Introduction
Agile denotes “the quality of being agile; readiness for motion; nimbleness, activity, dexterity in
motion”, implying light weight along with faster and nimbler software development process. Agile
methodology is aimed at rapidly growing and volatile internet software industry as well as the
mobile application environment.
Agile is concerned with producing software that meets the user's needs within the shortest possible
time. The user is usually involved in the iterative production process. Agile software processes are
characterized by accelerated delivery of working software at any stage in the development process.
The emphasis is on customer collaboration, communication and teamwork. Thus requirements may
change anywhere in the process and the process is adaptive to the change
Agile software life cycle is an iterative process where software is ready at each iteration but can
always be improved by further iteration. There is minimal documentation and maximum emphasis
on direct face-to-face communication. Agile software is adaptable to fast changes and is ideal for
small teams who have to deliver workable software within a very short deadline.
Existing Agile Methods
Given below are some of the popular methodologies that seem to represent the Agile methodology:
 Extreme Programming
 Scrum (this document focuses on Scrum methodology)
 Crystal Family of methodologies
 Feature Driven Development
 Rational Unified Process
 Dynamic Systems Development Method
 Adaptive Software Development
 Open Source Software Development
Overview of Scrum Lifecycle
Scrum Lifecycle consists of three phases:
1. Pre-game: This in turn consists of the following sub-phases:
a. Pre-Planning
b. Architecture/High Level Design
c. Sprint Planning
2. Development iterations:
The development phases consist of Sprints that are iterative cycles. One Sprint lasts
between 1 week to 1 month. There may be 3 to 8 sprints in a software development process
before a system is ready for distribution.
3. Post-game: This in turn consists of sub-phases as follows:
a. Product Integration
b. System Testing
c. Documentation
The Scrum Lifecycle
1.1. Pre-Planning Phase
1.1.1. Purpose
The Planning Phase focuses on identifying a viable project and the strategy for its execution.
1.1.2. Entry Criteria
 Need to identify viable projects
1.1.3. Inputs
 Opportunities available at hand
1.1.4. Outputs
 Selection of Projects
 High Level Problem Statement
 Product backlog for the selected Product
1.1.5. Exit Criteria
 Selection of system to be developed
1.1.6. Tasks
 The projects are prioritized and selected by the key stakeholders including management, the
customer, users, Sprint Manager as follows:
o Define the business opportunities
o Identify Viable project
o Assess feasibilities. Just enough feasibility study done to decide yes or no on the
project
o Prioritize projects based on the potential gains and other aspects
o Select Projects that are of higher priority
 Other decisions made at this phase includes the following:
o Whether to build new system or modify existing system
o the development team and its location
 Garnering support and funding for the project
 Starting to build the team
1.2. Architecture/High Level Design
1.2.1. Purpose
In the architecture phase, the high level design of the system including the architecture shall be
planned based on the Product Backlog.
A design review meeting is held to go over the proposals for implementation and decisions are
made. In addition, preliminary plans for the contents of releases are prepared.
1.2.2. Entry Criteria
 Selection of system to be developed
1.2.3. Inputs
 Selection of Projects
1.2.4. Outputs
 Product Backlog updates
 Generalized use cases that captures the intentions of a user
 Architecture and High Level Design
 High Level Activity diagram
 High level workflow
 Standards, Conventions, Technology, Resources
 High Level estimates
1.2.5. Exit Criteria
 Approved Architecture and High Level Design
1.2.6. Tasks
This phase involves the following tasks by the Sprint team:
 Define high level scope
 Define Technology stack
 High level analyses and Design
 Setting up the environment
 Estimating the project at high level
1.3. Sprint Planning
1.3.1. Purpose
The Sprint Planning meeting is carried out for each sprint with the purpose of defining the Sprint
backlog for the next Sprint.
1.3.2. Entry Criteria
 Need to plan for the next Sprint
1.3.3. Inputs
 Product Backlog
1.3.4. Outputs
 Updated Product backlog
 Sprint Goal and Sprint Backlog finalized for the next sprint
 Estimates and Plan for the next sprint
1.3.5. Exit Criteria
 Approved plan for the next Sprint
1.3.6. Tasks
 The Scrum Manager along with Scrum team shall review the latest Product Backlog. During
this process, new items may be added or existing items modified or deleted in the Product
Backlog. The priority may be revised.
 Based on the updated priority, a set of items shall be selected for the next sprint and
commitment taken from the Sprint team. This establishes the Sprint Goals and the Sprint
Backlog for the next Sprint.
 The following are assessed for the next sprint:
o Assess resource requirements
o Risk and Issues Management
o Training needs
 Just enough Analysis and Design shall be performed by the Scrum team so as to give good
estimates.
 The Scrum Manager prepares the plan for the next sprint
 Finally, seek necessary approvals from the management, customer and users on the Sprint
Backlog for the next Sprint.
1.3.7. Verification
 Review and Approval of Sprint Backlog
1.4. Development Iterations
1.4.1. Purpose
During Development iterations, high-quality working software is incrementally delivered that
