GÖNKA Inc. Afghanistan References




                                    Afghanistan National Military Hospital
GÖNKA
Afghanistan National Military Hospital




                                         HVAC Equipment Supply Renovated Afghanistan National Military Hospital
                                         Location: Kabul, Afghanistan              Project Description:
                                         Project Proceeding Date: 01.10.2004   !   Renovation of existing Military Hospital in Kabul
                                         Project Completion Date: 01.04.2006   !   Project consists of supply of HVAC devices for patient care
                                         Client: US Army                           building, operation building, kitchen, rehabilitation building,
                                                                                   polytechnic institute, morgue, engineering offices, workshops,
                                                                                   administration building and treatment of waste water
                                                                               !   Total 45,000 m² appliance area
   2006




           2/3
Communication Support Element Upgrade (CSE)




                                              HVAC Equipment Supply To Communication Support Element Upgrade (CSE)
    2008




             4/5
HVAC Equipment Supply To Communication Support
Element Upgrade (CSE)


Location: Kabul, Afghanistan
Project Proceeding Date: : 11.01.2007
Project Completion Date: : 11.01.2008
Client: USACE Afghanistan Engineer District
Project Description:
This project consists of the design and construction of
upgrading an existing compound and new additions in
Kabul, Afghanistan. The work took place on the existing
Compound. The purpose of this expansion is to support 600-
soldier Communications Support Element (CSE) compound.
Guard houses, maintenance buildings, dormitory building,
communication, training building and all required utility works
are constructed. HVAC equipment are supplied by GONKA.
2005 Qandahar Ana Brigade Project Communication Building




                                                             HVAC Equipment Supply To Qandahar Ana Brigade Project Communication Building



                                                           ANA Brigade Headquarters construction begun in Farah            Projects include eight ANP headquarters; one in each of the   The project consists of a dining facility, a Brigade HQ, Infantry
                                                                                                                           following districts: Shib Koh, Lash wa Jowayn, Gulestan,      Battalion Complexes, Bachelors Officers Quarters, and other
                                                           KABUL, Afghanistan – A construction project to build an ANA
                                                                                                                                                                                         centralized maintenance area, Ammunition Supply Point,
                                                           Brigade Headquarters near Farah City.                           Purchaman, Bakwa, Pusht Rod, Khaks-e Safid and Qal-I Kah
                                                                                                                                                                                         Helipad, a Training Building and Training Ranges, a Reception
                                                           The project, which employed 4,000 workers for the year-long     and a Border Police headquarters for 100 men in Qal-e Kah.    Center, Fire Station, Class VIII Storage Facility,
                                                           construction period, house of 2,000 soldiers.                   Design/Build an Afghan National Army (ANA) Brigade camp.      communications system, construction of a 6MW prime
                                                                                                                           The Brigade facilities will cover an approximate area of      power plant and electrical distribution system, and other
                                                           The ANA headquarters is part of the United States Army Corps                                                                  buildings to serve the base. HVAC equipment are supplied by
                                                           of Engineers’ plan to improve security in Farah province. An    800,000 SQM (198 acres) or 80 hectares. The site contains
                                                                                                                                                                                         GONKA.
                                                           excess of $85 million spent in Farah on a variety of projects   unexploded ordnance (UXO) and clearing the site is a
                                                           throughout the year.                                            required part of the contract.

               6/7
TSEK

       KAZAKHSTAN




TSEK

        KAZAKHSTAN
National Police UP District 9 Headquarters Building




                                                      National Police UP District 9 Headquarters Building,
                                                                                  HVAC Equipment Supply
                                                                         Location: Kabul, Afghanistan
                                                                         Project Proceeding Date:    26.08.2009
                                                                         Project Completion Date:    21.06.2010
                                                                         Client: USACE
                                                                         Project Description:
                                                                         The project consists of the design and construction of
                                                                         Afghanistan National Police (ANP) Uniformed Police District
                                                                         Headquarters facilities to be located at District 9, Kabul,
    2010




