen Carroll Amy Carter Cheryl Carter Michael Carter Peter A. Cartwright Linda and Patrick Casey Shawn Casey Dwight Castellanos Edith Catling Anthony and Roberta Ceci Pat Chambers Lalitha Harish Chandra Bruce Chapin Dolcey Chaplin Carol Chapman Anthony Charlton Jean and William Chew Marion Chorley Maria Chornobroff Patricia Churchill Delores H. Churry Colleen and Joseph Ciampoli ” MILESTONES } 10 JULY 2010 Bancroft teamed with the Phillies for a special night at Citizens Bank Park. More than 100 of us attended, thanks to board member and former Phillies player Greg Dobbs. } SEPTEMBER 2010 Planning began for the Bancroft Transition Program at Camden County College, which launched the following September. The program helps students with intellectual and developmental disabilities transition to adult lives and jobs. } OCTOBER 2010 We launched the reconstruction of our Mullica Hill Campus. The project – slated for completion in 2012 – is creating modern, fully accessible residential and vocational facilities. } NOVEMBER 2010 Philadelphia-based Art-Reach recognized Bancroft for helping people with disabilities to access the arts and cultural activities. NBC10 news anchor Dawn Timmeney presented the prestigious award. 11
  • 8.
    DONORS (continued) “ The missionof Bancroft perfectly aligns with TD Bank’s values, and we are proud to support their good work. –Rob Curley ” South Jersey Market President, TD Bank Aaron Clark Robin and Bruce Clark John Clayton Lorraine Clayton Niesha Coar Wendy and Michael Coffman Howard and Shara Cohen Michelle Cohen Rona Cohen Pam and John Coletti Mary Ann and David Collins Maureen and Bernard Collins James Comose Timothy Coneby Ramona Congdon Nancy Conley Jerome and Barbara Connell Patricia and Lawrence Connell Debra and Donald Conner Mary Anne and John Connolly Jacqueline Conover-Rogers Joanne and William Conrad Amelia Conte Thomas Conte Wayne and Myrna Cook Alan and Ruth Cooper Maurice Copeland Daniel and Ellen Corn Sam Cortella Joanne Cortese Katherine Costigan and Jacalyn Wintling Matthew Costolo Nakiya Cox J.D. and S.E. Coyle Joe Coyne Mary and Alan Craig Michael and Silvia Crociata Sue and Dana Crouse Juan Cruz Dorothy Curran Elizabeth and J. Edwin Cusack Frances and Ludomir Czynski Morvarid Dadgari Linda Daley Richard Dana, Jr. Eileen and Vincent Danielenko Naomi and Joseph Daniels Susan and David Danton Carole and Michael Dascenzo Meg and Brian Davies Ceil and Craig Davis Crystal Davis Perceen Davis Sonya Deason-Barnes Christine Decker Joseph DeFalco Kathleen Delaney Anne and Kevin Deluca Noreen DeMarco Joanne and Augustine DeMedio Diane DeSantis Milford and Zita Desenberg Arleen DeStefano Dr. Lawrence Deutsch Andrea Devereux Laura Devine Roy Di Maria Maria Di Pipi Chris Di Renzo Mike Di Veto Christopher Dickert Leola Dicks Ronald and Renne Dictrow Pam Diehl Robert Dimattia Marie Dimatties Kenneth Dineen Silvia Dingfeld Diana and Paul Dintino Bernadette and Gaetano DiPasquale Susan and Dr. Robert DiRenzo Nora and Chuck Dissinger Richard Dodd Timothy M. Dodd Robert C. Dohrenwend Martha Joan and Eugene Donohoe Mary Angela Donohoe Ellen Donohue Kathryn Donohue Michael Donohue Amy Dorfmeister Diana and William Dorris Nicole Doss Irene and John Dougherty Rosemarie Dougherty Robert and Karen Dragani Lakia Dreggs Karen and Edward Drennen Cherylin Ducille John Dugan Lisa and Jeffrey Dunn Eugenie and Joseph Dunphy Joseph Dunphy Elizabeth and Francis DuVernois Joan Dwyer Deborah and Joseph Ebling Jeffrey Edwards Barbara A. Edwardson Deborah Eiserman and Eddie Newsome Kanayo Ekweonu Rob Elder Ebony Ellis Mary G. Ellis Rachel Ellis Mary Ann and Richard Enchura Kelly Engel George Engle Audrey Erickson Kathy and Mikael Eriksson Michele Ermi Joanna and George Erwin Albert Eshun Alan and Barbara Esserman Nikki Esserman and Joel Wolpe Bernice and Vance Evans Karen McDowell Fair Anna and Gregory Fanelli Maia and Dr. Donald Farish Jerniva Faulkner Gregory Fayer Chris Fazio Jessica Fedezko Sveltlana and Roman Feldblum Amy Feldman Ellyn and Robert Feldman Stacey and Mark Feldman Shawn Feniello Mary Amelia and Brian Fennell Noelynne Fentress Robert and Colleen Ferara Elizabeth and Robert Feriozzi Charles Fertonardo JoAnn and Charles Fest Laurie and James Finkenauer Alexandra and Robert Finley Crystal Finnegan