Ali Abd El Rahman Mohammed El Sharkawy
PERSONAL DATA
 Address: 32 Hedar Street - Helwan - Cairo - Egypt.
 Nationality: Egyptian.
 Date of birth: 22/09/1989.
 Marital status: Married.
 Military status: Served.
 Driver’s License: Yes.
 Mobile: (002)01069647447 – (002)01064663188.
 Email: eng.ali.elsharkawy@gmail.com
EDUCATION
 Degree: B.Sc. of Civil Engineering, Al-Azhar University in Cairo.
 Graduation date: May 2013.
 Cumulative grade: Good.
 Final year grade: Very Good.
 Project Title: Projects Management with Dr. Hatem El Behary at Gulsan Factory project, the
consult ECG and the main contractor Hassan Allam.
 Project grade: Excellent.
TECHNICAL SKILLS
 Computer:
o AutoCAD (all versions).
o Primavera (Very Professionally in all versions).
o AutoCAD Structure Detailing 2014.
o Revit Structure (Basic Knowledge).
o MS Project.
o Sap2000.
o CSI COLUMN.
o Microsoft Office 2013: Professionally in (Word, Excel and power point).
o Very Professionally about general software & hardware with a Computer.
 Site: Certifying for "Site Engineering Diploma", producer by Eng. Hassan Kandil.
 SAFTY: Certifying from Economics and Political Science University & Knowledge Academy for
"OSHA".
 HR: Certifying form dream infinity company for "HR resources"
 Surving: Certifying from Road and Bridges Association for “the training of Total station,
Theodolite and Leveling Devices “.
 Management
o PMP Preparation Course in Expert Center in Oct. 2015.
o Making Delay Analysis for The Time & Cost.
o Making Time and cost Schedule for any project as A Freelancer.
o Study tenders and bids for any project.
CURRENT JOBS
 Cost Control Engineer: Worked in ECIP Company (Engineering Company for Integrated Projects)
from Sep. 2015 until NOW in two Project:
1) Chipsy Our Planet Factory –El Obor City Budget 160 Million Pounds as a Cost Controller
& Planner from Sep.2015 until NOW the Following:
 Calculation Variation Order.
 Submit Claims to the consultant.
 Prepare the Cash Flow, Cash in & Cash Out.
 Earned Value Report.
 Prediction Report, to be on Schedule and behind cost
 Review Purchasing Orders.
 Connect with Accounting Dep. in all Processes.
 Review All Quantity Survey and Making Sure that is according to Executing.
 Calculation for Wages of Labours every.
 Review the time line.
 Making Issue Log with All Problems are faces the Project.
 Calculate the Productivity for Labours and Materials.
 Making All Owner and Sub-Contractors Invoices.
 Compare Between Offers for Subcontractors and Making Report for This Study.
 Audit All Materials Store Dep.
PREVIOUS JOBS
From Oct. 2014 Till Sep. 2015
2) Project Control Engineer: Worked in ECIP Company in “Marvel City Project” in Fifth
District Budget of Total Works 30 Million Pounds with the Following:
 Making Update the time line as a Scheduler.
 Calculate the Material’s Cost.
 Submit All Quantity Survey and Making Sure that is according to Executing.
 Making All Sub-Contractors Invoices.
 Prepare Shop drawing for Civil Works.
PREVIOUS JOBS
From Nov. 2013 Till Jan. 2014
 Site Engineer : As Site Engineer of Based Signal Corps of the Military Engineering
Department Mohamed Abdel Wahab Company’s for General Contracting
from Nov 2013 until Jan 2014.
SUMMER TRAINING
 Training in Ashraf Zaid Company in summer 2011.
 Training in Metro Station (Ard El Marred) in summer 2010.
OTHER TRAINING
 A seminar in Project Management at Anwar Resala Nasr city Branch in July 2015.
 Hr Diploma from Dreamy Infinity.
 An Active volunteer in “Masr EL Mahrousa”.
LANGUAGES
o Arabic language: (mother tongue).
o English language: Very Good (reading, speaking and writing).