meets the changing needs of our stakeholders. Each iteration is called a Sprint.
Each sprint consists of traditional phases – Requirements, Analysis, Design, Evolution and Delivery.
Each Sprint involves development or enhancements of new functionality. One Sprint lasts between
1 week to 1 month. There may be 3 to 8 sprints in a software development process before a system
is ready for distribution.
1.4.2. Entry Criteria
 Approved plan for the next Sprint
1.4.3. Inputs
 Updated Product backlog
 Sprint Goal and Sprint Backlog
 Sprint Plan
1.4.4. Outputs
 Agile class diagrams depicting data layer objects
 Agile class diagrams depicting business layer objects
 Agile sequence diagrams for complex logic
 User interface mock-ups and flows
 Working Code
 Defects and their status
1.4.5. Exit Criteria
 Working Code is complete
1.4.6. Tasks
 All stakeholders collaborate during this phase to reduce the risk through fast feedback cycle.
 Analysis and Design is carried out Just in time. This involves the following steps:
o Refine the requirements (The requirements evolve throughout the project)
o Refine the Architecture and design of the system (The architecture and design
evolves during the sprint development).
o Model shall be done in a manner that you can always come back later
o All stakeholders shall actively participates
o Issues are intended to be resolved just in time
 The functionality is coded in the order of priority. This may be accomplished through
practices such as follows:
o Active stakeholder participation
o Test Driven development
o Pair programming
o Accomplished in iterations
o Develop Incrementally
o Code refactoring
 The quality is assured through guidance like coding convention and other guidelines.
 Confirmatory testing: The developers shall perform development testing to confirm the
design and the users shall perform agile acceptance testing to confirm the requirements.
This isn't the complete testing because we are producing working software on a regular
basis.
 Independent Testing: This involves the following:
o System Testing/Function Testing. This is performed by test professionals who are
good at finding defects which the developers have missed.
o User Testing
 Majority of testing is done during each construction cycle so that the testing in the release
iteration is smaller.
 Daily Scrum meetings that are conducted by the Scrum Master and attended by Product
owner and Scrum team. The management can also participate in the Scrum meetings.
During this meeting, the following are reviewed:
o Assess Velocity to check the progress
o Work completed
o Issues and Risks
o Work planned for the next days
1.5. Post Game (or Release Iteration)
1.5.1. Purpose
During the release iteration(s), also known as the "end game", the system is transitioned into
production. Not that for complex systems the end game may prove to be several iterations, although
if you've done system and user testing during construction iterations this likely won't be the case
1.5.2. Entry Criteria
 Working Code is complete
1.5.3. Inputs
 Working Code
1.5.4. Outputs
 Integrated and tested Code
 User documentation
 Deployment of code
 Scrum Review Checklist
1.5.5. Exit Criteria
1.5.6. Tasks
 Product Integration. This involves integrating the code with the previous build.
 Final testing of the system. Final system and acceptance testing should be performed at
this point, although the majority of testing should be done during construction iterations.
 Rework the code
 User documentation. Some documentation may have been written during construction
iterations, but it typically isn't finalized until the system release itself has been finalized to
avoid unnecessary rework. Documentation is produced if the stakeholder is willing to pay
for it.
 Training. Train end users, operations staff, and support staff to work effectively with our
system
 Deploy the System
 Daily Scrum meetings that are conducted by the Scrum Master and attended by Product
owner and Scrum team. The management can also participate in the Scrum meetings.
1.6. Sprint Review meeting
This is held on the last day of a Sprint. In this meeting, the Scrum team and Scrum master present
the result (i.e. the working product increment) of the Sprint to the management, customers, users
and the Product Owner.
The review meeting may bring out new Backlog items and even change the direction of the system
being built.
These meetings are informal.
Scrum master reviews whether project is carried out in accordance with Scrum values, practices and
rules and it progresses as planned. The following checklist is used for the purpose:
 Scrum Review Checklist
Scrum in a nutshell Metrics
Stage
Event/
Meeting
Led/
Facilitated
by
Participants Frequency Artifacts
1 Strategy *
Product
Owner
Key
stakeholders
(Customer and
Users), Sr
Executive
Once a
year
Vision
Statement *
2
Define
Product
Roadmap *
Product
Owner
Key
stakeholders
(Customer and
Users)
Twice a
year
Product
Roadmap *
Themes *
3
Release
Planning
Meeting *
Product
Owner
Development
team,
SCRUM Master
(Optional)
Once a
quarter
Product Backlog
Epics
User Stories
4
Sprint
Planning
Meeting
Product
Owner
Development
team,
SCRUM Master
At
beginning
of sprint
Sprint Backlog
User Stories
Tasks
5
Daily
SCRUM
SCRUM
Master
Development
team, Product
Owner (as
desired)
Daily
Task Board
Sprint Burndown
Chart
6
Spring
Review (End
Meeting #1)
Product
Owner
Key
stakeholders
(Customer and
Users),
Development
team
At end of
Sprint
Potentially
shippable
increment, User
acceptance
7
Sprint
Retrospective
(End Meeting
#2)
SCRUM
Master
Development
team,
At end of
Sprint
Release
Burndown Chart