Sabina Finnegan Dianne and William Fisher Nancy and Lew Fishman Eileen and Brian Fletcher Faith Foreman Linda and Michael Foreman Betty Forgerson Jessica and Russell Forman Pamela Forzley Amy and David Fowles Ann Frambes Patti Franco Michelle Franks George Freisleben Lia Friel Rachel Friel Steven Frizzie Esther Frydenberg Kevin Fullerton Kim Funkhouser Joyce Furgiuele Elizabeth Fuzy Anthony Gadaleta Bill Gaehring Brittany Gafas Michael and Suzanne Gaglianone Anne Marie Galinas Monica and Ted Gallagher Mary Gallo Lena Gallotti Jonathan Ganiaris Brian Gantt Jennifer Sells Garcia Louie Garcia Janine Gardner Paula Garrison Marianne and Norman Gaskill James and Christine Gaydos Marie Gaylert Michael Geary Nancy and Joseph Gendron Theresa Gentile Darnely Gerard Christine Germano Dominique Getka Gregory and Colleen Gewirtz Sarah Gharbi Beth Giaccardo Theresa Gibbs Lucille and Richard Gilkey Anna Gillespie Dawn Gilmore Jaymi Gilmore Toni Gilmore Dana Giordano Denise Giorgianni Meredith Glansberg Carol Glassman Jan Goan Judi Godor Bryan Godshall Bettie and Henry Goehring Shauna Goetz Wendy Jane and Bernard Gold Jennifer Goldman Shelby Goldman Allison Goldsborough James Goldschmidt Elaine and Herschel Goldstein Katherine Golembiewski Katherine Goodwin Cathy and Richard Gordon Cynthia and Barry Gould Kay and LeGrand Gould Jennifer Grabbe Annette M. Granato Judith and Charles Graser Renee and Frederick Gray Barbara and Robert Greco Brenda Green Evelyn Green Regina Green Roberta Green Velma Green Paul Greenamoyer Jaclyn Greenberg Assemblyman Louis D. Greenwald, District 6 Beth and Ronald Greer Paula Griesel Tandra Griffin and Daniel Schwartz Norma and Greg Grimaldi Ann Marie Grimes Michele and Robert Groody Colleen Gross Phyllis Grossman Joan Gussak Peter Gutekunst John and Sandra Gutowski Jeff Haas Patricia Habingreither Darlene and Douglas Haines Larry Halfin Hazel Hall Carol Hallman Marcus Hampton Gail and Hugh Hansell Beth Hanson Nancy and Edmund Hardy Linda and John Hargreaves Tammy Harkless Judy Harper Kelly and Brett Harrington Rachel Harrington Abby Harris Gwenn Harris Zachary Harrison Christina Harrop Charles Hart Renee Hart Phyllis Harter Virginia and Ralph Hartman Cynthia Hathaway Jo Ann Hathazi Amelia Haubenstein Sylvia and Ronald Hauser Elizabeth Hawk Joan Hayes Mary and Donald Healy Patrick Healy Mindi Heckendurn Helen Heffler Wayne Hefner Elizabeth and John Heinz Barbara and Joseph Heitman William Hendricks Edwin Hensle Jeffrey and Judith Heppard Jacqueline C. Herens Diane and Gary Herman Trudi and Irwin Herman Denise Higginbotham Louise and Harry Hill Paul Hinderliter Phyllis and Bruce Hinderliter Susan and Callie Hinderliter Catherine and Dr. Philip N. Hineline Donna and Bob Hoey James Hoff Doris and Joseph Hoffman Dorothea Hoffman Nancy Hollingsworth Jeffrey Holman Barbara and Jeffery Holt Patricia Holton Linda and Michael Holtz Maribeth and Kenneth Horn Linda and Arthur Horneff Michele Horner Susan and Lawrence Horwitz Peter Hovnanian Elana Howard David and Pamela Hozie Francois Jean Huby Sandra Huffman Janet Huss Patricia and Richard Hyde Darma Ie Christopher Ilconich Karen and Anthony Ingenito Dr. George O. Isaacson Stacielee Isaacson Steve Isackson Sondra Jacob Alice Jacobs Daniel Jacobs Mary Jacobs Patricia and Carl Jacobs Estelle Jacobson Peggy and Dr. Allyn Jacobson Kenneth Jadlowiec Tina and Eric Jago Laura James Mary Janes Carolyn and Dr. Scott Jarmain Alicia Jarvis Maryann and Charles Jarvis Elizabeth and Ronald Jaworski Robin Jay Carolyn and Almond Jellison JoAnna Jenkins William and Lynn Jennings Elaine and Dimitri Jeon Derrick Jeter Dean Johnson Heather Johnson Latasha Johnson Lucas Johnson Margaret Johnson Mary Martha Johnson Rina and John Johnson Terrance Johnson Tina Johnson Michael Johnston Patrick Johnston Dawn and Kenneth Jones Roman Jones Howard and Marilyn Jost Sydney Judah Desiree and Walter Juraniec Veronica and Zeljko Jurjevic Sharon Jurman Genevieve and John Juzaitis Vincent Kabbeko Laura Kalck Barbara and Robert Kalinski Fred Kamara Sheku Kamara Albert Kanach Gary and Barbara Kanalstein Joy Kapeghian and Richard Carlin Milton Karten Shelly and Mark Kasrel Julia and Charles Kass Virginia Kassa Nazira Kazakbaeua Scott Kegler Curtis Keller Marie and Thomas Kelley Madge and Hugh Kelly Mark Kelly