The Power of the Combination
                  2009 Annual Report
Contents

    4         Foreword by Kees Eijkel, CEO of Kennispark Twente
    6         Kennispark Twente is on the up
    8         Entrepreneurship is second nature at the UT
    10        Nominations and awards in 2009

    12        Entrepreneurship
         14   Talent for entrepreneurship
         16   Interview: FAME scheme is a significant step for student enterprise
         18   Successful start
         20   Successful growth
         22   Interview: It is all about long hours in the US
         24   TOP places in 2009

    26        Innovation
         28   From idea to business
         28   Knowledge transfer
         29   Facility sharing
         29   Interview: TPRC underlines UT’s great expertise

    32        Events and meetings

    34        Area
         36   Room for entrepreneurship
         37   Events and meetings
         38   Guidance in locating business premises
         39   Interview: Kennispark - a unique area in Enschede

    40        Results of Kennispark Twente
    42        Publication details
    43        Partners




2                                                                                   3
Foreword The power of the combination

                             Creating an environment in which              Internationally, Kennispark Twente is also
                             every ingredient is present for succes-       working to build its reputation, and its
                             sful high-tech enterprise and innova-         name, despite not being translated, is
                             tion. Combining the right elements            surprisingly well known among internatio-
                             and the right partners. The power of          nal contacts. In Melbourne (Australia), they
                             the combination: that is what it is all       were so impressed by our system that we
                             about. And this is what we have seen          have been asked to be a formal consultant
                             once again over the last year.                to the largest park in Australia, labelling
                                                                           us a ‘benchmark project in the global
                             The combination of different partners,        arena’. This, too, is the result of the right
                             such as the research institutes at the        combination of, in this case, Enschede
                             University of Twente, BTC Twente, NIKOS,      municipal council, the Province of Overijs-
                             Innovation Platform Twente and our            sel, the University of Twente and, since
                             founding fathers, has ensured that we         recently, Saxion University of Applied
                             have been able to make significant            Sciences.
                             progress in 2009. An example of this
                             progress was the approval of the Master       In this annual report, we are delighted to
                             Plan for the Development of Kennispark        take you through the various factors that
                             Twente in January 2009. The launch of the     make Kennispark Twente the place to be
                             open innovation centre with Stork Fokker,     for high-tech entrepreneurs: ideas for new
                             Ten Cate, Boeing and the University of        businesses, business development
                             Twente is another. These companies were       support facilities, talent, meetings and an
                             looking for an enterprising area with         inspiring environment. We will happily
                             substantial knowledge, and they found it      share with you the highlights of 2009 and
                             in Twente. At the end of 2009, Kennispark     the power of the combination in Twente.
                             Twente was also officially recognised as an
                             innovation campus of national importance
                             to the Netherlands, alongside Food Valley,    Kees Eijkel
                             the High Tech Campus and the BioScience-       CEO Kennispark Twente
                             park in Leiden. We and our partners can
                             be proud of this acknowledgement. We
                             have worked hard to achieve it.

    Kennispark Twente Team
4                                                                                                                          5
Kennispark Twente is on the up

            Things are really on the up for Kennis-       The members of the steering committee                   Close collaboration                           Saxion has 22,000 students, of whom
            park Twente. National recognition as one      – Carry Abbenhues (representative of the                For Carry Abbenhues, the involvement of       14,000 study in Enschede. The impor-
            of the five innovation campuses in the        province of Overijssel) Ineke van Olde-                 these market partners is critical.            tance of Twente as an economic and
            Netherlands, a unique, open innovation        niel (member of the Board of Governors                  Kennispark Twente is a long-term project,     residential base for Saxion is evident.
            centre with internationally operating         at Saxion), Eric Helder (councillor in                  for which financial support from the          Ineke van Oldeniel sees that the
            companies, a growing number of start-         Enschede) and Kees van Ast (vice-chair of               business sector is vital. This also applies   Kennispark is developing itself as an
            ups working with the UT, the growing in-      the Board of Governors at the University                to area development and its physical          engine for economic development in the
            volvement of SMEs, and the space, which,      of Twente) – draw this conclusion from                  aspects. “Moving forward in collaboration     region. “The Kennispark is for everyone
            administratively speaking, Twente has         developments in 2009 with becoming                      with the business sector is increasingly      in Twente, not just in Enschede.
            given to the physical development of the      modesty, but with great inner joy.                      important in order to continue to syste-      Fortunately, that idea is increasingly get-
            Kennispark and the economic develop-                                                                  matically strengthen the region.” Support     ting through to people.”
            ment that goes with it, all help contribute   Incubator                                               from the Twente region, the increasing
            to this.                                      “Kennispark Twente is a complex pro-                    involvement of Saxion, the collaboration      Strength
                                                          ject with many social aspects,” says Eric               with Boeing, Koninklijke Ten Cate and         It is key that the development of the
                                                          Helder. “In the initial stages, it is always            Fokker Aerostructures. The allocation of      Kennispark occupies a prominent place
                                                          difficult to highlight the use or impact                €7 million from the Economic Stimulation      on the political Agenda of Twente along
                                                          effectively. I have always seen Kennispark              Fund for the High Tech Factory project by     with the two other economical develop-
                                                          Twente as an incubator for economic                     MESA+. “That’s exactly why we’re doing        ments at the airport and the ‘Heart of the
                                                          developments in Twente. The first results               this. I have high expectations for the new    South’ (incl. World Trade Center Twente).
                                                          are now visible. Take the open innovation               business activities and employment op-        That is a condition for sustained deve-
                                                          centre with Boeing, Stork Fokker, Ten                   portunities that will be created.”            lopment in the long term. Kees van Ast:
                                                          Cate and the UT, for example, which is                                                                “Partners throughout society are beco-
                                                          being acknowledged at national and even                 Coalescing                                    ming ever more involved in Kennispark
                                                          international level. That is very important             Ineke van Oldeniel sees the coalescence       Twente. The power of the combination is
                                                          for the trust of our market partners.”                  of the UT and Saxion as a significant         the key term. We keep everything com-
                                                                                                                  advantage. “Saxion has added value for        pact and aim for visibility. The Corridor is
                                                                                                                  the Kennispark. Technological innovation      the building in which everything involving
                                                          The members of the steering committee –                 begins at the UT, but spin-offs often end     innovation and entrepreneurship is con-
                                                          Carry Abbenhues (representative of the province of      up with people at higher professional         centrated. This will also occur later in the
                                                          Overijssel) Ineke van Oldeniel (member of the Board     education level. We develop innovation        Langezijds building. And not to forget, of
                                                          of Governors at Saxion), Eric Helder (councillor in     programmes too. For some of these pro-        course, the successes of the innovation
                                                          Enschede) and Kees van Ast (vice-chair of the Board     grammes, it is better for us to collaborate   institutes, or the Medical Imaging pro-
                                                          of Governors at the University of Twente) – draw this   from the very start. In 2010, Saxion will     gramme. We must allow knowledge from
                                                          conclusion from developments in 2009 with becoming      be a valuable associate of Kennispark         the UT to pervade the business sector.
6                                                         modesty, but with great inner joy.                      Twente.”                                      That is what leads to employment. That is      7
                                                                                                                                                                Kennispark Twente for you.”
coordination point for the first seven        nanotechnology with our scientific
                                                                                                                  years of the EIT ICT Labs. NOKIA,             knowledge and equipment. Strengthening
                                                                                                                  Ericsson, Alcatel, SAP, Philips and the       the nano-industry in Twente is one of our
    Entrepreneurship is second nature at the UT                                                                   three Dutch universities of technology in     key objectives.”
                                                                                                                  Eindhoven, Delft and Enschede will
                                                                                                                  develop strategies in a very extensive        Venturelab Twente
    Innovative successes are piling up. Internationally, the six research institutes at the University of Twen-   programme with an annual subsidy of           For Sjoerd van Tongeren of the IGS, the
    te have achieved key successes. The number of spin-off companies is increasing steadily. The directors        €30 million to help “get technologically      establishment of the VentureLab Twente
    of each institute are doing their utmost to optimise the valorisation together with Kennispark Twente.        innovative products into the business         in 2009 signified the birth of a new
    And there you have the key word: valorisation. Described by one director as: “how our knowledge rea-          sector” more rapidly. Iddo Bante: “This is    instrument that offers starting UT
    ches society.”                                                                                                European innovation par excellence.           entrepreneurs the possibility of becoming
                                                                                                                  There will be numerous opportunities for      more successful as an entrepreneur in
                                                                                                                  truly enterprising ICT students. The          society. “Technologists are not always the
                   “Entrepreneurship is in the UT’s blood.         began as managing director in 2009, is         foundation is the knowledge and exper-        best business people. They’re too orien-
                   But I have the feeling that the innovative      dedicated to “unlocking the expertise that     tise within the UT. Kennispark Twente         ted towards technology. Starting a
                   potential of the UT can be used even            is often hidden within the UT”. “At            will be a stepping stone to a more            business is actually a social activity.
                   more,” says Martijn Kuit, managing              IMPACT, we don’t come up with anything         prominent position for the UT within          VentureLab Twente is looking for entre-
                   director of MIRA, the institute for             ourselves,” he says. “We translate             Europe, with SMEs occupying a very            preneurs who want to use technology to
                   biomedical technology, since 2009. “The         expertise into business activities. How        important place. The directors of all our     make their company bigger. While the
                   Board provides encouragement where              can we make the enormous expertise of          biggest companies unanimously acknow-         fundamental research carried out at the
                   possible. Kennispark Twente is the              the UT more accessible to the business         ledge that without SMEs, these plans          UT is vital, it has to be translated into
                   catalyst in the valorisation process. If we     sector? The challenge for 2010 is to learn     could not be achieved.”                       practice in a business situation. You need
                   can tap every source within the UT, we          even more than we do now about what                                                          tools for this, tools which have been
                   can experience many exciting things in          the UT has to offer. The development of        High-Tech Factory                             developed on the basis of knowledge of
                   the future.”                                    spin-off companies is continuing unaba-        For MESA+, the most important activity is     social sciences.”
                                                                   ted at high levels and has done so for         the High-Tech Factory. This production
                  Employment                                       more than 10 years. For every euro from        facility for companies in micro and           Product development
                   In 2009, MIRA took a major step forward         the UT, we double it in the market. We are     nanotechnology receives subsidies             Society is not made up of technology but
                   with the Centre for Medical Imaging, a          focused more on attracting big compa-          totalling more than €11 million from the      of people who apply technology. Oscar
                   joint venture with Siemens and the UMC          nies such as Philips Drachten, BP and          Ministry of Economic Affairs, the Province    Peters of the IBR knows this better than
                   Groningen. Martijn Kuit: “I expect an           Shell, without, of course, losing sight of     of Overijssel and the Twente region.          anyone. Launching a particular product is
                   enormous amount of technological                the smaller spin-offs.”                        Managing director Miriam Luizink: “We         all about an acceptance process. “We do
                   innovation from this major alliance. Top                                                       will focus on the development of produc-      not have products as such that we launch
                   Technology for the Patient. In 2011, this      Kennispark Twente as a stepping                 tion processes, the establishment of an       ourselves. We supply the market. I have
                   CMI will also be physically located in         stone to a more prominent position              equipment fund, to support companies          noticed that the realisation is growing
                   Kennispark Twente, leading to an               in Europe                                       within and outside the UT. We will            that products should ultimately be
                   immediate creation of jobs.                     For Iddo Bante, managing director of           primarily try to help smaller SMEs that       intended to increase the well-being of
                                                                   CTIT, there was one undisputed highlight       find it difficult to attract funding. Where   people and society. The IBR are increasin-
                  Attracting big companies                         in 2009: the European Institute of             possible, we will try to facilitate compa-    gly involved, also at the beginning of a
                   Jan Emmerzaal of IMPACT, who also               Technology (EIT) made the UT the               nies based in Twente that work with           product development process.”
8                                                                                                                                                                                                            9
Nominations and awards in 2009
     Young Technology Award 2009
                                                                                                         Nominations for
                                                                                                         Deloitte Fast 50 for fast-growing
         Blue4Green Erik Staijen                                   Eastern Netherlands in the            engineering companies
                                                                   Innovation Top 100
                                                                                                         This is the fourth consecutive year in which 10%
        Nominated                                                                                        of candidates listed consisted of companies
                                                                         StatiqCooling Rijssen           from Twente.
                                                                                                                                                            Top 30 knowledge and
         Smart Signs Solutions, Xiophotonics,                                                                                                               research institutes in Technisch
         Twee R Recycling, Mobihealth and                                Capzo International Ootmarsum        Bizz Design Academy Enschede                  Weekblad magazine
         Steray.

