LOG SHEET -WEEK 1
Company Name Student
Supervising Architect Stu.No
Project 1
Site Location
Project 2
Site Location
Project 3
Site Location
Stages
Mon Tues Wed Thurs Fri Sat Sun
Schematic Design
Sketching, 3D modeling and
Rendering 5.0 3.5
Prepare presentation drawings
Aware of site conditions: Site
Visit, Study and Measure
Prepare preliminary project
evaluations, programs and
feasibility studies
OTHER: PHYSICAL
MODELING 4.0
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
Participate in permit application
OTHER: 3D ANIMATION VIDEO
8.0
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process
OTHER:
Contract Administration
Aware of OR observe a standard
form of construction contract
OTHER:
Total: 0.0 4.0 5.0 3.5 8.0 0.0 20.5
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)
A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
KLANG
ATSA ARCHITECTS NIK AFIQ AMADI
EN. ISMAIL 0317749
MASJID AL-FIRDAUS
MASJID KAMPUNG TELUK MEMALI
IPOH, PERAK
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
ARC2625 Log Sheet-WK1 Page 11
LOG SHEET -WEEK 2
Company Name Student
Supervising Architect Stu.No
Project 1
Site Location
Project 2
Site Location
Project 3
Site Location
Stages
Mon Tues Wed Thurs Fri Sat Sun
Schematic Design
Sketching, 3D modeling and
Rendering
Prepare presentation drawings
2.0 8.0 8.0
Aware of site conditions: Site
Visit, Study and Measure
Prepare preliminary project
evaluations, programs and
feasibility studies
OTHER: 3D ANIMATION VIDEO
6.0 8.0
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
Participate in permit application
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process
OTHER:
Contract Administration
Aware of OR observe a standard
form of construction contract
OTHER:
Total: 8.0 8.0 8.0 0.0 8.0 0.0 32.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)
A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
IPOH, PERAL
ATSA ARCHITECTS NIK AFIQ AMADI
AR. AZIM, EN ISMAIL, FAIZ RUSLI 0317749
MASJID KAMPUNG TELUK MEMALI
ABSENT ON THURSDAY DUE TO FEVER (MIGRAINE)
MASJID AL- FIRDAUS
KLANG
SUBANG MURNI (NADAYU)
SUBANG
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
ARC2625 Log Sheet-WK2 Page 11
LOG SHEET -WEEK 3
Company Name Student
Supervising Architect Stu.No
Project 1
Site Location
Project 2
Site Location
Project 3
Site Location
Stages
Mon Tues Wed Thurs Fri Sat Sun
Schematic Design
Sketching, 3D modeling and
Rendering 6.0 5.5 3.0
Prepare presentation drawings
8.0 2.5 5.0
Aware of site conditions: Site
Visit, Study and Measure
Prepare preliminary project
evaluations, programs and
feasibility studies
FOLD DRAWINGS
2.0
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
Participate in permit application
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants 8.0
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process
OTHER:
Contract Administration
Aware of OR observe a standard
form of construction contract
OTHER:
Total: 8.0 8.0 8.0 8.0 8.0 0.0 40.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)
A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
SUBANG
ATSA ARCHITECTS NIK AFIQ AMADI
FAIZ RUSLI, NUR FAIZ 0317749
SUBANG MURNI (NADAYU)
CTRM
BATU BERENDAM, MELAKA
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
ARC2625 Log Sheet-WK3 Page 11
LOG SHEET -WEEK 4
Company Name Student
Supervising Architect Stu.No
Project 1
Site Location
Project 2
Site Location
Project 3
Site Location
Stages
Mon Tues Wed Thurs Fri Sat Sun
Schematic Design
Sketching, 3D modeling and
Rendering 5.0 8.0
Prepare presentation drawings
3.0 7.0
Aware of site conditions: Site
Visit, Study and Measure
Prepare preliminary project
evaluations, programs and
feasibility studies
OTHER:
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
Participate in permit application
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants 6.0
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process
OTHER:
Contract Administration
Aware of OR observe a standard
form of construction contract
ATTEND PRODUCT
PRESENTATION 1.0
Total: 8.0 8.0 6.0 8.0 0.0 0.0 30.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)