Maureen Kelly Jack Kennedy Nancy Kennedy Tracey Lynn Kennedy Thomas Kent Wendy Keppe Jospeh Kernen Susan Kerr Isabel Kerwin Dr. Mary Louise E. Kerwin, BCBA Christine Kienzle Quinton Kindon Nicole King Joan Kingsland Elizabeth Kinney Kathleen Kirk Karen Kirkhope Jessica Kirkland Megan Kirsch John and Laurie Kirschner Kristin Kisal Mindy Klarin Barak Klein Janice and Martin Klein Anne and Ralph Kohart Michael and Rosalie Kohn Jan Kolchinsky Paula and Thomas Kole Jennifer and Jason Kolinsky Marlene and Marvin Korff Frances Kozub Heather and Mark Kramer Dr. Judith A. Kramer Roberta and Harold Kramer Martha Krasne Stacy and Russell Krauss Heather Kriesman Neera Kuckreja Jeffrey Kueny John and Rochelle Kugler Rich Kukla Laura Kuntz and Edmund Mikalauskas Jodi Kurtzman Joseph Kushnerick Bridget and Gene Lambey Hugh LaMonaca Dani Lamothe Eleanor and Beth Lampe Max and June Lang Alix and Mark Langer Rennae Langley Darren Larsen Marcia Larson Janis Lauer Terry Laurelli Dawn Law Kathleen Law Mireille Lawrence Mary and Kenneth Layre Benjamin Lee Michelle Lee Rita and Michael Lee Angela and Richard Lees Janet Leinbach Robert Lenherr Allison Leung John and Loisann Levicchi Claire Levitt Arthur and Marie Lewandowski Dolly Lewis Sue Lewis Dr. Karen Lindgren and Kyran Hurley George Lindstrom Cathy and Dr. Robert Lipshutz Robbin Lobue Stephen Locastro Nancy Londres Donnell Long Sandra and John Lonia Jacquelynn and Thomas Lott Pierre Louis Nicasio and Monica Lovecchio Fred and Joanne Lubker Joan Lucas Patricia Lukas and Philip Friedensohn Kristin Lukianovich Kevin Lynch Madeleine and Richard MacDonald Ann Marie Machion Robin and David Macken Donald Mackowski Maureen Mackowski Joseph and Maxine Macnow Megan Mahan Thomas and Catherine Maheady Shahriar Mahmud Rachelle Malat Dianne and James Malley Christina and Edward Maloney James Maloney Abu Mansaray Jessica Marchese Edwin and Carol Marder Randi Marder John M. Mardirosian Victor Y. Marfo April Marino Joseph and Carol Marrazzo Carol and Joseph Martella Marjorie S. Martin Melissa Martin Diane and Joseph Martino Steve Marusky Dottie and Rudolph Mascellino Barbara Masino Helene Matkowski Kathy and Edwin Matos Mark Matteson Karen Maucher Linda and Kevin Maull David May Selina May-Harris Jamie McAllister Amanda McAlpin James McBride Thomas McCann Kathryn McCarthy Terrence McCarty Colleen and Peter McCauley Louis McCauley Mary and Joseph McCauley Elizabeth McCleary Amy McClintock “ Our partnership with Bancroft and our understanding of the people they serve has made us better architects. ” Gary Kanalstein, AIA Principal, KDA Architects, P.A. Karen McCunney Ed McDonnell Mary McDonough Linda McEady Frances A. McElhill, Esq. Megan McGinnis Nicolette McGlashan Christina McHale Kelliann McHugh Anne McKernan Dana McLaughlin Marian and Thomas McLaughlin Lorraine McLeod Sara McMahon Carole McManus Timothy McManus Dorothy McMillian Darlene McNeil Matt McNicholas Michele and Timothy McShea Andrea and Samuel McWhirt Helena Meade Karl Medley Jaclyn and Gary Melchiano Kathy Mellish Shelley Mendias George Mess Frank Messina Terri Meytrott Christian Michels Annie Miele Marcia Milazzo Jan Miles Joanne Miles Arlene and Thomas Milich Eva and George Milko Dean and Brenda Miller Gerald Miller Linda Miller and Dennis Duffy Timothy Miloshevsky Derek Minner Manuel Miranda Nicholas Mirkay Myrlie Misskelly Theresa Molettiere Steve Molzon MILESTONES (continued) } 12 NOVEMBER 2010 Our annual Butterfly Ball was a hit, with nearly 300 guests. Hosted by TV sports personality and Eagles football legend Ron Jaworski, it honored KDA architects and neurologist Steven Bromley, M.D. } MARCH 2011 Our inaugural “Bancroft Unplugged” events celebrated Brain Injury Awareness Month. People supported by our brain-injury programs gave poignant and inspiring speeches to appreciative audiences in Cherry Hill, Brick and Plainsboro, N.J. } MARCH 2011 Visitors previewed Little Butterflies, Bancroft’s inclusive daycare center, which opened in July. The innovative program serves children both with and without developmental delays. } APRIL 2011 Leading healthcare executive Martin A. Bieber (right) was named chairman of the Bancroft Board of Trustees, succeeding Joseph Atkinson (center). Mr. Bieber is president and CEO of Kennedy Health System. 13
  • 9.