                                                                         Afghanistan. The project is defined as the management,
                                                                         planning, design, material, labor, and equipment, to site
                                                                         adapt and construct all utilities, vehicular access, buildings,
                                                                         force protection measures, site security, de-mining activities,
                                                                         and other features as referenced herein.
               8/9
Unit heaters with axial fan
GÖNKA GTA series unit heaters are designed to meet the          Axial fan-motor group                                            Air discharge louvers
heating requirements of workshops, warehouses, factories,       As a standard the axial fans are directly coupled to the         In order to direct the airflow to desired direction adjustable
                                                                                                                                 discharge louvers, consisting of parallel moving flaps and
stores, garages, sporting halls etc. They are manufactured so   electric motor, which has high starting torque. The fans are
                                                                                                                                 frames, are used. The louvers on wall mounted units provide
as to be connected either to hot water, superheated water or    statically and dynamically balanced to ensure vibration and      airflow in one direction, while the louvers on the ceiling types
                                                                noise free operation.                                            distribute the air symmetrically in two directions.
steam lines. There are 12 models in order to provide heating
                                                                Heating coil                                                     Coil connections
capacities up to 50.000Kcal/h and they are available in two
                                                                                                                                 Connection of the coils to the hot water or steam lines is done
types; wall mounted and ceiling.                                Heat exchanger coils are of steel pipe-steel fin type having
                                                                                                                                 easily via coil union stems, manufactured to fit standard
                                                                tough structure and long operation life. In order to achieve     pipes.
Technical specification
                                                                high heat transfer rates the pipes are connected to collectors   Hanger
Casing                                                          in staggered pattern. All heating coils are tested under 15      There are two hangers for wall mounted units and four
Manufactured from phosphatized steel sheets finished with       Atm pressure. When desired the heating coils can also be         hangers for ceiling models. Hangers are designed to carry
oven baked electrostatic paint.                                 manufactured from copper pipes and aluminium fins.               the unit safely.
NDS Hospital




                                       TSEK                                   TSEK
                                                     KAZAKHSTAN




                                                                                     TSEK
                                                                                            KAZAKHSTAN




               NDS Hospital
               In 2006, Afghanistan 'on the following 60-bed Women's
               Hospital (NDS HOSPITAL) furnishings for hospitals, operating
               rooms and laboratory equipment, has been provided.
               Air cooled liquid chiller,
               Hygienic air handling unit,
               Exhaust fan,
               Vapor humidifier for air handling unit,
               Duct type exhaust fan,
               Fan coil unit.
 2006




 10/11
Air handling unit
    Standard Accessories;                                              Standard Series                                              Optional Accessories;
!   Filter Chambers; Chamber design which provides easy                Application Area: business centers, schools,             !   GONKA vapor humidifier, standard vapor cylinder,
    mounting and de-mounting in filters and filters with               hospitals, factories, hotels and restaurants.                immersion electrodes, stainless vapor distributor and
    different productivity levels on demand.                                                                                        microprocessor control unit.
!   Heating and Cooling Coils; Seamless cooper tubes. In           !   8 different models which provide required humidity and
                                                                       temperature by conditioning air volume in the range of   !   Mufflers which are made up of coulisses to provide
    heating coils, 4 options: warm water, vapour, hot water,                                                                        required sound holding capacity.
    electrically heated; in cooling coils, 2 options: chilled          3000m³/h and 100.000 m³/h.
    water and DX (direct expansion).                                                                                            !   Plate heat exchanger or Heat recovery wheel for
                                                                   !   The framework which is formed by combination of              recovery of the heat emitted with exhaust air.
!   Dampers; Rigid aluminum frame in multi airfoil structure           aluminum frames, which are connected specially, with
    which is the least resistant against airflow. Rubber gaskets                                                                !   Electrical board.
                                                                       plastic and aluminum comers.
    which reduce air leakage through blades to the
    minimum level.                                                                                                              !   Frequency Converter
                                                                   !   Boards which are made up of double skilled galvanized
!   Fans; Statically and dynamically balanced aspirators               iron in a standard way.
    and ventilators in double inlet belt driven centrifugal
    type. Forward curved fans in systems with low, medium          !   Polyurethane insulated panels, which are 30 mm in
    and high duct pressures,.                                          thickness, for thermal and acoustic insulation in a
                                                                       standard way.
NDS Hospital