A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
BATU BERENDAM, MELAKA
ATSA ARCHITECTS NIK AFIQ AMADI
NUR FAIZ ABDUL JABAR 0317749
CTRM
SUBANG MURNI (NADAYU)
SUBANG
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
ARC2625 Log Sheet-WK4 Page 11
LOG SHEET -WEEK 5
Company Name Student
Supervising Architect Stu.No
Project 1
Site Location
Project 2
Site Location
Project 3
Site Location
Stages
Mon Tues Wed Thurs Fri Sat Sun
Schematic Design
Sketching, 3D modeling and
Rendering 8.0 8.0
Prepare presentation drawings
Aware of site conditions: Site
Visit, Study and Measure
Prepare preliminary project
evaluations, programs and
feasibility studies
OTHER:
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
Participate in permit application
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process
OTHER:
Contract Administration
Aware of OR observe a standard
form of construction contract
OTHER:
Total: 0.0 0.0 0.0 8.0 8.0 0.0 16.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)
A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
BATU BERENDAM, MELAKA
ATSA ARCHITECTS NIK AFIQ AMADI
NUR FAIZ ABDUL JABAR 0317749
CTRM
CHINESE NEW YEAR FROM MONDAY TO WEDNESDAY
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
ARC2625 Log Sheet-WK5 Page 11
LOG SHEET -WEEK 6
Company Name Student
Supervising Architect Stu.No
Project 1
Site Location
Project 2
Site Location
Project 3
Site Location
Stages
Mon Tues Wed Thurs Fri Sat Sun
Schematic Design
Sketching, 3D modeling and
Rendering 8.0 7.0 8.0
Prepare presentation drawings
Aware of site conditions: Site
Visit, Study and Measure
Prepare preliminary project
evaluations, programs and
feasibility studies
OTHER:
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
Participate in permit application
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants 1.0 4.0
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process 4.0
OTHER:
Contract Administration
Aware of OR observe a standard
form of construction contract
OTHER:
Total: 8.0 8.0 8.0 0.0 8.0 0.0 32.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)
A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
BATU BERENDAM, MELAKA
ATSA ARCHITECTS NIK AFIQ AMADI
NUR FAIZ ABDUL JABAR 0317749
CTRM
THAIPUSAM ON THURSDAY
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
ARC2625 Log Sheet-WK6 Page 11
LOG SHEET -WEEK 7
Company Name Student
Supervising Architect Stu.No
Project 1
Site Location
Project 2
Site Location
Project 3
Site Location
Stages
Mon Tues Wed Thurs Fri Sat Sun
Schematic Design
Sketching, 3D modeling and
Rendering 8.0 7.0 8.0 8.0
Prepare presentation drawings
Aware of site conditions: Site
Visit, Study and Measure
Prepare preliminary project
evaluations, programs and
feasibility studies
OTHER:
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
Participate in permit application
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process
OTHER:
Contract Administration
Aware of OR observe a standard
form of construction contract
ATTEND PRODUCT
PRESENTATION 1.0
Total: 8.0 0.0 8.0 8.0 8.0 0.0 32.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)
A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
BATU BERENDAM, MELAKA
ATSA ARCHITECTS NIK AFIQ AMADI
NUR FAIZ ABDUL JABAR 0317749
CTRM
ON MC ON TUESDAY DUE TO ILLNES (FEVER)
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
ARC2625 Log Sheet-WK7 Page 11
LOG SHEET -WEEK 8
Company Name Student
Supervising Architect Stu.No
Project 1
Site Location
Project 2
Site Location
Project 3
Site Location
Stages
Mon Tues Wed Thurs Fri Sat Sun
Schematic Design
Sketching, 3D modeling and
Rendering 8.0 8.0 8.0 7.0 8.0
Prepare presentation drawings
Aware of site conditions: Site
Visit, Study and Measure
Prepare preliminary project
evaluations, programs and
feasibility studies
OTHER:
Permit Application
Aware of different local
authorities
Observe OR Assess regulatory
context: Building By-law, Set
back, Fire escape requirement
Establish requirements for, and
co-ordinate, specialists
Participate in permit application
OTHER:
