Global Business Services, GBS




Agile retrospectives
Erfaringer fra en agile coach

          bestbrains
          4. september 2012



                                        © 2012 Søren Weiss Hansen
Global Business Services, GBS




2                                   © 2012, Søren Weiss Hansen
Global Business Services, GBS


The agile coach team in IBM/DK
   Min. 5 years of practical experience (scrum)
   Have worked as scrumteammembers, scrummasters, product owners and agile coaches
   Have faced the “dragons”- and are still alive…




    Søren                          Thomas                    Gitte                    Annette
    Weiss                          Byrdal                    Klitgaard                Klink
    • Coaching                     • Agile tools             • Agile testing          • Management
    • Scrum practices              • International           • Process &              • Agile contracts
    • Agile values                   scrum teams               Methodology            • Training




                                                                                               © 2012, Søren Weiss Hansen
3
Global Business Services, GBS




Agile coaching @IBM/DK 2008-2012


                                            4 agile
                                89         coaches
                              Projects


                                          131
                                         teams




                                1089 people
                                                      © 2012, Søren Weiss Hansen
Global Business Services, GBS



    Stop, reflekter og find en bedre vej….
                                         “Here is Edward Bear coming downstairs now.
                                         Bump, bump, bump, on the back of his head,
                                         behind Christopher Robin. It is, as far as he
                                         knows, the only way of coming downstairs, but
                                         sometimes he feels that there might be another
                                         way. If only he could stop bumping for a
                                         moment and think of it.”
                                                                             A. A. Milne
                                                                       Winnie the Pooh
                                                                            (Peter Plys)




     ”De fleste siger, at de gerne vil lære, men færre tager sig tiden til det…”
5                                                                           © 2012, Søren Weiss Hansen
Global Business Services, GBS




    Hvad er et retrospective?
    “Et møde af en fast varighed afholdt mellem sprints
    med det formål at drage sig erfaringer med, hvad
    der virker særlig godt, og hvad der kan forbedres
    yderligere. Erfaringerne omsættes til forbedrende
    handlinger i det næste sprint og på den måde
    optimeres arbejdsformen, leverancerne og
    trivslen”.




                                                          Andre kilder:
                                                          • Scrumfoundation
                                                          • Scrum.org




6                                                                         © 2012, Søren Weiss Hansen
Global Business Services, GBS




    Historie
    •   1997: in "Surviving Object-Oriented Projects", Alistair Cockburn describes several
        projects (dating as far back as 1993) informally using the practice, but does not give it a
        label; he summarizes it as "Work in increments, focus after each"
    •   2001: the first description of a "reflection workshop" in the context of an Agile project
        appears in Alistair Cockburn’s "Agile Software Development"
    •   2001: regular retrospectives are one of the principles of the Agile Manifesto: "At regular
        intervals, the team reflects on how to become more effective, then tunes and adjusts its
        behavior accordingly", though not necessarily yet common practice
    •   2001: the term "Project Retrospectives" is introduced in Norm Kerth’s book of the same
        name
    •   2001: the XP community endorses retrospectives early on, by way of a paper at XP2001
        on "Adaptation: XP Style"
    •   2003: thanks in good part to sessions at the XP Day cycle of conferences, more teams
        start practicing project and iteration retrospectives
    •   2006: the publication of Esther Derby and Diana Larsen’s "Agile Retrospectives" brings to
        a close the codification of heartbeat retrospectives
        Kilde: agilealliance.org

7                                                                                         © 2012, Søren Weiss Hansen
Global Business Services, GBS




    Læring i det traditionelle og i det agile projekt

                                          •   Varighed: 1-3 dage
                                          •   Gennemføres efter projektet er afsluttet
        Evaluering                        •
                                          •
                                              Fokus på det der ikke virkede
                                              Reflektion og læring til brug i næste projekt
                                          •   Vanskeligt at overføre læringen til næste
       (Traditionel udvikling)                projekt.                                                        Projekt-
                                                                                                                 leder




                                          • Varighed: 2-4 timer
                                          • Gennemføres efter hver iteration
      Retrospective                       • (Også) fokus på det, som vi er gode til og
                                            som vi vil gøre mere af
                                          • Reflektion og læring til brug i næste iteration
         (Agile udvikling)                • Forholdsvis nemt at overføre læringen til den                      Scrum-
                                            næste iteration.                                                   master




8                                                                                             © 2012, Søren Weiss Hansen
Global Business Services, GBS



    Miniretrospective – et eksempel
    Hvor mange af jer har deltaget i et retrospective?


    Hvor godt fungerede det seneste retrospective, som du deltog i? (Fo5)

    Hvad fungerede særlig godt? (Skriv på en grøn post it note)
    Hvad fungerede særlig dårligt? (Skriv på en rød post it note)

    Gruppen placerer alle post it notes på en easyflip og danner sig et overblik emnerne (uddyb for hinanden hvis der er tvivl om indhold).


    Organiser identiske emner i klynger. Tegn en cirkel om en klynge og navngiv den.


    Hver person har tre stemmer (dot votes). Stem på de tre emner, som du er mest interesseret i at undersøge nærmere.


    Skriv emnet med flest stemmer på en ny easyflip og tegn en cirkel om emnet.


    Vedkommende, der har skrevet emnet, præsenterer det for resten af gruppen.


    Tegn - som en gruppe - et mindmap eller et rigt billede, der viser hvordan man i det næste retrospective, som I skal deltage i, vil kunne
    bruge jeres indsigt om emnet til at forbedre mødet.


    Præsenter mindmap / rigt billede for de andre grupper.


9                                                                                                                             © 2012, Søren Weiss Hansen
Global Business Services, GBS




     Miniretrospektive - opfølgning




                       ”Hvad er den vigtigste læring, som
                        du tager med fra denne øvelse?”