                                                                                                              Sqills Enschede, established by two former        Nr. 6 MESA+
                                                                                                              students from the UT ODS2 Enschede


                                         Simon Stevin Meesterschap                                                                                              Nr. 8 ITC
                                                                                                              ODS2 Enschede

                                                Professor Detlef Lohse                                                                                          Nr. 9 CTIT
                                                University of Twente                                          TSI Solutions Enschede, spin-off
                                                                                                              University of Twente
                                                                                                                                                                Nr. 12 IMPACT

     UT van den Kroonenberg Prijs                                                                             Webprint Oldenzaal, winnaar
                                                                                                              Rising Start Twente, 2007                         Nr. 23 Telematica Institute




                                                                                                                                                                                               Entrepreneurship
         Sigmax                                        NWO Spinozapremie
                                                                                                              Xsens Technologies Enschede,
                                                                                                              spin-off University of Twente
                                                            Prof. dr. ir. A. (Albert) van den Berg
                                                            University of Twente

10                                                                                                                                                                                               11
Entrepreneurship



                    The entrepreneurial University of Twente (UT) is a breeding ground for

                    new ideas, innovation and new technology. The perfect seed bed for

                    entrepreneurship. For the last 25 years, the UT has actively encouraged

                    its scientists, students and doctoral students to be enterprising.

                    Innovative entrepreneurs are the foundations on which economic

                    progress is built.




12                                                                                       13
Education in entrepreneurship
                                                                                                         UT students also look for knowledge
     Entrepreneurship                                                                                    concerning entrepreneurship within the
                                                                                                         curriculum of the education programmes
                                                                                                         at the university. In 2009-2010,
             The enterprising region                       a compulsory subject focusing on              35 students participated in the minor in
             In the Netherlands, the University of         entrepreneurship was developed in 2009,       Entrepreneurship and 27 students
             Twente leads the way in creating spin-off     which students in all faculties will follow   enrolled for the master track in Innova-
             companies. Up until now, the UT has           during their Bachelor’s phase.                tion & Entrepreneurship.                      skills during workshops. Some 100
             spawned more than 700 companies, with                                                                                                     enterprising students took part in this
             the total still growing. Since 2006, the UT   In addition, the Career Center Twente         Student entrepreneurship                      annual event.
             has worked with Enschede municipal            organises monthly get-togethers at which      In collaboration with the Student Union,
             council (on behalf of Network City) and       students can get to know companies            Kennispark Twente provides support to         During a speed-dating dinner in May,
             the Province of Overijssel to encourage       based in Twente. On behalf of Kennispark      enterprising students at the University of    student entrepreneurs were given the
             entrepreneurship and innovation in the        Twente, a young company explains about        Twente through the platform                   opportunity to meet other such students
             Twente region. This joint venture is called   entrepreneurship as a career option and       Studentondernemer.nl. This platform has       as well as entrepreneurs from Twente
             Kennispark Twente.                            about working for an SME after gradua-        76 student entrepreneurs currently            who have recently set up businesses.
                                                           tion.                                         registered, with an estimated number of       Some 30 entrepreneurs exchanged
             Kennispark Twente revolves around the                                                       some 150 active within the university.        experiences and got acquainted with one
             creation of an environment in which                                                                                                       another.
             knowledge- intensive entrepreneurship                                                       In the past year, more than 100 requests
             and innovation can be optimally utilised;      NIKOS                                        for assistance have been submitted to the
             an environment in which new business            Education in entrepreneurship is            coordinator for student entrepreneurship.
             activities can start and develop. The aim       provided by the Dutch Institute for         These requests vary from help in looking          UT News, 17 September 2009
             is to create 10,000 new, high-quality jobs      Knowledge-Intensive Entrepreneurship        for office space to legal support. In 2009,
             for the Twente region.                          (NIKOS), which is part of the School of     seven student entrepreneurs transferred         Spin-off Blue4Green wins an award
                                                             Management and Governance. This             to the TOP scheme after graduation. In
             Talent for entrepreneurship                     institute covers areas such as educa-       doing so, they took the first step towards
                                                                                                                                                           On the evening of 5 November, UT alumnus
                                                             tion, research, business development        launching their careers as entrepreneurs.
                                                                                                                                                           Erik Staijen from the spin-off Blue4Green took
             Everything begins with talent for entre-        support and the interface between
             preneurship and the awareness of                them. NIKOS facilitates the TOP scheme      In addition to providing substantial              home the Young Technology Award. In the
             entrepreneurship as a career option - the       and VentureLab Twente for Kennispark        support, Studentondernemer.nl also                Prismare Theatre in the Roombeek district of




                                                                                                                                                                                                            Entrepreneurship
             seeds of which are sown during the              Twente, both of which form part of the      organises events for student entrepre-            Enschede, the jury chose his lab-on-a-chip
             period of study at the University of            basis of research into methods and          neurs, such as the student entrepreneur           invention from six nominations as ‘the most
             Twente.                                         techniques to support entrepreneur-         day held in May in collaboration with the         convincing product’. The award, a cheque for
                                                             ship.                                       Chamber of Commerce and Saxion Young              five thousand euros and a glass trophy, is in-
             Entrepreneurship as a career option                                                         Business Professionals. During this day,          tended for young companies from the province
             As part of the strategic vision at the                                                      student entrepreneurs learned about
                                                                                                                                                           of Overijssel that have their own in-house
             University of Twente (Route ’14),                                                           support possibilities and developed their
                                                                                                                                                           technology.
14                                                                                                                                                                                                            15
UT News, 3 September 2009


      FAME scheme up and running                                                                                                 FAME scheme isis krachtig instrument
                                                                                                                                 FAME-regeling a significant step for student enterprise

     During the opening of the academic year, the
     first place on the FAME scheme was awarded          During ten Route Suc66 sessions,                                        For Wessel Draijer of the Student Union, the creation of the FAME
                                                         established and successful entrepreneurs                                scheme is by far the most important achievement of 2009. “It is a
     to Menno van der Werff from the company
                                                         shared their experiences on the road to                                 wonderful instrument with which to combine studying and student
     Wame. The FAME scheme for enterprising
                                                         success with 50 or so student entrepre-                                 enterprise. The UT is the first university in the Netherlands to offer
     students was officially launched on Monday. In      neurs and students with entrepreneurial                                 students this kind of systematic support in combining study and
     doing so, the UT is the first university to offer   ambitions.                                                              entrepreneurship.”
     students systematic support in combining their
     studies and their businesses.                       FAME scheme
                                                         The FAME scheme was officially launched
                                                         at the opening of the UT’s academic year       Wessel Draijer estimates that there are        Applicants must go through a rigorous
                                                         on 1 September 2009. While compara-            between 100 and 150 students involved in       selection procedure, however. They must
                                                         ble to a study scheme for professional         a small company in one form or another.        be able to show that they excel at both
                                                         sportsmen and women, FAME revolves             “Most begin in their third year, and while I   their studies and their business, that they
                                                         around the offer of guidance in running        couldn’t say what the actual numbers are,      have a sound business plan and they must
                                                         a business and following a study pro-          I would say that they are definitely           guarantee to show progress in their study
                                                         gramme. FAME offers student entrepre-          growing.”                                      programmes.
                                                         neurs systematic support and guidance          The difficulty of combining study with
                                                         regarding study progress and the pos-          running a business is most apparent            Employment
                                                         sibility of arranging an interest-free loan.   during the graduation period. Wessel           “And not unimportantly,” says Wessel
                                                         Two student enterprises are currently          Draijer: “The students have to choose          Draijer, “they must declare a willingness
                                                         using the scheme, which is established in      between graduating or continuing with          to remain in the region with their com-
                                                         cooperation with the Rabobank Enschede-        their companies. Combining the two is          pany after they graduate. This is key to
                                                         Haaksbergen and the Student Union.             virtually impossible. But FAME provides a      Kennispark Twente, one of the reasons
                                                                                                        solution to that problem.”                     being that they want to stimulate employ-
                                                                                                                                                       ment opportunities in Twente.” WAME and
                                                                                                        Mentor                                         Goal Gorilla were the first two companies
                                                                                                        Student entrepreneurs who are admitted         to make use of the FAME scheme in 2009,




                                                                                                                                                                                                          Entrepreneurship
                                                                                                        to the scheme get assigned a mentor and,       with another two expected to join in the
                                                                                                        if required, advice in various fields from     coming academic year.
                                                                                                        Kennispark Twente. They can also secure
                                                                                                        a €10,000 interest-free loan.




16                                                                                                                                                                                                          17
Successful start                                                                                Incubator BTC-Twente                        At the end of 2009, 69 companies were
                                                                                                     2009 also saw close collaboration           located in the BTC building and the
     To actually make a successful start is not                                                      between Kennispark Twente and BTC-          buildings managed by BTC-Twente
     easy, even if you have a good idea for a                                                        Twente, the oldest incubator in the         (Capitool 50, Tpoint, Novay and The
     company and you have the requisite entre-                                                       Netherlands. BTC-Twente provides space      Corridor) under one tenancy agreement.
     preneurial knowledge. Kennispark Twente                                                         and services to small and medium-sized      Due to the financial crisis, occupancy
     provides support in starting up new busines-                                                    business that wish to establish themsel-    rates were lower in 2009 than in previous
     ses with a range of different schemes.                                                          ves in the vicinity of the UT. As an        years. In the BTC building, the average
                                                                                                     incubator, BTC provides services, such as   occupancy rate was more than 68%. In the
     25 years of TOP                                                                                 coaching and guidance, to entrepreneurs     other buildings this varied from 75% to
     TOP stands for Tijdelijke Ondernemers                                                           starting a business. In addition, the       more than 94%.
     Plaats [Temporary Place for Entrepreneurs]                                                      network meetings that BTC organises
     and is a scheme that organises the basic                                                        contribute to Kennispark Twente’s
     funding and coaching for start-ups. In                                                          objectives. The monthly entrepreneurs’
     addition, start-ups can also use the facilities                                                 get-together (BTC Café) is a good
     of the department with which their company                                                      example of this.
     is affiliated. A total of 27 people were given
     a TOP place in 2009, 25 of whom qualified                                                       Since October 2009, BTC-Twente has
     as technostarters. 2009 saw the 25th                                                            been managing The Corridor, which is
     anniversary of the TOP scheme and in                                                            acting as a pilot location during the                     TC Tubantia, 7 November 2009
     December 2009, NIKOS organised a festive                                                        redevelopment phase of the Langezijds
     reunion with TOP businesses and partners,                                                       building. BTC-Twente will fulfil its
     which was attended by some 100 people.            In November 2009, VentureLab Twente also      incubator function in this new building                 Twente’s promising projects
                                                       received the NBIA Soft Landings Internatio-   and may also participate as an operating                entice the sharpest minds
     VentureLab Twente                                 nal Incubator status from a panel of          partner in the redevelopment of
     In collaboration with NIKOS and Saxion’s          experienced business incubator managers.      Langezijds into The Gallery.
     Knowledge Centre for Innovative Entrepre-         This programme acknowledges incubators                                                                  A print factory for blood vessels and organs,
     neurship, the VentureLab Twente was also          that help other international companies                                                                 a pharmaceutical industry, an aviation school
     launched in 2009. VentureLab Twente is a          enter the Dutch market.                                                                                 and the development of biofuel for aircraft.
     business development support programme                                                                                                                    Soon, this will all be possible in Twente. In the
     for ambitious individuals and teams who           The Legal Desk                                                                                          VentureLab Twente, dozens of ambitious plans
     start a new business or reorganise an             In 2008, Kennispark Twente launched a
                                                                                                                                                               such as these by entrepreneurs from all over
     existing company within the programme,            legal desk where young (student) entrepre-
                                                                                                                                                               the world are being hatched as we speak. The
     the aim being to establish a high-tech,           neurs can go with legal questions and where
     fast-growing company. In May, an initial          they can get examples of standard con-
                                                                                                                                                               aim: three thousand jobs for highly qualified
     group of 18 entrepreneurs started in the          tracts. The lawyer also assesses legal                                                                  graduates.
     pilot programme, to be followed in October        documents drawn up by the entrepreneurs
     by the first official group with 24 partici-      themselves. In 2009, the lawyer was asked
     pants.                                            for support on 53 occasions, most of which
                                                       involved assessing the general terms and
18                                                     conditions and standard contracts.                                                                                                                          19
Technology Circle Twente                      At the end of May 2009, Kennispark
     Every entrepreneur knows the importance       Twente took part in the Silicon Summit in
     of networking. In June 2009, the Techno-      Palo Alto (USA), together with a number
     logy Circle Twente (TKT) celebrated its       of young entrepreneurs. B&M Business
     25th anniversary with a gala dinner. In       Development, Recore Systems, Micronit
     honour of this anniversary, TKT and           and Novulo participated in workshops
     Kennispark Twente published a booklet         designed to take a close look at their
     entitled ‘Startfighters’, containing          companies and their skills, and to provide
     portraits of entrepreneurs with a unique      networking opportunities.                    The job vacancy service on the Kennis-
     tale to tell.                                                                              park Twente website was continued in
                                                   Contact with talent                          2009. This website enables Twente-based
     Successful growth                             Growing companies need talented em-          companies (particularly spin-offs) to
                                                   ployees. However, fast-growing SMEs are      publish their vacancies for free. This site
     Entrepreneurs often start up alone or with    often overlooked by students and the         was made known to the UT community
     a companion, expanding as soon as             companies do not yet have the resour-        through adverts in the UT News.
     business starts to go well. Kennispark        ces to actively recruit them. Kennispark
     Twente supports knowledge-intensive           Twente, often in cooperation with Career
     companies in developing their ambitions.      Center Twente, facilitates contact with
                                                   talent in various ways.
     International growth
     Too few start-ups succeed in converting       During the Twente Recruitment Days in
     their innovative technologies into succes-    October 2009, Kennispark Twente facilita-
     sful global brands, products and compa-       ted the participation of nine companies,                   UT News, 22 October 2009
     nies. Through Embedded Coaching,              all of which took part in Career Center
     Kennispark Twente enables entrepreneurs       Twente’s ‘Twenteplein’. Kennispark Twen-
     to give their business strategy an interna-   te also provided young entrepreneurs                      Minister praises innovative character
     tional focus. This is achieved by making      with the opportunity to present themsel-                  of the region
     use of intensive expert coaching, an          ves to students during the Bright Twente
     extensive international network and an        get-togethers. These get-togethers are
                                                                                                              What exactly is the situation in terms of
     individually tailored programme in Silicon    organised by Career Center Twente and
     Valley (USA) for a period of eight weeks.     are aimed at giving students a chance to                   knowledge and innovation in the Nether-
     Following a successful pilot in 2008, the     get to know employers from the Twente                      lands? This was the question on Minister of
     Embedded Coaching programme was               region.                                                    Foreign Affairs Maxime Verhagen’s lips when