Contract Documentation
Prepare architectural drawings
with regard to location,building
elements, finishes, fittings and
Participate or co-ordinate
meetings with consultants
Establish requirements for, and
co-ordinate, consultants,
specialists, product suppliers
Prepare for tender documents
OR participate in the process
OTHER: ATTEND PRODUCT
PRESENTATION 1.0
Contract Administration
Aware of OR observe a standard
form of construction contract
OTHER:
Total: 8.0 8.0 8.0 8.0 8.0 0.0 40.0
NOTE:
Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH)
A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below
Remark:
BATU BERENDAM, MELAKA
ATSA ARCHITECTS NIK AFIQ AMADI
NUR FAIZ ABDUL JABAR 0317749
CTRM
DAY
You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet)
Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc
You might involve multiple stages per day, record the hour/hours accordingly
Do not record Saturday and Sunday if is not applicable to you
Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file
ARC2625 Log Sheet-WK8 Page 11

Arc2625 log sheet nik afiq amadi 0317749 final.pdf

  • 1.
    LOG SHEET -WEEK1 Company Name Student Supervising Architect Stu.No Project 1 Site Location Project 2 Site Location Project 3 Site Location Stages Mon Tues Wed Thurs Fri Sat Sun Schematic Design Sketching, 3D modeling and Rendering 5.0 3.5 Prepare presentation drawings Aware of site conditions: Site Visit, Study and Measure Prepare preliminary project evaluations, programs and feasibility studies OTHER: PHYSICAL MODELING 4.0 Permit Application Aware of different local authorities Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists Participate in permit application OTHER: 3D ANIMATION VIDEO 8.0 Contract Documentation Prepare architectural drawings with regard to location,building elements, finishes, fittings and Participate or co-ordinate meetings with consultants Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process OTHER: Contract Administration Aware of OR observe a standard form of construction contract OTHER: Total: 0.0 4.0 5.0 3.5 8.0 0.0 20.5 NOTE: Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH) A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below Remark: KLANG ATSA ARCHITECTS NIK AFIQ AMADI EN. ISMAIL 0317749 MASJID AL-FIRDAUS MASJID KAMPUNG TELUK MEMALI IPOH, PERAK DAY You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet) Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc You might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file ARC2625 Log Sheet-WK1 Page 11
  • 2.
    LOG SHEET -WEEK2 Company Name Student Supervising Architect Stu.No Project 1 Site Location Project 2 Site Location Project 3 Site Location Stages Mon Tues Wed Thurs Fri Sat Sun Schematic Design Sketching, 3D modeling and Rendering Prepare presentation drawings 2.0 8.0 8.0 Aware of site conditions: Site Visit, Study and Measure Prepare preliminary project evaluations, programs and feasibility studies OTHER: 3D ANIMATION VIDEO 6.0 8.0 Permit Application Aware of different local authorities Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists Participate in permit application OTHER: Contract Documentation Prepare architectural drawings with regard to location,building elements, finishes, fittings and Participate or co-ordinate meetings with consultants Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process OTHER: Contract Administration Aware of OR observe a standard form of construction contract OTHER: Total: 8.0 8.0 8.0 0.0 8.0 0.0 32.0 NOTE: Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH) A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below Remark: IPOH, PERAL ATSA ARCHITECTS NIK AFIQ AMADI AR. AZIM, EN ISMAIL, FAIZ RUSLI 0317749 MASJID KAMPUNG TELUK MEMALI ABSENT ON THURSDAY DUE TO FEVER (MIGRAINE) MASJID AL- FIRDAUS KLANG SUBANG MURNI (NADAYU) SUBANG DAY You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet) Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc You might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file ARC2625 Log Sheet-WK2 Page 11
  • 3.