10                                                          © 2012, Søren Weiss Hansen
Global Business Services, GBS




     Mønstre

      #1 - Manglende        #2 - Manglende       #3 - Manglende         #4 - Manglende           #5 - Svagt
       forberedelse             struktur           opfølgning         variation i øvelserne   formulerede mål




       #6 - Passive         #7 - Forhastede     #8 - Utilstrækkelig       #9 – Uklare         #10 - Facilitatoren
      mødedeltagere          konklusioner       tid / for megen tid       møderegler            faciliterer ikke




                            #12 - Manglende       #13 - Skøjten                                  #15 - Utryg
     #11 - Distribuerede
                             anerkendelse af    ovenpå de “farlige”        #14 – ???          stemning / blame
           teams
                           retrospectivemødet        emner                                         game



                                                #18 - Manglende         #19 - Venten på        #20 –Prøver at
      #16 -Ugunstige        #17 - Manglende     opfølgning på mål     næste retrospective     implementere for
      fysiske rammer        mødetidsdisciplin      fra seneste        før en ændring kan      mange ændringer
                                                  retrospective          gennemføres            på een gang




11                                                                                                © 2012, Søren Weiss Hansen
Global Business Services, GBS

                                                                                            TIP: Bed deltagerne
                                                                                          reflektere før mødet og
                                                                                          medbringe input/data til
     #1 - Manglende forberedelse                                                                   mødet


                                                                                         TIP: Brug en sprintlog til at
                                                                                            indsamle information
                                                                                             undervejs i sprintet

                                  Indsaml              Indsaml                            TIP: også deltidsansatte,
                                  relevant             relevant                            studentermedhjælpere,
                              information fra      information fra                       projektkoordinatorer osv.
                               stakeholders           ledelsen                             kan have gode input til
                                                                                         arbejdsformen, processen
                                                                                           eller interaktionen med
                                                                         Logistik               andre enheder.
                Indsaml
                relevant                                             Find gerne en
            information fra                                           lokation der
             scrumteamet                                               indbyder til
                                                                       inspiration




         Indsaml
                                                                              Design /
         relevant
     information fra                      Facilitator                         forbered
                                                                               øvelser
     product owner




12                                                                                                © 2012, Søren Weiss Hansen
Global Business Services, GBS




     #2 - Manglende struktur



                     Set the                                                  Generate          Decide what            Close the
                                               Gather data
                     stage                                                     insights            to do             retrospective


         • Agenda                     • Brainstorming              •   Organiser data     • Brainstorm          • Check out
         • Mål                        • Objektivt og               •   Opsummere            actions             • Retrospective on
         • Check in                     factsbaseret               •   Analyser           • Prioriter actions     the retrospective
                                                                   •   Find mønstre       • Filtrer actions
                                                                   •   Få ideer           • Beslut
                                                                                          • Commit
                                                                                          • Vælg ansvarlige
                                                                                          • Aftal deadlines
                                                                                          • Overfør til næste
                                                                                            sprint




      Kilde: Agile Retrospectives – making good teams great (D. Larsen, E. Derby)

13                                                                                                                            © 2012, Søren Weiss Hansen
Global Business Services, GBS




     #3 - Manglende opfølgning


                                  • Gør i teamrummet actions for næste
                                    sprint synlige.

        Implementer               • Følg op i teamet løbet af sprintet.
           actions                • Vær disciplineret.
         som tasks                • Husk at det tager tid (mindst et
                                    sprint) at ændre en vane.
       i næste sprint
                                  • Husk at lave opfølgning på næste
                                    retrospective.




14                                                                        © 2012, Søren Weiss Hansen
Global Business Services, GBS


     #4 - Manglende variation i øvelserne (1/2)
                                                                                                                          Close the
         Set the stage                   Gather data                  Generate insights      Decide what to do
                                                                                                                        retrospective

                                        Time line and                                         The retrospective
           Check in                                                Brainstorming/filtering                                 +/Delta
                                          variations                                           planning game

      Focus on / focus off               Triple nickels              Force field analysis      SMART goals              Appreciations


             ESVP                      Color code dots                      5 whys           Circle of questions    Temperature reading

                                                                                                                      Helped, hindered,
     Working agreements                 Mad, sad, glad                     Fishbone            Short subjects
                                                                                                                         hypothesis

     Temperature reading              Locate strengths               Patterns and shifts        Triple nickels              ROTI


     Satisfaction histogram        Satisfaction histogram            Prioritize with dots    Force field analysis   Satisfaction histogram

                                                                       Report out and
                                         Team Radar                                                                     Team Radar
                                                                         synthesis

                                          Like to Like                 Identify themes                                 Learning matrix


                                             FRIM                      Learning matrix                                 Short subjects


        Kilde: Agile Retrospectives – making good teams great (D. Larsen, E. Derby)

15                                                                                                                               © 2012, Søren Weiss Hansen
Global Business Services, GBS




     #4 - Manglende variation i øvelserne (2/2)

      Benyt gerne temaretrospectives der er
      designet så øvelserne passer til det
      udviklingstrin, hvor teamet er.

      - ”Hvordan kan vi optimere på de tre roller?”

      - ”Hvordan får vi PBL’en i en tilstand, hvor
      den øverste del er groomet tilstrækkeligt?”




16                                                    © 2012, Søren Weiss Hansen
Global Business Services, GBS




     #5 - Svagt formulerede mål

                                          Før ændring til smart-mål:
                                          “Vi aftaler at øge anvendelsen af pair programmering”.



                                          Efter ændring til smart-mål:
                                          “Målet er at pair programmere mindst 5 timer dagligt
                                          startende næste mandag. Vi roterer dagligt. Peter laver et
                                          skema med et program over ordningen, og vi evaluerer på
                                          næste retrospective”.



                                          Tip:
                                          • Lav eet smart mål ad gangen

                                          • Lav 1-5 actionpunkter til hvert mål

                                          • Udpeg en ansvarlig

                                          • Planlæg med flere iterationer (pas på ikke at undervurdere
                                            tidsforbruget)
                                          • Det kræver øvelse at lave gode smart mål


17                                                                                     © 2012, Søren Weiss Hansen
Global Business Services, GBS




     #6 - Passive mødedeltagere
                                         Sørg for at samtlige mødedeltagere ”byder op til dans” i løbet
                                         af de første 5 minutter af mødet.

                                         Isen brydes ved at få samtlige deltagere til at sige noget.
                                         Undersøgelser viser, at det er afgørende for aktivitetsniveauet i
                                         løbet af mødet, at alle mødedeltagerne indenfor de første få
                                         minutter af mødet får sagt noget.

                                         Efter velkomsten og præsentation af mål og agenda, stiller
                                         retrospectivelederen eet kort spørgsmål. Hver person svarer efter
                                         round-robin princippet. Der stilles spørgsmål, som kan besvares
                                         kortfattet. Eksempler på spørgsmål:
                                         • Udtrykt i een sætning, hvad håber du, at vi opnår med dagens
                                           retrospective?

                                         • Udtrykt i eet ord, hvordan er din egentilstand lige nu?

                                         • Hvad er din største bekymring i relation til dagens
                                           retrospective?
                                         Retrospecitvlederen går rundt i lokalet og lytter aktivt men uden at
                                         bedømme svarene, dvs. uden at sige "godt", "super", "perfekt" osv.
                                         Retrospecitvlederen takker afslutningsvist alle personerne for
                                         deres deltagelse.




18                                                                                          © 2012, Søren Weiss Hansen
Global Business Services, GBS




     #7 - Forhastede konklusioner

      Dette er et mønster, som jeg ofte ser på retrospectives, typisk hvor der mangler
      struktur og facilitering.

