- Passenger traffic at Indian airports has grown significantly over the past decade and is expected to reach 421 million by 2020. The six major airports in India saw passenger traffic increase between 11-23% in the last fiscal year.
- India has 464 airports and airstrips, of which 125 are owned and managed by the Airports Authority of India. The six largest airports by passenger traffic are located in Delhi, Mumbai, Bengaluru, Chennai, Hyderabad, and Kolkata.
- Domestic passenger traffic has expanded at a 12.73% CAGR between 2006-2016, reaching 168.89 million in 2016. International passenger traffic grew at a 9.36% CAG