                                                                                                                                                             Entrepreneurship
     housed at Kennispark Twente in 2009,                                                                     he visited the BTC opposite the UT yester-
     where attention centred on the design of                                                                 day. Director Rob de Koning took him round
     the organisation of Embedded Coaching.                                                                   the complex where spin-offs from the UT
                                                                                                              and other small businesses are located. The
                                                                                                              Minister was impressed: “Twente is an excel-
                                                                                                              lent example of investment in knowledge and
                                                                                                              innovation”.
20                                                                                                                                                             21
It is all about long hours in the US

                  It is all about hard work in the US. Late                                                   presentation for a group of venture capi-      This was an experience the entrepreneurs
                  to bed, early to rise. And all manner of                                                    talists at the Summit. That is a significant   would not have missed for the world.
                  activities in the period in between, all                                                    accomplishment in itself. He failed to         “This offer, this chance had added value
                  part of doing business. “It was long day                                                    win “despite a formidable performance”,        and worked as catalyst,” say the partici-
                  again today. Sleep is not a favourite hobby here; we were told that a                       according to Paul Heysters. In addition        pants.
                  72- hour work week is not unusual. However, I have the idea that                            to being a useful experience, the Silicom
                  ‘working’ is a fairly broad notion here,” writes Paul Heysters of Recore                    Summit also provided the opportunity to
                  Systems in the diary he kept during the Silicom Summit trip to Silicon                      establish business contacts.
                  Valley organised by Kennispark Twente at the beginning of June 2009.                        Recore Systems has already been able
                                                                                                              to attract borrowed capital through a
                                                                                                              venture capitalist (source: Iddo Bante at
                 It was with the following objectives that      approach to the sales process is slightly     CTIT, see further in this annual report).
                 Kennispark Twente organised the mission        different. It appears in this respect that    The Twente-based entrepreneurs also
                 to Silicon Valley: to apply an international   networking is very important here, and to     found it a very positive experience to be
                 focus, to learn from the examples in           a certain extent ‘you are who you know’.”     able to make contacts with other Dutch
                 Silicon Valley, to expand the international    Jaap Beernink goes on: “Today, I have two     delegates with ambitions to expand into
                 network and, in particular, to take a          meetings planned, the first is a breakfast    the US.
                 closer look at company strategy. Four          meeting, which suits me perfectly, by the
                 entrepreneurs were part of the delega-         way. I might try to introduce it in the Ne-   Access to a network
                 tion: Paul Heysters (Recore Systems), Jaap     therlands. Here, business is often done in    Part of the programme on the trip was a
                 Beernink (B&M Business Development),           cafes and restaurants anyway. At 8 a.m.       visit to the PlugAndPlay centre: a good
                 Frank Wille (Novulo) and Ronny van ’t          the cafes are full with breakfast meetings    example of an American incubator with a
                 Oever (Micronit). “This type of mission        and this is also true at lunchtime.”          renowned office garden. “The great value
                 contributes to your development as an                                                        of PlugAndPlay is not the space that they
                 entrepreneur: how do I present myself,         Selling yourself in one pitch                 lease but the access that you gain to a
                 how does the investment climate operate,       Pitching should be common practice for        huge network of venture capitalists and
                 what is the situation in the US,” says one     entrepreneurs who want to do business         partners in the American market. Each




                                                                                                                                                                                                         Entrepreneurship
                 of the participants.                           in the US. The Twente delegation expe-        week, pitches are given by companies and
                                                                rienced dozens of pitches, followed trai-     you can visit the big venture capitalists
                You are who you know                            ning courses, and worked on their own         whenever you want. You can also make
                 Networking is also a key part of doing         presentations, often into the small hours,    continual use of experienced business
                 business in the US. “However,” says Ron-       without ever knowing if they would be as-     mentors who help you brainstorm about,
                 nie van ‘t Oever, “the way of doing busi-      ked to ‘tell their story’. But sure enough,   say, your business model and put their
                 ness here is very different to Europe, the     Ronnie van ‘t Oever was chosen to hold a      network at your disposal,” says Jaap.
22                                                                                                                                                                                                         23
Blue4Green
      Daan Sistermans
                                                                                                     TOP
                                                                                                     Places
                                                                                AKO
                                      Lightmotif                             Engineering
                                  Jeroen van Tienhoven                       Albert Koopman                                                                                    Kryoz
                                                                                                                                                                            Technologies
                                                                                                                                                                                  De Hoon




Avions Voisin
      Lievaart
     Meulenbelt
                               SeeEzi
                              Elisa Gielen
                              Paul Jenkins
                                                                SocialMine
                                                               Dennis Doubovski
                                                                                                     in 2009                                                           Cooll BV
                                                                                                                                                                  Johannes Burger
                                                                                                                                                                       Meijer

                                             Amitek Model
                                               Factory                                            In 2009, 27 people were given a TOP place..
                                              Rob Wermenbol                     Inertia
                                               Van der Zouw
                                                                              Technology
                                                                                  Marin-Perianu
                                                                                                                                                   Talent,
                            Distimo                                                                                Mylife                       Praktijk voor
                        Remco van der Elzen                                                                     Technologies                    kind en jeugd
                        Vincent Hoogsteder                 Inpression                                                Bystrova                    Mariët Reesink              Dynteq
                          Ruben Heerdink             Michiel van der Kwast                                                                                                   Markvoort
                                                                                                                                                                             Lenferink
                                                                                                                                                                             Haverslag




                                                                                                                                                                                            Entrepreneurship
                                       ELS Company                                                Agrawal Ecolabs                                      MobiHealth BV
                                             Els Holland                          SMC               Pramod Agrawal                                           Knoppel
                                                                              Wolbers


24                                                                                                                                                                                            25
Innovation


             Innovative businesses ensure a flexible and vital economy and new

             employment. In the new knowledge economy, the importance of rapid

             interpretation, exchange and application of up-to-date knowledge in new

             products and technologies is increasing. Kennispark Twente provides

             more knowledge transfer and collaboration between knowledge institutes

             and companies.




                                                                                 27
work placement or graduation assign-         Innovation vouchers
                                                                                                         ments, student entrepreneurs, as well as     With the SenterNovem innovation vou-
                                                                                                         departments and professors. Since it         cher, SMEs can gain knowledge by
     Innovation                                                                                          began two years ago, the SKP has             submitting a research assignment to a
                                                                                                         received 346 requests for knowledge - in-    knowledge institute. The results of the
                                                                                                         cluding 115 requests in 2009 - from 290      assignment can be used within the
             From idea to business                                                                       different companies. Only 7% of these        company to revamp products, processes
                                                                                                         requests were not linked to a spin-off,      or services. In 2009, 22 innovation
             Business Development                                                                        department or UT student.                    vouchers were submitted to the UT.
             Many new technologies and ideas are
             born at the University of Twente. Since                                                     Science Shop                                 Facility Sharing
             2009, the UT has had a Business Develop-      This has resulted in attracting invest-       The UT Science Shop (Wewi) is the link
             ment team in place at the institutes          ments, protection through patents,            between the university and society. The      In 2007, Kennispark Twente started with
             coordinated by Kennispark Twente. This        subsidies such as valorisation grants and     Wewi provides services to social organisa-   Facility Sharing projects, which involves
             team supports the invention, develop-         agreements concerning the transfer of         tions, interest groups, individuals and      making university equipment and
             ment and transfer of ideas that could lead    intellectual property.                        SMEs that need scientific research carried   facilities available. Start-ups can use
             to business.                                                                                out or require expert knowledge such as      these, for example, to conduct tests, do
                                                           Patents                                       that available at the UT. In 2009, the       research in a specific environment or
             Key tasks are:                                A key element of the work done by the         Wewi conducted the same number of            equip a pilot production location. The
             • scouting & screening of research into       Business Development team is the              research projects as the year before: 17,    MESA+ High-Tech Factory is one such
               promising ideas;                            protection of promising knowledge, part       of which 14 were published as public         example.
             • process supervision for the protection      of which is through patent applications.      reports and three embargoed. The
               of intellectual property;                   The UT has a special Patent Fund aimed        number of applications submitted rose        High-Tech Factory
             • spin-off development and ‘go-to-            at enabling the knowledge developed           from 73 in 2008 to 89 in 2009.               The High-Tech Factory is a new produc-
               market’, such as support in developing      within the UT to transfer through to the                                                   tion facility on the UT campus. The old
               a business plan, subsidies, contracts,      business sector in greater quantities,        The highlight for the Science Shop was       university clean room is being converted
               contacts, etc.);                            faster and more efficiently (at a reasona-    the publication of the report ‘50 years of   into a new production facility for compa-
             • the transfer of opportunities for           ble price). In 2009, 30 patent applications   Christian Democratic Cooperation in the      nies in the micro and nanotechnology
               valorisation.                               were submitted, of which six received a       EUREGIO’ in three different languages.       sectors, enabling bulk production for the
                                                           contribution from the Patent Fund.            The Dutch, English and German editions       commercial market.
             Business developers are active within the                                                   were presented to Mr Hans-Gert Pötte-
             technical research institutes of the UT. In   Knowledge transfer                            ring, chairman of the European Parlia-       The companies involved are mostly
             this way, they are close to the resear-                                                     ment, Prime Minister Jan-Peter Balkenen-     spin-offs of MESA+, the Institute for
             chers. This team is centrally managed by      Student Knowledge Portal                      de and the European CDA party leader         Nanotechnology. The arrival of this
             Kennispark Twente. Since mid-2009, the        The UT has various portals that enable        Wim van de Camp. The report was written      production facility enables them to focus