      Følgende ses:

      - Teamet indsamler ikke data men hopper direkte til at konkludere ved at spørge
      teamet: ”hvad gik godt?” og ”hvad skal vi gøre anderledes?”.

      - Teamet kommer i tidsnød og konkluderer med ”hovedet under armen”




                 Tip: Pas på! Forhastede konklusioner kan underminere tilliden til retrospectivet som institution.

19                                                                                                                   © 2012, Søren Weiss Hansen
Global Business Services, GBS



     #8 - Utilstrækkelig tid / for megen tid
                                                                    Eksempel: 2 timer
      Varighed: 2 - 4 timer                                         Fase
                                                                    Set the stage
                                                                                              Procent Minutes gns.
                                                                                              5%             5 minutter
                                                                    Gather Data               30% - 50%     50 minutter
                                                                    Generate insights         20% - 30%     30 minutter
                                                                    Decide what to do         15% - 20%     20 minutter
                                                                    Close the retrospective   10% - 15%     15 minutter
                                                                    Eksempel: 3 timer
                                                                    Fase                      Procent Minutes gns.
                                                                    Set the stage             5%            10 minutter
                                                                    Gather Data               30% - 50%     75 minutter
                                                                    Generate insights         20% - 30%     45 minutter
                                                                    Decide what to do         15% - 20%     30 minutter
                                                                    Close the retrospective   10% - 15%     20 minutter
                                                                    Eksempel: 4 timer
                                                                    Fase                      Procent Minutes gns.
                                                                    Set the stage             5%            15 minutter
                                                                    Gather Data               30% - 50%     95 minutter
       NB.: En halv time er ikke tilstrækkelig tid, hvis man skal   Generate insights         20% - 30%     60 minutter
         ned under overfladen og finde problemernes rod. Et
       retrospective af en acceptabel kvalitet kræver mere tid!     Decide what to do         15% - 20%     40 minutter
                                                                    Close the retrospective   10% - 15%     30 minutter

20                                                                                                        © 2012, Søren Weiss Hansen
Global Business Services, GBS




     #9 - Uklare “møderegler”

                                          At skabe et sæt af regler, som teammedlemmerne
                                          aftaler at følge med henblik på at skabe et miljø, hvor
                                          man kan arbejde sammen effektivt. Reglerne skabes
                                          af teamet selv. Reglerne skal holdes indenfor
                                          rammerne af scrum. Working agreements kan
                                          justeres fra sprint til sprint. Se eksempler herunder:


                                             Passivitet er ikke en acceptabel adfærd.
                                             Mobiltelefoner skal holdes slukket under alle
                                              scrumsessioner.
                                             Man forlader ikke en sessionen, før den er
                                              afsluttet. I tilfælde af, at man skal gå tidligt, aftaler
                                              man det med resten af teamet ved mødestart.
                                             Alle meninger er velkomne.
                                             Teamet skal tilstræbe en anerkendende
                                              interaktion med hinanden.
                                             Man holder ikke “møder i mødet”
                                             Der tales engelsk, så snart der er engelsktalende
                                              deltagere
                                             Vi bruger refereekort under diskussioner
                                             Vi afgør beslutninger ved Fo5


21                                                                                © 2012, Søren Weiss Hansen
Global Business Services, GBS




     #10 - Facilitatoren faciliterer ikke

                                                                          Observationer:
      Facilitatoren skal have fokus på
                                                                           Managerattitude vs. servant leader attitude
      processen – ikke på indholdet. Dette
      frigør de andre deltagere til at kunne                               Svært ved at håndtere forskellige
                                                                            personligheder
      deltage 100% i processen og
      øvelserne.                                                           Svært ved at håndtere forskellige kulturer
                                                                           Dårlig forberedelse
                                                                           Mister overblik under mødet
      Hvad virker bedst?
       Scrummaster som facilitator?
       Teammedlem som facilitator?
       Ekstern facilitator?




                 Tip: Overvej at skiftes til at facilitere retrospectivemøderne. Det kan skabe variation og fornyet energi.


22                                                                                                                            © 2012, Søren Weiss Hansen
Global Business Services, GBS



     #11 - Distribuerede teams
     Aaaarrrrgghhhh…….! Opleves ofte som en kæmpe udfordring


     •   Faldgruber
           •   Mødet bliver afholdt i øer som to separate møder (-> der skabes to teams i teamet)
           •   Retro by e-mail
           •   “Dem og os”-kultur
     •   Er “tungere” at gennemføre
     •   Kræver ekstraordinær meget forberedelse
     •   Det kan være svært at finde egnede øvelser
     •   Test teknikken grundigt
     •   Brug videounderstøttet kommunikationstool
     •   TelePresence rocks!


     •   Klik her for liste over brugbare tools


                       Tip: Lav en rotationsordning hvis muligt. Tilliden til og forståelsen for hinanden vil typisk stige markant.

23                                                                                                                              © 2012, Søren Weiss Hansen
Global Business Services, GBS



     #12 - Manglende anerkendelse af retrospectivemødet
     Observation:
     “Der investeres ressourcer i at gennemføre retrospective. Der aftales actions, men disse
     bliver ikke respekteret. Jo mere presset projektet er, desto mere udtalt bliver denne adfærd”.


     Citater:
     •   “Sådan plejer vi ikke at gøre her i firmaet”
     •   “Teamet er blevet umuligt at samarbejde med efter
         de er begyndt med det der scrum”
     •   “Det er mig, der er chefen”


     •   Scrummasteren kan blive en udsat person
     •   Bemærk at teammedlemmer også kan modarbejde
         teamets beslutninger.
     •   Det tager typisk 30-60 dage at ændre en vane.




                             Tip: Der kan være brug for træning og coaching af ledelsen samt omgivelserne!

24                                                                                                           © 2012, Søren Weiss Hansen
Global Business Services, GBS



     #13 - Skøjten ovenpå de “farlige” emner
     Observation:
     “Der er ingen i teamet, der bringer de farlige emner frem”.



     •   Faresignaler:
         •   Teamet mener ikke, at de har brug for at holde
             retrospectives.
         •   Actions er meget lavpraktiske og meget enkle.
         •   Teamet er altid glade
         •   Der er altid fravær til retrospectives


     •   1:1 samtaler med teamet afdækker ofte, at der er
         tale om sammenslutningen af konfliktsky elementer.
     •   Mønstret observeres oftest i teams uden kvinder.




                         Tip: Elefanten står ofte midt i lokalet i de teams, hvor man umiddelbart mindst kunne vente det

25                                                                                                                         © 2012, Søren Weiss Hansen
Global Business Services, GBS



     #14 - ???