                 Air cooled liquid chiller
               GONKA Screw compressor air cooled water cooling groups,         Evaporator; Shell- tube evaporator whose cooling liquid side           Low noise level.
               with its models in the range of high efficiency and high        and water side have one-circuit, multiple transitional, two            Multiple compressor, multiple cyclical, high efficiency.
               capacity, are ideal for cooling operations related to comfort   mirrored construction.                                                 %25-%100 continuous modulating capacity control in every
                                                                               Refrigerating Circuit;Cooling Circuit; Cooling circuit and             compressor.
               and industrial purposes.
                                                                               circuit elements entirely independent for every compressor.            Hard construction and long life.
               R22 , R134a or R407c options.                                                                                                          Easy handling, installation and service.
                                                                               Electrical Screen and Control Board; board including switch
               Compressors; Half hermetic screw compressors.                                                                                          Effortless service.
                                                                               and micro-processor controlled module and control cards
               Compressors changing between 1 and 4 according to                                                                                      Compatible with available BMS systems.
                                                                               as well as elements such as systemic control elements and              Meeting consumer requirements in the most suitable way
               cooling capacity.
2006




                                                                               f u s e , t h e r m i c m a g n e t i c s w i t c h a n d r e l a y.   through broad accessory and option alternatives.
               Condenser; Highly efficient, original condenser situated in V
                                                                               Micro-processor based Control System; Full control over all            Newly improved use of screw compressor with high COP
               type and condensation provided through 900 cyclical and         the cooling circuits. Connections on board through simplified          value.
               low sound level axial fans situated in the open edge of the     device failure follow-up and easily recognized electrical              Trouble-proof operations under high temperatures.
               condenser.                                                      diagram.                                                               Rational control.
 12/13
Fan coil units




                 TSEK
                        KAZAKHSTAN
Contrack Int. Inc.




                       Unit heaters with radial fan




                     GÖNKA GDA series unit heaters are designed to meet the           Technical specification Casing Manufactured from                In case fresh air intake is necessary, a mixing box is mounted
                     heating requirements of workshops, warehouses, factories,       phosphatized steel sheets finished with oven baked               on the air inlet to provide the required air mixture.Air
                     stores, garages, sporting halls etc. They are manufactured so                                                                    discharge louvers In order to direct the airflow to desired
                                                                                     electrostatic paint. Centrifugal fan-motor group As a
2008




                                                                                                                                                      direction adjustable discharge louvers, consisting of parallel
                     as to be connected either to hot water, superheated water or    standard the centrifugal fans are directly coupled to three-
                                                                                                                                                      moving flaps and frames, are used. Coil connections
                     steam lines. There are 13 models in order to handle heating     phase electric motor, which has high starting torque. The fans   Connection of the coils to the hot water or steam lines is done
                     capacities between 4.000-60.000Kcal/h and they are              are statically and dynamically balanced to ensure vibration      easily via coil union stems, manufactured to fit standard
                     available in two types; wall mounted and ceiling.               and noise free operation. Air mixing box                         pipes
 14/15
GÖNKA Afghanistan References

                                                                                           - Afghanistan National Military Hospital
                                                                                           - Communication Support Element
                                                                                            Upgrade (CSE)
                                                                                           - Qandahar Ana Brigade Project
                                                                                            Communication Building
                                                                                           - National Police UP District 9
                                                                                            Headquarters Building
                                                                                           - NDS Hospital
                                                                                           - Contrack Int. Inc.
                                                                                           - U.S. Army Corps. - Afghanistan
                                                                                           - Argonaut Ctc Afghanistan
                                                                                           - Yaras - Huma Ýnþ. Ltd. Þti.