                                                                                                                                                                                                  Innovation
             team has charted some 70 inventions,          SMEs and less resolute social organisati-     by Shira Godfried, a Master’s student in     on their operational management and
             just under 50% of which are being actively    ons to use the knowledge available at the     European Studies.                            growth.
             supervised.                                   UT. The Student Knowledge Portal (SKP)
                                                           links requests from SMEs to experts at
                                                           the UT. These could be students with
28                                                                                                                                                                                                 29
After all, the necessary basic infrastruc-
      Millions for high-tech factory                   ture has already been realised within the
                                                       High-Tech Factory. An equipment fund
     On 13 July 2009, Maria van der Hoeven             has also been formed, from which                                       TPRC underlines UT’s expertise
     (Minister for Economic Affairs) visited the UT    companies can request the necessary
     to hand over €11.6 million to Miriam Luizink,     production equipment. In 2009, the
     managing director of MESA+, for the               High-Tech Factory received €11.6 to                                    In June 2009, a very special open innovation centre opened at
     High-Tech Factory. The High-Tech Factory          support this equipment fund and to                                     Kennispark Twente: the Thermoplastic Composites Research Centre
     has already received a €4.4 million subsidy       redevelop the production environment.                                  (TPRC). Participants are the American airplane manufacturer
     from the EA programme ‘Pieken in de Delta’                                                                               Boeing, Royal Ten Cate, Fokker Aerostructures and the UT. “It is
     [Peaks in the Delta] and €2.2 million from the    Thermoplastic Composites                                               easy to see that this collaboration underlines the expertise in
     province of Overijssel. The Ministry of EA will   Research Center                                                        technological innovation at the UT,” says Pia Snijder, Boeing’s
                                                       Kennispark Twente is also dedicated to                                 strategic director for Northern Europe and managing director of the
     now contribute a further €7.6 million on
                                                       the development of open innovation                                     TPRC.
     condition that the province of Overijssel and
                                                       centres in which companies and the UT
     the Twente region guarantee that they will
                                                       can collaborate on open innovation. In
     underwrite the co-financing of another €
                                                       this way, the knowledge within the UT is     The world’s biggest airplane manufactu-         Employment
     4 million, bringing the total available budget
                                                       also valorised and R&D activities and        rer is working on the development of an         The global network currently comprises
     to €11.6 million.
                                                       employment opportunities in Twente           extensive and diverse network of centres        twelve innovation centres, none of which
                                                       created. Establishing such innovation        for technological innovation, and in order      overlap. Of those centres, only one focuses
                                                       centres involves intensive collaboration     to do so, the company has developed a           on the innovation of thermoplastic compo-
                                                       between Innovation Platform Twente and       very special model, a world first. Pia Snij-    sites and that is in Twente. And will be for
                                                       Oost NV.                                     der: “They are open innovation centres,         at least five years. Pia Snijder expects the
                                                                                                    in which the participants contribute their      TPRC to boost employment. “We intend to
                                                       On Friday 12 June 2009, members of the       expertise in technology and finances to a       involve SMEs in Twente wherever we can,
                                                       Boards of Boeing, Royal Ten Cate, Stork      separate company. Boeing does not have          which is one of the reasons the province
                                                       Fokker and the University of Twente          exclusive rights to the products from the       of Overijssel is willing to provide us with
                                                       signed an agreement for the establish-       collaboration. The intellectual property of     financial support. And it also fits perfectly
                                                       ment of a new Thermoplastic Composites       the new technology lies with the partici-       with the aims of Kennispark Twente.”
                                                       Research Center (TRPC) in Kennispark         pants. It is beneficial to Boeing not to have
                                                       Twente. In the centre, the parties will      to carry out technological innovation alone
                                                       conduct research into the technology of      nor to have to buy expertise. Other parties
                                                       thermoplastic composites for the aviation    can also benefit from our knowledge. In
                                                       industry. This technology has to deliver     this way, a scientific and independent
                                                       new and cost-efficient production and        research centre has been set up in which




                                                                                                                                                                                                    Innovation
                                                       assembly processes that offer key            companies can collaborate on the basis of
                                                       environmental benefits. Until now, more      trust and without fear of competition. This
                                                       than 50 companies have registered their      is the best way to utilise extensive, global
                                                       interest in the TPRC Community.              technological knowledge.”
                                                       .
30                                                                                                                                                                                                   31
Events
                                                                               5 November 2009:
                                                                               Young Technology Award




 and                                                                                                                      12 May 2009:




 Meetings
                                                                                                                          Speed-dating dinner for
                                                                                                                          young entrepreneurs



                                                                                                     13 May 2009:
                                                                                                     Student entrepreneurs’ day




                                             13 May and 10 December 2009:
                                             Symposium Entrepreneurship
                                             for PhD students
     12 June 2009:
     Getting acquainted with
     Nano4 Vitality and UT Innovation
                                        12 June 2009:
     lecture                                                                                                                           10 December 2009:
                                        25 years of Technology Circle Twente
                                        and the launch of ‘Startfighters’                                                              25th anniversary reunion of TOP scheme




                                                                                                                                                                        Entrepreneurship
                                                                               12 June 2009:
                                                                               Launch of the Thermoplastic
32                                                                                                                                                                        33
                                                                               Composites Research Center
Area
        One of the preconditions for successful entrepreneurship is a physical

        environment that inspires starters and attracts established companies.

        An inviting research and business climate in an exciting location where

        talent is present in abundance. Kennispark Twente’s physical area

        covers the UT campus and the adjacent Business & Science Park.

        An area of some 180 hectares, with more than 300 companies.

        Together they represent 5,000 jobs in the industry and another 3,000 or

        so in education and research. In the last year, work has largely focused

        on the Master Plan for the Development of Kennispark Twente and the

        redevelopment of the UT’s Langezijds building.




34                                                                           35
Area                                                                                                                                           addition, Kennispark Twente’s calendar,
                                                                                                                                                    and those of its partners, is full with
                                                                                                                                                    meetings at which entrepreneurs can get
            Room for entrepreneurship                    knowledge campuses. Of the 55 initia-                                                      together, with financiers, talented
                                                         tives that call themselves campuses, more                                                  students and partners. Below are a
            Area Development Master Plan                 than 50% are nothing more than an                                                          number of examples.
            The ‘Master Plan for the Development of      industrial estate. There are a mere four
            Kennispark Twente’ is the spatial transla-   fully developed campuses in the Nether-                                                    Young Technology Award 2009
            tion of Kennispark Twente’s ambitions.       lands, one of which is Kennispark Twente.                                                  The finals of the Young Technology
            New companies require space and an                                                                                                      Award 2009 were held on the evening of
            attractive environment that fits the bill    A campus of national importance is not                                                     Thursday,5 November, and was attended
            and draws new companies. The master          only a natural and, for knowledge             gateway to The Gallery’ and was officially   by some 90 interested parties. Six
            plan transforms the three areas of           workers and R&D departments, attractive       opened in the first quarter of 2010. It is   nominees battled for the award for most
            Kennispark Twente into a single spatial      crystallisation point for open innovation     now frequently used by young start-up        promising technology company. During
            unit that stimulates the coming together     and public-private R&D collaborative          VentureLab participants, the Twentse lab     the final, each company presented itself
            and collaboration of knowledge and           opportunities, it is also an innovation       for Telemedicine and several other young     to the jury and the audience in an
            business. The UT campus, the Business &      accelerator nationwide on account of its      companies. Kennispark Twente has also        elevator pitch. The jury comprised Geert
            Science Park and the interjacent provin-     distinctive capabilities and ability to       relocated its organisation to these          Kolthof (Service2Media, winner of the
            cial road will become one.                   anticipate national priorities. In the        premises, as has Innovation Platform         national Rising Star Award in 2008),
                                                         international competition climate sur-        Twente. The Corridor and The Gallery are     Martijn Kuit (managing director of MIRA
            In January 2009, Enschede council            rounding R&D centres and knowledge            a key part of the Area Development           biomedical research institute) and Mark
            approved the ‘Master Plan for the Deve-      workers, a good campus can be a               Master Plan on account of the concentra-     van Buiten (Eurosafe Solutions, serial
            lopment of Kennispark Twente’. The UT        significant asset.                            tion of innovation and entrepreneurship      entrepreneur).
            Board had already approved the plan.                                                       there.
            2009 saw the further search for funding      The Corridor: Gateway to The Gallery                                                       The nominees were Blue4Green, Smart
            for the implementation of the plan and       The redevelopment of the UT’s Lange-          Events and meetings                          Signs Solutions, Xiophotonics, Twee R
            the alteration of the zoning plan. A study   zijds building into The Gallery was also                                                   Recycling, Mobihealth and Steray. The
            was also carried out into the existing       continued in 2009 in collaboration with       Meetings between scientists and entrepre-    award went to Erik Staijen with his
            amenities for entrepreneurs in the area      Kondor Wessels Projecten. The project         neurial talent and financiers are a vital    company Blue4Green, who received a
            and how these could be shared.               scheduling was changed due to market          element in the Kennispark Twente area.       cheque for €5,000 from Kennispark
                                                         conditions, which is why a pilot started in   These meetings can be both planned and       Twente and Innovation Platform Twente
            Campus of national importance                October 2009 in an empty building of          ad hoc. In the latter case, people can       intended to boost his company.
            In late 2009, Kennispark Twente was          Enschede municipal council. In this           bump into one another in any one of the
            declared an innovation campus of             building, the concept of incubator,           many facilities in the area: at a match of
            national importance. On behalf of the        events, contact with talent, financiers and   the national soccer champion FC Twente,




                                                                                                                                                                                               Area
            Ministry of Economic Affairs, BUCK           others was created and refined. The           an evening at Cinestar movie theatre or
            consultants conducted a study into Dutch     building is called: ‘The Corridor, your       while skating at Twente ice rink. In
36                                                                                                                                                                                             37
Powered by Twente: events for entre-
     preneurship and innovation
     The Powered by Twente Foundation was
     set up on 17 November 2009. This is a                                                                              Kennispark: a unique district in Enschede
     foundation that organises events aimed at
     entrepreneurship and innovation, events
     not only organised by the foundation                                                                              For UT campus manager Pieter Binsbergen, the approval of the Area
     itself but also by other parties in the     Guidance in locating business premises                                Development Master plan in 2009 signifies an important step
     region that are proud that their event is                                                                         forward in the redevelopment of the entire area. “We are busy
     held in Twente and are only to happy to     Knowledge intensive companies looking                                 creating a new district in Enschede. Kennispark Twente must
     give it the ‘Powered by Twente’ name.       for premises in Twente can be assisted by                             become a key district, like Roombeek. An area that has a green
     The Innoversum Innovation Conference        Ontwikkelingsmaatschappij Oost NV at                                  character and a dynamic appeal, with high levels of activity and
     was planned for June 2009, but due to       the behest of Kennispark Twente. This                                 interesting events held on a regular basis.”
     poor market conditions has been moved       involves the establishment of contact with
     forward to April 2010, where it will be     potential partners, as well as information
     held under the ‘Powered by Twente’ label.   concerning office locations, projects and
                                                 funding.                                     Pieter Binsbergen envisages a large           here, which FC Twente chairman Joop
     Workshops for entrepreneurial                                                            Kennispark Twente: the campus plus the        Munsterman continually cites in his pep
     scientists                                  New premises and expansions                  area on the other side of the Hengelose-      talks.”
     A workshop was held for doctoral            In 2009, a total of eight new companies      straat: the Business and Science Park,
     students from the UT on 13 May and 10       were established in Twente with a direct     Go Planet, the ice rink, the Grolsch Veste.   Train station Kennispark Twente
     December 2009. On these two occasions,      link to the UT or other knowledge                                                          In Pieter Binsbergen’s eyes, Kennispark
     some 30 scientists looked more closely at   institutes. Two companies were linked as     International ambitions                       Twente is the vehicle with which to get an
     setting up their own companies. After a     part of Kennispark Twente. Together,         “2,500 people live on campus, and 12,000      effective Twente Promotie up and
     short introduction about the support        these projects bring with them some €12      currently work and study in the whole         running, without forgetting to emphasise
     possibilities offered by Kennispark         million in investments and 158 jobs.         area every day. In a year’s time, Lange-      the green character of Twente. “But
     Twente, the workshop went into the value    In this way, Kennispark Twente has           zijds will be bristling with new activity.    Twente is also a great place for young
     of patents in more depth. Other subjects    become an important magnet for the           The amenities for recreation on the           people to live. The economic spin-off
     included writing an application for an      Eastern Netherlands. Half of the R&D         campus alone are already of a very high       from the UT is by far the biggest in the
     STW Valorisation Grant and how to apply     projects supported by Oost NV in 2009        standard. This should be used for the         Netherlands. With all the opportunities
     for a patent. In the December workshop,     were realised within Kennispark Twente.      creation of a new profile for Kennispark,     that that creates. Green. Young. Dynamic.
     additional topics included patents and      The same is true for 50% of the R&D-rela-    where people can work and relax at a          Technological. That is Twente. That is
     business development at the UT.             ted jobs and almost 42% of R&D invest-       high level. The area around Amsterdam         Kennispark. Drienerlo Station should
                                                 ments from the Eastern Netherlands.          has a natural appeal. Here, we have to go     really be renamed Kennispark Twente
                                                                                              that little bit further. Everything is        Station. You can feel that you are in a
                                                                                              possible. It is a question of alerting the    unique area straight away.”
                                                                                              rest of the Netherlands to that fact. We
                                                                                              have to take some important steps. I am