26                                        © 2012, Søren Weiss Hansen
Global Business Services, GBS



     #15 - Utryg stemning / blame game
     Observation:
     “Mødet udvikler sig til personlige angreb. Folk er ukomfortable”.


     •   Brug The Prime Directive i forbindelse med check-in
     •   Bed folk om eksplicit at committe sig til at deltage på
         præmisserne fremfor “bare” at starte mødet som alle
         andre møder.
     •   Vær særlig opmærksom på, at fokus på konstant at
         skulle levere kan være stressende. Der kan nemt
         opstå “overtryk” i et scrumteam.


                                                         The retrospective prime directive says:
                                               "Regardless of what we discover, we understand and
                                                 truly believe that everyone did the best job they
                                                could, given what they knew at the time, their skills
                                                   and abilities, the resources available, and the
                                                                  situation at hand.“
                                                                                                   Norm Kerth



27                                                                                                       © 2012, Søren Weiss Hansen
Global Business Services, GBS



     #16 -Ugunstige fysiske rammer
     Observation:
     “Mødet bliver afholdt i fx teamrummet, “i kælderen” eller…”.


     •   Teamet kan være ufokuserede, hvis mødes
         holdes i teamrummet.
     •   Vores egentilstand påvirkes af vores omgivelser.
         Ugunstige omgivelser =


     •   Anbefaling:
           •   Skab noget forandring på dette møde, der
               er en investering i at forbedre sig.
           •   Tilstræb at booke mødet et sted, hvor
               teamet ikke opholder sig i hverdagen.
           •   Tilstræb at afholde mødet i nogle rammer,
               der indbyder til læring og reflektion.



                                Tip: et retrospective kan sagtens holdes fx. i parken på en solksinsdag

28                                                                                                        © 2012, Søren Weiss Hansen
Global Business Services, GBS



     #17 - Manglende mødetidsdisciplin
     Observation:
     “Folk kommer for sent til mødet eller dukker slet ikke op”.


     •   Det er rigtig svært at få mødet til at
         fungere, hvis der er udeblivelser. Der
         mangler input til gather data og de
         fraværende giver ikke buy-in til nye
         actions.


     •   Anbefaling:
           •   Lad facilitatoren påminde
               mødedeltagerne inden mødet.
           •   Start til tiden uanset om folk er
               mødt frem.
           •   Lav en ordning, hvor man tager
               sidemanden med.
           •   Tag det op som et emne på
               retrospectivemødet.


29                                                                 © 2012, Søren Weiss Hansen
Global Business Services, GBS



     #18 - Manglende opfølgning på mål fra seneste retrospective
     Observation:
     “Retrospectivemødet gennemføres, uden at der følges op på de actions og mål, der blev defineret ved
     seneste retrospective.”.

     •   Det breder sig meget hurtigt et oplevelse af
         ligegyldighed ift. de initiativer, der aftaler på
         retrospective.
     •   Retrospectivemødet mister sin værdi.


     •   Anbefaling:
         •   Retrospectivemødet begynder med, at
             “Guardian angel” læser målsætningen op
             og redegør for, hvordan der er blevet
             arbejdet med målet i sprintet.
         •   Teamet kommenterer.
         •   Der stemmes om, hvorvidt:
             1. videreføres til næste sprint
             2. noteres, som dokumentation
             3. direkte i waste




30                                                                                               © 2012, Søren Weiss Hansen
Global Business Services, GBS



     #19 - Venten på næste retrospective før en ændring kan gennemføres

     Observation:
     “Teamet følger scrummetoden så slavisk, at intet justeres og ændres mellem retrospectivemøderne”.


      •   Det er en balance ikke at underkende
          retrospectivemødet og på den anden side
          ikke blive decideret reaktive.


      •   Anbefaling:
            •   Udvid eksplicit et daily scrum med
                henblik på at drøfte de udfordringer,
                der kræver handling nu og her.




31                                                                                              © 2012, Søren Weiss Hansen
Global Business Services, GBS



     #20 – Prøver at implementere for mange ændringer på een gang

     Observation:
     “Teamet ender op med en kæmpelang actionliste efter retrospectivemødet uden at have forholdt sig til,
     om initiativerne kan implementeres i næste sprint”.


      •   Der sker typisk det, at der bliver
          implementeret færre actions i sådan et team
          sammenlignet med et team, der har lavet en
          realistisk vurdering af deres formået.


      •   Anbefaling:
            1. Identificer actions
            2. Prioriter
            3. Vurder størrelse (effort)
            4. Vurder impact (værdi)
            5. Vurder “energibidrag”
            6. Reprioriter
            7. Anfør ansvarlig (guardian angel)
            8. Beskriv som SMART mål



32                                                                                                © 2012, Søren Weiss Hansen
Global Business Services, GBS



     Inspiration - litteratur




                                          © 2012, Søren Weiss Hansen
33
Global Business Services, GBS




     Kontakt

     Søren Weiss
      Phone: +45 41 20 81 05,
      E-mail: swh@dk.ibm.com
      Linkedin: http://linkd.in/sorenweiss
      Twitter: http://twitter.com/sorenweiss




34                                              © 2012, Søren Weiss Hansen
Global Business Services, GBS




35                                   © 2012, Søren Weiss Hansen

More Related Content

Viewers also liked (7)

Palveluväylä yrityksen sähköisissä palveluissa - Yritys-Suomen asiakasraatipä...
Palveluväylä yrityksen sähköisissä palveluissa - Yritys-Suomen asiakasraatipä...Palveluväylä yrityksen sähköisissä palveluissa - Yritys-Suomen asiakasraatipä...
Palveluväylä yrityksen sähköisissä palveluissa - Yritys-Suomen asiakasraatipä...
 
