After all, it’s the transmission, stupid!
Kashif Mateen Ansari Published March 25, 2023
During Bill Clinton’s 1992 campaign for presidency, James Carville
famously coined the phrase “it’s the economy, stupid” to emphasize
how crucial the economy was to the election.
It could be argued that “it’s the transmission, stupid” accurately
describes the difficulties the power sector is facing in Pakistan. Many
of the issues affecting Pakistan’s power sector, such as power
outages, limited access to electricity, inefficient use of the country’s
existing power generation capacity, and high system losses, cannot
be resolved due to the absence of a reliable transmission network.
Blackouts and load shedding are frequent in Pakistan as a result of
the transmission network’s constrained capacity. This has a major
impact on households, businesses, and the economy.
Electricity access is limited in many parts of the country, particularly
in rural areas, due to lack of transmission infrastructure. Although
we list this as an outcome of the transmission problem but for remote village access, we are not advocating
transmission networks, rather this has to be dealt with micro grids and distributed generation as covered
in another piece on “democratisation of energy”.
Mother of all ills, the nuclear bomb of the current crisis is this lack of transmission infrastructure that has
caused the existing power generation capacity to frequently go underutilized, which raises costs for both
the government and the general public. Currently, Pakistan’s generation capacity is over 42,000 MW, which
is far more than what we can utilise and what our transmission system can take. By any estimate our
transmission capacity stands at merely 22,000 MW. This means that we are underutilizing our generation
capacity to a very high proportion. Now as per the contracts of power plants, capacity payments must be
made for all the generation capacity whether we use it or not, so if we assume that fifty percent capacity
is not used at any time then the units produced at that time would have to bear the cost of this unused
production capacity, essentially making those units even costlier. So, if a 2000 MW plant operates at 1000
MW level, the power produced will be costlier per unit compared to when it would operate at 100%
capacity.
The real rub comes from the point that at a time when we are running from pillar to post to get foreign
exchange, one mode of power generation that doesn’t utilise imported fuel cannot be fully used. 100%
generation capacity of renewable energy that is already installed cannot be delivered to the consumers
due to lack of transmission infrastructure. Hence the irony we are facing is that we keep on running
thermal power plants but curtail the production of Wind power in Jhimpir because our grid is unable to
dispatch it. This is happening at a time when it is crucial for decreasing Pakistan’s reliance on fossil fuels
and addressing our foreign exchange issues.
Unfortunately, wind as a resource cannot be stored for future like diesel or petrol. So, the amount of power
that has been curtailed from the existing wind power plants is power lost forever. Currently, installed wind
power generation capacity is about 1900 MW and almost half of it cannotbe transmitted through the grid.
This is over half a billion-dollar worth of investment going to waste and we are using power generated
through imported fuel.
To cap off all this there are plans afoot to establish further solar energy power plants of 600 MW at the
federal government level. Added on top of that are multitude of solar plants of smaller capacities that are
under consideration by many other important organisations.
When we have excess generation capacity and unutilised installed wind power then why our policy makers
are focusing on new generation capacity. Why not to focus on transmission lines. Transmission lines as a
private business make a wonderful case of stability and profitability. If there are investors out there who
want to make money by developing new generation capacity, then surely, they can make money in
transmission line installation also. So the focus needs to change from generation to transmission.
To handle this problem of transmission we need to look out for private investment. Several countries have
implemented transmission line privatization in the power sector. One of the successful examples is the
United Kingdom where National Grid plc, a private company, now oversees the transmission network after
it was privatized in 1990. This has been viewed as a successful example of privatization due to the
network’s increased efficiency and dependability.
In Chile, the government privatized the country’s transmission lines and the entire electricity sector in the
1980s. A private company named Transelec now owns and manages the transmission network. The
privatization has been deemed successful in terms of raising the transmission network’s effectiveness and
lowering costs. There are many other examples of privatisation of transmission network in the world,
including Brazil and the Philippines.
Transmission infrastructure could be improved with speed and efficiency if we allow private sector to
participate. This is not a new concept. For the corporate world Warren Buffet, one of the richest persons
in the world, is always an example to follow and Berkshire Hathaway, the Warren Buffett-led company, has