    LOG SHEET -WEEK3 Company Name Student Supervising Architect Stu.No Project 1 Site Location Project 2 Site Location Project 3 Site Location Stages Mon Tues Wed Thurs Fri Sat Sun Schematic Design Sketching, 3D modeling and Rendering 6.0 5.5 3.0 Prepare presentation drawings 8.0 2.5 5.0 Aware of site conditions: Site Visit, Study and Measure Prepare preliminary project evaluations, programs and feasibility studies FOLD DRAWINGS 2.0 Permit Application Aware of different local authorities Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists Participate in permit application OTHER: Contract Documentation Prepare architectural drawings with regard to location,building elements, finishes, fittings and Participate or co-ordinate meetings with consultants 8.0 Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process OTHER: Contract Administration Aware of OR observe a standard form of construction contract OTHER: Total: 8.0 8.0 8.0 8.0 8.0 0.0 40.0 NOTE: Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH) A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below Remark: SUBANG ATSA ARCHITECTS NIK AFIQ AMADI FAIZ RUSLI, NUR FAIZ 0317749 SUBANG MURNI (NADAYU) CTRM BATU BERENDAM, MELAKA DAY You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet) Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc You might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file ARC2625 Log Sheet-WK3 Page 11
  • 4.
    LOG SHEET -WEEK4 Company Name Student Supervising Architect Stu.No Project 1 Site Location Project 2 Site Location Project 3 Site Location Stages Mon Tues Wed Thurs Fri Sat Sun Schematic Design Sketching, 3D modeling and Rendering 5.0 8.0 Prepare presentation drawings 3.0 7.0 Aware of site conditions: Site Visit, Study and Measure Prepare preliminary project evaluations, programs and feasibility studies OTHER: Permit Application Aware of different local authorities Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists Participate in permit application OTHER: Contract Documentation Prepare architectural drawings with regard to location,building elements, finishes, fittings and Participate or co-ordinate meetings with consultants 6.0 Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process OTHER: Contract Administration Aware of OR observe a standard form of construction contract ATTEND PRODUCT PRESENTATION 1.0 Total: 8.0 8.0 6.0 8.0 0.0 0.0 30.0 NOTE: Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH) A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below Remark: BATU BERENDAM, MELAKA ATSA ARCHITECTS NIK AFIQ AMADI NUR FAIZ ABDUL JABAR 0317749 CTRM SUBANG MURNI (NADAYU) SUBANG DAY You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet) Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc You might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file ARC2625 Log Sheet-WK4 Page 11
  • 5.
    LOG SHEET -WEEK5 Company Name Student Supervising Architect Stu.No Project 1 Site Location Project 2 Site Location Project 3 Site Location Stages Mon Tues Wed Thurs Fri Sat Sun Schematic Design Sketching, 3D modeling and Rendering 8.0 8.0 Prepare presentation drawings Aware of site conditions: Site Visit, Study and Measure Prepare preliminary project evaluations, programs and feasibility studies OTHER: Permit Application Aware of different local authorities Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists Participate in permit application OTHER: Contract Documentation Prepare architectural drawings with regard to location,building elements, finishes, fittings and Participate or co-ordinate meetings with consultants Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process OTHER: Contract Administration Aware of OR observe a standard form of construction contract OTHER: Total: 0.0 0.0 0.0 8.0 8.0 0.0 16.0 NOTE: Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH) A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below Remark: BATU BERENDAM, MELAKA ATSA ARCHITECTS NIK AFIQ AMADI NUR FAIZ ABDUL JABAR 0317749 CTRM CHINESE NEW YEAR FROM MONDAY TO WEDNESDAY DAY You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet) Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc You might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file ARC2625 Log Sheet-WK5 Page 11
  • 6.
