ARUN KUMAR
Mobile: +91 8826615564
+91 9953142343
E-Mail: mr.arun_harish@yahoo.co.in
OBJECTIVE
To work in the area where my knowledge and experience can be best availed of and be an asset for
the organization for its mutual growth. To pursue a career, which requires an optimistic attitude,
high confidence and the absolute intelligence in the motivational, progressive, and friendly
environment, where the individual achievements and performance will be counted.
PROFESSIONAL SUMMATION
B.TECH (Electronics & Instrumentation) with 8.0Years’ Experience in Detail
Engineering of Control & Instrumentation Systems.
 8.0 Years of competitive experience in industrial Automation which includes (Distributed
Control system, Programmable control system, SCADA, Field instruments etc.), Power, Oil &
Gas and manufacturing company.
 2.10 Years of experience in Industrial Automation in Yokogawa (DCS, PLC, SCADA, DNP3,
MODBUS, HOST TO HOST, TCP/IP Protocol etc.).
 5+ Years of competitive experience in Power plant as instrument Maintenance engineer.
 Analysing the problem and working a way towards finding and proposing different solutions
to that problem (to clients).
 Handling multiple responsibilities (Managing team, inspection team work, leading the team,
troubleshooting the problems, planning and executing from scheduling to completion
Periodic, Shutdown, Emergency maintenance visits).
 Resource planning and sharing the Final maintenance report. Helping team in case they
stuck in problem at site.
 Well versed with MS Office & Internet Applications.
CORE STRENGTHS
 Ability to provide thought leadership.
 Ability to work individually and as part of cross functional teams.
 Demonstrated decision making and problem solving skills.
 Team oriented with excellent collaboration skills.
 Attention to detail and commitment to quality of work.
 Deliverance of work in compliance to requirements.
 Good work ethics with excellent communication and interpersonal skills.
EDUCATION BACKGROUND
SUMMATION
Degree Year Board/University Percentage
B Tech (Electronics
and Instrumentation)
2007 Punjab Technical University, Jalandhar (Punjab) 72.52%
DIPLOMA (Electronics
and Communication)
2004
Punjab State Board of Technical Education and
Industrial training Chandigarh
59.28%
MATRIC (10th
) 2001 Punjab School Education Board 62.0 %
EMPLOYMENT CHRONICLE
Organisation Position Period
Yokogawa India Limited (New Delhi) Executive Engineer (Industrial
Automation)
November 2012 - till date
Saluja Manufacturing Limited,
Nawashahar, Punjab
Instrument Maintenance
Engineer
August 2007 – October 2012
TECHNICAL SKILLS
DCS
Centum VP, CS 3000, CS1000, CENTUM CS,Honeywell, ABB Freelance
800F
PLC Prosafe RS, Siemens, Allen Bradley etc.
SCADA Yokogawa’s Fast Tool SCADA 9.04
Field Instruments
Flow, Pressure, Temperature, Differential pressure, Level transmitters,
expertise on Indicators and controllers, Sensors, analysers (Oxygen, PH,
TDS, Conductivity, Dust, Moisture) etc.
Organization: YOKOGAWA INDIA LIMITED (November 2012 - Till Date)
PROJECTS UNDERTAKEN
Functional
Responsibilities
 Detailed engineering and application software development for industrial
projects using YOKOGAWA DCS systems – CENTUM CS-3000, CENTUM VP,
PROSAFE & TRICONIX PLC.
 Giving after commissioning support and services at customer’s site.
 Looking after the Hardware and Software maintenance and support DCS and
PLC systems and subsystems at the customer sites.
 DCS system Hardware & software testing, System integration third party
components selection and loop checking.
 Participates in on-site engineering, start-up and application commissioning.
 Exposure to Industry standard – 3rd Party interface protocol such as
MODBUS.
 Design and finalization of Graphics on system according to Process and
Instrumentation schemes (P&ID schemes).
 Preparation and review of control room layout.