investments in the transmission industry. The business owns and manages transmission lines in the US.
He owns two companies in transmission business in line with his business strategy of making investments
in companies that are stable and profitable. The demand for transmission lines will remain high in the
coming years as renewable energy sources become more prevalent. Hence this makes a good case for
inviting Pakistani and global investors in this sector.
We can go the public private partnership route to unlock investment in this sector. It would require
policymakers’ attention towards a legal and regulatory framework that is well-designed, careful project
identification and feasibility assessment, effective risk allocation and financing, performance monitoring
and evaluation, stakeholder engagement, and strong contract management.
Policymakers can look at opening the sector to tolling agreements for private transmission lines; these are
a type of public-private partnership (PPP) in which private companies or investors are granted the right to
build and operate transmission lines in exchange for compensation via a tolling mechanism.
The private company or investor is responsible for financing, constructing, and operating the transmission
line under this arrangement. In exchange, they are given the right to charge third parties who use the
transmission line to transport electricity a fee or toll. Tolls are typically based on a fixed rate per unit of
electricity transported or a negotiated rate based on the transmission arrangement’s specific
circumstances.
When private investors can generate a return on their investment through tolls, they will be willing to
further invest in transmission infrastructure. Because their revenue is linked to transmission line usage,
private companies will have a stronger incentive to operate transmission lines efficiently and effectively.
Construction delays or cost overruns are shared by the private company and the government or utility,
lowering the risk to the government or utility. Private companies may be more creative in their approach
to constructing and operating transmission lines, potentially resulting in more efficient and effective
infrastructure.
Tolling arrangements are currently used in the USA, Europe, UK, Chile, the Philippines and many other
countries. Not all of these countries are developed but this public private partnership has created value
for their power systems.
The model of private investment in transmission assets, which has proven successful in other parts of the
world, has the potential to be replicated in Pakistan. However, several factors must be considered before
such a model can be implemented in Pakistan. To begin with, a regulatory framework for transmission
infrastructure must be established in order to encourage private investment. This would entail defining
the roles and responsibilities of the government and private investors in the development and operation
of transmission infrastructure, as well as establishing a regulatory framework to ensure that private
investors are incentivized to invest in infrastructure while also protecting consumers.
A clear pipeline of transmission projects ready for investment would be required. This would entail
identifying areas in need of new transmission infrastructure and developing a project pipeline that is
appealing to private investors. Transmission projects would require a transparent and efficient bidding
process. This would entail ensuring that private investors have access to the information they need to
evaluate a project’s potential risks and returns, as well as that the bidding process is fair and transparent.
Above all, a stable and predictable investment climate in Pakistan would be required to encourage long-
term investment in transmission infrastructure. This would entail creating a stable regulatory environment,
ensuring that we treat our investors during the lifetime of projects as partners and not as pariahs. Here a
word about current investors in the power sector: we must revisit how we treat the current investors, local
and foreign, who face delayed payments, all sorts of legal lacunas that are used to scuttle their business
plan and economic returns, all in the name of a witch-hunt whose premise is that they are making a lot of
money. This needs a rethink at the policy level, while making any policy, it is the duty of the policymaker
to look farther into the future and plan as per the requirements and ability to shoulder the burden of an
investment. Now if despite of having 42,000 MW of generation capacity we are still issuing tenders for
new power plants there is something seriously wrong with our policymakers and regulatory institutions.
For Pakistan to get out of the current mess economically we need to address problems of the power sector
and we must start thinking beyond power generation. Our current and short-term problem is not
generation, it is indeed transmission. Unless significant investment is made in upgrading transmission
infrastructure as well as policy changes are made to create a conducive regulatory environment that
promotes private investment in this sector we are doomed to get deeper into the troubles that are already
hounding us. So, we better adopt the slogan, “it’s the transmission, stupid”.
(The writer is a Harvard Alumni and tweets as @kashif_m_ansari) also the
writer is CEO of a wind power project and can be reached at kashifmateenansari@post.harvard.edu