Yritys-Suomen asiakasraati
Yritys-Suomen asiakasraatiYritys-Suomen asiakasraati
Yritys-Suomen asiakasraati
 
Yritys-Suomi lyhyesti
Yritys-Suomi lyhyestiYritys-Suomi lyhyesti
Yritys-Suomi lyhyesti
 
Yritys-Suomi sosiaalisessa mediassa
Yritys-Suomi sosiaalisessa mediassaYritys-Suomi sosiaalisessa mediassa
Yritys-Suomi sosiaalisessa mediassa
 
Yritys-Suomen asiakasraati
Yritys-Suomen asiakasraatiYritys-Suomen asiakasraati
Yritys-Suomen asiakasraati
 
Retrospective in a kanban team april 20th 2012
Retrospective in a kanban team april 20th 2012Retrospective in a kanban team april 20th 2012
Retrospective in a kanban team april 20th 2012
 
Fearless journey - reflections
Fearless journey - reflectionsFearless journey - reflections
Fearless journey - reflections
 

Similar to Agile retrospectives - erfaringer fra en agile coach

Spark zakiaelvang.oplæg
Spark zakiaelvang.oplægSpark zakiaelvang.oplæg
Spark zakiaelvang.oplæg
Spark cph
 
DI's videregående HR-uddannelse
DI's videregående HR-uddannelseDI's videregående HR-uddannelse
DI's videregående HR-uddannelse
DI - Dansk Industri
 
Etableringsseminar 17 august.pdf
Etableringsseminar 17 august.pdfEtableringsseminar 17 august.pdf
Etableringsseminar 17 august.pdf
Rikke12
 
Etableringsseminar 17 august.pdf
Etableringsseminar 17 august.pdfEtableringsseminar 17 august.pdf
Etableringsseminar 17 august.pdf
Rikke12
 

Similar to Agile retrospectives - erfaringer fra en agile coach (20)

Unboss - Formålsdrevet ledelse i praksis
Unboss - Formålsdrevet ledelse i praksisUnboss - Formålsdrevet ledelse i praksis
Unboss - Formålsdrevet ledelse i praksis
 
Den lærende organisation
Den lærende organisationDen lærende organisation
Den lærende organisation
 
2014 11-27 - wemind handout
2014 11-27 - wemind handout2014 11-27 - wemind handout
2014 11-27 - wemind handout
 
Formålsdrevet ledelse med UNBOSS i praksis - 2015-02-24 - DJØF IDA Århus - h...
Formålsdrevet ledelse  med UNBOSS i praksis - 2015-02-24 - DJØF IDA Århus - h...Formålsdrevet ledelse  med UNBOSS i praksis - 2015-02-24 - DJØF IDA Århus - h...
Formålsdrevet ledelse med UNBOSS i praksis - 2015-02-24 - DJØF IDA Århus - h...
 
Kapitel 17: Teams i internationale virksomheder
Kapitel 17: Teams i internationale virksomhederKapitel 17: Teams i internationale virksomheder
Kapitel 17: Teams i internationale virksomheder
 
Vinterinternat2013 kompetenceudvikling jette_ditte
Vinterinternat2013 kompetenceudvikling jette_ditteVinterinternat2013 kompetenceudvikling jette_ditte
Vinterinternat2013 kompetenceudvikling jette_ditte
 
Spark zakiaelvang.oplæg
Spark zakiaelvang.oplægSpark zakiaelvang.oplæg
Spark zakiaelvang.oplæg
 
Motivation og formålsdrevet ledelse med UNBOSS, i praksis - hos IDA
Motivation og formålsdrevet ledelse med UNBOSS, i praksis - hos IDAMotivation og formålsdrevet ledelse med UNBOSS, i praksis - hos IDA
Motivation og formålsdrevet ledelse med UNBOSS, i praksis - hos IDA
 
Proaktiv Projektledelse, Morten Fangel
Proaktiv Projektledelse, Morten FangelProaktiv Projektledelse, Morten Fangel
Proaktiv Projektledelse, Morten Fangel
 
Videregående projektledelse i Niras, Claus Pilvang
Videregående projektledelse i Niras, Claus PilvangVideregående projektledelse i Niras, Claus Pilvang
Videregående projektledelse i Niras, Claus Pilvang
 
DI's videregående HR-uddannelse
DI's videregående HR-uddannelseDI's videregående HR-uddannelse
DI's videregående HR-uddannelse
 
2015 03-11 - LUs årsmøde - handout
2015 03-11 - LUs årsmøde - handout2015 03-11 - LUs årsmøde - handout
2015 03-11 - LUs årsmøde - handout
 
DI's strategiske HR uddannelse
DI's strategiske HR uddannelse DI's strategiske HR uddannelse
DI's strategiske HR uddannelse
 
Ledelse gennem andre morgenmøde template
Ledelse gennem andre morgenmøde   templateLedelse gennem andre morgenmøde   template
Ledelse gennem andre morgenmøde template
 
Videndeling og implementering i praksis
Videndeling og implementering i praksisVidendeling og implementering i praksis
Videndeling og implementering i praksis
 
Erfaringer fra Design Sprint - sådan får din virksomhed mest ud af dem
Erfaringer fra Design Sprint - sådan får din virksomhed mest ud af demErfaringer fra Design Sprint - sådan får din virksomhed mest ud af dem
Erfaringer fra Design Sprint - sådan får din virksomhed mest ud af dem
 
Etableringsseminar 17 august.pdf
Etableringsseminar 17 august.pdfEtableringsseminar 17 august.pdf
Etableringsseminar 17 august.pdf
 
Etableringsseminar 17 august.pdf
Etableringsseminar 17 august.pdfEtableringsseminar 17 august.pdf
Etableringsseminar 17 august.pdf
 
Præsentation fra seminar om distanceledelse i skandinaviske organisationer - ...
Præsentation fra seminar om distanceledelse i skandinaviske organisationer - ...Præsentation fra seminar om distanceledelse i skandinaviske organisationer - ...
Præsentation fra seminar om distanceledelse i skandinaviske organisationer - ...
 
Fangel consulting: Proaktiv projektledelse
Fangel consulting:  Proaktiv projektledelseFangel consulting:  Proaktiv projektledelse
Fangel consulting: Proaktiv projektledelse
 