FACTORY and MAIN OFFICE      AZERBAIJAN BRANCH OFFICE           GEORGIA BRANCH OFFICE


Organize Sanayi Bölgesi      Nerimanov rayonu,                  117 Tsereteli avenue
Göktürk C ad. N o:6          Y. V. Çemenzeminli Sok.            Tbilisi - GEORGIA
Sincan / ANKARA / TURKEY     1996-cý mahalle AFEN Plaza         Tel: (00 995) 32 921 821
Tel :0 312 267 09 90 (pbx)   Baku - AZERBAIJAN                  Fax:(00 995) 32 941 120
Fax:0 312 267 09 93          Tel / Fax: (00 994) 12 564 07 04

More Related Content

More from gonka klima as.

Kazakistan references
Kazakistan referencesKazakistan references
Kazakistan references
gonka klima as.
 
Gürcistan references
Gürcistan referencesGürcistan references
Gürcistan references
gonka klima as.
 
Gürcistan references
Gürcistan referencesGürcistan references
Gürcistan references
gonka klima as.
 
Rusya references
Rusya referencesRusya references
Rusya references
gonka klima as.
 
Kazakistan references
Kazakistan references   Kazakistan references
Kazakistan references
gonka klima as.
 
Gürcistan references
Gürcistan referencesGürcistan references
Gürcistan references
gonka klima as.
 
Azerbaycan references
Azerbaycan referencesAzerbaycan references
Azerbaycan references
gonka klima as.
 
Afganistan references
Afganistan references  Afganistan references
Afganistan references
gonka klima as.
 

More from gonka klima as. (9)

Kazakistan references
Kazakistan referencesKazakistan references
Kazakistan references
 
Gürcistan references
Gürcistan referencesGürcistan references
Gürcistan references
 
Gürcistan references
Gürcistan referencesGürcistan references
Gürcistan references
 
Rusya references
Rusya referencesRusya references
Rusya references
 
Kazakistan references
Kazakistan references   Kazakistan references
Kazakistan references
 
Gürcistan references
Gürcistan referencesGürcistan references
Gürcistan references
 
Azerbaycan references
Azerbaycan referencesAzerbaycan references
Azerbaycan references
 
Sudan references
Sudan references   Sudan references
Sudan references
 
Afganistan references
Afganistan references  Afganistan references
Afganistan references
 

Recently uploaded

CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)
Wonjun Hwang
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
FIDO Alliance
 
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
Muhammad Subhan
 
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
FIDO Alliance
 

Recently uploaded (20)

CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)CORS (Kitworks Team Study 양다윗 발표자료 240510)
CORS (Kitworks Team Study 양다윗 발표자료 240510)
 
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
Event-Driven Architecture Masterclass: Integrating Distributed Data Stores Ac...
 
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
Human Expert Website Manual WCAG 2.0 2.1 2.2 Audit - Digital Accessibility Au...
 
How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdf
 
Introduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptxIntroduction to FIDO Authentication and Passkeys.pptx
Introduction to FIDO Authentication and Passkeys.pptx
 
State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!State of the Smart Building Startup Landscape 2024!
State of the Smart Building Startup Landscape 2024!
 
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptxHarnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
Harnessing Passkeys in the Battle Against AI-Powered Cyber Threats.pptx
 
2024 May Patch Tuesday
2024 May Patch Tuesday2024 May Patch Tuesday
2024 May Patch Tuesday
 
ChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps ProductivityChatGPT and Beyond - Elevating DevOps Productivity
ChatGPT and Beyond - Elevating DevOps Productivity
 
Top 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development CompaniesTop 10 CodeIgniter Development Companies
Top 10 CodeIgniter Development Companies
 
Portal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russePortal Kombat : extension du réseau de propagande russe
Portal Kombat : extension du réseau de propagande russe
 
ERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage IntacctERP Contender Series: Acumatica vs. Sage Intacct
ERP Contender Series: Acumatica vs. Sage Intacct
 
The Ultimate Prompt Engineering Guide for Generative AI: Get the Most Out of ...
The Ultimate Prompt Engineering Guide for Generative AI: Get the Most Out of ...The Ultimate Prompt Engineering Guide for Generative AI: Get the Most Out of ...
The Ultimate Prompt Engineering Guide for Generative AI: Get the Most Out of ...
 
Introduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDMIntroduction to use of FHIR Documents in ABDM
Introduction to use of FHIR Documents in ABDM
 
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
Observability Concepts EVERY Developer Should Know (DevOpsDays Seattle)
 
Microsoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - QuestionnaireMicrosoft CSP Briefing Pre-Engagement - Questionnaire
Microsoft CSP Briefing Pre-Engagement - Questionnaire
 
Generative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdfGenerative AI Use Cases and Applications.pdf
Generative AI Use Cases and Applications.pdf
 
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
“Iamnobody89757” Understanding the Mysterious of Digital Identity.pdf
 
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider  Progress from Awareness to Implementation.pptxTales from a Passkey Provider  Progress from Awareness to Implementation.pptx
Tales from a Passkey Provider Progress from Awareness to Implementation.pptx
 
Six Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal OntologySix Myths about Ontologies: The Basics of Formal Ontology
Six Myths about Ontologies: The Basics of Formal Ontology
 

Afganistan references

  • 1. GÖNKA Inc. Afghanistan References Afghanistan National Military Hospital GÖNKA
  • 2. Afghanistan National Military Hospital HVAC Equipment Supply Renovated Afghanistan National Military Hospital Location: Kabul, Afghanistan Project Description: Project Proceeding Date: 01.10.2004 ! Renovation of existing Military Hospital in Kabul Project Completion Date: 01.04.2006 ! Project consists of supply of HVAC devices for patient care Client: US Army building, operation building, kitchen, rehabilitation building, polytechnic institute, morgue, engineering offices, workshops, administration building and treatment of waste water ! Total 45,000 m² appliance area 2006 2/3
  • 3.
  • 4. Communication Support Element Upgrade (CSE) HVAC Equipment Supply To Communication Support Element Upgrade (CSE) 2008 4/5
  • 5. HVAC Equipment Supply To Communication Support Element Upgrade (CSE) Location: Kabul, Afghanistan Project Proceeding Date: : 11.01.2007 Project Completion Date: : 11.01.2008 Client: USACE Afghanistan Engineer District Project Description: This project consists of the design and construction of upgrading an existing compound and new additions in Kabul, Afghanistan. The work took place on the existing Compound. The purpose of this expansion is to support 600- soldier Communications Support Element (CSE) compound. Guard houses, maintenance buildings, dormitory building, communication, training building and all required utility works are constructed. HVAC equipment are supplied by GONKA.
  • 6. 2005 Qandahar Ana Brigade Project Communication Building HVAC Equipment Supply To Qandahar Ana Brigade Project Communication Building ANA Brigade Headquarters construction begun in Farah Projects include eight ANP headquarters; one in each of the The project consists of a dining facility, a Brigade HQ, Infantry following districts: Shib Koh, Lash wa Jowayn, Gulestan, Battalion Complexes, Bachelors Officers Quarters, and other KABUL, Afghanistan – A construction project to build an ANA centralized maintenance area, Ammunition Supply Point, Brigade Headquarters near Farah City. Purchaman, Bakwa, Pusht Rod, Khaks-e Safid and Qal-I Kah Helipad, a Training Building and Training Ranges, a Reception The project, which employed 4,000 workers for the year-long and a Border Police headquarters for 100 men in Qal-e Kah. Center, Fire Station, Class VIII Storage Facility, construction period, house of 2,000 soldiers. Design/Build an Afghan National Army (ANA) Brigade camp. communications system, construction of a 6MW prime The Brigade facilities will cover an approximate area of power plant and electrical distribution system, and other The ANA headquarters is part of the United States Army Corps buildings to serve the base. HVAC equipment are supplied by of Engineers’ plan to improve security in Farah province. An 800,000 SQM (198 acres) or 80 hectares. The site contains GONKA. excess of $85 million spent in Farah on a variety of projects unexploded ordnance (UXO) and clearing the site is a throughout the year. required part of the contract. 6/7
