RESUME
ANCHAL KUMAR
HN-5358/39, SHAHEED
BHAGAT SINGH NAGAR
ROPAR, PUNJAB PIN -140001
M: +917024148989; 9584451716
Email; akumar6133@gmail.com
To obtain a challenging leadership position in an organization that will utilize my skill to benefit
mutual growth & success.
● A dynamic Professional with 6.5 years of experience in Production Product Assembly
Vehicle assembly (Trim, Chassis & Fitment) and Exposure in Body Shop, proto
shop, FVI,PDI and field complaints issues capturing.
● Well versed in achieving new production targets, enhance efficiency, reduction in DPV,
Cost reduction with best utilization of available manpower, service departments and other
available resources.
● Possess excellent communication skills and Leadership capabilities to integrate out of
box thinking & problem solving analysis to improve process.
Industrial Experience
VOLVO EICHER COMMERCIALVEHICLE LTD.
Working with effect from 28th may 2012 to till present for the Bus Plant as a
Deputy Manager to look after Production Vehicle assembly.
Volvo Eicher is a joint 50:50 joint venture of Volvo and Eicher.
It deals with manufacturing of Trucks and Buses in both LCV and HCV segment. Sited
Pithampur having top line manufacturing processes which include cab weld shop with robotic
welding & Robotic paint shop and Penetrating in Medium & Heavy commercial Truck &
Passenger Bus segment.
CAREER OBJECTIVE
SUMMARY
Roles & Responsibilities
● Responsible for day to day production activities.
● Monitoring and controlling Man power to execute the Daily production activity.
● Responsible for overall Production & Quality to meet the target & also customer
satisfaction in both quantity & quality.
● Continuous improvisation of defects coming in Line Production, & Stage Inspection for
controlling Line Rejection.
● To maintain and enhance Kaizen activities.
● Controlling consumable cost and raw material wastage during regular production
activity.
● To work for Line balancing activity in guidance of Industrial engineering department.
● Preparing Competency chart skill Matrix & Job responsibility of work force.
● Involve in recruitment of technicians & shop floor staff as per requirement from Govt.
Institutions / ITI diploma colleges within four states to maintain diversity of workers.
● Involved in Process controlling & documentations like CAPA, PFMEA, and AOS.
● Involved in activities of HIRA and AIA.
● Assignment of induction training of new technicians & trainees.
Experience
SML ISUZU LTD (Formerly SWARAJ MAZDA LTD.)
Worked w.e.f 11th January 2010 to 24th May 2012 as Production Engineer and handled the
production Vehicle Assembly line for the fitment of Engine, transmission and Cabin
mounting.
● It was the joint venture of SWARAJ GROUP and MAZDA MOTORS Japan.
● Now it is collaborated with ISUZU JAPAN and hence its name has been changed to SML ISUZU.
● IT deals with the production of LCV & HCV in trucks and buses with their in-house manufacturing
of CHASIS,ENGINE, TRASMISSION and BODY.
Roles & Responsibilities
● Monitoring and controlling Man power to execute the Daily production activity
● Ensure delivery of product in time as planned with effective utilization of available
capacities & budget.
● Maintain visual management system and 5‘s’ at shop floor.
● To maintain work discipline and ensure harmony within the department by building team to
obtain optimum results & ensure quality standards.
● Responsible for maintaining rejection and waste levels within norms.
● Development and implementation of productivity improvement projects
● Follow and adhere to Company policies on Health, Safety & Environment.
EDUCATIONAL BACKGROUND
Degree Institute/ University University/Boar
d
Year of
passing
Percentage
B.Tech.
(Mech.)
Shaheed Bhagat Singh College of
Egg. & technology, Ferozepur
(Established by Punjab govt.)
PTU Jalandhar 2009 71.8%
12th Class D.A.V PUBLIC Sr. Sec.SCHOOL PSEB 2004 66%
10th Class SHRI GURU RAM RAI SCHOOL. CBSE 2002 65.6%
SKILLS
● Introduction to Computer.
● Application Software’s: AutoCAD 2006/2009, MS-WORD, MS-EXCEL.
● Language: Basic Knowledge in C programming.
● OS: Windows 98/2000/XP.
● Internet
● Management Skills: Manpower Management.
Training Undertaken
● Training about 5 ‘S’ & about Fire Fighting.
● Six month industrial training at SWARAJ MAZDA LTD. ROPAR
● Six week vocational training at DCM ENGINEERING PRODUCTS dealing with
cylinder heads and blocks, ROPAR
● Six week training at Central Workshop SBSCET Ferozepur.
Extra Curricular Activities
● Got Award for the cost cutting of sealant consumption of window fitment in VECV.
● Won FIRST Prize IN DISTT. Level essay writing competition.
● Executive member in SFME & SECA in college.
Personal Details
Father Name SH. VASUDEV PAL
Mother Name: Smt. RAMA PAL
Date of Birth: 27 June 1987
Gender: Male
Hobbies: playing chess and cricket, Listening Music
Language Known: English, Hindi and Punjabi.
Permanent Address: HN-5358/39, SHAHEED BHAGAT SINGH NAGAR ROPAR,
PUNJAB.PIN-140001
Declaration
I hereby declare that information provided by me is true to best of my knowledge & record.