                                                                                                                                                                                           Area
                                                                                              very much drawn to the level of ambition

38                                                                                                                                                                                         39
‘Financieel dagblad’ newspaper,
     15 June 2009
                                                                                                        Looking at the Eastern Netherlands,            time, create 158 extra jobs. This makes
                                                         Results of Kennispark Twente                   50% of the R&D projects supported by           Kennispark Twente an important magnet
      TPRC                                                                                              Oost NV are located in the Kennispark.         for knowledge-intensive companies in the
                                                                                                        These projects bring with them some            Eastern Netherlands.
     Airplane manufacturer Boeing will be a              Entrepreneurship                               €12 million in investments and will, in
     partner in a new research centre for thermo-
     plastic materials at the University of Twente.      The figures for Kennispark Twente show
     Together with companies such as Royal Ten           that student entrepreneurs turn out to
     Cate and Stork Fokker, Boeing hopes to              become serious entrepreneurs. After
     develop new composite materials here                graduation, seven student entrepreneurs      Kennispark Twente in cijfers                     2006      2007         2008       2009     Totaal
     “within several years” that are lighter, stronger   received a TOP place, which enabled them
     and more environmentally friendly than the          to put serious effort into pursuing their
     current generation of composites. Jan
                                                         businesses. In September, two student           Stimulation of entrepreneurship
                                                         entrepreneurs made immediate use of
     Närlinge, president of Boeing Northern
                                                         the new FAME scheme, enabling them to           Number of active student businesses          Unknown       55            82         76
     Europe, expects that, within five years, the
                                                         combine their studies and entrepreneur-         Number of students in FAME scheme                                                    2
     new Thermoplastic Composites Research
                                                         ship and indicate their willingness to re-      TOP places granted                                 10      21            21         27      336*
     Centre (TPRC) in Twente will be producing
                                                         main in Twente after graduation. We also        Number of jobs at TOP
     materials that can actually be used in
                                                         saw an increase in the number of TOP            companies 1984-2008                                                                         2254
     airplanes.
                                                         places granted and a large number of par-       Participants in Venturelab Twente (started in 2009)                                 42
                                                         ticipants in the new Venturelab Twente:
                                                         42. As a result, knowledge- intensive
                                                         entrepreneurship remains an enduringly          Companies and jobs
                                                         popular career option in Twente.
                                                                                                         Jobs in the area (excl. UT)                    4669      5332          5549      5611        +62
                                                                                                         Number of companies in the area                 302       324           355       323         -32
                                                         Companies and jobs

                                                         The total number of companies in the            Knowledge transfer
                                                         park has dropped slightly, while the
                                                         number of jobs in the area increased            Patent applications                               24       20            14         30
                                                         marginally. R&D activities in the park          Number of requests from SMEs
                                                         remain high. This means that despite the        through the Knowledge Portal (start 2007)                 114           121        115
                                                         financial and economic crisis, knowledge-       Number of requests to Science Shop                72       69            73         89
                                                         intensive companies have grown in
                                                         volume.




                                                                                                                                                                                                             Area
                                                                                                         * Total number of TOP companies since the TOP Scheme began in 1984.
                                                                                                           The total number of spin-off companies from the UT (including TOP companies) is approx. 700.
40                                                                                                                                                                                                           41
Publication details                                                                 Partners

                                                                                         Kennispark Twente is a joint initiative of:




                                                                                         Kennispark Twente is made possible with the help of:


               Editorial staff
                Kennispark Twente and
                Axis Media-ontwerpers

               Design and layout
                Axis Media-ontwerpers                      Stichting Kennispark Twente
                                                           PO Box 217
               Printing                                    7500 AE Enschede
                Drukkerij Te Sligte                        The Netherlands

               Photography                                 Visiting address
                University of Twente Communication         The Corridor
                Department,                                Hengelosestraat 525
                Jan Schartman Fotografie,                  Enschede
                Eric Brinkhorst Fotografie                 The Netherlands

               Text                                        T   +31 53 489 4118
                Janinka Feenstra, Kennispark Twente, and   F   +37 53 489 2098
                Marcel te Kiefte                           E   contact@kennispark.nl
42                                                         W   www.kennispark.nl                                                                43
Annual Report Kennispark Twente 2009
Annual Report Kennispark Twente 2009