More Related Content

Similar to After All Its Tranmission Stupid, 25 Mar 2023.pptx

Looking for safe abortion pills? Dial +971581248768 for availability in Dubai...
Looking for safe abortion pills? Dial +971581248768 for availability in Dubai...Looking for safe abortion pills? Dial +971581248768 for availability in Dubai...
Looking for safe abortion pills? Dial +971581248768 for availability in Dubai...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 
Need safe abortion pills? Call +971581248768 for 100% original and safe produ...
Need safe abortion pills? Call +971581248768 for 100% original and safe produ...Need safe abortion pills? Call +971581248768 for 100% original and safe produ...
Need safe abortion pills? Call +971581248768 for 100% original and safe produ...
DUBAI (+971)581248768 BUY ABORTION PILLS IN ABU dhabi...Qatar
 
Formulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
Formulation of Net Metering Policy for Odisha to boost rooftop Solar ProjectsFormulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
Formulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
Bikash Kumar Mallick
 
Solar city distributed_grid
Solar city distributed_gridSolar city distributed_grid
Solar city distributed_grid
Frédéric Lambert
 
Zero-subsidy Onshore Wind Energy Projects
Zero-subsidy Onshore Wind Energy ProjectsZero-subsidy Onshore Wind Energy Projects
Zero-subsidy Onshore Wind Energy Projects
Stavros Thomas
 
Task 3 Privatisation (a133921)
Task 3   Privatisation (a133921) Task 3   Privatisation (a133921)
Task 3 Privatisation (a133921) izham27
 
Rauluk Testimony Final no pics
Rauluk Testimony Final no picsRauluk Testimony Final no pics
Rauluk Testimony Final no picsValerie Rauluk
 
Privatization and deregulation
Privatization and deregulationPrivatization and deregulation
Privatization and deregulation
NabeelAhmed258
 
1512a CSIRO & ENA - Network Transformation Roadmap - IPR Full
1512a CSIRO & ENA - Network Transformation Roadmap - IPR Full1512a CSIRO & ENA - Network Transformation Roadmap - IPR Full
1512a CSIRO & ENA - Network Transformation Roadmap - IPR FullMark Paterson
 
Steve Avary - Electricity Utility 2 point 0 Paper
Steve Avary - Electricity Utility 2 point 0 PaperSteve Avary - Electricity Utility 2 point 0 Paper
Steve Avary - Electricity Utility 2 point 0 PaperSteven Avary
 
2015 Altran Battery Storage White Paper
2015 Altran Battery Storage White Paper2015 Altran Battery Storage White Paper
2015 Altran Battery Storage White PaperPhilip Clark
 
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
Dr. Oliver Massmann
 
Economics of Electricity Transmission Line Rehabilitation Investments
Economics of Electricity Transmission Line Rehabilitation Investments Economics of Electricity Transmission Line Rehabilitation Investments
Economics of Electricity Transmission Line Rehabilitation Investments
Sener Salci
 
09112017 mass mkt_offgrid
09112017 mass mkt_offgrid09112017 mass mkt_offgrid
09112017 mass mkt_offgrid
Roger Jeffrey
 
Policies for smart grid
Policies for smart gridPolicies for smart grid
Policies for smart grid
Ashfaq khan
 
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...FEF Philippines
 
Speaking green communcations eco green group utility overview presentation 5 ...
Speaking green communcations eco green group utility overview presentation 5 ...Speaking green communcations eco green group utility overview presentation 5 ...
Speaking green communcations eco green group utility overview presentation 5 ...
Speaking Green Communications
 
power systems.pdf
power systems.pdfpower systems.pdf
power systems.pdf
Gollapalli Sreenivasulu
 
Energy
EnergyEnergy
Energy
Mark Werwath
 
Vietnam _Green Growth
Vietnam _Green GrowthVietnam _Green Growth
Vietnam _Green Growth
Dr. Oliver Massmann
 

Similar to After All Its Tranmission Stupid, 25 Mar 2023.pptx (20)

Looking for safe abortion pills? Dial +971581248768 for availability in Dubai...
Looking for safe abortion pills? Dial +971581248768 for availability in Dubai...Looking for safe abortion pills? Dial +971581248768 for availability in Dubai...
Looking for safe abortion pills? Dial +971581248768 for availability in Dubai...
 
Need safe abortion pills? Call +971581248768 for 100% original and safe produ...
Need safe abortion pills? Call +971581248768 for 100% original and safe produ...Need safe abortion pills? Call +971581248768 for 100% original and safe produ...
Need safe abortion pills? Call +971581248768 for 100% original and safe produ...
 
Formulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
Formulation of Net Metering Policy for Odisha to boost rooftop Solar ProjectsFormulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
Formulation of Net Metering Policy for Odisha to boost rooftop Solar Projects
 
Solar city distributed_grid
Solar city distributed_gridSolar city distributed_grid
Solar city distributed_grid
 
Zero-subsidy Onshore Wind Energy Projects
Zero-subsidy Onshore Wind Energy ProjectsZero-subsidy Onshore Wind Energy Projects
Zero-subsidy Onshore Wind Energy Projects
 
Task 3 Privatisation (a133921)
Task 3   Privatisation (a133921) Task 3   Privatisation (a133921)
Task 3 Privatisation (a133921)
 
Rauluk Testimony Final no pics
Rauluk Testimony Final no picsRauluk Testimony Final no pics
Rauluk Testimony Final no pics
 
Privatization and deregulation
Privatization and deregulationPrivatization and deregulation
Privatization and deregulation
 
1512a CSIRO & ENA - Network Transformation Roadmap - IPR Full
1512a CSIRO & ENA - Network Transformation Roadmap - IPR Full1512a CSIRO & ENA - Network Transformation Roadmap - IPR Full
1512a CSIRO & ENA - Network Transformation Roadmap - IPR Full
 
Steve Avary - Electricity Utility 2 point 0 Paper
Steve Avary - Electricity Utility 2 point 0 PaperSteve Avary - Electricity Utility 2 point 0 Paper
Steve Avary - Electricity Utility 2 point 0 Paper
 
2015 Altran Battery Storage White Paper
2015 Altran Battery Storage White Paper2015 Altran Battery Storage White Paper
2015 Altran Battery Storage White Paper
 
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...OMassmann - Investment into the grid and transmission system in Vietnam (2024...
OMassmann - Investment into the grid and transmission system in Vietnam (2024...
 
Economics of Electricity Transmission Line Rehabilitation Investments
Economics of Electricity Transmission Line Rehabilitation Investments Economics of Electricity Transmission Line Rehabilitation Investments
Economics of Electricity Transmission Line Rehabilitation Investments
 
09112017 mass mkt_offgrid
09112017 mass mkt_offgrid09112017 mass mkt_offgrid
09112017 mass mkt_offgrid
 
Policies for smart grid
Policies for smart gridPolicies for smart grid
Policies for smart grid
 
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS:  ...
FEF STATEMENT ON THE PRESIDENT’S REQUEST FOR EMERGENCY POWER FROM CONGRESS: ...
 
Speaking green communcations eco green group utility overview presentation 5 ...
Speaking green communcations eco green group utility overview presentation 5 ...Speaking green communcations eco green group utility overview presentation 5 ...
Speaking green communcations eco green group utility overview presentation 5 ...
 
power systems.pdf
power systems.pdfpower systems.pdf
power systems.pdf
 
Energy
EnergyEnergy
Energy
 
Vietnam _Green Growth
Vietnam _Green GrowthVietnam _Green Growth
Vietnam _Green Growth
 

More from Kashif Mateen Ansari

15. Pakistan's Elite and the Art of Deception 02 May 2024.pptx
15. Pakistan's Elite and the Art of Deception 02 May 2024.pptx15. Pakistan's Elite and the Art of Deception 02 May 2024.pptx
15. Pakistan's Elite and the Art of Deception 02 May 2024.pptx
Kashif Mateen Ansari
 
13. It's turtles all the way down, 24 Feb 24.pptx
13. It's turtles all the way down, 24 Feb 24.pptx13. It's turtles all the way down, 24 Feb 24.pptx
13. It's turtles all the way down, 24 Feb 24.pptx
Kashif Mateen Ansari
 
12. In search of reasonable thinking - 06 Feb 24.pptx
12. In search of reasonable thinking - 06 Feb 24.pptx12. In search of reasonable thinking - 06 Feb 24.pptx
12. In search of reasonable thinking - 06 Feb 24.pptx
Kashif Mateen Ansari
 
11. Get rich before getting old - 30 Nov 23.pptx
11. Get rich before getting old - 30 Nov 23.pptx11. Get rich before getting old - 30 Nov 23.pptx
11. Get rich before getting old - 30 Nov 23.pptx
Kashif Mateen Ansari
 
Rising Again, 01 Nov 23.pptx
Rising Again, 01 Nov 23.pptxRising Again, 01 Nov 23.pptx
Rising Again, 01 Nov 23.pptx
Kashif Mateen Ansari
 
The Quick Fix, 25 Oct 2023.pptx
The Quick Fix, 25 Oct 2023.pptxThe Quick Fix, 25 Oct 2023.pptx
The Quick Fix, 25 Oct 2023.pptx
Kashif Mateen Ansari
 