Agile retrospectives - erfaringer fra en agile coach

  • 1. Global Business Services, GBS Agile retrospectives Erfaringer fra en agile coach bestbrains 4. september 2012 © 2012 Søren Weiss Hansen
  • 2. Global Business Services, GBS 2 © 2012, Søren Weiss Hansen
  • 3. Global Business Services, GBS The agile coach team in IBM/DK  Min. 5 years of practical experience (scrum)  Have worked as scrumteammembers, scrummasters, product owners and agile coaches  Have faced the “dragons”- and are still alive… Søren Thomas Gitte Annette Weiss Byrdal Klitgaard Klink • Coaching • Agile tools • Agile testing • Management • Scrum practices • International • Process & • Agile contracts • Agile values scrum teams Methodology • Training © 2012, Søren Weiss Hansen 3
  • 4. Global Business Services, GBS Agile coaching @IBM/DK 2008-2012 4 agile 89 coaches Projects 131 teams 1089 people © 2012, Søren Weiss Hansen
  • 5. Global Business Services, GBS Stop, reflekter og find en bedre vej…. “Here is Edward Bear coming downstairs now. Bump, bump, bump, on the back of his head, behind Christopher Robin. It is, as far as he knows, the only way of coming downstairs, but sometimes he feels that there might be another way. If only he could stop bumping for a moment and think of it.” A. A. Milne Winnie the Pooh (Peter Plys) ”De fleste siger, at de gerne vil lære, men færre tager sig tiden til det…” 5 © 2012, Søren Weiss Hansen
  • 6. Global Business Services, GBS Hvad er et retrospective? “Et møde af en fast varighed afholdt mellem sprints med det formål at drage sig erfaringer med, hvad der virker særlig godt, og hvad der kan forbedres yderligere. Erfaringerne omsættes til forbedrende handlinger i det næste sprint og på den måde optimeres arbejdsformen, leverancerne og trivslen”. Andre kilder: • Scrumfoundation • Scrum.org 6 © 2012, Søren Weiss Hansen
  • 7. Global Business Services, GBS Historie • 1997: in "Surviving Object-Oriented Projects", Alistair Cockburn describes several projects (dating as far back as 1993) informally using the practice, but does not give it a label; he summarizes it as "Work in increments, focus after each" • 2001: the first description of a "reflection workshop" in the context of an Agile project appears in Alistair Cockburn’s "Agile Software Development" • 2001: regular retrospectives are one of the principles of the Agile Manifesto: "At regular intervals, the team reflects on how to become more effective, then tunes and adjusts its behavior accordingly", though not necessarily yet common practice • 2001: the term "Project Retrospectives" is introduced in Norm Kerth’s book of the same name • 2001: the XP community endorses retrospectives early on, by way of a paper at XP2001 on "Adaptation: XP Style" • 2003: thanks in good part to sessions at the XP Day cycle of conferences, more teams start practicing project and iteration retrospectives • 2006: the publication of Esther Derby and Diana Larsen’s "Agile Retrospectives" brings to a close the codification of heartbeat retrospectives Kilde: agilealliance.org 7 © 2012, Søren Weiss Hansen
  • 8. Global Business Services, GBS Læring i det traditionelle og i det agile projekt • Varighed: 1-3 dage • Gennemføres efter projektet er afsluttet Evaluering • • Fokus på det der ikke virkede Reflektion og læring til brug i næste projekt • Vanskeligt at overføre læringen til næste (Traditionel udvikling) projekt. Projekt- leder • Varighed: 2-4 timer • Gennemføres efter hver iteration Retrospective • (Også) fokus på det, som vi er gode til og som vi vil gøre mere af • Reflektion og læring til brug i næste iteration (Agile udvikling) • Forholdsvis nemt at overføre læringen til den Scrum- næste iteration. master 8 © 2012, Søren Weiss Hansen
  • 9. Global Business Services, GBS Miniretrospective – et eksempel Hvor mange af jer har deltaget i et retrospective? Hvor godt fungerede det seneste retrospective, som du deltog i? (Fo5) Hvad fungerede særlig godt? (Skriv på en grøn post it note) Hvad fungerede særlig dårligt? (Skriv på en rød post it note) Gruppen placerer alle post it notes på en easyflip og danner sig et overblik emnerne (uddyb for hinanden hvis der er tvivl om indhold). Organiser identiske emner i klynger. Tegn en cirkel om en klynge og navngiv den. Hver person har tre stemmer (dot votes). Stem på de tre emner, som du er mest interesseret i at undersøge nærmere. Skriv emnet med flest stemmer på en ny easyflip og tegn en cirkel om emnet. Vedkommende, der har skrevet emnet, præsenterer det for resten af gruppen. Tegn - som en gruppe - et mindmap eller et rigt billede, der viser hvordan man i det næste retrospective, som I skal deltage i, vil kunne bruge jeres indsigt om emnet til at forbedre mødet. Præsenter mindmap / rigt billede for de andre grupper. 9 © 2012, Søren Weiss Hansen
  • 10. Global Business Services, GBS Miniretrospektive - opfølgning ”Hvad er den vigtigste læring, som du tager med fra denne øvelse?” 10 © 2012, Søren Weiss Hansen
  • 11. Global Business Services, GBS Mønstre #1 - Manglende #2 - Manglende #3 - Manglende #4 - Manglende #5 - Svagt forberedelse struktur opfølgning variation i øvelserne formulerede mål #6 - Passive #7 - Forhastede #8 - Utilstrækkelig #9 – Uklare #10 - Facilitatoren mødedeltagere konklusioner tid / for megen tid møderegler faciliterer ikke #12 - Manglende #13 - Skøjten #15 - Utryg #11 - Distribuerede anerkendelse af ovenpå de “farlige” #14 – ??? stemning / blame teams retrospectivemødet emner game #18 - Manglende #19 - Venten på #20 –Prøver at #16 -Ugunstige #17 - Manglende opfølgning på mål næste retrospective implementere for fysiske rammer mødetidsdisciplin fra seneste før en ændring kan mange ændringer retrospective gennemføres på een gang 11 © 2012, Søren Weiss Hansen
  • 12. Global Business Services, GBS TIP: Bed deltagerne reflektere før mødet og medbringe input/data til #1 - Manglende forberedelse mødet TIP: Brug en sprintlog til at indsamle information undervejs i sprintet Indsaml Indsaml TIP: også deltidsansatte, relevant relevant studentermedhjælpere, information fra information fra projektkoordinatorer osv. stakeholders ledelsen kan have gode input til arbejdsformen, processen eller interaktionen med Logistik andre enheder. Indsaml relevant Find gerne en information fra lokation der scrumteamet indbyder til inspiration Indsaml Design / relevant information fra Facilitator forbered øvelser product owner 12 © 2012, Søren Weiss Hansen