Annual Report Kennispark Twente 2009

  • 1.
    The Power ofthe Combination 2009 Annual Report
  • 3.
    Contents 4 Foreword by Kees Eijkel, CEO of Kennispark Twente 6 Kennispark Twente is on the up 8 Entrepreneurship is second nature at the UT 10 Nominations and awards in 2009 12 Entrepreneurship 14 Talent for entrepreneurship 16 Interview: FAME scheme is a significant step for student enterprise 18 Successful start 20 Successful growth 22 Interview: It is all about long hours in the US 24 TOP places in 2009 26 Innovation 28 From idea to business 28 Knowledge transfer 29 Facility sharing 29 Interview: TPRC underlines UT’s great expertise 32 Events and meetings 34 Area 36 Room for entrepreneurship 37 Events and meetings 38 Guidance in locating business premises 39 Interview: Kennispark - a unique area in Enschede 40 Results of Kennispark Twente 42 Publication details 43 Partners 2 3
  • 4.
    Foreword The powerof the combination Creating an environment in which Internationally, Kennispark Twente is also every ingredient is present for succes- working to build its reputation, and its sful high-tech enterprise and innova- name, despite not being translated, is tion. Combining the right elements surprisingly well known among internatio- and the right partners. The power of nal contacts. In Melbourne (Australia), they the combination: that is what it is all were so impressed by our system that we about. And this is what we have seen have been asked to be a formal consultant once again over the last year. to the largest park in Australia, labelling us a ‘benchmark project in the global The combination of different partners, arena’. This, too, is the result of the right such as the research institutes at the combination of, in this case, Enschede University of Twente, BTC Twente, NIKOS, municipal council, the Province of Overijs- Innovation Platform Twente and our sel, the University of Twente and, since founding fathers, has ensured that we recently, Saxion University of Applied have been able to make significant Sciences. progress in 2009. An example of this progress was the approval of the Master In this annual report, we are delighted to Plan for the Development of Kennispark take you through the various factors that Twente in January 2009. The launch of the make Kennispark Twente the place to be open innovation centre with Stork Fokker, for high-tech entrepreneurs: ideas for new Ten Cate, Boeing and the University of businesses, business development Twente is another. These companies were support facilities, talent, meetings and an looking for an enterprising area with inspiring environment. We will happily substantial knowledge, and they found it share with you the highlights of 2009 and in Twente. At the end of 2009, Kennispark the power of the combination in Twente. Twente was also officially recognised as an innovation campus of national importance to the Netherlands, alongside Food Valley, Kees Eijkel the High Tech Campus and the BioScience- CEO Kennispark Twente park in Leiden. We and our partners can be proud of this acknowledgement. We have worked hard to achieve it. Kennispark Twente Team 4 5
  • 5.
    Kennispark Twente ison the up Things are really on the up for Kennis- The members of the steering committee Close collaboration Saxion has 22,000 students, of whom park Twente. National recognition as one – Carry Abbenhues (representative of the For Carry Abbenhues, the involvement of 14,000 study in Enschede. The impor- of the five innovation campuses in the province of Overijssel) Ineke van Olde- these market partners is critical. tance of Twente as an economic and Netherlands, a unique, open innovation niel (member of the Board of Governors Kennispark Twente is a long-term project, residential base for Saxion is evident. centre with internationally operating at Saxion), Eric Helder (councillor in for which financial support from the Ineke van Oldeniel sees that the companies, a growing number of start- Enschede) and Kees van Ast (vice-chair of business sector is vital. This also applies Kennispark is developing itself as an ups working with the UT, the growing in- the Board of Governors at the University to area development and its physical engine for economic development in the volvement of SMEs, and the space, which, of Twente) – draw this conclusion from aspects. “Moving forward in collaboration region. “The Kennispark is for everyone administratively speaking, Twente has developments in 2009 with becoming with the business sector is increasingly in Twente, not just in Enschede. given to the physical development of the modesty, but with great inner joy. important in order to continue to syste- Fortunately, that idea is increasingly get- Kennispark and the economic develop- matically strengthen the region.” Support ting through to people.” ment that goes with it, all help contribute Incubator from the Twente region, the increasing to this. “Kennispark Twente is a complex pro- involvement of Saxion, the collaboration Strength ject with many social aspects,” says Eric with Boeing, Koninklijke Ten Cate and It is key that the development of the Helder. “In the initial stages, it is always Fokker Aerostructures. The allocation of Kennispark occupies a prominent place difficult to highlight the use or impact €7 million from the Economic Stimulation on the political Agenda of Twente along effectively. I have always seen Kennispark Fund for the High Tech Factory project by with the two other economical develop- Twente as an incubator for economic MESA+. “That’s exactly why we’re doing ments at the airport and the ‘Heart of the developments in Twente. The first results this. I have high expectations for the new South’ (incl. World Trade Center Twente). are now visible. Take the open innovation business activities and employment op- That is a condition for sustained deve- centre with Boeing, Stork Fokker, Ten portunities that will be created.” lopment in the long term. Kees van Ast: Cate and the UT, for example, which is “Partners throughout society are beco- being acknowledged at national and even Coalescing ming ever more involved in Kennispark international level. That is very important Ineke van Oldeniel sees the coalescence Twente. The power of the combination is for the trust of our market partners.” of the UT and Saxion as a significant the key term. We keep everything com- advantage. “Saxion has added value for pact and aim for visibility. The Corridor is the Kennispark. Technological innovation the building in which everything involving The members of the steering committee – begins at the UT, but spin-offs often end innovation and entrepreneurship is con- Carry Abbenhues (representative of the province of up with people at higher professional centrated. This will also occur later in the Overijssel) Ineke van Oldeniel (member of the Board education level. We develop innovation Langezijds building. And not to forget, of of Governors at Saxion), Eric Helder (councillor in programmes too. For some of these pro- course, the successes of the innovation Enschede) and Kees van Ast (vice-chair of the Board grammes, it is better for us to collaborate institutes, or the Medical Imaging pro- of Governors at the University of Twente) – draw this from the very start. In 2010, Saxion will gramme. We must allow knowledge from conclusion from developments in 2009 with becoming be a valuable associate of Kennispark the UT to pervade the business sector. 6 modesty, but with great inner joy. Twente.” That is what leads to employment. That is 7 Kennispark Twente for you.”
  • 6.
    coordination point forthe first seven nanotechnology with our scientific years of the EIT ICT Labs. NOKIA, knowledge and equipment. Strengthening Ericsson, Alcatel, SAP, Philips and the the nano-industry in Twente is one of our Entrepreneurship is second nature at the UT three Dutch universities of technology in key objectives.” Eindhoven, Delft and Enschede will develop strategies in a very extensive Venturelab Twente Innovative successes are piling up. Internationally, the six research institutes at the University of Twen- programme with an annual subsidy of For Sjoerd van Tongeren of the IGS, the te have achieved key successes. The number of spin-off companies is increasing steadily. The directors €30 million to help “get technologically establishment of the VentureLab Twente of each institute are doing their utmost to optimise the valorisation together with Kennispark Twente. innovative products into the business in 2009 signified the birth of a new And there you have the key word: valorisation. Described by one director as: “how our knowledge rea- sector” more rapidly. Iddo Bante: “This is instrument that offers starting UT ches society.” European innovation par excellence. entrepreneurs the possibility of becoming There will be numerous opportunities for more successful as an entrepreneur in truly enterprising ICT students. The society. “Technologists are not always the “Entrepreneurship is in the UT’s blood. began as managing director in 2009, is foundation is the knowledge and exper- best business people. They’re too orien- But I have the feeling that the innovative dedicated to “unlocking the expertise that tise within the UT. Kennispark Twente ted towards technology. Starting a potential of the UT can be used even is often hidden within the UT”. “At will be a stepping stone to a more business is actually a social activity. more,” says Martijn Kuit, managing IMPACT, we don’t come up with anything prominent position for the UT within VentureLab Twente is looking for entre- director of MIRA, the institute for ourselves,” he says. “We translate Europe, with SMEs occupying a very preneurs who want to use technology to biomedical technology, since 2009. “The expertise into business activities. How important place. The directors of all our make their company bigger. While the Board provides encouragement where can we make the enormous expertise of biggest companies unanimously acknow- fundamental research carried out at the possible. Kennispark Twente is the the UT more accessible to the business ledge that without SMEs, these plans UT is vital, it has to be translated into catalyst in the valorisation process. If we sector? The challenge for 2010 is to learn could not be achieved.” practice in a business situation. You need can tap every source within the UT, we even more than we do now about what tools for this, tools which have been can experience many exciting things in the UT has to offer. The development of High-Tech Factory developed on the basis of knowledge of the future.” spin-off companies is continuing unaba- For MESA+, the most important activity is social sciences.” ted at high levels and has done so for the High-Tech Factory. This production Employment more than 10 years. For every euro from facility for companies in micro and Product development In 2009, MIRA took a major step forward the UT, we double it in the market. We are nanotechnology receives subsidies Society is not made up of technology but with the Centre for Medical Imaging, a focused more on attracting big compa- totalling more than €11 million from the of people who apply technology. Oscar joint venture with Siemens and the UMC nies such as Philips Drachten, BP and Ministry of Economic Affairs, the Province Peters of the IBR knows this better than Groningen. Martijn Kuit: “I expect an Shell, without, of course, losing sight of of Overijssel and the Twente region. anyone. Launching a particular product is enormous amount of technological the smaller spin-offs.” Managing director Miriam Luizink: “We all about an acceptance process. “We do innovation from this major alliance. Top will focus on the development of produc- not have products as such that we launch Technology for the Patient. In 2011, this Kennispark Twente as a stepping tion processes, the establishment of an ourselves. We supply the market. I have CMI will also be physically located in stone to a more prominent position equipment fund, to support companies noticed that the realisation is growing Kennispark Twente, leading to an in Europe within and outside the UT. We will that products should ultimately be immediate creation of jobs. For Iddo Bante, managing director of primarily try to help smaller SMEs that intended to increase the well-being of CTIT, there was one undisputed highlight find it difficult to attract funding. Where people and society. The IBR are increasin- Attracting big companies in 2009: the European Institute of possible, we will try to facilitate compa- gly involved, also at the beginning of a Jan Emmerzaal of IMPACT, who also Technology (EIT) made the UT the nies based in Twente that work with product development process.” 8 9
  • 7.
    Nominations and awardsin 2009 Young Technology Award 2009 Nominations for Deloitte Fast 50 for fast-growing Blue4Green Erik Staijen Eastern Netherlands in the engineering companies Innovation Top 100 This is the fourth consecutive year in which 10% Nominated of candidates listed consisted of companies StatiqCooling Rijssen from Twente. Top 30 knowledge and Smart Signs Solutions, Xiophotonics, research institutes in Technisch Twee R Recycling, Mobihealth and Capzo International Ootmarsum Bizz Design Academy Enschede Weekblad magazine Steray. Sqills Enschede, established by two former Nr. 6 MESA+ students from the UT ODS2 Enschede Simon Stevin Meesterschap Nr. 8 ITC ODS2 Enschede Professor Detlef Lohse Nr. 9 CTIT University of Twente TSI Solutions Enschede, spin-off University of Twente Nr. 12 IMPACT UT van den Kroonenberg Prijs Webprint Oldenzaal, winnaar Rising Start Twente, 2007 Nr. 23 Telematica Institute Entrepreneurship Sigmax NWO Spinozapremie Xsens Technologies Enschede, spin-off University of Twente Prof. dr. ir. A. (Albert) van den Berg University of Twente 10 11
  • 8.
    Entrepreneurship The entrepreneurial University of Twente (UT) is a breeding ground for new ideas, innovation and new technology. The perfect seed bed for entrepreneurship. For the last 25 years, the UT has actively encouraged its scientists, students and doctoral students to be enterprising. Innovative entrepreneurs are the foundations on which economic progress is built. 12 13
  • 9.
    Education in entrepreneurship UT students also look for knowledge Entrepreneurship concerning entrepreneurship within the curriculum of the education programmes at the university. In 2009-2010, The enterprising region a compulsory subject focusing on 35 students participated in the minor in In the Netherlands, the University of entrepreneurship was developed in 2009, Entrepreneurship and 27 students Twente leads the way in creating spin-off which students in all faculties will follow enrolled for the master track in Innova- companies. Up until now, the UT has during their Bachelor’s phase. tion & Entrepreneurship. skills during workshops. Some 100 spawned more than 700 companies, with enterprising students took part in this the total still growing. Since 2006, the UT In addition, the Career Center Twente Student entrepreneurship annual event. has worked with Enschede municipal organises monthly get-togethers at which In collaboration with the Student Union, council (on behalf of Network City) and students can get to know companies Kennispark Twente provides support to During a speed-dating dinner in May, the Province of Overijssel to encourage based in Twente. On behalf of Kennispark enterprising students at the University of student entrepreneurs were given the entrepreneurship and innovation in the Twente, a young company explains about Twente through the platform opportunity to meet other such students Twente region. This joint venture is called entrepreneurship as a career option and Studentondernemer.nl. This platform has as well as entrepreneurs from Twente Kennispark Twente. about working for an SME after gradua- 76 student entrepreneurs currently who have recently set up businesses. tion. registered, with an estimated number of Some 30 entrepreneurs exchanged Kennispark Twente revolves around the some 150 active within the university. experiences and got acquainted with one creation of an environment in which another. knowledge- intensive entrepreneurship In the past year, more than 100 requests and innovation can be optimally utilised; NIKOS for assistance have been submitted to the an environment in which new business Education in entrepreneurship is coordinator for student entrepreneurship. activities can start and develop. The aim provided by the Dutch Institute for These requests vary from help in looking UT News, 17 September 2009 is to create 10,000 new, high-quality jobs Knowledge-Intensive Entrepreneurship for office space to legal support. In 2009, for the Twente region. (NIKOS), which is part of the School of seven student entrepreneurs transferred Spin-off Blue4Green wins an award Management and Governance. This to the TOP scheme after graduation. In Talent for entrepreneurship institute covers areas such as educa- doing so, they took the first step towards On the evening of 5 November, UT alumnus tion, research, business development launching their careers as entrepreneurs. Erik Staijen from the spin-off Blue4Green took Everything begins with talent for entre- support and the interface between preneurship and the awareness of them. NIKOS facilitates the TOP scheme In addition to providing substantial home the Young Technology Award. In the entrepreneurship as a career option - the and VentureLab Twente for Kennispark support, Studentondernemer.nl also Prismare Theatre in the Roombeek district of Entrepreneurship seeds of which are sown during the Twente, both of which form part of the organises events for student entrepre- Enschede, the jury chose his lab-on-a-chip period of study at the University of basis of research into methods and neurs, such as the student entrepreneur invention from six nominations as ‘the most Twente. techniques to support entrepreneur- day held in May in collaboration with the convincing product’. The award, a cheque for ship. Chamber of Commerce and Saxion Young five thousand euros and a glass trophy, is in- Entrepreneurship as a career option Business Professionals. During this day, tended for young companies from the province As part of the strategic vision at the student entrepreneurs learned about of Overijssel that have their own in-house University of Twente (Route ’14), support possibilities and developed their technology. 14 15