    DONORS (continued) Kamaldeep Momi CorinneLloyd Moody Steven Mooney Beth and Paul Mora Erin and Paul Morales Mary and Eileen Moran Sylvie Moran Tamara and Todd Moreland Dennis Morgan Marlene Morgan Pete Morisco Frank Morreale Ilene Morris and Sheldon Oxenberg James and Roberta Morris Melanie Morrow Harriet B. Moskowitz Lynnda Mosley Kimberlie and Barry Mostyn Wayne P. Mozzo Steve Mozzon Mike Muccie Virginia Mulhatten Mary Munroe Elizabeth and Stephen Murawski Judy Murphy Pat Murphy Nancy and Stephen Murray Phylis Musser Judy Musto Stephanie Muth Violet Mwangi Christine and Larry Myers Lorraine Myro Diane and Raymond Nabb Lily and George Najim Mary and Paul Nantz Ayse Narinlik Veda Naylor Kathleen and Glenn Nazarok Barbara Nealis Nicole Nelms Angie and Charlie Newman Joyce Nicolo Tinamarie Nicolo-Dorfner Christina Nieves James E. Nigro, Sr. Kristin Nilsen Rodney Nixon Daniel Nulton Jean and John Nuneville Luann O’Brien Joan and John O’Connor Brian Odenath Linda Odenath James O’Dowd Oluyemisi Oladele Dr. Frances and David E. Olar Lisa Oliver Margaret Ollis-Leon Joseph and Robin O’Malley Edward Onyekachukwu Elizabeth and Peter Orlando Yuliana Ortiz Robert Osgood Sherri Ann and James Ouimette Betsy Paisley Mary and John Palma Kathryn Palmerchuck Susan Papadopoulos Thomas Paparone Dr. Anna Mamalakis Pappas Nikos Pappas Karen Parenti Judith Parker Nora and Frank Parker Regina and William Parker Chris Partridge Jo Lynn and Robert Passarelli Rachel Pastore Donna and Itshack Peer Elizabeth and Anthony Pell Marti and Frank Pelosi Rachelle and Joseph Pendleton William C. Peoples Lisa and Joseph Perez Bill Perla Barbara and Richard Perlman Shelly Perna Frances Perrin Pamela Perry and Scott Buchheit Joseph and Patrice Persico Deborah Peters Pat and Fred Peterson Audrey Warne Peyton Anne Pfaff Donna and Curtis Phillips Karen and Steve Phillips Suzanne Phillips Orion Anita Pie Alfred J. Pierce, III Alvin and Grace Pierce Michael Pierce Greg and Elsa Pine Andrea Pinkston Diana Pinzon Michelle Pisaturo Darryl Pitt Judith and Bernard Platt Mike Platt Pedro Plaza Barbara and Francis Pollack Karen Pollard Melissa Pontecorvo Jodi and Sean Porrini Keith A. Pote, II Thomas and Nancy Pote Jennifer Potter Josephine and Franklin Potts Patricia and Glenn Potts William Potts Carla Powell Sean Powell Lisa and Daniel Prangler Buck Price Kevin Priest Dr. Eugene R. Principato Anne Marie Proctor Mary Quaranta Donna Quigley Sharon and Donald Quigley Anna Marie Quinn Doris Rabasca Lillian and Daniel Ragone Carol Rahner Margaret Reaves Steven C. Reback Josephine Reese Patricia and Wayne Reid Katherine Reilly Karen L. Reiss Catherine and Dr. James Reuter Paul Reyes Maya Ribas John and Tracy Riccetti Rick Ricciardi Maria and Patrick Rich Mary Ann and Wayne Richardson Gwendolyn S. Riggs Margaret and William Righter Jane and Steven Riley Margot and Norman Rimbey Doreen and Steve Ripa Scott Ritter Hedwidge Rivas Willie Rivera Heidi and Todd Rixman Haksoo and Soonog Ro Joanne and Don Roberts Linda and William Robertson Muriel Robinson Sherry Berman Robinson William Robinson Mary Roche Deborah and Roger Rocque Christine Rodriguez Christa and Magnus Rodums Ruth-Ann Rohrman Angela and Michael Rollison Sandra Roluga Kara Roman Jessica Rosh Mary Rosica Carol Ross Heather Ross Amy Rossdale Hazel Rossdale Diane and Otto Rossmeyer Babe Roth Emmett Roth Jackson Roth Phoebe Roth Reiko Rotzell André Roualet Thomas and Catherine Rovito Kerry Ann Rowe Laurette Rowe Marie Rowe MaCal Roy Cheryl Rubba Drs. Denise and Arthur Rubenstein Marci and Paul Rubin Lorna and Robert Runkle Joseph and Suzanne Ruotolo Christine Russell Nancy and Harold Russell Dorothy and Herman Saatkamp Nancy and Edward Sadler Fatima Sakarya Anne-Marie and Mark Salerno Anthony and Susan Salerno Marilyn and Dr. Edward H. Salmon Diane Salter Thomas Sandfort Amanda Sandoval Nicholas Sanfilippo Loyda Santiago Rick Santiago Stanley and Cynthia Saperstein Gloria Sapurstein Samantha Sarin Mario and Donna Sartori Dot