As part of calculating yourfinal sell price, you need to determine how many electricians it will take to build the job.
The answer could determine whether you need to factor in additional labor costs,such as overtime labor, supervision
costs and more labor hours.
More labor hours may require the need to add electricians, which could mean additional costs for drug testing,
badging and security, training, and otherrequired nonproductive time. You may need to add costs for tools, trucks,
travel, lodging, meals, equipment rental, uniforms and insurance. You may need to increase youradministration
costs (overhead),as there is a lot of paperwork in hiring extra or temporary employees. And there is paperwork
involved with laying them off after their work is done.
A simple formula: Total man-hours ÷ actual work days ÷ 8 hours/day = No. of electricians
Example: Your estimate says the project will require 4,000 man-hours to build. The contract is six months,which,
by the way, is not really 180 working days—unless yourelectricians work seven days per week. On average, there
are only 20 working days each month. So, six working months is only about 120 working days.
Now apply the formula: 4,000 hours ÷ 120 days ÷ 8 hours = 4.17 electricians (call it 4)
Keep in mind, your estimate’s 4,000 hours does not include any time for lost productivity. The 4,000 hours is only a
figure from your extended takeoff and is strictly based on what it will take to build the job. You’ll be lucky to get six
fully productive labor hours per day, per electrician, so you need to factor for the lost time.
A better formula: Total man-hours ÷ actual working days ÷ 6 hours/day = No. of electricians
Now your electrician count is up to 5.5. Might as well make it six. Guess what. You gained anothertwo electricians
per day.
Lost time formula: No. of actual working days × No. of lost hours/day × No. of electricians = No. of hours needed to
add to your estimate (really)
But wait, there’s more! Even though you are going to get only about six productive hours per day from each
electrician, you still need to pay them for eight. So, unless you like giving away money, you need to add back in the
lost unproductive labor.
120 days × 2 hours × 6 electricians = 1,440 hours
What?! Another1,440 hours of lost time? It can’t be! Or can it? Do the math, and prove me wrong.
What does the schedule tell you?
Knowing the contract schedule is critical. The duration of the project and its phasing will have a direct impact on
how many electricians you need to have on the job and when. As most projects go, you are not going to need all
your calculated electricians each day. In fact, most days you will need only a percentage of them, which means there
will be days when you will need only one or two and days when you will need 10 or more.
The job startup is typically light. Coordination, mobilization and layout may require only your foreman and one
other guy for a couple weeks. Maybe the job site won’t be ready for six months? Keep in mind that underground
rough-in work can happen fast, and you don’t want to miss the opportunity to get in fast. You could need 20
electricians right out of the gate.
So how will you know which part of the job will be labor light and which will be labor heavy? This is where your
well-planned, super-segregated takeoff comes in. If you performed and entered your takeoff in a manner that allows
you to analyze your job by systems (e.g., rough-in, wiring, device installation, etc.) and even phasing,you should be
able to run a few reports to find out where, when and how much labor your project will have.
A matter of class
Anotherimportant labor assessment is calculating how many foremen, journeymen and apprentices you will need.
Smaller jobs are relatively easy,as they typically don’t need a complicated mix of labor. Larger jobs pose a greater
challenge. Will you need more than one foreman? Are there enough hours to warrant a full-time (100 percent
overhead) superintendent? How many different crews will you need to have?
Fuzzy math aside, at the end of the day, it may come down to which electricians your company has available. So be
careful: If you bid the job with 30 percent of the labor using apprentice wage rates and, during the job, you are able
to use only 10 percent,the remaining 20 percent might be billed at higher journeyman, or worse, foreman rates.
Correctly calculating lost labor and the perfect labor mix might seem like a laborious task, especially 30 minutes
before the bid, but it is one well worth performing. Adding it all up could mean not bidding the job—yes, I said not
bidding the job—as you most certainly don’t want to win a contract yourcompany can’t possibly build.

More Related Content

Similar to As part of calculating your final sell price

Electrical estimating today
Electrical estimating todayElectrical estimating today
Electrical estimating today
Ralph Calvert
 
Benefits_of_outsourcing
Benefits_of_outsourcingBenefits_of_outsourcing
Benefits_of_outsourcing
Kate Greenwood
 
MGT 3302, Introduction to Project Management 1 Cou.docx
MGT 3302, Introduction to Project Management 1 Cou.docxMGT 3302, Introduction to Project Management 1 Cou.docx
MGT 3302, Introduction to Project Management 1 Cou.docx
madlynplamondon
 
Benefits of Outsourcing
Benefits of OutsourcingBenefits of Outsourcing
Benefits of Outsourcing
Daniel Cookson
 
152 Case 33 Piping Plus .docx
152 Case 33 Piping Plus           .docx152 Case 33 Piping Plus           .docx
152 Case 33 Piping Plus .docx
felicidaddinwoodie
 
OpenAir Calculating Utilization
OpenAir Calculating UtilizationOpenAir Calculating Utilization
OpenAir Calculating Utilization
Mark Spangler
 