  • 13. Global Business Services, GBS #2 - Manglende struktur Set the Generate Decide what Close the Gather data stage insights to do retrospective • Agenda • Brainstorming • Organiser data • Brainstorm • Check out • Mål • Objektivt og • Opsummere actions • Retrospective on • Check in factsbaseret • Analyser • Prioriter actions the retrospective • Find mønstre • Filtrer actions • Få ideer • Beslut • Commit • Vælg ansvarlige • Aftal deadlines • Overfør til næste sprint Kilde: Agile Retrospectives – making good teams great (D. Larsen, E. Derby) 13 © 2012, Søren Weiss Hansen
  • 14. Global Business Services, GBS #3 - Manglende opfølgning • Gør i teamrummet actions for næste sprint synlige. Implementer • Følg op i teamet løbet af sprintet. actions • Vær disciplineret. som tasks • Husk at det tager tid (mindst et sprint) at ændre en vane. i næste sprint • Husk at lave opfølgning på næste retrospective. 14 © 2012, Søren Weiss Hansen
  • 15. Global Business Services, GBS #4 - Manglende variation i øvelserne (1/2) Close the Set the stage Gather data Generate insights Decide what to do retrospective Time line and The retrospective Check in Brainstorming/filtering +/Delta variations planning game Focus on / focus off Triple nickels Force field analysis SMART goals Appreciations ESVP Color code dots 5 whys Circle of questions Temperature reading Helped, hindered, Working agreements Mad, sad, glad Fishbone Short subjects hypothesis Temperature reading Locate strengths Patterns and shifts Triple nickels ROTI Satisfaction histogram Satisfaction histogram Prioritize with dots Force field analysis Satisfaction histogram Report out and Team Radar Team Radar synthesis Like to Like Identify themes Learning matrix FRIM Learning matrix Short subjects Kilde: Agile Retrospectives – making good teams great (D. Larsen, E. Derby) 15 © 2012, Søren Weiss Hansen
  • 16. Global Business Services, GBS #4 - Manglende variation i øvelserne (2/2) Benyt gerne temaretrospectives der er designet så øvelserne passer til det udviklingstrin, hvor teamet er. - ”Hvordan kan vi optimere på de tre roller?” - ”Hvordan får vi PBL’en i en tilstand, hvor den øverste del er groomet tilstrækkeligt?” 16 © 2012, Søren Weiss Hansen
  • 17. Global Business Services, GBS #5 - Svagt formulerede mål Før ændring til smart-mål: “Vi aftaler at øge anvendelsen af pair programmering”. Efter ændring til smart-mål: “Målet er at pair programmere mindst 5 timer dagligt startende næste mandag. Vi roterer dagligt. Peter laver et skema med et program over ordningen, og vi evaluerer på næste retrospective”. Tip: • Lav eet smart mål ad gangen • Lav 1-5 actionpunkter til hvert mål • Udpeg en ansvarlig • Planlæg med flere iterationer (pas på ikke at undervurdere tidsforbruget) • Det kræver øvelse at lave gode smart mål 17 © 2012, Søren Weiss Hansen
  • 18. Global Business Services, GBS #6 - Passive mødedeltagere Sørg for at samtlige mødedeltagere ”byder op til dans” i løbet af de første 5 minutter af mødet. Isen brydes ved at få samtlige deltagere til at sige noget. Undersøgelser viser, at det er afgørende for aktivitetsniveauet i løbet af mødet, at alle mødedeltagerne indenfor de første få minutter af mødet får sagt noget. Efter velkomsten og præsentation af mål og agenda, stiller retrospectivelederen eet kort spørgsmål. Hver person svarer efter round-robin princippet. Der stilles spørgsmål, som kan besvares kortfattet. Eksempler på spørgsmål: • Udtrykt i een sætning, hvad håber du, at vi opnår med dagens retrospective? • Udtrykt i eet ord, hvordan er din egentilstand lige nu? • Hvad er din største bekymring i relation til dagens retrospective? Retrospecitvlederen går rundt i lokalet og lytter aktivt men uden at bedømme svarene, dvs. uden at sige "godt", "super", "perfekt" osv. Retrospecitvlederen takker afslutningsvist alle personerne for deres deltagelse. 18 © 2012, Søren Weiss Hansen
  • 19. Global Business Services, GBS #7 - Forhastede konklusioner Dette er et mønster, som jeg ofte ser på retrospectives, typisk hvor der mangler struktur og facilitering. Følgende ses: - Teamet indsamler ikke data men hopper direkte til at konkludere ved at spørge teamet: ”hvad gik godt?” og ”hvad skal vi gøre anderledes?”. - Teamet kommer i tidsnød og konkluderer med ”hovedet under armen” Tip: Pas på! Forhastede konklusioner kan underminere tilliden til retrospectivet som institution. 19 © 2012, Søren Weiss Hansen
  • 20. Global Business Services, GBS #8 - Utilstrækkelig tid / for megen tid Eksempel: 2 timer Varighed: 2 - 4 timer Fase Set the stage Procent Minutes gns. 5% 5 minutter Gather Data 30% - 50% 50 minutter Generate insights 20% - 30% 30 minutter Decide what to do 15% - 20% 20 minutter Close the retrospective 10% - 15% 15 minutter Eksempel: 3 timer Fase Procent Minutes gns. Set the stage 5% 10 minutter Gather Data 30% - 50% 75 minutter Generate insights 20% - 30% 45 minutter Decide what to do 15% - 20% 30 minutter Close the retrospective 10% - 15% 20 minutter Eksempel: 4 timer Fase Procent Minutes gns. Set the stage 5% 15 minutter Gather Data 30% - 50% 95 minutter NB.: En halv time er ikke tilstrækkelig tid, hvis man skal Generate insights 20% - 30% 60 minutter ned under overfladen og finde problemernes rod. Et retrospective af en acceptabel kvalitet kræver mere tid! Decide what to do 15% - 20% 40 minutter Close the retrospective 10% - 15% 30 minutter 20 © 2012, Søren Weiss Hansen
  • 21. Global Business Services, GBS #9 - Uklare “møderegler” At skabe et sæt af regler, som teammedlemmerne aftaler at følge med henblik på at skabe et miljø, hvor man kan arbejde sammen effektivt. Reglerne skabes af teamet selv. Reglerne skal holdes indenfor rammerne af scrum. Working agreements kan justeres fra sprint til sprint. Se eksempler herunder:  Passivitet er ikke en acceptabel adfærd.  Mobiltelefoner skal holdes slukket under alle scrumsessioner.  Man forlader ikke en sessionen, før den er afsluttet. I tilfælde af, at man skal gå tidligt, aftaler man det med resten af teamet ved mødestart.  Alle meninger er velkomne.  Teamet skal tilstræbe en anerkendende interaktion med hinanden.  Man holder ikke “møder i mødet”  Der tales engelsk, så snart der er engelsktalende deltagere  Vi bruger refereekort under diskussioner  Vi afgør beslutninger ved Fo5 21 © 2012, Søren Weiss Hansen
  • 22. Global Business Services, GBS #10 - Facilitatoren faciliterer ikke Observationer: Facilitatoren skal have fokus på  Managerattitude vs. servant leader attitude processen – ikke på indholdet. Dette frigør de andre deltagere til at kunne  Svært ved at håndtere forskellige personligheder deltage 100% i processen og øvelserne.  Svært ved at håndtere forskellige kulturer  Dårlig forberedelse  Mister overblik under mødet Hvad virker bedst?  Scrummaster som facilitator?  Teammedlem som facilitator?  Ekstern facilitator? Tip: Overvej at skiftes til at facilitere retrospectivemøderne. Det kan skabe variation og fornyet energi. 22 © 2012, Søren Weiss Hansen