Sattler Pamela and Dennis Saunders Regina Savage Debbie and Joseph Scanlon Dr. Karen Scardigli Mark Schaeer Julie Schaekel Robin and James Schaffner Gregg and Kathleen Scharnagl Judith Schermer Jay Schleifenheimer Debra and Howard Schlesinger Paul Schmincke Mark Schmitz Rachel and Walter Schnee Antoinette and John Schnitzius Monica and William Schramm Renee Schreiber Victoria Schriver Martha and Ted Schroeder Cheryl Schumacher Ella Mae Schussler Alan and Karen Schwartz Rose and Sol Schwartz Jean Scornaienchi Colleen Scrimenti Lynne Scully Jim Seasholtz Jean Sedar Denise Sellers Patrick Senft Arleen Severino John Seymour Patricia and Jesse Shafer Dr. Harriet M. Sharlin Micole Sharlin and Christopher Thatcher Matthew Sharp Mildred Sharp Susan Sheer Almas and Asif Sheikh Deborah Shemeley Marion Shepeski Paul Shepherd Mary Sheridan Carolyn Sherman Leigh Sherwood Ana and Kevin Shields Carol Shields Susan Shilcrat and Harry Mazurek Beatriz Shipley Mary Shull Janeen Shumaker Amy Shute John Sieminski Shirley Silberstein Debbi and Michael Silverman Patricia and Robert Simalchik Wayne Simcox Rune Simeonsson Dorothy and Craig Simpson Thelma and Jesse Sintikakis Traci and Christopher Slate Meagan Sloan Jean Small and Terry Handley Michael Smelson Barbara and Russell Smith Carol Smith Dawn Smith Dorothy A. Smith Gustave Smith Kirk Smith Nicole Smith Renee Smith Suzanne and Edward Smith Nancy and Clete Snavely Allison Snyder Barbara and Robert Snyder-Rigney Louise and Theodore Soddy Sally Solis-Cohen Denise Sommerville Albert and Marilyn Sonsini Raymond and Maryann Sooy Oscar Soriano Kathy and Arthur Spangenberg Mary Spence Serina Spitzer Myrna and Harvey Springel Doris Stabingas Barbara Stadalman Camille Stahl Raymond and Karen Stang Christine and John Stefankiewicz Nancy Steinmetz Aaron Sternberg Joann Stevens Wanda Stevenson James and Joyce Stigliano Michelle and Scott Stilts Karen Stone Reverend Richard Straughn Carol and Richard Stravach Sue Strawbridge Charles Streeper Nicole Streeper Timothy Streeper Margaret Strong Merilyn Styles Mary Kat Sundahl Averil and Claude Sutphen Roy and Diedra Swanson Victoria Sweeney Karen Swett Winifred and Ralph Swift Amtul and Salim Syed Marie Sykes Frances Tailey Drs. Esther and James Taitsman Veronica Talbot Raymond Talty Stephen Tarnoff Donald Tatham Chris and Charlie Taylor Joanne Taylor Lauren and Paul Taylor Will Taylor Mary G. Tedesco Daniel and Nan Teplitz David Tesch Dr. Mark Testaiuti Dawn and John Thein Mary Tholen Michael Thomas Tara Thompson Evette and Steve Tiger Fran and Alvin Tiger Colleen and John Tighe Patrice and Jeffrey Timm Annette Tolbert-Ellis Theresa Tolotta Cara and Christopher Tomasco Shaina Torres Cookie Totka Maurice Towns Maryann Tracey Rose and Frank Tripicchio Robert Trombley Joseph and Michelle Tropea Valerie Trueax Martha Tsampis Spencer Tucker Isatu Turay Donna Turley LaTanya Turner Joann and Paul Tyer William and Judith Uricher Anna Vadino Cheri Valko Clem VanZelst Karen and Todd Veneziano Joanne and Frank Vesci Myrna and James Vest Michelle Villalobos Ronda Vitale Allison Vogdes Michael and Nancy Vogelstein Kathy and John Von Thaden Maureen VonStetina Dr. Christina Vorndran Donna and Gary Vukicevich Marge and John Vytowich Joseph and Mary Ann Wadzin Regina and Donald Wagner Arlene Wahrmann Kathleen and William Waldron Dorothy and Donald Walls Julie Walsh Michelle and Robert Walsh Alexton Walters Jeannie Warren Kathleen Warren Allan and Cynthia Wasserlauf Denise and Edward Waters Rodney Watson Tamelia Watson-Harris Charles Waugh Sarah Way Karen Weaver Megan Webb Thomas and Kathleen Weber Deborah and David Webster Judy Wechsler Bobbie and Ted Weeks Gail and Dr. Barry M. Weichman Joe Weinlick, Jr. David Weiser Susan Weisman and Andrew Howard Barbara and Gary Weissenberger April and Scott Weitz Larry Weitzner Gail and Doran Welch Elizabeth Welker Eva and Claudia West Gabriel Wetmore Bryant Wezner Franklin and Dolores Wezner Richard Wezner Wendy and Marc Wezner Shelly and