B30 IN USE - NORTH WHARF GARDENS
NAME - Paddington Exchange - North Wharf Gardens
SECTOR - Residential
LOCATION - Paddington
ARCHITECT - Assael Architecture
CONTRACTOR - Bouygues UK Ltd
CONTRACT VALUE - £55M
BALUSTRADE VALUE - £467K
Paddington Exchange, is a striking residential development by Taylor Wimpey Central London.
It is a collection of just 123 high specification one, two and three bedroom apartments, all with
terraces or balconies, arranged over fourteen spacious floors. Light-coloured brickwork and
extensive use of glass throughout the development reflect light to maximise the feeling of
space. The overall effect is one of openness and light – with a touch of style and glamour –
Taylor Wimpey.
BA Systems is currently working with Bouygues UK Ltd to provide balustrade to the balconies,
terraces – a prime feature of this project is approximately 250m of B30 Frame and vertical
railing infill balustrade system where BA Systems worked closely with the design team to
integrate the system into the façade construction. This met the structural loading requirements
whilst keeping the fixing points as minimalistic as possible.
WHY CHOOSE BA SYSTEMS
“We’re ready,
when you are ready for us!”
Construction programmes are constantly changing.
To ensure we fully meet our clients’ needs, we have
spent the last 12 months further streamlining all of our
processes - from initial site survey and design &
drawing, through to our manufacturing and site
installation procedures.
This means we have improved our service level and at
the same time, more than halved our average lead-time
from 12 weeks to less than 6 weeks.
What difference does this make to you?
1. We are more flexible - we can accommodate changes in
programme, “We’re ready, when you are ready for us”
2. We are reliable - we consistently meet our client’s final
agreed installation dates.
3. We carry out rapid installation - the installation of our
products is completed in remarkably short time on site.
4. We aim to achieve no hassle - With BA’s management
pro-actively working closely with our clients project
management team, we do all we can to assist them with
smooth & snag free completions.
INITIAL DESIGN REVIEW DESIGN DEVELOPMENT SURVEY & MANUFACTURE DRAWING
At the initial pre-order stage, a detailed
design review is completed to ensure
all parties understand and agree on the
overall concept – this ensures our
proposals meet all requirements.
We collaborate with all parties involved
in a project, to develop the design and
successfully meet all requirements.
Our CAD facilities enable us to offer 3D
visuals to ensure clarity - this process
facilitates the approval process and
saves valuable project time.
When the site is fully ready, we survey
all relevant areas and provide detailed
manufacture & installation set out
drawings. These are based on the
site’s dimensions and all previously
agreed elements. A final copy of these
are submitted to our clients for
their records.
Getting the design right as early as possible in a
project ensures success for all parties involved.
Step threeStep twoStep one
B30 Brochure

More Related Content

Similar to B30 Brochure

STANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD emailSTANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD emailLyndrea McGregor
 
STANDOUT_PROJECTS - VIC email
STANDOUT_PROJECTS - VIC emailSTANDOUT_PROJECTS - VIC email
STANDOUT_PROJECTS - VIC emailLyndrea McGregor
 
R&M Developments & Property Group Ltd - offsite history elements 2018 full co...
R&M Developments & Property Group Ltd - offsite history elements 2018 full co...R&M Developments & Property Group Ltd - offsite history elements 2018 full co...
R&M Developments & Property Group Ltd - offsite history elements 2018 full co...Thomas McKenna
 
Fbs Portfolio 2011 2012
Fbs Portfolio 2011   2012Fbs Portfolio 2011   2012
Fbs Portfolio 2011 2012Tom Stack
 
Leedwell PM Corporate Profile 2016
Leedwell PM Corporate Profile 2016Leedwell PM Corporate Profile 2016
Leedwell PM Corporate Profile 2016Nicholas Grear
 
Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Benjamin Leavy
 
MRM brochure new residential march 2nd
MRM brochure new residential march 2ndMRM brochure new residential march 2nd
MRM brochure new residential march 2ndmichael matthews
 
Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012Tom Stack
 
Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016David Karim
 
ABC New Brochure June 2016
ABC New Brochure June 2016ABC New Brochure June 2016
ABC New Brochure June 2016Mike Reid
 
Slides Transcription.docx
Slides Transcription.docxSlides Transcription.docx
Slides Transcription.docxbrian157854
 
Residential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architectsResidential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architectsSimon Woods
 
DvJ Design Capability Statement
DvJ Design Capability StatementDvJ Design Capability Statement
DvJ Design Capability StatementDavid Davies
 
eCUBED LIGHT 2013 c
eCUBED LIGHT 2013 ceCUBED LIGHT 2013 c
eCUBED LIGHT 2013 cmark kessner
 
Aglo Custom Manufacturing Brochure - EMAIL
Aglo Custom Manufacturing Brochure - EMAILAglo Custom Manufacturing Brochure - EMAIL
Aglo Custom Manufacturing Brochure - EMAILJoe Whelan
 

Similar to B30 Brochure (20)

Deepblue Smarthouse Products Catalogs
Deepblue Smarthouse Products CatalogsDeepblue Smarthouse Products Catalogs
Deepblue Smarthouse Products Catalogs
 
Lekki pearl estate presentation
Lekki pearl estate presentationLekki pearl estate presentation
Lekki pearl estate presentation
 
STANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD emailSTANDOUT_PROJECTS - QLD email
STANDOUT_PROJECTS - QLD email
 
STANDOUT_PROJECTS - VIC email
STANDOUT_PROJECTS - VIC emailSTANDOUT_PROJECTS - VIC email
STANDOUT_PROJECTS - VIC email
 
R&M Developments & Property Group Ltd - offsite history elements 2018 full co...
R&M Developments & Property Group Ltd - offsite history elements 2018 full co...R&M Developments & Property Group Ltd - offsite history elements 2018 full co...
R&M Developments & Property Group Ltd - offsite history elements 2018 full co...
 