  • 7. TSEK KAZAKHSTAN TSEK KAZAKHSTAN
  • 8. National Police UP District 9 Headquarters Building National Police UP District 9 Headquarters Building, HVAC Equipment Supply Location: Kabul, Afghanistan Project Proceeding Date: 26.08.2009 Project Completion Date: 21.06.2010 Client: USACE Project Description: The project consists of the design and construction of Afghanistan National Police (ANP) Uniformed Police District Headquarters facilities to be located at District 9, Kabul, 2010 Afghanistan. The project is defined as the management, planning, design, material, labor, and equipment, to site adapt and construct all utilities, vehicular access, buildings, force protection measures, site security, de-mining activities, and other features as referenced herein. 8/9
  • 9. Unit heaters with axial fan GÖNKA GTA series unit heaters are designed to meet the Axial fan-motor group Air discharge louvers heating requirements of workshops, warehouses, factories, As a standard the axial fans are directly coupled to the In order to direct the airflow to desired direction adjustable discharge louvers, consisting of parallel moving flaps and stores, garages, sporting halls etc. They are manufactured so electric motor, which has high starting torque. The fans are frames, are used. The louvers on wall mounted units provide as to be connected either to hot water, superheated water or statically and dynamically balanced to ensure vibration and airflow in one direction, while the louvers on the ceiling types noise free operation. distribute the air symmetrically in two directions. steam lines. There are 12 models in order to provide heating Heating coil Coil connections capacities up to 50.000Kcal/h and they are available in two Connection of the coils to the hot water or steam lines is done types; wall mounted and ceiling. Heat exchanger coils are of steel pipe-steel fin type having easily via coil union stems, manufactured to fit standard tough structure and long operation life. In order to achieve pipes. Technical specification high heat transfer rates the pipes are connected to collectors Hanger Casing in staggered pattern. All heating coils are tested under 15 There are two hangers for wall mounted units and four Manufactured from phosphatized steel sheets finished with Atm pressure. When desired the heating coils can also be hangers for ceiling models. Hangers are designed to carry oven baked electrostatic paint. manufactured from copper pipes and aluminium fins. the unit safely.
  • 10. NDS Hospital TSEK TSEK KAZAKHSTAN TSEK KAZAKHSTAN NDS Hospital In 2006, Afghanistan 'on the following 60-bed Women's Hospital (NDS HOSPITAL) furnishings for hospitals, operating rooms and laboratory equipment, has been provided. Air cooled liquid chiller, Hygienic air handling unit, Exhaust fan, Vapor humidifier for air handling unit, Duct type exhaust fan, Fan coil unit. 2006 10/11
  • 11. Air handling unit Standard Accessories; Standard Series Optional Accessories; ! Filter Chambers; Chamber design which provides easy Application Area: business centers, schools, ! GONKA vapor humidifier, standard vapor cylinder, mounting and de-mounting in filters and filters with hospitals, factories, hotels and restaurants. immersion electrodes, stainless vapor distributor and different productivity levels on demand. microprocessor control unit. ! Heating and Cooling Coils; Seamless cooper tubes. In ! 8 different models which provide required humidity and temperature by conditioning air volume in the range of ! Mufflers which are made up of coulisses to provide heating coils, 4 options: warm water, vapour, hot water, required sound holding capacity. electrically heated; in cooling coils, 2 options: chilled 3000m³/h and 100.000 m³/h. water and DX (direct expansion). ! Plate heat exchanger or Heat recovery wheel for ! The framework which is formed by combination of recovery of the heat emitted with exhaust air. ! Dampers; Rigid aluminum frame in multi airfoil structure aluminum frames, which are connected specially, with which is the least resistant against airflow. Rubber gaskets ! Electrical board. plastic and aluminum comers. which reduce air leakage through blades to the minimum level. ! Frequency Converter ! Boards which are made up of double skilled galvanized ! Fans; Statically and dynamically balanced aspirators iron in a standard way. and ventilators in double inlet belt driven centrifugal type. Forward curved fans in systems with low, medium ! Polyurethane insulated panels, which are 30 mm in and high duct pressures,. thickness, for thermal and acoustic insulation in a standard way.