Moving from Failure to Failure Successfully, 18 Sep 2023.pptx
Moving from Failure to Failure Successfully, 18 Sep 2023.pptxMoving from Failure to Failure Successfully, 18 Sep 2023.pptx
Moving from Failure to Failure Successfully, 18 Sep 2023.pptx
Kashif Mateen Ansari
 
Elephant in the Room, 24 Jul 2023.pptx
Elephant in the Room, 24 Jul 2023.pptxElephant in the Room, 24 Jul 2023.pptx
Elephant in the Room, 24 Jul 2023.pptx
Kashif Mateen Ansari
 
Don;t Take IMF Seriously, 17 Jun 2023.pptx
Don;t Take IMF Seriously, 17 Jun 2023.pptxDon;t Take IMF Seriously, 17 Jun 2023.pptx
Don;t Take IMF Seriously, 17 Jun 2023.pptx
Kashif Mateen Ansari
 
Pakistan Paradox, 22 May 2023.pptx
Pakistan Paradox, 22 May 2023.pptxPakistan Paradox, 22 May 2023.pptx
Pakistan Paradox, 22 May 2023.pptx
Kashif Mateen Ansari
 
Pakistan the scourge of inequality, 17 Apr 2023.pptx
Pakistan the scourge of inequality, 17 Apr 2023.pptxPakistan the scourge of inequality, 17 Apr 2023.pptx
Pakistan the scourge of inequality, 17 Apr 2023.pptx
Kashif Mateen Ansari
 
Energy Security of Pakistan, 09 Mar 2023.pptx
Energy Security of Pakistan, 09 Mar 2023.pptxEnergy Security of Pakistan, 09 Mar 2023.pptx
Energy Security of Pakistan, 09 Mar 2023.pptx
Kashif Mateen Ansari
 
Democratization of Energy, 19 Feb 2023.pptx
Democratization of Energy, 19 Feb 2023.pptxDemocratization of Energy, 19 Feb 2023.pptx
Democratization of Energy, 19 Feb 2023.pptx
Kashif Mateen Ansari
 
Article on CPEC
Article on CPECArticle on CPEC
Article on CPEC
Kashif Mateen Ansari
 
The Greater Good; How to Make State Owned Enterprise better by kashif mateen ...
The Greater Good; How to Make State Owned Enterprise better by kashif mateen ...The Greater Good; How to Make State Owned Enterprise better by kashif mateen ...
The Greater Good; How to Make State Owned Enterprise better by kashif mateen ...
Kashif Mateen Ansari
 
Interview Published in Pakistan and Gulf Economist Oct 2014
Interview Published in Pakistan and Gulf Economist Oct 2014Interview Published in Pakistan and Gulf Economist Oct 2014
Interview Published in Pakistan and Gulf Economist Oct 2014
Kashif Mateen Ansari
 
Micro entities
Micro entities Micro entities
Micro entities
Kashif Mateen Ansari
 
Privatization; salvation or an incomplete truth
Privatization; salvation or an incomplete truthPrivatization; salvation or an incomplete truth
Privatization; salvation or an incomplete truthKashif Mateen Ansari
 
The Last Sermon of Muhammad , Mercy to the mankind (p b u h)
The Last Sermon of Muhammad , Mercy to the mankind (p b u h)The Last Sermon of Muhammad , Mercy to the mankind (p b u h)
The Last Sermon of Muhammad , Mercy to the mankind (p b u h)
Kashif Mateen Ansari
 
Solar Energy Article
Solar Energy ArticleSolar Energy Article
Solar Energy Article
Kashif Mateen Ansari
 

More from Kashif Mateen Ansari (20)

15. Pakistan's Elite and the Art of Deception 02 May 2024.pptx
15. Pakistan's Elite and the Art of Deception 02 May 2024.pptx15. Pakistan's Elite and the Art of Deception 02 May 2024.pptx
15. Pakistan's Elite and the Art of Deception 02 May 2024.pptx
 
13. It's turtles all the way down, 24 Feb 24.pptx
13. It's turtles all the way down, 24 Feb 24.pptx13. It's turtles all the way down, 24 Feb 24.pptx
13. It's turtles all the way down, 24 Feb 24.pptx
 