  • 10.
    UT News, 3September 2009 FAME scheme up and running FAME scheme isis krachtig instrument FAME-regeling a significant step for student enterprise During the opening of the academic year, the first place on the FAME scheme was awarded During ten Route Suc66 sessions, For Wessel Draijer of the Student Union, the creation of the FAME established and successful entrepreneurs scheme is by far the most important achievement of 2009. “It is a to Menno van der Werff from the company shared their experiences on the road to wonderful instrument with which to combine studying and student Wame. The FAME scheme for enterprising success with 50 or so student entrepre- enterprise. The UT is the first university in the Netherlands to offer students was officially launched on Monday. In neurs and students with entrepreneurial students this kind of systematic support in combining study and doing so, the UT is the first university to offer ambitions. entrepreneurship.” students systematic support in combining their studies and their businesses. FAME scheme The FAME scheme was officially launched at the opening of the UT’s academic year Wessel Draijer estimates that there are Applicants must go through a rigorous on 1 September 2009. While compara- between 100 and 150 students involved in selection procedure, however. They must ble to a study scheme for professional a small company in one form or another. be able to show that they excel at both sportsmen and women, FAME revolves “Most begin in their third year, and while I their studies and their business, that they around the offer of guidance in running couldn’t say what the actual numbers are, have a sound business plan and they must a business and following a study pro- I would say that they are definitely guarantee to show progress in their study gramme. FAME offers student entrepre- growing.” programmes. neurs systematic support and guidance The difficulty of combining study with regarding study progress and the pos- running a business is most apparent Employment sibility of arranging an interest-free loan. during the graduation period. Wessel “And not unimportantly,” says Wessel Two student enterprises are currently Draijer: “The students have to choose Draijer, “they must declare a willingness using the scheme, which is established in between graduating or continuing with to remain in the region with their com- cooperation with the Rabobank Enschede- their companies. Combining the two is pany after they graduate. This is key to Haaksbergen and the Student Union. virtually impossible. But FAME provides a Kennispark Twente, one of the reasons solution to that problem.” being that they want to stimulate employ- ment opportunities in Twente.” WAME and Mentor Goal Gorilla were the first two companies Student entrepreneurs who are admitted to make use of the FAME scheme in 2009, Entrepreneurship to the scheme get assigned a mentor and, with another two expected to join in the if required, advice in various fields from coming academic year. Kennispark Twente. They can also secure a €10,000 interest-free loan. 16 17
  • 11.
    Successful start Incubator BTC-Twente At the end of 2009, 69 companies were 2009 also saw close collaboration located in the BTC building and the To actually make a successful start is not between Kennispark Twente and BTC- buildings managed by BTC-Twente easy, even if you have a good idea for a Twente, the oldest incubator in the (Capitool 50, Tpoint, Novay and The company and you have the requisite entre- Netherlands. BTC-Twente provides space Corridor) under one tenancy agreement. preneurial knowledge. Kennispark Twente and services to small and medium-sized Due to the financial crisis, occupancy provides support in starting up new busines- business that wish to establish themsel- rates were lower in 2009 than in previous ses with a range of different schemes. ves in the vicinity of the UT. As an years. In the BTC building, the average incubator, BTC provides services, such as occupancy rate was more than 68%. In the 25 years of TOP coaching and guidance, to entrepreneurs other buildings this varied from 75% to TOP stands for Tijdelijke Ondernemers starting a business. In addition, the more than 94%. Plaats [Temporary Place for Entrepreneurs] network meetings that BTC organises and is a scheme that organises the basic contribute to Kennispark Twente’s funding and coaching for start-ups. In objectives. The monthly entrepreneurs’ addition, start-ups can also use the facilities get-together (BTC Café) is a good of the department with which their company example of this. is affiliated. A total of 27 people were given a TOP place in 2009, 25 of whom qualified Since October 2009, BTC-Twente has as technostarters. 2009 saw the 25th been managing The Corridor, which is anniversary of the TOP scheme and in acting as a pilot location during the TC Tubantia, 7 November 2009 December 2009, NIKOS organised a festive redevelopment phase of the Langezijds reunion with TOP businesses and partners, building. BTC-Twente will fulfil its which was attended by some 100 people. In November 2009, VentureLab Twente also incubator function in this new building Twente’s promising projects received the NBIA Soft Landings Internatio- and may also participate as an operating entice the sharpest minds VentureLab Twente nal Incubator status from a panel of partner in the redevelopment of In collaboration with NIKOS and Saxion’s experienced business incubator managers. Langezijds into The Gallery. Knowledge Centre for Innovative Entrepre- This programme acknowledges incubators A print factory for blood vessels and organs, neurship, the VentureLab Twente was also that help other international companies a pharmaceutical industry, an aviation school launched in 2009. VentureLab Twente is a enter the Dutch market. and the development of biofuel for aircraft. business development support programme Soon, this will all be possible in Twente. In the for ambitious individuals and teams who The Legal Desk VentureLab Twente, dozens of ambitious plans start a new business or reorganise an In 2008, Kennispark Twente launched a such as these by entrepreneurs from all over existing company within the programme, legal desk where young (student) entrepre- the world are being hatched as we speak. The the aim being to establish a high-tech, neurs can go with legal questions and where fast-growing company. In May, an initial they can get examples of standard con- aim: three thousand jobs for highly qualified group of 18 entrepreneurs started in the tracts. The lawyer also assesses legal graduates. pilot programme, to be followed in October documents drawn up by the entrepreneurs by the first official group with 24 partici- themselves. In 2009, the lawyer was asked pants. for support on 53 occasions, most of which involved assessing the general terms and 18 conditions and standard contracts. 19
  • 12.
    Technology Circle Twente At the end of May 2009, Kennispark Every entrepreneur knows the importance Twente took part in the Silicon Summit in of networking. In June 2009, the Techno- Palo Alto (USA), together with a number logy Circle Twente (TKT) celebrated its of young entrepreneurs. B&M Business 25th anniversary with a gala dinner. In Development, Recore Systems, Micronit honour of this anniversary, TKT and and Novulo participated in workshops Kennispark Twente published a booklet designed to take a close look at their entitled ‘Startfighters’, containing companies and their skills, and to provide portraits of entrepreneurs with a unique networking opportunities. The job vacancy service on the Kennis- tale to tell. park Twente website was continued in Contact with talent 2009. This website enables Twente-based Successful growth Growing companies need talented em- companies (particularly spin-offs) to ployees. However, fast-growing SMEs are publish their vacancies for free. This site Entrepreneurs often start up alone or with often overlooked by students and the was made known to the UT community a companion, expanding as soon as companies do not yet have the resour- through adverts in the UT News. business starts to go well. Kennispark ces to actively recruit them. Kennispark Twente supports knowledge-intensive Twente, often in cooperation with Career companies in developing their ambitions. Center Twente, facilitates contact with talent in various ways. International growth Too few start-ups succeed in converting During the Twente Recruitment Days in their innovative technologies into succes- October 2009, Kennispark Twente facilita- sful global brands, products and compa- ted the participation of nine companies, UT News, 22 October 2009 nies. Through Embedded Coaching, all of which took part in Career Center Kennispark Twente enables entrepreneurs Twente’s ‘Twenteplein’. Kennispark Twen- to give their business strategy an interna- te also provided young entrepreneurs Minister praises innovative character tional focus. This is achieved by making with the opportunity to present themsel- of the region use of intensive expert coaching, an ves to students during the Bright Twente extensive international network and an get-togethers. These get-togethers are What exactly is the situation in terms of individually tailored programme in Silicon organised by Career Center Twente and Valley (USA) for a period of eight weeks. are aimed at giving students a chance to knowledge and innovation in the Nether- Following a successful pilot in 2008, the get to know employers from the Twente lands? This was the question on Minister of Embedded Coaching programme was region. Foreign Affairs Maxime Verhagen’s lips when Entrepreneurship housed at Kennispark Twente in 2009, he visited the BTC opposite the UT yester- where attention centred on the design of day. Director Rob de Koning took him round the organisation of Embedded Coaching. the complex where spin-offs from the UT and other small businesses are located. The Minister was impressed: “Twente is an excel- lent example of investment in knowledge and innovation”. 20 21
  • 13.
    It is allabout long hours in the US It is all about hard work in the US. Late presentation for a group of venture capi- This was an experience the entrepreneurs to bed, early to rise. And all manner of talists at the Summit. That is a significant would not have missed for the world. activities in the period in between, all accomplishment in itself. He failed to “This offer, this chance had added value part of doing business. “It was long day win “despite a formidable performance”, and worked as catalyst,” say the partici- again today. Sleep is not a favourite hobby here; we were told that a according to Paul Heysters. In addition pants. 72- hour work week is not unusual. However, I have the idea that to being a useful experience, the Silicom ‘working’ is a fairly broad notion here,” writes Paul Heysters of Recore Summit also provided the opportunity to Systems in the diary he kept during the Silicom Summit trip to Silicon establish business contacts. Valley organised by Kennispark Twente at the beginning of June 2009. Recore Systems has already been able to attract borrowed capital through a venture capitalist (source: Iddo Bante at It was with the following objectives that approach to the sales process is slightly CTIT, see further in this annual report). Kennispark Twente organised the mission different. It appears in this respect that The Twente-based entrepreneurs also to Silicon Valley: to apply an international networking is very important here, and to found it a very positive experience to be focus, to learn from the examples in a certain extent ‘you are who you know’.” able to make contacts with other Dutch Silicon Valley, to expand the international Jaap Beernink goes on: “Today, I have two delegates with ambitions to expand into network and, in particular, to take a meetings planned, the first is a breakfast the US. closer look at company strategy. Four meeting, which suits me perfectly, by the entrepreneurs were part of the delega- way. I might try to introduce it in the Ne- Access to a network tion: Paul Heysters (Recore Systems), Jaap therlands. Here, business is often done in Part of the programme on the trip was a Beernink (B&M Business Development), cafes and restaurants anyway. At 8 a.m. visit to the PlugAndPlay centre: a good Frank Wille (Novulo) and Ronny van ’t the cafes are full with breakfast meetings example of an American incubator with a Oever (Micronit). “This type of mission and this is also true at lunchtime.” renowned office garden. “The great value contributes to your development as an of PlugAndPlay is not the space that they entrepreneur: how do I present myself, Selling yourself in one pitch lease but the access that you gain to a how does the investment climate operate, Pitching should be common practice for huge network of venture capitalists and what is the situation in the US,” says one entrepreneurs who want to do business partners in the American market. Each Entrepreneurship of the participants. in the US. The Twente delegation expe- week, pitches are given by companies and rienced dozens of pitches, followed trai- you can visit the big venture capitalists You are who you know ning courses, and worked on their own whenever you want. You can also make Networking is also a key part of doing presentations, often into the small hours, continual use of experienced business business in the US. “However,” says Ron- without ever knowing if they would be as- mentors who help you brainstorm about, nie van ‘t Oever, “the way of doing busi- ked to ‘tell their story’. But sure enough, say, your business model and put their ness here is very different to Europe, the Ronnie van ‘t Oever was chosen to hold a network at your disposal,” says Jaap. 22 23
  • 14.
    Blue4Green Daan Sistermans TOP Places AKO Lightmotif Engineering Jeroen van Tienhoven Albert Koopman Kryoz Technologies De Hoon Avions Voisin Lievaart Meulenbelt SeeEzi Elisa Gielen Paul Jenkins SocialMine Dennis Doubovski in 2009 Cooll BV Johannes Burger Meijer Amitek Model Factory In 2009, 27 people were given a TOP place.. Rob Wermenbol Inertia Van der Zouw Technology Marin-Perianu Talent, Distimo Mylife Praktijk voor Remco van der Elzen Technologies kind en jeugd Vincent Hoogsteder Inpression Bystrova Mariët Reesink Dynteq Ruben Heerdink Michiel van der Kwast Markvoort Lenferink Haverslag Entrepreneurship ELS Company Agrawal Ecolabs MobiHealth BV Els Holland SMC Pramod Agrawal Knoppel Wolbers 24 25
  • 15.
    Innovation Innovative businesses ensure a flexible and vital economy and new employment. In the new knowledge economy, the importance of rapid interpretation, exchange and application of up-to-date knowledge in new products and technologies is increasing. Kennispark Twente provides more knowledge transfer and collaboration between knowledge institutes and companies. 27
  • 16.
    work placement orgraduation assign- Innovation vouchers ments, student entrepreneurs, as well as With the SenterNovem innovation vou- departments and professors. Since it cher, SMEs can gain knowledge by Innovation began two years ago, the SKP has submitting a research assignment to a received 346 requests for knowledge - in- knowledge institute. The results of the cluding 115 requests in 2009 - from 290 assignment can be used within the From idea to business different companies. Only 7% of these company to revamp products, processes requests were not linked to a spin-off, or services. In 2009, 22 innovation Business Development department or UT student. vouchers were submitted to the UT. Many new technologies and ideas are born at the University of Twente. Since Science Shop Facility Sharing 2009, the UT has had a Business Develop- This has resulted in attracting invest- The UT Science Shop (Wewi) is the link ment team in place at the institutes ments, protection through patents, between the university and society. The In 2007, Kennispark Twente started with coordinated by Kennispark Twente. This subsidies such as valorisation grants and Wewi provides services to social organisa- Facility Sharing projects, which involves team supports the invention, develop- agreements concerning the transfer of tions, interest groups, individuals and making university equipment and ment and transfer of ideas that could lead intellectual property. SMEs that need scientific research carried facilities available. Start-ups can use to business. out or require expert knowledge such as these, for example, to conduct tests, do Patents that available at the UT. In 2009, the research in a specific environment or Key tasks are: A key element of the work done by the Wewi conducted the same number of equip a pilot production location. The • scouting & screening of research into Business Development team is the research projects as the year before: 17, MESA+ High-Tech Factory is one such promising ideas; protection of promising knowledge, part of which 14 were published as public example. • process supervision for the protection of which is through patent applications. reports and three embargoed. The of intellectual property; The UT has a special Patent Fund aimed number of applications submitted rose High-Tech Factory • spin-off development and ‘go-to- at enabling the knowledge developed from 73 in 2008 to 89 in 2009. The High-Tech Factory is a new produc- market’, such as support in developing within the UT to transfer through to the tion facility on the UT campus. The old a business plan, subsidies, contracts, business sector in greater quantities, The highlight for the Science Shop was university clean room is being converted contacts, etc.); faster and more efficiently (at a reasona- the publication of the report ‘50 years of into a new production facility for compa- • the transfer of opportunities for ble price). In 2009, 30 patent applications Christian Democratic Cooperation in the nies in the micro and nanotechnology valorisation. were submitted, of which six received a EUREGIO’ in three different languages. sectors, enabling bulk production for the contribution from the Patent Fund. The Dutch, English and German editions commercial market. Business developers are active within the were presented to Mr Hans-Gert Pötte- technical research institutes of the UT. In Knowledge transfer ring, chairman of the European Parlia- The companies involved are mostly this way, they are close to the resear- ment, Prime Minister Jan-Peter Balkenen- spin-offs of MESA+, the Institute for chers. This team is centrally managed by Student Knowledge Portal de and the European CDA party leader Nanotechnology. The arrival of this Kennispark Twente. Since mid-2009, the The UT has various portals that enable Wim van de Camp. The report was written production facility enables them to focus Innovation team has charted some 70 inventions, SMEs and less resolute social organisati- by Shira Godfried, a Master’s student in on their operational management and just under 50% of which are being actively ons to use the knowledge available at the European Studies. growth. supervised. UT. The Student Knowledge Portal (SKP) links requests from SMEs to experts at the UT. These could be students with 28 29