 Have developed programs using SEBOL.
 Troubleshooting and resolving issues of Clients.
 System Analysis and Maintenance.
 Helping team in case they stuck in something.
 Resource planning and sharing the Project Documents.
Projects
Handled
1. Bharat Oman refineries Limited, Bina, Madhya Pradesh (Client)
 Worked as Resident Support Engineer from Period February 2013 to June
2013.
 Responsibility of maintaining DCS system (hardware and software), Prosafe
RS PLC’s (High speed safety/protection PLC) Exa-quantum, Exa-OPC, PRM in
refinery.
 Programming of DCS, adding new tags, add new logics, editing old logics as
per process requirement, troubleshooting the DCS programming problems
etc.
 Responsibility of troubleshooting of DCS, PLC, Networking and other party
interference faults.
 Maintaining daily maintenance activities, Shutdown and start up activities,
Weekly and monthly maintenance activities and their reports.
Projects
Handled
2. HMEL Refinery, Bathinda (Client)
 Worked as Resident Support Engineer from October 2013 to May 2014.
 Responsibility of maintaining DCS (Yokogawa make Centum VP) system
(hardware and software), Exa-quantum, Exa-OPC, PRM in refinery.
 Programming of DCS, adding new tags, add new logics, editing old logics as
per process requirement, troubleshooting the DCS programming problems
etc.
 Responsibility of troubleshooting of DCS, PLC, Networking and other party
interference faults.
 Maintaining daily maintenance activities, Shutdown and start up activities,
Weekly and monthly maintenance activities and their reports.
3. GAIL (Gas Authority India Limited) (Client)
 Worked as a Resident Support Engineer from Period November 2014 to April
2015.
 Responsibility of maintaining Centralized SCADA system (hardware and
software) (FASTTOOL 9.04),OPC servers, Web servers, Zonal servers, Client
Servers, History Servers, Pipeline Locations FEP’s, HMI’s etc.
 Programming of SCADA, adding new tags Database, add new logics etc.
 Maintaining daily maintenance activities, Shutdown and start up activities,
Weekly and monthly maintenance activities and their reports.
Organization: SEL Manufacturing limited (August 2007 - October 2012)
PROJECTS UNDERTAKEN
Functional
Responsibilities
As a Department Head/Engineer, I am responsible for the following:
 Maintenance of plants instruments.
 System Analysis Troubleshooting and resolving issues.
 Helping team in case they stuck in something.
 Resource planning and sharing the Project Documents.
Projects
Handled
Power Plant Division (10MW and 12MW)
 Have successfully complete Erection and commissioning work of both plants.
 Maintenance and Calibration of all Field Instruments like Distributed Control
system (having Yokogawa and Honeywell DCS, Siemens PLC), PLCs, Air
Compressors, Air Dryers, Variable Frequency Drives [VFDs], DC/AC Drives,
Control Valves, Solenoid Valves, Motorized Valves, all types of Transmitters,
Switches, Sensors, Pneumatic Cylinders, Field Gauges, Local/Field
Indicators, etc.
 To prepare and maintain all kinds of reports, record of failures and other
important documents.
INDUSTRIAL TRAININGS
 Two months training on Distributed control system (Centum VP, CS3000), Prosafe RS PLC,
Modbus, Host to host communication, DNP3 Protocol etc. from Yokogawa India Limited.
 Two weeks training on Fast tool software (SCADA) from Yokogawa India Limited.
 Six months industrial training in Semiconductor Complex Limited Mohali in field of Microcontroller
programming.
PERSONAL DOSSIER
Present Address:
#46-D, Fourth Floor, B-12ADhawalgiri Apartments,
Sector 34, Noida, Pin Code - 201307
Permanent Address :
House no 197, Ward no 12,vill. Kainthain, Tehsel. Dasuya
Distt. Hoshiarpur, Punjab, India Pin-144205
Date of Birth: February 23, 1986
Linguistics: English, Hindi & Punjabi
I, ARUN KUMAR hereby declare that all of the above statements are correct and true to the best of my
knowledge.