    LOG SHEET -WEEK6 Company Name Student Supervising Architect Stu.No Project 1 Site Location Project 2 Site Location Project 3 Site Location Stages Mon Tues Wed Thurs Fri Sat Sun Schematic Design Sketching, 3D modeling and Rendering 8.0 7.0 8.0 Prepare presentation drawings Aware of site conditions: Site Visit, Study and Measure Prepare preliminary project evaluations, programs and feasibility studies OTHER: Permit Application Aware of different local authorities Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists Participate in permit application OTHER: Contract Documentation Prepare architectural drawings with regard to location,building elements, finishes, fittings and Participate or co-ordinate meetings with consultants 1.0 4.0 Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process 4.0 OTHER: Contract Administration Aware of OR observe a standard form of construction contract OTHER: Total: 8.0 8.0 8.0 0.0 8.0 0.0 32.0 NOTE: Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH) A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below Remark: BATU BERENDAM, MELAKA ATSA ARCHITECTS NIK AFIQ AMADI NUR FAIZ ABDUL JABAR 0317749 CTRM THAIPUSAM ON THURSDAY DAY You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet) Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc You might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file ARC2625 Log Sheet-WK6 Page 11
  • 7.
    LOG SHEET -WEEK7 Company Name Student Supervising Architect Stu.No Project 1 Site Location Project 2 Site Location Project 3 Site Location Stages Mon Tues Wed Thurs Fri Sat Sun Schematic Design Sketching, 3D modeling and Rendering 8.0 7.0 8.0 8.0 Prepare presentation drawings Aware of site conditions: Site Visit, Study and Measure Prepare preliminary project evaluations, programs and feasibility studies OTHER: Permit Application Aware of different local authorities Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists Participate in permit application OTHER: Contract Documentation Prepare architectural drawings with regard to location,building elements, finishes, fittings and Participate or co-ordinate meetings with consultants Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process OTHER: Contract Administration Aware of OR observe a standard form of construction contract ATTEND PRODUCT PRESENTATION 1.0 Total: 8.0 0.0 8.0 8.0 8.0 0.0 32.0 NOTE: Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH) A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below Remark: BATU BERENDAM, MELAKA ATSA ARCHITECTS NIK AFIQ AMADI NUR FAIZ ABDUL JABAR 0317749 CTRM ON MC ON TUESDAY DUE TO ILLNES (FEVER) DAY You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet) Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc You might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file ARC2625 Log Sheet-WK7 Page 11
  • 8.
    LOG SHEET -WEEK8 Company Name Student Supervising Architect Stu.No Project 1 Site Location Project 2 Site Location Project 3 Site Location Stages Mon Tues Wed Thurs Fri Sat Sun Schematic Design Sketching, 3D modeling and Rendering 8.0 8.0 8.0 7.0 8.0 Prepare presentation drawings Aware of site conditions: Site Visit, Study and Measure Prepare preliminary project evaluations, programs and feasibility studies OTHER: Permit Application Aware of different local authorities Observe OR Assess regulatory context: Building By-law, Set back, Fire escape requirement Establish requirements for, and co-ordinate, specialists Participate in permit application OTHER: Contract Documentation Prepare architectural drawings with regard to location,building elements, finishes, fittings and Participate or co-ordinate meetings with consultants Establish requirements for, and co-ordinate, consultants, specialists, product suppliers Prepare for tender documents OR participate in the process OTHER: ATTEND PRODUCT PRESENTATION 1.0 Contract Administration Aware of OR observe a standard form of construction contract OTHER: Total: 8.0 8.0 8.0 8.0 8.0 0.0 40.0 NOTE: Lunch Break & Chinese New Year break should be excluded from this Log Sheets file. Public Holiday (PH) A valid reason or explanation is require for any day of absence, please write in the 'remark' blank below Remark: BATU BERENDAM, MELAKA ATSA ARCHITECTS NIK AFIQ AMADI NUR FAIZ ABDUL JABAR 0317749 CTRM DAY You might involve multiple projects per week, record the project details accordingly (top of this Log Sheet) Record your hour/hours in the 'grey box'. Examples 0.5, 1, 2, 3...1.5, 2.5, 3.5…etc You might involve multiple stages per day, record the hour/hours accordingly Do not record Saturday and Sunday if is not applicable to you Each Log Sheet per week, total 8 weeks should be recorded all in the 8 Log Sheets tab prepared in this file ARC2625 Log Sheet-WK8 Page 11