More Related Content

What's hot

CP7301 Software Process and Project Management notes
CP7301 Software Process and Project Management   notesCP7301 Software Process and Project Management   notes
CP7301 Software Process and Project Management notes
AAKASH S
 
Software Quality Assurance in software engineering
Software Quality Assurance in software engineeringSoftware Quality Assurance in software engineering
Software Quality Assurance in software engineering
MuhammadTalha436
 
Comparing Software Quality Assurance Techniques And Activities
Comparing Software Quality Assurance Techniques And ActivitiesComparing Software Quality Assurance Techniques And Activities
Comparing Software Quality Assurance Techniques And Activities
Lemia Algmri
 
CIPL Application Development Process
CIPL Application Development ProcessCIPL Application Development Process
CIPL Application Development Processreetamclassic
 
Software development life cycle
Software development life cycleSoftware development life cycle
Software development life cycleGurban Daniel
 
Lect1 fault+quality
Lect1 fault+qualityLect1 fault+quality
Lect1 fault+quality
babak sh
 
Software Maintenance
Software MaintenanceSoftware Maintenance
Software Maintenance
Bijay Bhandari
 
Software engineering 15 software quality assurance practices
Software engineering 15 software quality assurance practicesSoftware engineering 15 software quality assurance practices
Software engineering 15 software quality assurance practices
Vaibhav Khanna
 
software development life cycle(SDLC)
software development life cycle(SDLC)software development life cycle(SDLC)
software development life cycle(SDLC)
sanoop s
 
Software life-cycle
Software life-cycleSoftware life-cycle
Software life-cyclegnesoni
 
Validation & verification software engineering
Validation & verification software engineeringValidation & verification software engineering
Validation & verification software engineering
Sweta Kumari Barnwal
 
Term Paper - Quality Assurance in Software Development
Term Paper - Quality Assurance in Software DevelopmentTerm Paper - Quality Assurance in Software Development
Term Paper - Quality Assurance in Software DevelopmentSharad Srivastava
 
Software Quality Assurance(SQA)
Software Quality Assurance(SQA)Software Quality Assurance(SQA)
Software Quality Assurance(SQA)Farkhanda Kiran
 
Manual testing by reddy
Manual testing by reddyManual testing by reddy
Manual testing by reddy
Krishna Gurjar
 
Software Engineering by Pankaj Jalote
Software Engineering by Pankaj JaloteSoftware Engineering by Pankaj Jalote
Software Engineering by Pankaj Jalote
Golda Margret Sheeba J
 
software configuration management
software configuration managementsoftware configuration management
software configuration managementFáber D. Giraldo
 
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29 - sw process 1-3 sdlc m...
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29  - sw process 1-3 sdlc m...Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29  - sw process 1-3 sdlc m...
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29 - sw process 1-3 sdlc m...
babak danyal
 
software maintenance
software maintenancesoftware maintenance
software maintenance
rajshreemuthiah
 
SOFTWARE VERIFICATION & VALIDATION
SOFTWARE VERIFICATION & VALIDATIONSOFTWARE VERIFICATION & VALIDATION
SOFTWARE VERIFICATION & VALIDATIONAmin Bandeali
 
المحاضرة الرابعة والخامسة
المحاضرة الرابعة والخامسةالمحاضرة الرابعة والخامسة
المحاضرة الرابعة والخامسة
Ahmed Alageed
 

What's hot (20)

CP7301 Software Process and Project Management notes
CP7301 Software Process and Project Management   notesCP7301 Software Process and Project Management   notes
CP7301 Software Process and Project Management notes
 
Software Quality Assurance in software engineering
Software Quality Assurance in software engineeringSoftware Quality Assurance in software engineering
Software Quality Assurance in software engineering
 
Comparing Software Quality Assurance Techniques And Activities
Comparing Software Quality Assurance Techniques And ActivitiesComparing Software Quality Assurance Techniques And Activities
Comparing Software Quality Assurance Techniques And Activities
 
CIPL Application Development Process
CIPL Application Development ProcessCIPL Application Development Process
CIPL Application Development Process
 
Software development life cycle
Software development life cycleSoftware development life cycle
Software development life cycle
 
Lect1 fault+quality
Lect1 fault+qualityLect1 fault+quality
Lect1 fault+quality
 
Software Maintenance
Software MaintenanceSoftware Maintenance
Software Maintenance
 
Software engineering 15 software quality assurance practices
Software engineering 15 software quality assurance practicesSoftware engineering 15 software quality assurance practices
Software engineering 15 software quality assurance practices
 
software development life cycle(SDLC)
software development life cycle(SDLC)software development life cycle(SDLC)
software development life cycle(SDLC)
 
Software life-cycle
Software life-cycleSoftware life-cycle
Software life-cycle
 
Validation & verification software engineering
Validation & verification software engineeringValidation & verification software engineering
Validation & verification software engineering
 
Term Paper - Quality Assurance in Software Development
Term Paper - Quality Assurance in Software DevelopmentTerm Paper - Quality Assurance in Software Development
Term Paper - Quality Assurance in Software Development
 
Software Quality Assurance(SQA)
Software Quality Assurance(SQA)Software Quality Assurance(SQA)
Software Quality Assurance(SQA)
 
Manual testing by reddy
Manual testing by reddyManual testing by reddy
Manual testing by reddy
 
Software Engineering by Pankaj Jalote
Software Engineering by Pankaj JaloteSoftware Engineering by Pankaj Jalote
Software Engineering by Pankaj Jalote
 
software configuration management
software configuration managementsoftware configuration management
software configuration management
 
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29 - sw process 1-3 sdlc m...
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29  - sw process 1-3 sdlc m...Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29  - sw process 1-3 sdlc m...
Beit 381 se lec 5, 6, 7 & 8 - 69 - 12 feb21,22,28,29 - sw process 1-3 sdlc m...
 
