2. Does MATC/AMC
Support Wind Power?
ā¢ The Maine Appalachian Trail Club (MATC) supports significant
increases in renewable energy ā¦ā¦ā¦. The MATC recognizes the
need to develop wind power as a renewable energy source.
ā¢ The Appalachian Mountain Club (AMC) supports significant
increases in renewable energy that result in actual greenhouse
gas and air pollutant reductions and is balanced with strong
protection of natural and recreational resources of statewide,
regional or national significance.
Yes, but a Qualified Yes
3. 5-MILE BUFFER
3+ CLASS WIND SHADED
CIRCLE SIZE & PLACEMENT APPROXIMATE
Potential
Wind
Power
Conflict
Areas in
Maine
4. āEnergy Issues: Because there are both societal benefits to
renewable energy and significant adverse impacts associated
with the installation of wind farms, the benefits of any
individual project must be weighed in relation to the costs.
Some of these factors include:
Source of power that is likely to be displaced by the wind
farm: Will the wind displace fossil-fuel plants or other
renewable sources? (This is a remarkably complex question, but in
some circumstances it seems likely that wind will not displace fossil fuels, but
rather will lead to closure of biomass generation or increased peaking of
hydroelectric dams.)
Power production in relation to the severity of impacts: Will
the amount of power produced be in proportion to the
severity of the impacts?ā
Policy on Wind-Energy Facilities
(As adopted by the ATC Board of Directors on November 3, 2007)
6. 2008 Wind
Energy Act
ā¢ Wind Projects are a Permissible
Use in LURC Jurisdiction
ā¢ Wind Power is Presumed
āGoodā
ā¢ No Visual Impact if > 8 miles
ā¢ Expedited Areas, fees and
procedures.
7. A.T.
First Windās Bingham Wind will be its 6th & Largest
Project
62 turbines
492-ft tall
Base Elevation 1,400ā - 1,800ā
All > 7 miles from the A.T.
10. Protection for some Combination of
Conservation Land
Bald Mountain
Pond Northeast
Shoreline
Protected from
Development
Protection of a
Potential Wind
Power Mountain
Ridge
Protection of
Crocker Mtn.
&/or Orbeton
Stream
11. Protection, Mitigation & Enhancement
(PME) Agreement
ā¢ Radar Activated Lighting
ā¢ Orbeton viewshed
ā¢ Minimize Visual Impact on
Bald Mtn. Pond
ā¢ Conservation Land
Protection
ā¢ A.T. Related Issues
Resolved
ā¢ MATC/AMC will not
Oppose Project
ā¢ No Collaboration with
other Opposition Parties
ā¢ MATC/AMC Signs PME
Agreement
17. Wind Assessment Study
ā¢ 15 wind-related bills
submitted to Legislature
in 2011.
ā¢ All rejected by EUT
committee & Governor.
ā¢ Under pressure, passed
a āresolveā.
ā¢ 25 Recommendations to
Improve the current
Wind Act.
18. An Act to Protect Maineās
Scenic Character
LD 1147
ā¢ Visual assessments up to 15
miles.
ā¢ Consider cumulative visual
impacts.
ā¢ Require DEP approved
Decommissioning Plan.
.
19. More than 50% of Maineās
wind generating capacity
was built prior to the
Wind Act.
After 7 years, it is time to
recalibrate the Wind Act
to better balance wind
power development with
protection of Maineās
āQuality of Placeā.
Amendments to the Act
will not stop future wind
power development.
20. Appalachian Mountain Club
ā¢ Over 100,000 members
ā¢ Joy Street, Boston office
ā¢ Social activities, kayak trips, hikes, etc.
ā¢ Enjoy the Outdoors
Maine Appalachian Trail Club
ā¢ About 700 members
ā¢ Augusta post office box
ā¢ Chainsaw training, stone steps,
clipping, etc.
ā¢ Work so others can enjoy the A.T.
Editor's Notes
SPEAKER: Tony Barrett
BRIEF BACKGROUND: Tony worked 21 years in the energy industry. Ā He served on the ATC Stewardship Council from 2005-2009 (Chair of the Energy SubCommittee) when ATC's Policy on Wind Energy Facilities was adopted in 2007. He is also a member of the MATC Executive Committee and of the MATC Wind Power Committee. Ā Tony worked on the MATC Ā Wind Power Development policy adopted in 2009.