Ali elsharkawy - CV - Cost Control

  • 1.
    Ali Abd ElRahman Mohammed El Sharkawy PERSONAL DATA  Address: 32 Hedar Street - Helwan - Cairo - Egypt.  Nationality: Egyptian.  Date of birth: 22/09/1989.  Marital status: Married.  Military status: Served.  Driver’s License: Yes.  Mobile: (002)01069647447 – (002)01064663188.  Email: eng.ali.elsharkawy@gmail.com EDUCATION  Degree: B.Sc. of Civil Engineering, Al-Azhar University in Cairo.  Graduation date: May 2013.  Cumulative grade: Good.  Final year grade: Very Good.  Project Title: Projects Management with Dr. Hatem El Behary at Gulsan Factory project, the consult ECG and the main contractor Hassan Allam.  Project grade: Excellent. TECHNICAL SKILLS  Computer: o AutoCAD (all versions). o Primavera (Very Professionally in all versions). o AutoCAD Structure Detailing 2014. o Revit Structure (Basic Knowledge). o MS Project. o Sap2000. o CSI COLUMN. o Microsoft Office 2013: Professionally in (Word, Excel and power point). o Very Professionally about general software & hardware with a Computer.  Site: Certifying for "Site Engineering Diploma", producer by Eng. Hassan Kandil.  SAFTY: Certifying from Economics and Political Science University & Knowledge Academy for "OSHA".  HR: Certifying form dream infinity company for "HR resources"  Surving: Certifying from Road and Bridges Association for “the training of Total station, Theodolite and Leveling Devices “.
  • 2.
     Management o PMPPreparation Course in Expert Center in Oct. 2015. o Making Delay Analysis for The Time & Cost. o Making Time and cost Schedule for any project as A Freelancer. o Study tenders and bids for any project. CURRENT JOBS  Cost Control Engineer: Worked in ECIP Company (Engineering Company for Integrated Projects) from Sep. 2015 until NOW in two Project: 1) Chipsy Our Planet Factory –El Obor City Budget 160 Million Pounds as a Cost Controller & Planner from Sep.2015 until NOW the Following:  Calculation Variation Order.  Submit Claims to the consultant.  Prepare the Cash Flow, Cash in & Cash Out.  Earned Value Report.  Prediction Report, to be on Schedule and behind cost  Review Purchasing Orders.  Connect with Accounting Dep. in all Processes.  Review All Quantity Survey and Making Sure that is according to Executing.  Calculation for Wages of Labours every.  Review the time line.  Making Issue Log with All Problems are faces the Project.  Calculate the Productivity for Labours and Materials.  Making All Owner and Sub-Contractors Invoices.  Compare Between Offers for Subcontractors and Making Report for This Study.  Audit All Materials Store Dep. PREVIOUS JOBS From Oct. 2014 Till Sep. 2015 2) Project Control Engineer: Worked in ECIP Company in “Marvel City Project” in Fifth District Budget of Total Works 30 Million Pounds with the Following:  Making Update the time line as a Scheduler.  Calculate the Material’s Cost.  Submit All Quantity Survey and Making Sure that is according to Executing.  Making All Sub-Contractors Invoices.  Prepare Shop drawing for Civil Works.
  • 3.
    PREVIOUS JOBS From Nov.2013 Till Jan. 2014  Site Engineer : As Site Engineer of Based Signal Corps of the Military Engineering Department Mohamed Abdel Wahab Company’s for General Contracting from Nov 2013 until Jan 2014. SUMMER TRAINING  Training in Ashraf Zaid Company in summer 2011.  Training in Metro Station (Ard El Marred) in summer 2010. OTHER TRAINING  A seminar in Project Management at Anwar Resala Nasr city Branch in July 2015.  Hr Diploma from Dreamy Infinity.  An Active volunteer in “Masr EL Mahrousa”. LANGUAGES o Arabic language: (mother tongue). o English language: Very Good (reading, speaking and writing).