Brent White Susan Whited John and Lillian Wilkins Breanna Williams Deyshia Williams Janet Williams Randy and Sherry Williams Sue Williams David Willis Joan and Keith Willoughby Ronald and Lisa Willoughby Elizabeth Wills Rosemary and James Wills Carla Wilson Dolores Wilson Jennifer Wilson Lillian Wilson June and John Winchester Jane Windle Christine and Robert Winn Jo Winslow Tracy and Bob Wolak Terrence Wolfe Daniel and Roni Wolfson Joseph Wolfson Paul Wolfson Jennifer Wolinetz Mindy and Dr. Larry A. Wolk Leslie and Mark Wood Laura Wooding Stephen and Maureen Woods Brad Wool Elizabeth and Frederick Wright William and Robin Wright William and Valerie Wynne Charlie Yedlin Donna Young Wendy Young Donna and Philip Yturbe Megan Zahler Amy Zambotti Robert Zampella Robert Zimmerman Alfred Zulu Hanna Zyruk and Dr. James Hainer The Jacob Schaefer Legacy Society The Jacob Schaefer Legacy Society honors those who have made planned gifts to Bancroft. Bruce Baker Linda Bennett Kathy and Chris Capritti Virginia and James Carson Estate of Helen Davis Jaqueline and Leonard Faupel Susan and Bob Freeman Judith Harper Abby Harris on behalf of Danny Harris Justin Israel Geraldine Knudsen Patricia and Bob Mate Wayne and Kathy Ross Virginia Rushmore Rita Waranch Susan Weisman and Andrew Howard Joanne and Raymond Welsh IN-KIND GIFTS In-kind giving allows donors to have an immediate impact by providing much-needed equipment and supplies, reducing Bancroft’s need to purchase the items and have them shipped. Allied Beverage Group, LLC Gertrude Bampi-Nelson Barry’s Bistro Rosalyn and Laurence Belgin Erin Bereheiko Dr. Mary G. Brownsberger Carrie Cafiero Kimberly and Stephen Caputo Catherine Carchidi David Checchio Cherry Hill Skating Center Cinemark Nancy Costello Couples Resorts Molly Coyle Jean D’Ambrosio Gregory Davis Thomas Deeney Jennifer Deluca Jeremy Duncan Christina and Eric Eberman Robert Escheman Bernice and Vance Evans Maryann and Colin Farrell Jacqueline Faupel Pam Fenner and Michael McLaughlin Colleen and Edwin Ferren Joanna Fiori Jenna Forziati The Funplex Amy Garfinkel Theresa Gibbs Jan Goan Beth and Ronald Greer Diane and Gary Herman Diane and Jim Higgins Bob Hoban Joseph Hodakowski Sandra Huffman Patricia Hurka Sondra Jacob Johnson’s Corner Farm Knights of Columbus: Bishop Eustace Assembly 652 Komfort & Kare Heather Kriesman Maureen and John Krihwan Laurel Lanes Michelle Lee Jennifer and Chris Lucania Magnum Computer Recycling Mindy and Daniel Maranon Esther Miller Linda Miller and Dennis Duffy Teresa and John Moffett Sylvie Moran NELSON Technology Services Daina Norman Janet and Allen Pawling Philly Pretzel Factory Playdrome Cherry Hill Pump It Up Lynda and Stewart Resnick Valerie Ridgway-Carter Rita’s Water Ice Heidi and Todd Rixman Ross Concrete Kathy and Wayne Ross Harry Serad ShopRite Kirk Smith Stewart Business Systems Karen Stone Carol and Richard Stravach Mary Stringfellow Kevin Sullivan T & L Transportation Mary G. Tedesco Diane and Carl Thomas Kathleen M. Thompson Tina’s Hallmark Selena and Paul Tropea United by Autism Julie Walsh Dale Williams Gale and Bill Wills Hanna Zyruk and Dr. James Hainer MILESTONES (continued) } 14 MAY 2011 The U.S. Department of Veterans Affairs approved Bancroft to provide brain-injury rehabilitation services to veterans through a new pilot program. As a result, VA funding is now available for these vital supports. } JUNE 2011 Bancroft’s Golf Outing featured two twists this year: a new site – Galloway National Golf Course; and special messages to each foursome from their “team captain” – a student or adult served by Bancroft. } JUNE 2011 David Weiser (left) ran with the Special Olympics torch to help kick off New Jersey’s Summer Games. He and staff member Shaun Erwin (right) compete in community road races, too. } JUNE 2011 Thirty-one students graduated from The Bancroft School this year. Of those, 93 percent went on to jobs and/or adult programs provided by Bancroft or other organizations. 15
  • 10.