12. In search of reasonable thinking - 06 Feb 24.pptx
12. In search of reasonable thinking - 06 Feb 24.pptx12. In search of reasonable thinking - 06 Feb 24.pptx
12. In search of reasonable thinking - 06 Feb 24.pptx
 
11. Get rich before getting old - 30 Nov 23.pptx
11. Get rich before getting old - 30 Nov 23.pptx11. Get rich before getting old - 30 Nov 23.pptx
11. Get rich before getting old - 30 Nov 23.pptx
 
Rising Again, 01 Nov 23.pptx
Rising Again, 01 Nov 23.pptxRising Again, 01 Nov 23.pptx
Rising Again, 01 Nov 23.pptx
 
The Quick Fix, 25 Oct 2023.pptx
The Quick Fix, 25 Oct 2023.pptxThe Quick Fix, 25 Oct 2023.pptx
The Quick Fix, 25 Oct 2023.pptx
 
Moving from Failure to Failure Successfully, 18 Sep 2023.pptx
Moving from Failure to Failure Successfully, 18 Sep 2023.pptxMoving from Failure to Failure Successfully, 18 Sep 2023.pptx
Moving from Failure to Failure Successfully, 18 Sep 2023.pptx
 
Elephant in the Room, 24 Jul 2023.pptx
Elephant in the Room, 24 Jul 2023.pptxElephant in the Room, 24 Jul 2023.pptx
Elephant in the Room, 24 Jul 2023.pptx
 
Don;t Take IMF Seriously, 17 Jun 2023.pptx
Don;t Take IMF Seriously, 17 Jun 2023.pptxDon;t Take IMF Seriously, 17 Jun 2023.pptx
Don;t Take IMF Seriously, 17 Jun 2023.pptx
 
Pakistan Paradox, 22 May 2023.pptx
Pakistan Paradox, 22 May 2023.pptxPakistan Paradox, 22 May 2023.pptx
Pakistan Paradox, 22 May 2023.pptx
 
Pakistan the scourge of inequality, 17 Apr 2023.pptx
Pakistan the scourge of inequality, 17 Apr 2023.pptxPakistan the scourge of inequality, 17 Apr 2023.pptx
Pakistan the scourge of inequality, 17 Apr 2023.pptx
 
Energy Security of Pakistan, 09 Mar 2023.pptx
Energy Security of Pakistan, 09 Mar 2023.pptxEnergy Security of Pakistan, 09 Mar 2023.pptx
Energy Security of Pakistan, 09 Mar 2023.pptx
 
Democratization of Energy, 19 Feb 2023.pptx
Democratization of Energy, 19 Feb 2023.pptxDemocratization of Energy, 19 Feb 2023.pptx
Democratization of Energy, 19 Feb 2023.pptx
 
Article on CPEC
Article on CPECArticle on CPEC
Article on CPEC
 
The Greater Good; How to Make State Owned Enterprise better by kashif mateen ...
The Greater Good; How to Make State Owned Enterprise better by kashif mateen ...The Greater Good; How to Make State Owned Enterprise better by kashif mateen ...
The Greater Good; How to Make State Owned Enterprise better by kashif mateen ...
 
Interview Published in Pakistan and Gulf Economist Oct 2014
Interview Published in Pakistan and Gulf Economist Oct 2014Interview Published in Pakistan and Gulf Economist Oct 2014
Interview Published in Pakistan and Gulf Economist Oct 2014
 
Micro entities
Micro entities Micro entities
Micro entities
 
Privatization; salvation or an incomplete truth
Privatization; salvation or an incomplete truthPrivatization; salvation or an incomplete truth
Privatization; salvation or an incomplete truth
 
The Last Sermon of Muhammad , Mercy to the mankind (p b u h)
The Last Sermon of Muhammad , Mercy to the mankind (p b u h)The Last Sermon of Muhammad , Mercy to the mankind (p b u h)
The Last Sermon of Muhammad , Mercy to the mankind (p b u h)
 
Solar Energy Article
Solar Energy ArticleSolar Energy Article
Solar Energy Article
 

Recently uploaded

Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
Kamal Acharya
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
Intella Parts
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
SUTEJAS
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
dxobcob
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
NidhalKahouli2
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
camseq
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
symbo111
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 

Recently uploaded (20)

Water billing management system project report.pdf
Water billing management system project report.pdfWater billing management system project report.pdf
Water billing management system project report.pdf
 
Forklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella PartsForklift Classes Overview by Intella Parts
Forklift Classes Overview by Intella Parts
 
Understanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine LearningUnderstanding Inductive Bias in Machine Learning
Understanding Inductive Bias in Machine Learning
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
一比一原版(Otago毕业证)奥塔哥大学毕业证成绩单如何办理
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
basic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdfbasic-wireline-operations-course-mahmoud-f-radwan.pdf
basic-wireline-operations-course-mahmoud-f-radwan.pdf
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Modelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdfModelagem de um CSTR com reação endotermica.pdf
Modelagem de um CSTR com reação endotermica.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Building Electrical System Design & Installation
Building Electrical System Design & InstallationBuilding Electrical System Design & Installation
Building Electrical System Design & Installation
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 

After All Its Tranmission Stupid, 25 Mar 2023.pptx

  • 1. After all, it’s the transmission, stupid! Kashif Mateen Ansari Published March 25, 2023 During Bill Clinton’s 1992 campaign for presidency, James Carville famously coined the phrase “it’s the economy, stupid” to emphasize how crucial the economy was to the election. It could be argued that “it’s the transmission, stupid” accurately describes the difficulties the power sector is facing in Pakistan. Many of the issues affecting Pakistan’s power sector, such as power outages, limited access to electricity, inefficient use of the country’s existing power generation capacity, and high system losses, cannot be resolved due to the absence of a reliable transmission network. Blackouts and load shedding are frequent in Pakistan as a result of the transmission network’s constrained capacity. This has a major impact on households, businesses, and the economy. Electricity access is limited in many parts of the country, particularly in rural areas, due to lack of transmission infrastructure. Although we list this as an outcome of the transmission problem but for remote village access, we are not advocating transmission networks, rather this has to be dealt with micro grids and distributed generation as covered in another piece on “democratisation of energy”. Mother of all ills, the nuclear bomb of the current crisis is this lack of transmission infrastructure that has caused the existing power generation capacity to frequently go underutilized, which raises costs for both the government and the general public. Currently, Pakistan’s generation capacity is over 42,000 MW, which is far more than what we can utilise and what our transmission system can take. By any estimate our transmission capacity stands at merely 22,000 MW. This means that we are underutilizing our generation capacity to a very high proportion. Now as per the contracts of power plants, capacity payments must be made for all the generation capacity whether we use it or not, so if we assume that fifty percent capacity is not used at any time then the units produced at that time would have to bear the cost of this unused production capacity, essentially making those units even costlier. So, if a 2000 MW plant operates at 1000 MW level, the power produced will be costlier per unit compared to when it would operate at 100% capacity. The real rub comes from the point that at a time when we are running from pillar to post to get foreign exchange, one mode of power generation that doesn’t utilise imported fuel cannot be fully used. 100%
  • 2. generation capacity of renewable energy that is already installed cannot be delivered to the consumers due to lack of transmission infrastructure. Hence the irony we are facing is that we keep on running thermal power plants but curtail the production of Wind power in Jhimpir because our grid is unable to dispatch it. This is happening at a time when it is crucial for decreasing Pakistan’s reliance on fossil fuels and addressing our foreign exchange issues. Unfortunately, wind as a resource cannot be stored for future like diesel or petrol. So, the amount of power that has been curtailed from the existing wind power plants is power lost forever. Currently, installed wind power generation capacity is about 1900 MW and almost half of it cannotbe transmitted through the grid. This is over half a billion-dollar worth of investment going to waste and we are using power generated through imported fuel. To cap off all this there are plans afoot to establish further solar energy power plants of 600 MW at the federal government level. Added on top of that are multitude of solar plants of smaller capacities that are under consideration by many other important organisations. When we have excess generation capacity and unutilised installed wind power then why our policy makers are focusing on new generation capacity. Why not to focus on transmission lines. Transmission lines as a private business make a wonderful case of stability and profitability. If there are investors out there who want to make money by developing new generation capacity, then surely, they can make money in transmission line installation also. So the focus needs to change from generation to transmission. To handle this problem of transmission we need to look out for private investment. Several countries have implemented transmission line privatization in the power sector. One of the successful examples is the United Kingdom where National Grid plc, a private company, now oversees the transmission network after it was privatized in 1990. This has been viewed as a successful example of privatization due to the network’s increased efficiency and dependability. In Chile, the government privatized the country’s transmission lines and the entire electricity sector in the 1980s. A private company named Transelec now owns and manages the transmission network. The