software maintenance
software maintenancesoftware maintenance
software maintenance
 
SOFTWARE VERIFICATION & VALIDATION
SOFTWARE VERIFICATION & VALIDATIONSOFTWARE VERIFICATION & VALIDATION
SOFTWARE VERIFICATION & VALIDATION
 
المحاضرة الرابعة والخامسة
المحاضرة الرابعة والخامسةالمحاضرة الرابعة والخامسة
المحاضرة الرابعة والخامسة
 

Similar to Agile lifecycle handbook by bhawani nandan prasad

Software Development Life Cycle-SDLC
Software Development Life Cycle-SDLCSoftware Development Life Cycle-SDLC
Software Development Life Cycle-SDLC
Adeel Rasheed
 
Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )
eshtiyak
 
7 stages of system Development life cycle ppt
7 stages of system Development life cycle ppt7 stages of system Development life cycle ppt
7 stages of system Development life cycle ppt
IphsTechnologies
 
SDLC presentation-1.pptx
SDLC presentation-1.pptxSDLC presentation-1.pptx
SDLC presentation-1.pptx
EvelynChinnu
 
STLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxSTLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptx
ssusere4c6aa
 
Working Agile with Scrum and TFS 2013
Working Agile with Scrum and TFS 2013Working Agile with Scrum and TFS 2013
Working Agile with Scrum and TFS 2013Moataz Nabil
 
Slide set 1 (Traditional Software Development) (1).pptx
Slide set 1 (Traditional Software Development) (1).pptxSlide set 1 (Traditional Software Development) (1).pptx
Slide set 1 (Traditional Software Development) (1).pptx
UTKARSHBHARDWAJ71
 
ISE_Lecture Week 2-SW Process Models.ppt
ISE_Lecture Week 2-SW Process Models.pptISE_Lecture Week 2-SW Process Models.ppt
ISE_Lecture Week 2-SW Process Models.ppt
HumzaWaris1
 
Agile methodology
Agile methodologyAgile methodology
Agile methodology
Muhammad Shoaib
 
Quality assuarance bharath anche (1)
Quality assuarance bharath anche (1)Quality assuarance bharath anche (1)
Quality assuarance bharath anche (1)
bharathanche
 
functional testing
functional testing functional testing
functional testing
bharathanche
 
SIA-101-Final-_SDLC.pdf
SIA-101-Final-_SDLC.pdfSIA-101-Final-_SDLC.pdf
SIA-101-Final-_SDLC.pdf
JanreiDevillaTe
 
Chapter 5 Software Quality Assurance-Finalised_BW.ppt
Chapter 5 Software Quality Assurance-Finalised_BW.pptChapter 5 Software Quality Assurance-Finalised_BW.ppt
Chapter 5 Software Quality Assurance-Finalised_BW.ppt
Bule Hora University
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
UMA PARAMESWARI
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
UMA PARAMESWARI
 
3Audit Software & Tools.pptx
3Audit Software & Tools.pptx3Audit Software & Tools.pptx
3Audit Software & Tools.pptx
jack952975
 
16103271 software-testing-ppt
16103271 software-testing-ppt16103271 software-testing-ppt
16103271 software-testing-ppt
atish90
 
Rishi
RishiRishi
Software life-cycle
Software life-cycleSoftware life-cycle
Software life-cyclegnesoni
 

Similar to Agile lifecycle handbook by bhawani nandan prasad (20)

Software Development Life Cycle-SDLC
Software Development Life Cycle-SDLCSoftware Development Life Cycle-SDLC
Software Development Life Cycle-SDLC
 
Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )Software Development Life Cycle (SDLC )
Software Development Life Cycle (SDLC )
 
7 stages of system Development life cycle ppt
7 stages of system Development life cycle ppt7 stages of system Development life cycle ppt
7 stages of system Development life cycle ppt
 
SDLC presentation-1.pptx
SDLC presentation-1.pptxSDLC presentation-1.pptx
SDLC presentation-1.pptx
 
STLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptxSTLC & SDLC-ppt-1.pptx
STLC & SDLC-ppt-1.pptx
 
Working Agile with Scrum and TFS 2013
Working Agile with Scrum and TFS 2013Working Agile with Scrum and TFS 2013
Working Agile with Scrum and TFS 2013
 
Slide set 1 (Traditional Software Development) (1).pptx
Slide set 1 (Traditional Software Development) (1).pptxSlide set 1 (Traditional Software Development) (1).pptx
Slide set 1 (Traditional Software Development) (1).pptx
 
ISE_Lecture Week 2-SW Process Models.ppt
ISE_Lecture Week 2-SW Process Models.pptISE_Lecture Week 2-SW Process Models.ppt
ISE_Lecture Week 2-SW Process Models.ppt
 
Agile methodology
Agile methodologyAgile methodology
Agile methodology
 
Quality assuarance bharath anche (1)
Quality assuarance bharath anche (1)Quality assuarance bharath anche (1)
Quality assuarance bharath anche (1)
 
functional testing
functional testing functional testing
functional testing
 
SIA-101-Final-_SDLC.pdf
SIA-101-Final-_SDLC.pdfSIA-101-Final-_SDLC.pdf
SIA-101-Final-_SDLC.pdf
 