Budgeting-In-Housekeeping-Department-ppt.ppt
Budgeting-In-Housekeeping-Department-ppt.pptBudgeting-In-Housekeeping-Department-ppt.ppt
Budgeting-In-Housekeeping-Department-ppt.ppt
Ramesh852110
 

Similar to As part of calculating your final sell price (20)

Sage Job Ready Guide
Sage Job Ready GuideSage Job Ready Guide
Sage Job Ready Guide
 
2Project_management. Ghjjkkutfghuuijkpdf
2Project_management. Ghjjkkutfghuuijkpdf2Project_management. Ghjjkkutfghuuijkpdf
2Project_management. Ghjjkkutfghuuijkpdf
 
Report
ReportReport
Report
 
Electrical estimating today
Electrical estimating todayElectrical estimating today
Electrical estimating today
 
Benefits_of_outsourcing
Benefits_of_outsourcingBenefits_of_outsourcing
Benefits_of_outsourcing
 
MGT 3302, Introduction to Project Management 1 Cou.docx
MGT 3302, Introduction to Project Management 1 Cou.docxMGT 3302, Introduction to Project Management 1 Cou.docx
MGT 3302, Introduction to Project Management 1 Cou.docx
 
Benefits of Outsourcing
Benefits of OutsourcingBenefits of Outsourcing
Benefits of Outsourcing
 
Why should your organisation use timesheets?
Why should your organisation use timesheets? Why should your organisation use timesheets?
Why should your organisation use timesheets?
 
D Prior Scrum In The Waterfall
D Prior Scrum In The WaterfallD Prior Scrum In The Waterfall
D Prior Scrum In The Waterfall
 
152 Case 33 Piping Plus .docx
152 Case 33 Piping Plus           .docx152 Case 33 Piping Plus           .docx
152 Case 33 Piping Plus .docx
 
I don’t understand it fido
I don’t understand it fidoI don’t understand it fido
I don’t understand it fido
 
OpenAir Calculating Utilization
OpenAir Calculating UtilizationOpenAir Calculating Utilization
OpenAir Calculating Utilization
 
What is employee productivity ratio & How do you Calculate it
What is employee productivity ratio & How do you Calculate it What is employee productivity ratio & How do you Calculate it
What is employee productivity ratio & How do you Calculate it
 
Budgeting-In-Housekeeping-Department-ppt.ppt
Budgeting-In-Housekeeping-Department-ppt.pptBudgeting-In-Housekeeping-Department-ppt.ppt
Budgeting-In-Housekeeping-Department-ppt.ppt
 
Are your audits convenient?
Are your audits convenient?Are your audits convenient?
Are your audits convenient?
 
10-payroll-tips-final
10-payroll-tips-final10-payroll-tips-final
10-payroll-tips-final
 
DonnerCompany
DonnerCompanyDonnerCompany
DonnerCompany
 
Excel Time Tracking 4 Templates, Pros and Cons and Alternatives
Excel Time Tracking 4 Templates, Pros and Cons and AlternativesExcel Time Tracking 4 Templates, Pros and Cons and Alternatives
Excel Time Tracking 4 Templates, Pros and Cons and Alternatives
 
Aggregate Planning, Guide numericals
Aggregate Planning, Guide numericalsAggregate Planning, Guide numericals
Aggregate Planning, Guide numericals
 
Over servicing webinar slides with notes
Over servicing webinar slides with notes Over servicing webinar slides with notes
Over servicing webinar slides with notes
 

Recently uploaded

2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
Boundify
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
LR1709MUSIC
 

Recently uploaded (20)

A DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptxA DAY IN THE LIFE OF A SALESPERSON .pptx
A DAY IN THE LIFE OF A SALESPERSON .pptx
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
PALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTS
PALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTSPALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTS
PALWAL CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN PALWAL ESCORTS
 
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptxGoal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
Goal Presentation_NEW EMPLOYEE_NETAPS FOUNDATION.pptx
 
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx2024 May - Clearbit Integration with Hubspot  - Greenville HUG.pptx
2024 May - Clearbit Integration with Hubspot - Greenville HUG.pptx
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptxThompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
Thompson_Taylor_MBBS_PB1_2024-03 (1)- Project & Portfolio 2.pptx
 
10 Influential Leaders Defining the Future of Digital Banking in 2024.pdf
10 Influential Leaders Defining the Future of Digital Banking in 2024.pdf10 Influential Leaders Defining the Future of Digital Banking in 2024.pdf
10 Influential Leaders Defining the Future of Digital Banking in 2024.pdf
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdfThe Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
The Vietnam Believer Newsletter_May 13th, 2024_ENVol. 007.pdf
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024Marel Q1 2024 Investor Presentation from May 8, 2024
Marel Q1 2024 Investor Presentation from May 8, 2024
 
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON ESCORTS SERVICE PROVIDE
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON  ESCORTS SERVICE PROVIDEGURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON  ESCORTS SERVICE PROVIDE
GURGAON CALL GIRL ❤ 8272964427❤ CALL GIRLS IN GURGAON ESCORTS SERVICE PROVIDE
 
Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...Contact +971581248768 for 100% original and safe abortion pills available for...
Contact +971581248768 for 100% original and safe abortion pills available for...
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
How does a bike-share company navigate speedy success? - Cyclistic
How does a bike-share company navigate speedy success? - CyclisticHow does a bike-share company navigate speedy success? - Cyclistic
How does a bike-share company navigate speedy success? - Cyclistic
 
UJJAIN CALL GIRL ❤ 8272964427❤ CALL GIRLS IN UJJAIN ESCORTS SERVICE PROVIDE
UJJAIN CALL GIRL ❤ 8272964427❤ CALL GIRLS IN UJJAIN ESCORTS SERVICE PROVIDEUJJAIN CALL GIRL ❤ 8272964427❤ CALL GIRLS IN UJJAIN ESCORTS SERVICE PROVIDE
UJJAIN CALL GIRL ❤ 8272964427❤ CALL GIRLS IN UJJAIN ESCORTS SERVICE PROVIDE
 
Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312Shots fired Budget Presentation.pdf12312
Shots fired Budget Presentation.pdf12312
 
Moradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in PenacovaMoradia Isolada com Logradouro; Detached house with patio in Penacova
Moradia Isolada com Logradouro; Detached house with patio in Penacova
 

As part of calculating your final sell price

  • 1. As part of calculating yourfinal sell price, you need to determine how many electricians it will take to build the job. The answer could determine whether you need to factor in additional labor costs,such as overtime labor, supervision costs and more labor hours. More labor hours may require the need to add electricians, which could mean additional costs for drug testing, badging and security, training, and otherrequired nonproductive time. You may need to add costs for tools, trucks, travel, lodging, meals, equipment rental, uniforms and insurance. You may need to increase youradministration costs (overhead),as there is a lot of paperwork in hiring extra or temporary employees. And there is paperwork involved with laying them off after their work is done. A simple formula: Total man-hours ÷ actual work days ÷ 8 hours/day = No. of electricians Example: Your estimate says the project will require 4,000 man-hours to build. The contract is six months,which, by the way, is not really 180 working days—unless yourelectricians work seven days per week. On average, there are only 20 working days each month. So, six working months is only about 120 working days. Now apply the formula: 4,000 hours ÷ 120 days ÷ 8 hours = 4.17 electricians (call it 4) Keep in mind, your estimate’s 4,000 hours does not include any time for lost productivity. The 4,000 hours is only a figure from your extended takeoff and is strictly based on what it will take to build the job. You’ll be lucky to get six fully productive labor hours per day, per electrician, so you need to factor for the lost time. A better formula: Total man-hours ÷ actual working days ÷ 6 hours/day = No. of electricians Now your electrician count is up to 5.5. Might as well make it six. Guess what. You gained anothertwo electricians per day. Lost time formula: No. of actual working days × No. of lost hours/day × No. of electricians = No. of hours needed to add to your estimate (really) But wait, there’s more! Even though you are going to get only about six productive hours per day from each electrician, you still need to pay them for eight. So, unless you like giving away money, you need to add back in the lost unproductive labor. 120 days × 2 hours × 6 electricians = 1,440 hours What?! Another1,440 hours of lost time? It can’t be! Or can it? Do the math, and prove me wrong. What does the schedule tell you? Knowing the contract schedule is critical. The duration of the project and its phasing will have a direct impact on how many electricians you need to have on the job and when. As most projects go, you are not going to need all your calculated electricians each day. In fact, most days you will need only a percentage of them, which means there will be days when you will need only one or two and days when you will need 10 or more. The job startup is typically light. Coordination, mobilization and layout may require only your foreman and one other guy for a couple weeks. Maybe the job site won’t be ready for six months? Keep in mind that underground rough-in work can happen fast, and you don’t want to miss the opportunity to get in fast. You could need 20 electricians right out of the gate. So how will you know which part of the job will be labor light and which will be labor heavy? This is where your well-planned, super-segregated takeoff comes in. If you performed and entered your takeoff in a manner that allows
  • 2. you to analyze your job by systems (e.g., rough-in, wiring, device installation, etc.) and even phasing,you should be able to run a few reports to find out where, when and how much labor your project will have. A matter of class Anotherimportant labor assessment is calculating how many foremen, journeymen and apprentices you will need. Smaller jobs are relatively easy,as they typically don’t need a complicated mix of labor. Larger jobs pose a greater challenge. Will you need more than one foreman? Are there enough hours to warrant a full-time (100 percent overhead) superintendent? How many different crews will you need to have? Fuzzy math aside, at the end of the day, it may come down to which electricians your company has available. So be careful: If you bid the job with 30 percent of the labor using apprentice wage rates and, during the job, you are able to use only 10 percent,the remaining 20 percent might be billed at higher journeyman, or worse, foreman rates. Correctly calculating lost labor and the perfect labor mix might seem like a laborious task, especially 30 minutes before the bid, but it is one well worth performing. Adding it all up could mean not bidding the job—yes, I said not bidding the job—as you most certainly don’t want to win a contract yourcompany can’t possibly build.