  • 17.
    After all, thenecessary basic infrastruc- Millions for high-tech factory ture has already been realised within the High-Tech Factory. An equipment fund On 13 July 2009, Maria van der Hoeven has also been formed, from which TPRC underlines UT’s expertise (Minister for Economic Affairs) visited the UT companies can request the necessary to hand over €11.6 million to Miriam Luizink, production equipment. In 2009, the managing director of MESA+, for the High-Tech Factory received €11.6 to In June 2009, a very special open innovation centre opened at High-Tech Factory. The High-Tech Factory support this equipment fund and to Kennispark Twente: the Thermoplastic Composites Research Centre has already received a €4.4 million subsidy redevelop the production environment. (TPRC). Participants are the American airplane manufacturer from the EA programme ‘Pieken in de Delta’ Boeing, Royal Ten Cate, Fokker Aerostructures and the UT. “It is [Peaks in the Delta] and €2.2 million from the Thermoplastic Composites easy to see that this collaboration underlines the expertise in province of Overijssel. The Ministry of EA will Research Center technological innovation at the UT,” says Pia Snijder, Boeing’s Kennispark Twente is also dedicated to strategic director for Northern Europe and managing director of the now contribute a further €7.6 million on the development of open innovation TPRC. condition that the province of Overijssel and centres in which companies and the UT the Twente region guarantee that they will can collaborate on open innovation. In underwrite the co-financing of another € this way, the knowledge within the UT is The world’s biggest airplane manufactu- Employment 4 million, bringing the total available budget also valorised and R&D activities and rer is working on the development of an The global network currently comprises to €11.6 million. employment opportunities in Twente extensive and diverse network of centres twelve innovation centres, none of which created. Establishing such innovation for technological innovation, and in order overlap. Of those centres, only one focuses centres involves intensive collaboration to do so, the company has developed a on the innovation of thermoplastic compo- between Innovation Platform Twente and very special model, a world first. Pia Snij- sites and that is in Twente. And will be for Oost NV. der: “They are open innovation centres, at least five years. Pia Snijder expects the in which the participants contribute their TPRC to boost employment. “We intend to On Friday 12 June 2009, members of the expertise in technology and finances to a involve SMEs in Twente wherever we can, Boards of Boeing, Royal Ten Cate, Stork separate company. Boeing does not have which is one of the reasons the province Fokker and the University of Twente exclusive rights to the products from the of Overijssel is willing to provide us with signed an agreement for the establish- collaboration. The intellectual property of financial support. And it also fits perfectly ment of a new Thermoplastic Composites the new technology lies with the partici- with the aims of Kennispark Twente.” Research Center (TRPC) in Kennispark pants. It is beneficial to Boeing not to have Twente. In the centre, the parties will to carry out technological innovation alone conduct research into the technology of nor to have to buy expertise. Other parties thermoplastic composites for the aviation can also benefit from our knowledge. In industry. This technology has to deliver this way, a scientific and independent new and cost-efficient production and research centre has been set up in which Innovation assembly processes that offer key companies can collaborate on the basis of environmental benefits. Until now, more trust and without fear of competition. This than 50 companies have registered their is the best way to utilise extensive, global interest in the TPRC Community. technological knowledge.” . 30 31
  • 18.
    Events 5 November 2009: Young Technology Award and 12 May 2009: Meetings Speed-dating dinner for young entrepreneurs 13 May 2009: Student entrepreneurs’ day 13 May and 10 December 2009: Symposium Entrepreneurship for PhD students 12 June 2009: Getting acquainted with Nano4 Vitality and UT Innovation 12 June 2009: lecture 10 December 2009: 25 years of Technology Circle Twente and the launch of ‘Startfighters’ 25th anniversary reunion of TOP scheme Entrepreneurship 12 June 2009: Launch of the Thermoplastic 32 33 Composites Research Center
  • 19.
    Area One of the preconditions for successful entrepreneurship is a physical environment that inspires starters and attracts established companies. An inviting research and business climate in an exciting location where talent is present in abundance. Kennispark Twente’s physical area covers the UT campus and the adjacent Business & Science Park. An area of some 180 hectares, with more than 300 companies. Together they represent 5,000 jobs in the industry and another 3,000 or so in education and research. In the last year, work has largely focused on the Master Plan for the Development of Kennispark Twente and the redevelopment of the UT’s Langezijds building. 34 35
  • 20.
    Area addition, Kennispark Twente’s calendar, and those of its partners, is full with meetings at which entrepreneurs can get Room for entrepreneurship knowledge campuses. Of the 55 initia- together, with financiers, talented tives that call themselves campuses, more students and partners. Below are a Area Development Master Plan than 50% are nothing more than an number of examples. The ‘Master Plan for the Development of industrial estate. There are a mere four Kennispark Twente’ is the spatial transla- fully developed campuses in the Nether- Young Technology Award 2009 tion of Kennispark Twente’s ambitions. lands, one of which is Kennispark Twente. The finals of the Young Technology New companies require space and an Award 2009 were held on the evening of attractive environment that fits the bill A campus of national importance is not Thursday,5 November, and was attended and draws new companies. The master only a natural and, for knowledge gateway to The Gallery’ and was officially by some 90 interested parties. Six plan transforms the three areas of workers and R&D departments, attractive opened in the first quarter of 2010. It is nominees battled for the award for most Kennispark Twente into a single spatial crystallisation point for open innovation now frequently used by young start-up promising technology company. During unit that stimulates the coming together and public-private R&D collaborative VentureLab participants, the Twentse lab the final, each company presented itself and collaboration of knowledge and opportunities, it is also an innovation for Telemedicine and several other young to the jury and the audience in an business. The UT campus, the Business & accelerator nationwide on account of its companies. Kennispark Twente has also elevator pitch. The jury comprised Geert Science Park and the interjacent provin- distinctive capabilities and ability to relocated its organisation to these Kolthof (Service2Media, winner of the cial road will become one. anticipate national priorities. In the premises, as has Innovation Platform national Rising Star Award in 2008), international competition climate sur- Twente. The Corridor and The Gallery are Martijn Kuit (managing director of MIRA In January 2009, Enschede council rounding R&D centres and knowledge a key part of the Area Development biomedical research institute) and Mark approved the ‘Master Plan for the Deve- workers, a good campus can be a Master Plan on account of the concentra- van Buiten (Eurosafe Solutions, serial lopment of Kennispark Twente’. The UT significant asset. tion of innovation and entrepreneurship entrepreneur). Board had already approved the plan. there. 2009 saw the further search for funding The Corridor: Gateway to The Gallery The nominees were Blue4Green, Smart for the implementation of the plan and The redevelopment of the UT’s Lange- Events and meetings Signs Solutions, Xiophotonics, Twee R the alteration of the zoning plan. A study zijds building into The Gallery was also Recycling, Mobihealth and Steray. The was also carried out into the existing continued in 2009 in collaboration with Meetings between scientists and entrepre- award went to Erik Staijen with his amenities for entrepreneurs in the area Kondor Wessels Projecten. The project neurial talent and financiers are a vital company Blue4Green, who received a and how these could be shared. scheduling was changed due to market element in the Kennispark Twente area. cheque for €5,000 from Kennispark conditions, which is why a pilot started in These meetings can be both planned and Twente and Innovation Platform Twente Campus of national importance October 2009 in an empty building of ad hoc. In the latter case, people can intended to boost his company. In late 2009, Kennispark Twente was Enschede municipal council. In this bump into one another in any one of the declared an innovation campus of building, the concept of incubator, many facilities in the area: at a match of national importance. On behalf of the events, contact with talent, financiers and the national soccer champion FC Twente, Area Ministry of Economic Affairs, BUCK others was created and refined. The an evening at Cinestar movie theatre or consultants conducted a study into Dutch building is called: ‘The Corridor, your while skating at Twente ice rink. In 36 37
  • 21.
    Powered by Twente:events for entre- preneurship and innovation The Powered by Twente Foundation was set up on 17 November 2009. This is a Kennispark: a unique district in Enschede foundation that organises events aimed at entrepreneurship and innovation, events not only organised by the foundation For UT campus manager Pieter Binsbergen, the approval of the Area itself but also by other parties in the Guidance in locating business premises Development Master plan in 2009 signifies an important step region that are proud that their event is forward in the redevelopment of the entire area. “We are busy held in Twente and are only to happy to Knowledge intensive companies looking creating a new district in Enschede. Kennispark Twente must give it the ‘Powered by Twente’ name. for premises in Twente can be assisted by become a key district, like Roombeek. An area that has a green The Innoversum Innovation Conference Ontwikkelingsmaatschappij Oost NV at character and a dynamic appeal, with high levels of activity and was planned for June 2009, but due to the behest of Kennispark Twente. This interesting events held on a regular basis.” poor market conditions has been moved involves the establishment of contact with forward to April 2010, where it will be potential partners, as well as information held under the ‘Powered by Twente’ label. concerning office locations, projects and funding. Pieter Binsbergen envisages a large here, which FC Twente chairman Joop Workshops for entrepreneurial Kennispark Twente: the campus plus the Munsterman continually cites in his pep scientists New premises and expansions area on the other side of the Hengelose- talks.” A workshop was held for doctoral In 2009, a total of eight new companies straat: the Business and Science Park, students from the UT on 13 May and 10 were established in Twente with a direct Go Planet, the ice rink, the Grolsch Veste. Train station Kennispark Twente December 2009. On these two occasions, link to the UT or other knowledge In Pieter Binsbergen’s eyes, Kennispark some 30 scientists looked more closely at institutes. Two companies were linked as International ambitions Twente is the vehicle with which to get an setting up their own companies. After a part of Kennispark Twente. Together, “2,500 people live on campus, and 12,000 effective Twente Promotie up and short introduction about the support these projects bring with them some €12 currently work and study in the whole running, without forgetting to emphasise possibilities offered by Kennispark million in investments and 158 jobs. area every day. In a year’s time, Lange- the green character of Twente. “But Twente, the workshop went into the value In this way, Kennispark Twente has zijds will be bristling with new activity. Twente is also a great place for young of patents in more depth. Other subjects become an important magnet for the The amenities for recreation on the people to live. The economic spin-off included writing an application for an Eastern Netherlands. Half of the R&D campus alone are already of a very high from the UT is by far the biggest in the STW Valorisation Grant and how to apply projects supported by Oost NV in 2009 standard. This should be used for the Netherlands. With all the opportunities for a patent. In the December workshop, were realised within Kennispark Twente. creation of a new profile for Kennispark, that that creates. Green. Young. Dynamic. additional topics included patents and The same is true for 50% of the R&D-rela- where people can work and relax at a Technological. That is Twente. That is business development at the UT. ted jobs and almost 42% of R&D invest- high level. The area around Amsterdam Kennispark. Drienerlo Station should ments from the Eastern Netherlands. has a natural appeal. Here, we have to go really be renamed Kennispark Twente that little bit further. Everything is Station. You can feel that you are in a possible. It is a question of alerting the unique area straight away.” rest of the Netherlands to that fact. We have to take some important steps. I am Area very much drawn to the level of ambition 38 39
  • 22.
    ‘Financieel dagblad’ newspaper, 15 June 2009 Looking at the Eastern Netherlands, time, create 158 extra jobs. This makes Results of Kennispark Twente 50% of the R&D projects supported by Kennispark Twente an important magnet TPRC Oost NV are located in the Kennispark. for knowledge-intensive companies in the These projects bring with them some Eastern Netherlands. Airplane manufacturer Boeing will be a Entrepreneurship €12 million in investments and will, in partner in a new research centre for thermo- plastic materials at the University of Twente. The figures for Kennispark Twente show Together with companies such as Royal Ten that student entrepreneurs turn out to Cate and Stork Fokker, Boeing hopes to become serious entrepreneurs. After develop new composite materials here graduation, seven student entrepreneurs Kennispark Twente in cijfers 2006 2007 2008 2009 Totaal “within several years” that are lighter, stronger received a TOP place, which enabled them and more environmentally friendly than the to put serious effort into pursuing their current generation of composites. Jan businesses. In September, two student Stimulation of entrepreneurship entrepreneurs made immediate use of Närlinge, president of Boeing Northern the new FAME scheme, enabling them to Number of active student businesses Unknown 55 82 76 Europe, expects that, within five years, the combine their studies and entrepreneur- Number of students in FAME scheme 2 new Thermoplastic Composites Research ship and indicate their willingness to re- TOP places granted 10 21 21 27 336* Centre (TPRC) in Twente will be producing main in Twente after graduation. We also Number of jobs at TOP materials that can actually be used in saw an increase in the number of TOP companies 1984-2008 2254 airplanes. places granted and a large number of par- Participants in Venturelab Twente (started in 2009) 42 ticipants in the new Venturelab Twente: 42. As a result, knowledge- intensive entrepreneurship remains an enduringly Companies and jobs popular career option in Twente. Jobs in the area (excl. UT) 4669 5332 5549 5611 +62 Number of companies in the area 302 324 355 323 -32 Companies and jobs The total number of companies in the Knowledge transfer park has dropped slightly, while the number of jobs in the area increased Patent applications 24 20 14 30 marginally. R&D activities in the park Number of requests from SMEs remain high. This means that despite the through the Knowledge Portal (start 2007) 114 121 115 financial and economic crisis, knowledge- Number of requests to Science Shop 72 69 73 89 intensive companies have grown in volume. Area * Total number of TOP companies since the TOP Scheme began in 1984. The total number of spin-off companies from the UT (including TOP companies) is approx. 700. 40 41
  • 23.
    Publication details Partners Kennispark Twente is a joint initiative of: Kennispark Twente is made possible with the help of: Editorial staff Kennispark Twente and Axis Media-ontwerpers Design and layout Axis Media-ontwerpers Stichting Kennispark Twente PO Box 217 Printing 7500 AE Enschede Drukkerij Te Sligte The Netherlands Photography Visiting address University of Twente Communication The Corridor Department, Hengelosestraat 525 Jan Schartman Fotografie, Enschede Eric Brinkhorst Fotografie The Netherlands Text T +31 53 489 4118 Janinka Feenstra, Kennispark Twente, and F +37 53 489 2098 Marcel te Kiefte E contact@kennispark.nl 42 W www.kennispark.nl 43