Chapter 5 Software Quality Assurance-Finalised_BW.ppt
Chapter 5 Software Quality Assurance-Finalised_BW.pptChapter 5 Software Quality Assurance-Finalised_BW.ppt
Chapter 5 Software Quality Assurance-Finalised_BW.ppt
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
Software Engineering
Software EngineeringSoftware Engineering
Software Engineering
 
3Audit Software & Tools.pptx
3Audit Software & Tools.pptx3Audit Software & Tools.pptx
3Audit Software & Tools.pptx
 
16103271 software-testing-ppt
16103271 software-testing-ppt16103271 software-testing-ppt
16103271 software-testing-ppt
 
Rishi
RishiRishi
Rishi
 
Rishi
RishiRishi
Rishi
 
Software life-cycle
Software life-cycleSoftware life-cycle
Software life-cycle
 

More from Bhawani N Prasad

Understanding Robotic process automation by bhawani nandan prasad
Understanding Robotic process automation by bhawani nandan prasadUnderstanding Robotic process automation by bhawani nandan prasad
Understanding Robotic process automation by bhawani nandan prasad
Bhawani N Prasad
 
Apache spark with akka couchbase code by bhawani
Apache spark with akka couchbase code by bhawaniApache spark with akka couchbase code by bhawani
Apache spark with akka couchbase code by bhawani
Bhawani N Prasad
 
Agile overview class for scrum masters
Agile overview class for scrum mastersAgile overview class for scrum masters
Agile overview class for scrum masters
Bhawani N Prasad
 
Machine learning computer science by bhawani n prasad
Machine learning computer science by bhawani n prasadMachine learning computer science by bhawani n prasad
Machine learning computer science by bhawani n prasad
Bhawani N Prasad
 
PM conpetency skills
PM conpetency skillsPM conpetency skills
PM conpetency skills
Bhawani N Prasad
 
What we can do in Retail analytics by bhawani nandanprasad
What we can do in Retail analytics by bhawani nandanprasadWhat we can do in Retail analytics by bhawani nandanprasad
What we can do in Retail analytics by bhawani nandanprasad
Bhawani N Prasad
 
Big data analytics bhawani nandan prasad
Big data analytics   bhawani nandan prasadBig data analytics   bhawani nandan prasad
Big data analytics bhawani nandan prasad
Bhawani N Prasad
 
Program management-steps
Program management-stepsProgram management-steps
Program management-steps
Bhawani N Prasad
 
Define enterprise integration strategy by industry leader bhawani nandanprasad
Define enterprise integration strategy by industry leader bhawani nandanprasadDefine enterprise integration strategy by industry leader bhawani nandanprasad
Define enterprise integration strategy by industry leader bhawani nandanprasad
Bhawani N Prasad
 
New IBM Information Server 11.3 - Bhawani Nandan Prasad
New IBM Information Server  11.3 - Bhawani Nandan PrasadNew IBM Information Server  11.3 - Bhawani Nandan Prasad
New IBM Information Server 11.3 - Bhawani Nandan PrasadBhawani N Prasad
 
Economic growth inequality across globe by bhawani nandan prasad
Economic growth inequality across globe  by bhawani nandan prasadEconomic growth inequality across globe  by bhawani nandan prasad
Economic growth inequality across globe by bhawani nandan prasad
Bhawani N Prasad
 
Agile project management tips and techniques
Agile project management tips and techniquesAgile project management tips and techniques
Agile project management tips and techniques
Bhawani N Prasad
 
Cognos 10 upgrade migrate fixpack by bhawani nandan prasad
Cognos 10 upgrade migrate fixpack by bhawani nandan prasadCognos 10 upgrade migrate fixpack by bhawani nandan prasad
Cognos 10 upgrade migrate fixpack by bhawani nandan prasad
Bhawani N Prasad
 
Software development with scrum methodology bhawani nandan prasad
Software development with scrum methodology   bhawani nandan prasadSoftware development with scrum methodology   bhawani nandan prasad
Software development with scrum methodology bhawani nandan prasad
Bhawani N Prasad
 
Agile formanagers by-bhawaninandanprasad
Agile formanagers by-bhawaninandanprasadAgile formanagers by-bhawaninandanprasad
Agile formanagers by-bhawaninandanprasad
Bhawani N Prasad
 
Dsdm by bhawani nandanprasad
Dsdm by bhawani nandanprasadDsdm by bhawani nandanprasad
Dsdm by bhawani nandanprasad
Bhawani N Prasad
 
Cmmi vs-agile
Cmmi vs-agileCmmi vs-agile
Cmmi vs-agile
Bhawani N Prasad
 
Pdu session challenges in agile
Pdu session   challenges in agilePdu session   challenges in agile
Pdu session challenges in agile
Bhawani N Prasad
 

More from Bhawani N Prasad (20)

Understanding Robotic process automation by bhawani nandan prasad
Understanding Robotic process automation by bhawani nandan prasadUnderstanding Robotic process automation by bhawani nandan prasad
Understanding Robotic process automation by bhawani nandan prasad
 
Apache spark with akka couchbase code by bhawani
Apache spark with akka couchbase code by bhawaniApache spark with akka couchbase code by bhawani
Apache spark with akka couchbase code by bhawani
 
Agile overview class for scrum masters
Agile overview class for scrum mastersAgile overview class for scrum masters
Agile overview class for scrum masters
 