Date : Signature :
(ANCHAL KUMAR)

anchal cv

  • 1.
    RESUME ANCHAL KUMAR HN-5358/39, SHAHEED BHAGATSINGH NAGAR ROPAR, PUNJAB PIN -140001 M: +917024148989; 9584451716 Email; akumar6133@gmail.com To obtain a challenging leadership position in an organization that will utilize my skill to benefit mutual growth & success. ● A dynamic Professional with 6.5 years of experience in Production Product Assembly Vehicle assembly (Trim, Chassis & Fitment) and Exposure in Body Shop, proto shop, FVI,PDI and field complaints issues capturing. ● Well versed in achieving new production targets, enhance efficiency, reduction in DPV, Cost reduction with best utilization of available manpower, service departments and other available resources. ● Possess excellent communication skills and Leadership capabilities to integrate out of box thinking & problem solving analysis to improve process. Industrial Experience VOLVO EICHER COMMERCIALVEHICLE LTD. Working with effect from 28th may 2012 to till present for the Bus Plant as a Deputy Manager to look after Production Vehicle assembly. Volvo Eicher is a joint 50:50 joint venture of Volvo and Eicher. It deals with manufacturing of Trucks and Buses in both LCV and HCV segment. Sited Pithampur having top line manufacturing processes which include cab weld shop with robotic welding & Robotic paint shop and Penetrating in Medium & Heavy commercial Truck & Passenger Bus segment. CAREER OBJECTIVE SUMMARY
  • 2.
    Roles & Responsibilities ●Responsible for day to day production activities. ● Monitoring and controlling Man power to execute the Daily production activity. ● Responsible for overall Production & Quality to meet the target & also customer satisfaction in both quantity & quality. ● Continuous improvisation of defects coming in Line Production, & Stage Inspection for controlling Line Rejection. ● To maintain and enhance Kaizen activities. ● Controlling consumable cost and raw material wastage during regular production activity. ● To work for Line balancing activity in guidance of Industrial engineering department. ● Preparing Competency chart skill Matrix & Job responsibility of work force. ● Involve in recruitment of technicians & shop floor staff as per requirement from Govt. Institutions / ITI diploma colleges within four states to maintain diversity of workers. ● Involved in Process controlling & documentations like CAPA, PFMEA, and AOS. ● Involved in activities of HIRA and AIA. ● Assignment of induction training of new technicians & trainees. Experience SML ISUZU LTD (Formerly SWARAJ MAZDA LTD.) Worked w.e.f 11th January 2010 to 24th May 2012 as Production Engineer and handled the production Vehicle Assembly line for the fitment of Engine, transmission and Cabin mounting. ● It was the joint venture of SWARAJ GROUP and MAZDA MOTORS Japan. ● Now it is collaborated with ISUZU JAPAN and hence its name has been changed to SML ISUZU. ● IT deals with the production of LCV & HCV in trucks and buses with their in-house manufacturing of CHASIS,ENGINE, TRASMISSION and BODY.
  • 3.
    Roles & Responsibilities ●Monitoring and controlling Man power to execute the Daily production activity ● Ensure delivery of product in time as planned with effective utilization of available capacities & budget. ● Maintain visual management system and 5‘s’ at shop floor. ● To maintain work discipline and ensure harmony within the department by building team to obtain optimum results & ensure quality standards. ● Responsible for maintaining rejection and waste levels within norms. ● Development and implementation of productivity improvement projects ● Follow and adhere to Company policies on Health, Safety & Environment. EDUCATIONAL BACKGROUND Degree Institute/ University University/Boar d Year of passing Percentage B.Tech. (Mech.) Shaheed Bhagat Singh College of Egg. & technology, Ferozepur (Established by Punjab govt.) PTU Jalandhar 2009 71.8% 12th Class D.A.V PUBLIC Sr. Sec.SCHOOL PSEB 2004 66% 10th Class SHRI GURU RAM RAI SCHOOL. CBSE 2002 65.6% SKILLS ● Introduction to Computer. ● Application Software’s: AutoCAD 2006/2009, MS-WORD, MS-EXCEL. ● Language: Basic Knowledge in C programming. ● OS: Windows 98/2000/XP. ● Internet ● Management Skills: Manpower Management.
  • 4.
    Training Undertaken ● Trainingabout 5 ‘S’ & about Fire Fighting. ● Six month industrial training at SWARAJ MAZDA LTD. ROPAR ● Six week vocational training at DCM ENGINEERING PRODUCTS dealing with cylinder heads and blocks, ROPAR ● Six week training at Central Workshop SBSCET Ferozepur. Extra Curricular Activities ● Got Award for the cost cutting of sealant consumption of window fitment in VECV. ● Won FIRST Prize IN DISTT. Level essay writing competition. ● Executive member in SFME & SECA in college. Personal Details Father Name SH. VASUDEV PAL Mother Name: Smt. RAMA PAL Date of Birth: 27 June 1987 Gender: Male Hobbies: playing chess and cricket, Listening Music Language Known: English, Hindi and Punjabi. Permanent Address: HN-5358/39, SHAHEED BHAGAT SINGH NAGAR ROPAR, PUNJAB.PIN-140001 Declaration I hereby declare that information provided by me is true to best of my knowledge & record. Date : Signature : (ANCHAL KUMAR)