Place:Noida (ARUN KUMAR)

Arun kumar

  • 1.
    ARUN KUMAR Mobile: +918826615564 +91 9953142343 E-Mail: mr.arun_harish@yahoo.co.in OBJECTIVE To work in the area where my knowledge and experience can be best availed of and be an asset for the organization for its mutual growth. To pursue a career, which requires an optimistic attitude, high confidence and the absolute intelligence in the motivational, progressive, and friendly environment, where the individual achievements and performance will be counted. PROFESSIONAL SUMMATION B.TECH (Electronics & Instrumentation) with 8.0Years’ Experience in Detail Engineering of Control & Instrumentation Systems.  8.0 Years of competitive experience in industrial Automation which includes (Distributed Control system, Programmable control system, SCADA, Field instruments etc.), Power, Oil & Gas and manufacturing company.  2.10 Years of experience in Industrial Automation in Yokogawa (DCS, PLC, SCADA, DNP3, MODBUS, HOST TO HOST, TCP/IP Protocol etc.).  5+ Years of competitive experience in Power plant as instrument Maintenance engineer.  Analysing the problem and working a way towards finding and proposing different solutions to that problem (to clients).  Handling multiple responsibilities (Managing team, inspection team work, leading the team, troubleshooting the problems, planning and executing from scheduling to completion Periodic, Shutdown, Emergency maintenance visits).  Resource planning and sharing the Final maintenance report. Helping team in case they stuck in problem at site.  Well versed with MS Office & Internet Applications. CORE STRENGTHS  Ability to provide thought leadership.  Ability to work individually and as part of cross functional teams.  Demonstrated decision making and problem solving skills.  Team oriented with excellent collaboration skills.  Attention to detail and commitment to quality of work.  Deliverance of work in compliance to requirements.  Good work ethics with excellent communication and interpersonal skills. EDUCATION BACKGROUND SUMMATION Degree Year Board/University Percentage B Tech (Electronics and Instrumentation) 2007 Punjab Technical University, Jalandhar (Punjab) 72.52% DIPLOMA (Electronics and Communication) 2004 Punjab State Board of Technical Education and Industrial training Chandigarh 59.28% MATRIC (10th ) 2001 Punjab School Education Board 62.0 %
  • 2.
    EMPLOYMENT CHRONICLE Organisation PositionPeriod Yokogawa India Limited (New Delhi) Executive Engineer (Industrial Automation) November 2012 - till date Saluja Manufacturing Limited, Nawashahar, Punjab Instrument Maintenance Engineer August 2007 – October 2012 TECHNICAL SKILLS DCS Centum VP, CS 3000, CS1000, CENTUM CS,Honeywell, ABB Freelance 800F PLC Prosafe RS, Siemens, Allen Bradley etc. SCADA Yokogawa’s Fast Tool SCADA 9.04 Field Instruments Flow, Pressure, Temperature, Differential pressure, Level transmitters, expertise on Indicators and controllers, Sensors, analysers (Oxygen, PH, TDS, Conductivity, Dust, Moisture) etc. Organization: YOKOGAWA INDIA LIMITED (November 2012 - Till Date) PROJECTS UNDERTAKEN Functional Responsibilities  Detailed engineering and application software development for industrial projects using YOKOGAWA DCS systems – CENTUM CS-3000, CENTUM VP, PROSAFE & TRICONIX PLC.  Giving after commissioning support and services at customer’s site.  Looking after the Hardware and Software maintenance and support DCS and PLC systems and subsystems at the customer sites.  DCS system Hardware & software testing, System integration third party components selection and loop checking.  Participates in on-site engineering, start-up and application commissioning.  Exposure to Industry standard – 3rd Party interface protocol such as MODBUS.  Design and finalization of Graphics on system according to Process and Instrumentation schemes (P&ID schemes).  Preparation and review of control room layout.  Have developed programs using SEBOL.  Troubleshooting and resolving issues of Clients.  System Analysis and Maintenance.  Helping team in case they stuck in something.  Resource planning and sharing the Project Documents. Projects Handled 1. Bharat Oman refineries Limited, Bina, Madhya Pradesh (Client)  Worked as Resident Support Engineer from Period February 2013 to June 2013.  Responsibility of maintaining DCS system (hardware and software), Prosafe RS PLC’s (High speed safety/protection PLC) Exa-quantum, Exa-OPC, PRM in refinery.  Programming of DCS, adding new tags, add new logics, editing old logics as per process requirement, troubleshooting the DCS programming problems etc.  Responsibility of troubleshooting of DCS, PLC, Networking and other party interference faults.  Maintaining daily maintenance activities, Shutdown and start up activities, Weekly and monthly maintenance activities and their reports.