privatization has been deemed successful in terms of raising the transmission network’s effectiveness and lowering costs. There are many other examples of privatisation of transmission network in the world, including Brazil and the Philippines. Transmission infrastructure could be improved with speed and efficiency if we allow private sector to participate. This is not a new concept. For the corporate world Warren Buffet, one of the richest persons in the world, is always an example to follow and Berkshire Hathaway, the Warren Buffett-led company, has investments in the transmission industry. The business owns and manages transmission lines in the US. He owns two companies in transmission business in line with his business strategy of making investments in companies that are stable and profitable. The demand for transmission lines will remain high in the coming years as renewable energy sources become more prevalent. Hence this makes a good case for inviting Pakistani and global investors in this sector. We can go the public private partnership route to unlock investment in this sector. It would require policymakers’ attention towards a legal and regulatory framework that is well-designed, careful project identification and feasibility assessment, effective risk allocation and financing, performance monitoring and evaluation, stakeholder engagement, and strong contract management.
  • 3. Policymakers can look at opening the sector to tolling agreements for private transmission lines; these are a type of public-private partnership (PPP) in which private companies or investors are granted the right to build and operate transmission lines in exchange for compensation via a tolling mechanism. The private company or investor is responsible for financing, constructing, and operating the transmission line under this arrangement. In exchange, they are given the right to charge third parties who use the transmission line to transport electricity a fee or toll. Tolls are typically based on a fixed rate per unit of electricity transported or a negotiated rate based on the transmission arrangement’s specific circumstances. When private investors can generate a return on their investment through tolls, they will be willing to further invest in transmission infrastructure. Because their revenue is linked to transmission line usage, private companies will have a stronger incentive to operate transmission lines efficiently and effectively. Construction delays or cost overruns are shared by the private company and the government or utility, lowering the risk to the government or utility. Private companies may be more creative in their approach to constructing and operating transmission lines, potentially resulting in more efficient and effective infrastructure. Tolling arrangements are currently used in the USA, Europe, UK, Chile, the Philippines and many other countries. Not all of these countries are developed but this public private partnership has created value for their power systems. The model of private investment in transmission assets, which has proven successful in other parts of the world, has the potential to be replicated in Pakistan. However, several factors must be considered before such a model can be implemented in Pakistan. To begin with, a regulatory framework for transmission infrastructure must be established in order to encourage private investment. This would entail defining the roles and responsibilities of the government and private investors in the development and operation of transmission infrastructure, as well as establishing a regulatory framework to ensure that private investors are incentivized to invest in infrastructure while also protecting consumers. A clear pipeline of transmission projects ready for investment would be required. This would entail identifying areas in need of new transmission infrastructure and developing a project pipeline that is appealing to private investors. Transmission projects would require a transparent and efficient bidding process. This would entail ensuring that private investors have access to the information they need to evaluate a project’s potential risks and returns, as well as that the bidding process is fair and transparent. Above all, a stable and predictable investment climate in Pakistan would be required to encourage long- term investment in transmission infrastructure. This would entail creating a stable regulatory environment, ensuring that we treat our investors during the lifetime of projects as partners and not as pariahs. Here a word about current investors in the power sector: we must revisit how we treat the current investors, local and foreign, who face delayed payments, all sorts of legal lacunas that are used to scuttle their business plan and economic returns, all in the name of a witch-hunt whose premise is that they are making a lot of money. This needs a rethink at the policy level, while making any policy, it is the duty of the policymaker to look farther into the future and plan as per the requirements and ability to shoulder the burden of an
  • 4. investment. Now if despite of having 42,000 MW of generation capacity we are still issuing tenders for new power plants there is something seriously wrong with our policymakers and regulatory institutions. For Pakistan to get out of the current mess economically we need to address problems of the power sector and we must start thinking beyond power generation. Our current and short-term problem is not generation, it is indeed transmission. Unless significant investment is made in upgrading transmission infrastructure as well as policy changes are made to create a conducive regulatory environment that promotes private investment in this sector we are doomed to get deeper into the troubles that are already hounding us. So, we better adopt the slogan, “it’s the transmission, stupid”. (The writer is a Harvard Alumni and tweets as @kashif_m_ansari) also the writer is CEO of a wind power project and can be reached at kashifmateenansari@post.harvard.edu