Fbs Portfolio 2011 2012
Fbs Portfolio 2011   2012Fbs Portfolio 2011   2012
Fbs Portfolio 2011 2012
 
Leedwell PM Corporate Profile 2016
Leedwell PM Corporate Profile 2016Leedwell PM Corporate Profile 2016
Leedwell PM Corporate Profile 2016
 
EPACK LGSF PPT
EPACK LGSF PPTEPACK LGSF PPT
EPACK LGSF PPT
 
Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3Clear Construction QLD - Capability Statement3
Clear Construction QLD - Capability Statement3
 
MRM brochure new residential march 2nd
MRM brochure new residential march 2ndMRM brochure new residential march 2nd
MRM brochure new residential march 2nd
 
Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012Fluid Portfolio Summer 2012
Fluid Portfolio Summer 2012
 
Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016Oasis Interior Construction Profile current March 2016
Oasis Interior Construction Profile current March 2016
 
ABC New Brochure June 2016
ABC New Brochure June 2016ABC New Brochure June 2016
ABC New Brochure June 2016
 
Slides Transcription.docx
Slides Transcription.docxSlides Transcription.docx
Slides Transcription.docx
 
Residential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architectsResidential apartments company brochure beglinwoods architects
Residential apartments company brochure beglinwoods architects
 
DvJ Design Capability Statement
DvJ Design Capability StatementDvJ Design Capability Statement
DvJ Design Capability Statement
 
eCUBED LIGHT 2013 c
eCUBED LIGHT 2013 ceCUBED LIGHT 2013 c
eCUBED LIGHT 2013 c
 
Aglo Custom Manufacturing Brochure - EMAIL
Aglo Custom Manufacturing Brochure - EMAILAglo Custom Manufacturing Brochure - EMAIL
Aglo Custom Manufacturing Brochure - EMAIL
 
Newsletter - Connect Sep15
Newsletter - Connect Sep15Newsletter - Connect Sep15
Newsletter - Connect Sep15
 
eCubed Light 2016
eCubed Light 2016eCubed Light 2016
eCubed Light 2016
 

B30 Brochure

  • 1.
  • 2.
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9. B30 IN USE - NORTH WHARF GARDENS NAME - Paddington Exchange - North Wharf Gardens SECTOR - Residential LOCATION - Paddington ARCHITECT - Assael Architecture CONTRACTOR - Bouygues UK Ltd CONTRACT VALUE - £55M BALUSTRADE VALUE - £467K Paddington Exchange, is a striking residential development by Taylor Wimpey Central London. It is a collection of just 123 high specification one, two and three bedroom apartments, all with terraces or balconies, arranged over fourteen spacious floors. Light-coloured brickwork and extensive use of glass throughout the development reflect light to maximise the feeling of space. The overall effect is one of openness and light – with a touch of style and glamour – Taylor Wimpey. BA Systems is currently working with Bouygues UK Ltd to provide balustrade to the balconies, terraces – a prime feature of this project is approximately 250m of B30 Frame and vertical railing infill balustrade system where BA Systems worked closely with the design team to integrate the system into the façade construction. This met the structural loading requirements whilst keeping the fixing points as minimalistic as possible.
  • 10.
  • 11. WHY CHOOSE BA SYSTEMS “We’re ready, when you are ready for us!” Construction programmes are constantly changing. To ensure we fully meet our clients’ needs, we have spent the last 12 months further streamlining all of our processes - from initial site survey and design & drawing, through to our manufacturing and site installation procedures. This means we have improved our service level and at the same time, more than halved our average lead-time from 12 weeks to less than 6 weeks. What difference does this make to you? 1. We are more flexible - we can accommodate changes in programme, “We’re ready, when you are ready for us” 2. We are reliable - we consistently meet our client’s final agreed installation dates. 3. We carry out rapid installation - the installation of our products is completed in remarkably short time on site. 4. We aim to achieve no hassle - With BA’s management pro-actively working closely with our clients project management team, we do all we can to assist them with smooth & snag free completions. INITIAL DESIGN REVIEW DESIGN DEVELOPMENT SURVEY & MANUFACTURE DRAWING At the initial pre-order stage, a detailed design review is completed to ensure all parties understand and agree on the overall concept – this ensures our proposals meet all requirements. We collaborate with all parties involved in a project, to develop the design and successfully meet all requirements. Our CAD facilities enable us to offer 3D visuals to ensure clarity - this process facilitates the approval process and saves valuable project time. When the site is fully ready, we survey all relevant areas and provide detailed manufacture & installation set out drawings. These are based on the site’s dimensions and all previously agreed elements. A final copy of these are submitted to our clients for their records. Getting the design right as early as possible in a project ensures success for all parties involved. Step threeStep twoStep one