    Financial Overview REVENUE ANDEXPENSES DONATIONS Year Ended Year Ended JUNE 30, 2010 JUNE 30, 2011 Total Revenue 1,308 14 12 $95,588 Interest and other income $97,926 873 $99,246 EXPENSES WERE INCURRED FOR: Salaries, wages and fringe benefits AMOUNT IN THOUSANDS $94,701 Donations $1,000 Bancroft is an incredible organization and, after serving three years as a board member, I’m honored to have been named board chairman in April. As president and CEO of Kennedy Health System, one of the region’s largest healthcare providers, I was already familiar with Bancroft and the excellent work it does. $1,200 REVENUE WAS PROVIDED FROM: Program revenue 1,308 $ $1,400 Transforming for a strong future Since I’ve become more directly involved, I’m even more impressed. And one of the most impressive aspects of the organization is its constant quest to improve. 873 $ $800 At the board level, we continually strive to challenge each other’s thinking, as well as to challenge management, in order to assure that we’re well-prepared for the future. For example, how do our families and other “stakeholders” define quality? And what is the board’s specific role in achieving Bancroft’s vision, in support of our mission? (For our new vision statement, please see Toni Pergolin’s message on page 1.) $600 $76,516 $78,238 Facilities and transportation 9,179 10,292 Supplies and other expenses 5,367 6,251 644 624 1,717 1,623 $93,423 $97,028 $2,165 $2,218 $3,375 $4,023 Restricted gifts 46 129 Gifts released from restriction (2) (502) ¢ Corporate/Organization Support 3,419 3,650 ¢ Special Events $9,615 $13,034 $13,034 $16,684 Interest Depreciation Total Expenses Net Operating Income NET ASSET ACTIVITY: Increase in unrestricted net assets Increase in net assets Net Assets beginning of year Net Assets end of year ABOVE NUMBERS ARE IN THOUSANDS 16 $400 $200 $0 FY 10 FY 11 ¢ Other income ¢ Individual Support As an organization, our sole purpose is to better the lives of those who seek our help. Each of us – from board members to administrators, clinicians to direct-care staff – must understand our responsibilities, and hold ourselves and one another accountable for achieving our goals. That’s the only way to assure Bancroft will be here in the future, for the families who rely on us today and those who will need us tomorrow. I’m confident that we’re on our way to achieving our vision to become the region’s elite service-provider in our field. As an elite provider, we are motivated to do our very best, each and every day, to provide the most effective services. We hope this vision will also inspire you to continue supporting us for many years to come. Through the use of best practices and a solid commitment to each person who comes to us for services, we are transforming lives. And we are transforming our world. Join us! MARTIN A. BIEBER, CHAIRMAN, BANCROFT BOARD OF TRUSTEES 17
  • 11.
    Transforming to achieveour vision PERSON-CENTERED modern facilities Our Promise Together, we are moving toward an exciting future for Bancroft and the people we support. Our vision is clear: By 2014, we will be the region’s elite provider of services to people with neurological disabilities. We will achieve this vision by providing high-quality, individualized services in modern living, learning and working environments; services that exceed the expectations of our stakeholders, from the people we support and their families to funding agencies. At the same time, we will preserve the qualities that make the Bancroft community so special: passion; caring; commitment. We are well on our way: We’ve begun transforming our Mullica Hill Campus (pictured) to a fully accessible, modern facility; we’re implementing the use of assistive technologies – which instill greater independence – at a rapid pace; and we’re focusing more than ever on the individual needs and desires of the people we support. employer of choice Together, we can achieve this transformative vision for a strong and rewarding future, for all of those who need us. PA S S I O N COMMITMENT CARING CREATING MODERN ENVIRONMENTS The empty field pictured in last year’s annual report has been transformed into this state-of-the-art residence on our Mullica Hill (N.J.) Campus. The campus is undergoing a complete renovation to create leading-edge facilities, to help people reach their full potential for fulfilling and productive lives. ASSISTIVE TECHNOLOGY 18 clinical excellence ACCESSIBILITY BEST PRACTICES elite provider BANCROFT “FAMILY” MEMBERS, from left: Sharmina Ransome, Wayne Hefner (staff), Bill Wills (parent), Ray Welsh (parent, board member), Martin Bieber (board chairman), Kia Dreggs (staff), Toni Pergolin (president), Eddie Smith, Caroline Eggerding (staff) 19
  • 12.