Product Management
Product ManagementProduct Management
Product Management
 
Product Engineering
Product EngineeringProduct Engineering
Product Engineering
 
Machine learning computer science by bhawani n prasad
Machine learning computer science by bhawani n prasadMachine learning computer science by bhawani n prasad
Machine learning computer science by bhawani n prasad
 
PM conpetency skills
PM conpetency skillsPM conpetency skills
PM conpetency skills
 
What we can do in Retail analytics by bhawani nandanprasad
What we can do in Retail analytics by bhawani nandanprasadWhat we can do in Retail analytics by bhawani nandanprasad
What we can do in Retail analytics by bhawani nandanprasad
 
Big data analytics bhawani nandan prasad
Big data analytics   bhawani nandan prasadBig data analytics   bhawani nandan prasad
Big data analytics bhawani nandan prasad
 
Program management-steps
Program management-stepsProgram management-steps
Program management-steps
 
Define enterprise integration strategy by industry leader bhawani nandanprasad
Define enterprise integration strategy by industry leader bhawani nandanprasadDefine enterprise integration strategy by industry leader bhawani nandanprasad
Define enterprise integration strategy by industry leader bhawani nandanprasad
 
New IBM Information Server 11.3 - Bhawani Nandan Prasad
New IBM Information Server  11.3 - Bhawani Nandan PrasadNew IBM Information Server  11.3 - Bhawani Nandan Prasad
New IBM Information Server 11.3 - Bhawani Nandan Prasad
 
Economic growth inequality across globe by bhawani nandan prasad
Economic growth inequality across globe  by bhawani nandan prasadEconomic growth inequality across globe  by bhawani nandan prasad
Economic growth inequality across globe by bhawani nandan prasad
 
Agile project management tips and techniques
Agile project management tips and techniquesAgile project management tips and techniques
Agile project management tips and techniques
 
Cognos 10 upgrade migrate fixpack by bhawani nandan prasad
Cognos 10 upgrade migrate fixpack by bhawani nandan prasadCognos 10 upgrade migrate fixpack by bhawani nandan prasad
Cognos 10 upgrade migrate fixpack by bhawani nandan prasad
 
Software development with scrum methodology bhawani nandan prasad
Software development with scrum methodology   bhawani nandan prasadSoftware development with scrum methodology   bhawani nandan prasad
Software development with scrum methodology bhawani nandan prasad
 
Agile formanagers by-bhawaninandanprasad
Agile formanagers by-bhawaninandanprasadAgile formanagers by-bhawaninandanprasad
Agile formanagers by-bhawaninandanprasad
 
Dsdm by bhawani nandanprasad
Dsdm by bhawani nandanprasadDsdm by bhawani nandanprasad
Dsdm by bhawani nandanprasad
 
Cmmi vs-agile
Cmmi vs-agileCmmi vs-agile
Cmmi vs-agile
 
Pdu session challenges in agile
Pdu session   challenges in agilePdu session   challenges in agile
Pdu session challenges in agile
 

Recently uploaded

Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
strikingabalance
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
A. F. M. Rubayat-Ul Jannat
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
tdt5v4b
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
tdt5v4b
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
Jim Smith
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
Rob Healy
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
tdt5v4b
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
Alexey Krivitsky
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
bernanbumatay1
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
Ahmed AbdelMoneim
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
Muhammad Adil Jamil
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
tdt5v4b
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
gcljeuzdu
 
Public Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdfPublic Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdf
Pinta Partners
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
Ram V Chary
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
RoopaTemkar
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
William (Bill) H. Bender, FCSI
 
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish GermanCV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
EUS+ Management & Consulting Excellence
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
Matthew Sinclair
 

Recently uploaded (19)

Enriching engagement with ethical review processes
Enriching engagement with ethical review processesEnriching engagement with ethical review processes
Enriching engagement with ethical review processes
 
Case Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of ManagementCase Analysis - The Sky is the Limit | Principles of Management
Case Analysis - The Sky is the Limit | Principles of Management
 
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
原版制作(澳洲WSU毕业证书)西悉尼大学毕业证文凭证书一模一样
 
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
原版制作(CDU毕业证书)查尔斯达尔文大学毕业证PDF成绩单一模一样
 
Senior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdfSenior Project and Engineering Leader Jim Smith.pdf
Senior Project and Engineering Leader Jim Smith.pdf
 
Comparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile SystemsComparing Stability and Sustainability in Agile Systems
Comparing Stability and Sustainability in Agile Systems
 
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
在线办理(UVic毕业证书)维多利亚大学毕业证录取通知书一模一样
 
Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™Strategic Org Design with Org Topologies™
Strategic Org Design with Org Topologies™
 
Risk-Management-presentation for cooperatives
Risk-Management-presentation for cooperativesRisk-Management-presentation for cooperatives
Risk-Management-presentation for cooperatives
 
The Management Guide: From Projects to Portfolio
The Management Guide: From Projects to PortfolioThe Management Guide: From Projects to Portfolio
The Management Guide: From Projects to Portfolio
 
Leadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact PlanLeadership Ethics and Change, Purpose to Impact Plan
Leadership Ethics and Change, Purpose to Impact Plan
 
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
在线办理(Murdoch毕业证书)莫道克大学毕业证电子版成绩单一模一样
 
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
一比一原版杜克大学毕业证(Duke毕业证)成绩单留信认证
 
Public Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdfPublic Speaking Tips to Help You Be A Strong Leader.pdf
Public Speaking Tips to Help You Be A Strong Leader.pdf
 
Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...Integrity in leadership builds trust by ensuring consistency between words an...
Integrity in leadership builds trust by ensuring consistency between words an...
 