SUMMARY: MATC's policy recognizes the need to develop Wind Power however, this need must be balanced against the scenic, natural and Ā recreational resources of the AT in Maine. Ā Ā Ā Careful siting is crucial. The 'expedited Wind Power' Act of 2008 set a goal of 2,000 MW of installed wind power capacity by 2015. It is unlikely that this goal will be met but wind power projects have certainly increased during the past 5 years and Maine has become the center of wind energy production in New England. Ā We also have over 6 years of experience under this law (passed as emergency legislation) and have a better handle on how the siting of wind projects has affected the Appalachian Trail and Maine's scenic landscapes. Ā Ā Is it time to recalibrate the Wind Power Act to better balance wind power development with protection of Maine's AT?
Some members/public assume that MATC & AMC are opposed to Wind Power.
Quite the opposite: Both AMC and MATC have policies that explicitly support wind power. These policies were developed in 2006/2007. ATC/MATC āborrowedā language from AMC.
Early on, we recognized that Maine had the greatest potential for conflict along the entire A.T.
In part due to Class 3+ resources being greater in New England than the southern mountains and that the corridor in Maine is narrow without the buffer of National Parks & Forests.
Besides scenic/landscape impacts, the policy also recognizes that the energy benefits must be balanced with the costs.
[Besides being proposed within 1.5-miles of trhe A.T. and on high elevation (>2,700ā) w/ severe erosion impacts], this project had very questionable energy impacts. The generator lead was shared with a biomass plant leading to Wyman Dam. Grid analysis by experts indicated that when the wind would blow, other renewables would be scaled back.
The denial of Reddington had a strong reaction from industry and wind supporters ā as well as expensive & lengthy hearings. There was a desire of both sides to have better siting criteria to avoid future delays and litigation.
The Governor formed a task force in late 2007 and the recommended legislation was passed as an emergency measure (takes immediate effect), āunder the hammerā (no floor debate) even though the final bill (the critical expedited areas map was not yet available).
Last month (Sept 11, 2014), the Maine DEP issued final permits for the largest wind project in New England.
Since the viewpoints from the A.T. are beyond 8 miles from the nearest turbine, legally there are no visual impacts.
This project has a wide angle of view, particularly when viewed from Moxie Bald.
Night sky impacts are in some ways more prominent than day time visual impacts:
- lights are visible at greater distance
- over the horizon impacts on cloudy nights
ATC & AMC have been working with FAA and developers on collision avoidance systems that minimize night sky impacts for over 8 years. Radar Activated Lighting Systems (RALS)
Even though greater than 8 miles distant, the Bingham project will have significant visual impact on the A.T. experience. AMC, ATC & MATC developed ideas to mitigate that impact.
Ken Kimball, took the lead to negotiate an agreement that was finalized this Spring. The Press mistakenly characterized this PME agreement as a payoff ā much to the chagrin of some members who were upset at this characterization. Copies of the statement and correction letter are available in the rear.
1.) PHOTO SIMULATIONS UNDERSTATE IMPACT AND ARE DEFICIENT. [Simulated view of Highland Project wind turbines from Flagstaff Lake].
After 7 years and over 10 projects (400 MW) installed, a number of deficiencies or oversights have been identified in the 2008 Wind Act.
2.) ACTUAL PHOTOS ALSO UNDERSTATE VISUAL IMPACT [Roxburyās Record Hill wind project 14 miles from the A.T.]
This project was evaluated from its closest point to the A.T. ā about 7 miles away. Never thought to evaluate from Baldpate Mtn. at over 14 miles away.
3.) NO CONSIDERATION OF CUMMULATIVE IMPACT
Under the Wind Act, each project is considered as standalone ā in fact, visual degradation can be used to justify new wind farm development.
4.) 8-MILE LIMIT IS INADEQUATE FOR HIGH ELEVATION PEAKS
This is a map with 8-mile circles around various viewpoints in the Bigelows and West Carry pond. A new project proposed by Iberdrola will be very visible from the Bigelows.
5.) TURBINES ARE GETTING HIGHER SINCE THE WIND ACT was passed.
Reddington proposed and Mars Hill and Kibby have turbines about 400-feet. The just approved turbines for Bingham are just under 500-ft. First Wind is seeking approval for its Hancock Wind project to have 575-ft. tall turbines.
In 2011, the Legislature authorized a study to review progress on goals and changes to the Wind Act.
Three of the 25 recommendations addressed deficiencies in handling visual impact. MATC sponsored its first bill ever. It was defeated in the House by 3 votes.
We are just wanting to achieve a better balance between renewable energy and conserving the northwoods landscape.
Help us support future legislation ā AMC has a much larger constituency.