    Bancroft at aGlance BANCROFT IN NUMBERS WE’RE PROUD THAT: EXECUTIVE STAFF • 501(c)(3) nonprofit organization • 98% of the children served in our Early Intervention Program went on to public school. • Most services are provided 24 hours a day, 365 days a year • 93% of Bancroft School students who took a New Jersey state assessment* scored “proficient” or higher in mathematics, and 86% earned the same rating in language-arts literacy. 97% of students who took the science tests achieved a “proficient” or higher score. Toni Pergolin, President, Chief Executive Stephen Bruce, Vice President of Strategic Planning Thomas J. Burke, Chief Financial Officer Caroline Eggerding, M.D., Vice President of Clinical Services, Chief Medical Officer Joseph Flamini, Chief Operating Officer Tracee Hunt, Chief Human Resouces Officer Daniel J. Keating, Ph.D., Vice President of Family Services Joan Galon King, Chief Advancement Officer Colleen Macalino, C.P.A., Vice President of Finance Kathy M. Ross, Vice President of Communications and Community Relations Melissa Wheatcroft, Esq., Vice President of Program Operations • 1,424 individuals served in 25 separate programs > 554 Children > 870 Adults • 198 homes and supervised apartments • Programs are located in six counties in New Jersey, Delaware, and Pennsylvania (Philadelphia area) • 1,996 employees • $100 million operating budget • 5th largest employer in Camden County, N.J. • 128 years of making a difference—Bancroft was founded in 1883! THE NEED • 1 in 94 New Jersey children show signs of autism – more than pediatric cancer, diabetes and AIDS combined. • An estimated 2.5 million people in the United States have an intellectual disability – about 1% of the population. • 2 million people sustain a brain injury every year. In New Jersey alone, over 9,000 people sustain a traumatic brain injury each year, 450 of whom will have long-term disabilities. 20 • 93% of graduating students at age 21 were effectively transitioned to post-educational opportunities. • 90% of the individuals we support in Community Vocational Services for Adults (CVSA) participate in paid employment and/or volunteer work opportunities. • 73% of those working (with supports through CVSA) have maintained their employment for at least 12 months. • 73% of the children who completed the Lindens program (for severe behavioral challenges) in 2010 decreased target behavior by 70% or greater. Our programs and supports for children and adults with intellectual and developmental disabilities, autism, and acquired brain injuries include: • • • • • • • • • • • • Early Intervention and Inclusive Daycare Program Early Education Program for Children on the Autism Spectrum Elementary and Secondary Special Education School Transition Education Program on a College Campus Vocational Training, Transitional and Supported Employment Programs Structured Day Programs for Adults Home and Community Services for Adults with Acquired Brain Injuries Campus and Community Living Programs Programs for Veterans with Acquired Brain Injuries Campus-based Behavioral Stabilization Program for Children/Youth Specialized Community-based Program for Older Adults Professional Training and Consultation Services *The New Jersey Alternate Proficiency Assessment, a state-required assessment for students who are unable to take typical standardized tests. VOLUNTEER LEADERSHIP BANCROFT BOARD OF TRUSTEES Martin A. Bieber, Chair Lisa Bean Alberts, APN, BC Scott Bannett Greg Dobbs James P. Dwyer, D.O. Kenneth L. Ewell Jeffrey R. Harris Samuel A. Pignatelli Jeremy W. Ryan, Esq. Jeffrey S. Swartz Howard M. Weinberg, D.O. Raymond H. Welsh Ronald L. Williams Leon J. Zimmerman EMERITUS TRUSTEES Theodore Beringer James Carson Leonard B. Faupel Robert J. Freeman Justin Israel Dimitri T. Jeon Robert F. Mate Clarence N. York, Ed.D. BANCROFT REHABILITATION SERVICES BOARD OF TRUSTEES Howard M. Weinberg, D.O., Chair Barbara Berkman Philip N. Hineline, Ph.D. Donna Icovino Mary Louise Kerwin, Ph.D. Charles S. McLister Mark Mintz, M.D. Donald Roberts, Immediate Past Chairman Joseph C. Atkinson, Immediate Past Chairman 21