  • 23. Global Business Services, GBS #11 - Distribuerede teams Aaaarrrrgghhhh…….! Opleves ofte som en kæmpe udfordring • Faldgruber • Mødet bliver afholdt i øer som to separate møder (-> der skabes to teams i teamet) • Retro by e-mail • “Dem og os”-kultur • Er “tungere” at gennemføre • Kræver ekstraordinær meget forberedelse • Det kan være svært at finde egnede øvelser • Test teknikken grundigt • Brug videounderstøttet kommunikationstool • TelePresence rocks! • Klik her for liste over brugbare tools Tip: Lav en rotationsordning hvis muligt. Tilliden til og forståelsen for hinanden vil typisk stige markant. 23 © 2012, Søren Weiss Hansen
  • 24. Global Business Services, GBS #12 - Manglende anerkendelse af retrospectivemødet Observation: “Der investeres ressourcer i at gennemføre retrospective. Der aftales actions, men disse bliver ikke respekteret. Jo mere presset projektet er, desto mere udtalt bliver denne adfærd”. Citater: • “Sådan plejer vi ikke at gøre her i firmaet” • “Teamet er blevet umuligt at samarbejde med efter de er begyndt med det der scrum” • “Det er mig, der er chefen” • Scrummasteren kan blive en udsat person • Bemærk at teammedlemmer også kan modarbejde teamets beslutninger. • Det tager typisk 30-60 dage at ændre en vane. Tip: Der kan være brug for træning og coaching af ledelsen samt omgivelserne! 24 © 2012, Søren Weiss Hansen
  • 25. Global Business Services, GBS #13 - Skøjten ovenpå de “farlige” emner Observation: “Der er ingen i teamet, der bringer de farlige emner frem”. • Faresignaler: • Teamet mener ikke, at de har brug for at holde retrospectives. • Actions er meget lavpraktiske og meget enkle. • Teamet er altid glade • Der er altid fravær til retrospectives • 1:1 samtaler med teamet afdækker ofte, at der er tale om sammenslutningen af konfliktsky elementer. • Mønstret observeres oftest i teams uden kvinder. Tip: Elefanten står ofte midt i lokalet i de teams, hvor man umiddelbart mindst kunne vente det 25 © 2012, Søren Weiss Hansen
  • 26. Global Business Services, GBS #14 - ??? 26 © 2012, Søren Weiss Hansen
  • 27. Global Business Services, GBS #15 - Utryg stemning / blame game Observation: “Mødet udvikler sig til personlige angreb. Folk er ukomfortable”. • Brug The Prime Directive i forbindelse med check-in • Bed folk om eksplicit at committe sig til at deltage på præmisserne fremfor “bare” at starte mødet som alle andre møder. • Vær særlig opmærksom på, at fokus på konstant at skulle levere kan være stressende. Der kan nemt opstå “overtryk” i et scrumteam. The retrospective prime directive says: "Regardless of what we discover, we understand and truly believe that everyone did the best job they could, given what they knew at the time, their skills and abilities, the resources available, and the situation at hand.“ Norm Kerth 27 © 2012, Søren Weiss Hansen
  • 28. Global Business Services, GBS #16 -Ugunstige fysiske rammer Observation: “Mødet bliver afholdt i fx teamrummet, “i kælderen” eller…”. • Teamet kan være ufokuserede, hvis mødes holdes i teamrummet. • Vores egentilstand påvirkes af vores omgivelser. Ugunstige omgivelser = • Anbefaling: • Skab noget forandring på dette møde, der er en investering i at forbedre sig. • Tilstræb at booke mødet et sted, hvor teamet ikke opholder sig i hverdagen. • Tilstræb at afholde mødet i nogle rammer, der indbyder til læring og reflektion. Tip: et retrospective kan sagtens holdes fx. i parken på en solksinsdag 28 © 2012, Søren Weiss Hansen
  • 29. Global Business Services, GBS #17 - Manglende mødetidsdisciplin Observation: “Folk kommer for sent til mødet eller dukker slet ikke op”. • Det er rigtig svært at få mødet til at fungere, hvis der er udeblivelser. Der mangler input til gather data og de fraværende giver ikke buy-in til nye actions. • Anbefaling: • Lad facilitatoren påminde mødedeltagerne inden mødet. • Start til tiden uanset om folk er mødt frem. • Lav en ordning, hvor man tager sidemanden med. • Tag det op som et emne på retrospectivemødet. 29 © 2012, Søren Weiss Hansen
  • 30. Global Business Services, GBS #18 - Manglende opfølgning på mål fra seneste retrospective Observation: “Retrospectivemødet gennemføres, uden at der følges op på de actions og mål, der blev defineret ved seneste retrospective.”. • Det breder sig meget hurtigt et oplevelse af ligegyldighed ift. de initiativer, der aftaler på retrospective. • Retrospectivemødet mister sin værdi. • Anbefaling: • Retrospectivemødet begynder med, at “Guardian angel” læser målsætningen op og redegør for, hvordan der er blevet arbejdet med målet i sprintet. • Teamet kommenterer. • Der stemmes om, hvorvidt: 1. videreføres til næste sprint 2. noteres, som dokumentation 3. direkte i waste 30 © 2012, Søren Weiss Hansen
  • 31. Global Business Services, GBS #19 - Venten på næste retrospective før en ændring kan gennemføres Observation: “Teamet følger scrummetoden så slavisk, at intet justeres og ændres mellem retrospectivemøderne”. • Det er en balance ikke at underkende retrospectivemødet og på den anden side ikke blive decideret reaktive. • Anbefaling: • Udvid eksplicit et daily scrum med henblik på at drøfte de udfordringer, der kræver handling nu og her. 31 © 2012, Søren Weiss Hansen
  • 32. Global Business Services, GBS #20 – Prøver at implementere for mange ændringer på een gang Observation: “Teamet ender op med en kæmpelang actionliste efter retrospectivemødet uden at have forholdt sig til, om initiativerne kan implementeres i næste sprint”. • Der sker typisk det, at der bliver implementeret færre actions i sådan et team sammenlignet med et team, der har lavet en realistisk vurdering af deres formået. • Anbefaling: 1. Identificer actions 2. Prioriter 3. Vurder størrelse (effort) 4. Vurder impact (værdi) 5. Vurder “energibidrag” 6. Reprioriter 7. Anfør ansvarlig (guardian angel) 8. Beskriv som SMART mål 32 © 2012, Søren Weiss Hansen
  • 33. Global Business Services, GBS Inspiration - litteratur © 2012, Søren Weiss Hansen 33
  • 34. Global Business Services, GBS Kontakt Søren Weiss  Phone: +45 41 20 81 05,  E-mail: swh@dk.ibm.com  Linkedin: http://linkd.in/sorenweiss  Twitter: http://twitter.com/sorenweiss 34 © 2012, Søren Weiss Hansen
  • 35. Global Business Services, GBS 35 © 2012, Søren Weiss Hansen