Employment Practices Regulation and Multinational Corporations
Employment PracticesRegulation and Multinational CorporationsEmployment PracticesRegulation and Multinational Corporations
Employment Practices Regulation and Multinational Corporations
 
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
W.H.Bender Quote 66 - ServPoints Sequence of Service™ should be Identified fo...
 
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish GermanCV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
CV Ensio Suopanki1.pdf ENGLISH Russian Finnish German
 
20240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 202420240608 QFM019 Engineering Leadership Reading List May 2024
20240608 QFM019 Engineering Leadership Reading List May 2024
 

Agile lifecycle handbook by bhawani nandan prasad

  • 1. Agile Lifecycle Handbook By Bhawani Nandan Prasad (MBA – Marketing and Strategy, B.E. Comp Sc) Introduction Agile denotes “the quality of being agile; readiness for motion; nimbleness, activity, dexterity in motion”, implying light weight along with faster and nimbler software development process. Agile methodology is aimed at rapidly growing and volatile internet software industry as well as the mobile application environment. Agile is concerned with producing software that meets the user's needs within the shortest possible time. The user is usually involved in the iterative production process. Agile software processes are characterized by accelerated delivery of working software at any stage in the development process. The emphasis is on customer collaboration, communication and teamwork. Thus requirements may change anywhere in the process and the process is adaptive to the change Agile software life cycle is an iterative process where software is ready at each iteration but can always be improved by further iteration. There is minimal documentation and maximum emphasis on direct face-to-face communication. Agile software is adaptable to fast changes and is ideal for small teams who have to deliver workable software within a very short deadline. Existing Agile Methods Given below are some of the popular methodologies that seem to represent the Agile methodology:  Extreme Programming  Scrum (this document focuses on Scrum methodology)  Crystal Family of methodologies  Feature Driven Development  Rational Unified Process  Dynamic Systems Development Method  Adaptive Software Development  Open Source Software Development
  • 2. Overview of Scrum Lifecycle Scrum Lifecycle consists of three phases: 1. Pre-game: This in turn consists of the following sub-phases: a. Pre-Planning b. Architecture/High Level Design c. Sprint Planning 2. Development iterations: The development phases consist of Sprints that are iterative cycles. One Sprint lasts between 1 week to 1 month. There may be 3 to 8 sprints in a software development process before a system is ready for distribution. 3. Post-game: This in turn consists of sub-phases as follows: a. Product Integration b. System Testing c. Documentation
  • 3. The Scrum Lifecycle 1.1. Pre-Planning Phase 1.1.1. Purpose The Planning Phase focuses on identifying a viable project and the strategy for its execution. 1.1.2. Entry Criteria  Need to identify viable projects 1.1.3. Inputs  Opportunities available at hand 1.1.4. Outputs  Selection of Projects  High Level Problem Statement  Product backlog for the selected Product 1.1.5. Exit Criteria  Selection of system to be developed 1.1.6. Tasks  The projects are prioritized and selected by the key stakeholders including management, the customer, users, Sprint Manager as follows: o Define the business opportunities o Identify Viable project o Assess feasibilities. Just enough feasibility study done to decide yes or no on the project o Prioritize projects based on the potential gains and other aspects o Select Projects that are of higher priority  Other decisions made at this phase includes the following: o Whether to build new system or modify existing system o the development team and its location  Garnering support and funding for the project  Starting to build the team
  • 4. 1.2. Architecture/High Level Design 1.2.1. Purpose In the architecture phase, the high level design of the system including the architecture shall be planned based on the Product Backlog. A design review meeting is held to go over the proposals for implementation and decisions are made. In addition, preliminary plans for the contents of releases are prepared. 1.2.2. Entry Criteria  Selection of system to be developed 1.2.3. Inputs  Selection of Projects 1.2.4. Outputs  Product Backlog updates  Generalized use cases that captures the intentions of a user  Architecture and High Level Design  High Level Activity diagram  High level workflow  Standards, Conventions, Technology, Resources  High Level estimates 1.2.5. Exit Criteria  Approved Architecture and High Level Design 1.2.6. Tasks This phase involves the following tasks by the Sprint team:  Define high level scope  Define Technology stack  High level analyses and Design  Setting up the environment  Estimating the project at high level
  • 5. 1.3. Sprint Planning 1.3.1. Purpose The Sprint Planning meeting is carried out for each sprint with the purpose of defining the Sprint backlog for the next Sprint. 1.3.2. Entry Criteria  Need to plan for the next Sprint 1.3.3. Inputs  Product Backlog 1.3.4. Outputs  Updated Product backlog  Sprint Goal and Sprint Backlog finalized for the next sprint  Estimates and Plan for the next sprint 1.3.5. Exit Criteria  Approved plan for the next Sprint 1.3.6. Tasks  The Scrum Manager along with Scrum team shall review the latest Product Backlog. During this process, new items may be added or existing items modified or deleted in the Product Backlog. The priority may be revised.  Based on the updated priority, a set of items shall be selected for the next sprint and commitment taken from the Sprint team. This establishes the Sprint Goals and the Sprint Backlog for the next Sprint.  The following are assessed for the next sprint: o Assess resource requirements o Risk and Issues Management o Training needs  Just enough Analysis and Design shall be performed by the Scrum team so as to give good estimates.  The Scrum Manager prepares the plan for the next sprint  Finally, seek necessary approvals from the management, customer and users on the Sprint Backlog for the next Sprint. 1.3.7. Verification  Review and Approval of Sprint Backlog