  • 12. NDS Hospital Air cooled liquid chiller GONKA Screw compressor air cooled water cooling groups, Evaporator; Shell- tube evaporator whose cooling liquid side Low noise level. with its models in the range of high efficiency and high and water side have one-circuit, multiple transitional, two Multiple compressor, multiple cyclical, high efficiency. capacity, are ideal for cooling operations related to comfort mirrored construction. %25-%100 continuous modulating capacity control in every Refrigerating Circuit;Cooling Circuit; Cooling circuit and compressor. and industrial purposes. circuit elements entirely independent for every compressor. Hard construction and long life. R22 , R134a or R407c options. Easy handling, installation and service. Electrical Screen and Control Board; board including switch Compressors; Half hermetic screw compressors. Effortless service. and micro-processor controlled module and control cards Compressors changing between 1 and 4 according to Compatible with available BMS systems. as well as elements such as systemic control elements and Meeting consumer requirements in the most suitable way cooling capacity. 2006 f u s e , t h e r m i c m a g n e t i c s w i t c h a n d r e l a y. through broad accessory and option alternatives. Condenser; Highly efficient, original condenser situated in V Micro-processor based Control System; Full control over all Newly improved use of screw compressor with high COP type and condensation provided through 900 cyclical and the cooling circuits. Connections on board through simplified value. low sound level axial fans situated in the open edge of the device failure follow-up and easily recognized electrical Trouble-proof operations under high temperatures. condenser. diagram. Rational control. 12/13
  • 13. Fan coil units TSEK KAZAKHSTAN
  • 14. Contrack Int. Inc. Unit heaters with radial fan GÖNKA GDA series unit heaters are designed to meet the Technical specification Casing Manufactured from In case fresh air intake is necessary, a mixing box is mounted heating requirements of workshops, warehouses, factories, phosphatized steel sheets finished with oven baked on the air inlet to provide the required air mixture.Air stores, garages, sporting halls etc. They are manufactured so discharge louvers In order to direct the airflow to desired electrostatic paint. Centrifugal fan-motor group As a 2008 direction adjustable discharge louvers, consisting of parallel as to be connected either to hot water, superheated water or standard the centrifugal fans are directly coupled to three- moving flaps and frames, are used. Coil connections steam lines. There are 13 models in order to handle heating phase electric motor, which has high starting torque. The fans Connection of the coils to the hot water or steam lines is done capacities between 4.000-60.000Kcal/h and they are are statically and dynamically balanced to ensure vibration easily via coil union stems, manufactured to fit standard available in two types; wall mounted and ceiling. and noise free operation. Air mixing box pipes 14/15
  • 15.
  • 16. GÖNKA Afghanistan References - Afghanistan National Military Hospital - Communication Support Element Upgrade (CSE) - Qandahar Ana Brigade Project Communication Building - National Police UP District 9 Headquarters Building - NDS Hospital - Contrack Int. Inc. - U.S. Army Corps. - Afghanistan - Argonaut Ctc Afghanistan - Yaras - Huma Ýnþ. Ltd. Þti. FACTORY and MAIN OFFICE AZERBAIJAN BRANCH OFFICE GEORGIA BRANCH OFFICE Organize Sanayi Bölgesi Nerimanov rayonu, 117 Tsereteli avenue Göktürk C ad. N o:6 Y. V. Çemenzeminli Sok. Tbilisi - GEORGIA Sincan / ANKARA / TURKEY 1996-cý mahalle AFEN Plaza Tel: (00 995) 32 921 821 Tel :0 312 267 09 90 (pbx) Baku - AZERBAIJAN Fax:(00 995) 32 941 120 Fax:0 312 267 09 93 Tel / Fax: (00 994) 12 564 07 04