  • 3.
    Projects Handled 2. HMEL Refinery,Bathinda (Client)  Worked as Resident Support Engineer from October 2013 to May 2014.  Responsibility of maintaining DCS (Yokogawa make Centum VP) system (hardware and software), Exa-quantum, Exa-OPC, PRM in refinery.  Programming of DCS, adding new tags, add new logics, editing old logics as per process requirement, troubleshooting the DCS programming problems etc.  Responsibility of troubleshooting of DCS, PLC, Networking and other party interference faults.  Maintaining daily maintenance activities, Shutdown and start up activities, Weekly and monthly maintenance activities and their reports. 3. GAIL (Gas Authority India Limited) (Client)  Worked as a Resident Support Engineer from Period November 2014 to April 2015.  Responsibility of maintaining Centralized SCADA system (hardware and software) (FASTTOOL 9.04),OPC servers, Web servers, Zonal servers, Client Servers, History Servers, Pipeline Locations FEP’s, HMI’s etc.  Programming of SCADA, adding new tags Database, add new logics etc.  Maintaining daily maintenance activities, Shutdown and start up activities, Weekly and monthly maintenance activities and their reports. Organization: SEL Manufacturing limited (August 2007 - October 2012) PROJECTS UNDERTAKEN Functional Responsibilities As a Department Head/Engineer, I am responsible for the following:  Maintenance of plants instruments.  System Analysis Troubleshooting and resolving issues.  Helping team in case they stuck in something.  Resource planning and sharing the Project Documents. Projects Handled Power Plant Division (10MW and 12MW)  Have successfully complete Erection and commissioning work of both plants.  Maintenance and Calibration of all Field Instruments like Distributed Control system (having Yokogawa and Honeywell DCS, Siemens PLC), PLCs, Air Compressors, Air Dryers, Variable Frequency Drives [VFDs], DC/AC Drives, Control Valves, Solenoid Valves, Motorized Valves, all types of Transmitters, Switches, Sensors, Pneumatic Cylinders, Field Gauges, Local/Field Indicators, etc.  To prepare and maintain all kinds of reports, record of failures and other important documents. INDUSTRIAL TRAININGS  Two months training on Distributed control system (Centum VP, CS3000), Prosafe RS PLC, Modbus, Host to host communication, DNP3 Protocol etc. from Yokogawa India Limited.  Two weeks training on Fast tool software (SCADA) from Yokogawa India Limited.  Six months industrial training in Semiconductor Complex Limited Mohali in field of Microcontroller programming. PERSONAL DOSSIER Present Address: #46-D, Fourth Floor, B-12ADhawalgiri Apartments, Sector 34, Noida, Pin Code - 201307 Permanent Address : House no 197, Ward no 12,vill. Kainthain, Tehsel. Dasuya Distt. Hoshiarpur, Punjab, India Pin-144205 Date of Birth: February 23, 1986 Linguistics: English, Hindi & Punjabi I, ARUN KUMAR hereby declare that all of the above statements are correct and true to the best of my knowledge. Place:Noida (ARUN KUMAR)