  • 6. 1.4. Development Iterations 1.4.1. Purpose During Development iterations, high-quality working software is incrementally delivered that meets the changing needs of our stakeholders. Each iteration is called a Sprint. Each sprint consists of traditional phases – Requirements, Analysis, Design, Evolution and Delivery. Each Sprint involves development or enhancements of new functionality. One Sprint lasts between 1 week to 1 month. There may be 3 to 8 sprints in a software development process before a system is ready for distribution. 1.4.2. Entry Criteria  Approved plan for the next Sprint 1.4.3. Inputs  Updated Product backlog  Sprint Goal and Sprint Backlog  Sprint Plan 1.4.4. Outputs  Agile class diagrams depicting data layer objects  Agile class diagrams depicting business layer objects  Agile sequence diagrams for complex logic  User interface mock-ups and flows  Working Code  Defects and their status 1.4.5. Exit Criteria  Working Code is complete 1.4.6. Tasks  All stakeholders collaborate during this phase to reduce the risk through fast feedback cycle.  Analysis and Design is carried out Just in time. This involves the following steps: o Refine the requirements (The requirements evolve throughout the project) o Refine the Architecture and design of the system (The architecture and design evolves during the sprint development). o Model shall be done in a manner that you can always come back later o All stakeholders shall actively participates o Issues are intended to be resolved just in time  The functionality is coded in the order of priority. This may be accomplished through practices such as follows: o Active stakeholder participation o Test Driven development o Pair programming o Accomplished in iterations
  • 7. o Develop Incrementally o Code refactoring  The quality is assured through guidance like coding convention and other guidelines.  Confirmatory testing: The developers shall perform development testing to confirm the design and the users shall perform agile acceptance testing to confirm the requirements. This isn't the complete testing because we are producing working software on a regular basis.  Independent Testing: This involves the following: o System Testing/Function Testing. This is performed by test professionals who are good at finding defects which the developers have missed. o User Testing  Majority of testing is done during each construction cycle so that the testing in the release iteration is smaller.  Daily Scrum meetings that are conducted by the Scrum Master and attended by Product owner and Scrum team. The management can also participate in the Scrum meetings. During this meeting, the following are reviewed: o Assess Velocity to check the progress o Work completed o Issues and Risks o Work planned for the next days
  • 8. 1.5. Post Game (or Release Iteration) 1.5.1. Purpose During the release iteration(s), also known as the "end game", the system is transitioned into production. Not that for complex systems the end game may prove to be several iterations, although if you've done system and user testing during construction iterations this likely won't be the case 1.5.2. Entry Criteria  Working Code is complete 1.5.3. Inputs  Working Code 1.5.4. Outputs  Integrated and tested Code  User documentation  Deployment of code  Scrum Review Checklist 1.5.5. Exit Criteria 1.5.6. Tasks  Product Integration. This involves integrating the code with the previous build.  Final testing of the system. Final system and acceptance testing should be performed at this point, although the majority of testing should be done during construction iterations.  Rework the code  User documentation. Some documentation may have been written during construction iterations, but it typically isn't finalized until the system release itself has been finalized to avoid unnecessary rework. Documentation is produced if the stakeholder is willing to pay for it.  Training. Train end users, operations staff, and support staff to work effectively with our system  Deploy the System  Daily Scrum meetings that are conducted by the Scrum Master and attended by Product owner and Scrum team. The management can also participate in the Scrum meetings. 1.6. Sprint Review meeting This is held on the last day of a Sprint. In this meeting, the Scrum team and Scrum master present the result (i.e. the working product increment) of the Sprint to the management, customers, users and the Product Owner. The review meeting may bring out new Backlog items and even change the direction of the system being built. These meetings are informal.
  • 9. Scrum master reviews whether project is carried out in accordance with Scrum values, practices and rules and it progresses as planned. The following checklist is used for the purpose:  Scrum Review Checklist
  • 10. Scrum in a nutshell Metrics Stage Event/ Meeting Led/ Facilitated by Participants Frequency Artifacts 1 Strategy * Product Owner Key stakeholders (Customer and Users), Sr Executive Once a year Vision Statement * 2 Define Product Roadmap * Product Owner Key stakeholders (Customer and Users) Twice a year Product Roadmap * Themes * 3 Release Planning Meeting * Product Owner Development team, SCRUM Master (Optional) Once a quarter Product Backlog Epics User Stories 4 Sprint Planning Meeting Product Owner Development team, SCRUM Master At beginning of sprint Sprint Backlog User Stories Tasks 5 Daily SCRUM SCRUM Master Development team, Product Owner (as desired) Daily Task Board Sprint Burndown Chart 6 Spring Review (End Meeting #1) Product Owner Key stakeholders (Customer and Users), Development team At end of Sprint Potentially shippable increment, User acceptance 7 Sprint Retrospective (End Meeting #2) SCRUM Master Development team, At end of Sprint Release Burndown Chart