 Well defined valleys

   – 4 Major valleys
        Koramangala
        Challaghatta
        Hebbal
        Vrishabhavathi
   – Minor valleys
        Arkavathi, Kathriguppe and Kethamaranahalli
         (Vrishabhavathi Valley)
        Taverekere (Koramangala valley)
BANGALORE’S CASCADING LAKES
          SERIES
Reasons for pollution of Lakes

 Un planned growth of city
 Un sewered pockets such as slums and erstwhile CMC areas
 Damage of main sewers
 Blockages and overflows in the sewer system
 Direct letting out of raw wastewater into storm water
  drainage system from un-sewered as well as sewered pockets
 Lack of adequate infrastructure facilities
 Dumping of solid waste within the drainage zones
Sewerage management in Bangalore

                      Facts
 Total sewage generated in Bangalore – 1000 MLD
 Sewerage connections              – 8 Lakh
 Sewerage network
   Laterals (< 300 mm dia)         – 3367 Kms
   Trunk Sewers (>300 mm dia)      – 302 Kms
 Number of plants                  – 14
 Sewage treatment capacity         – 721 MLD
 Average Present treatment         – 453 MLD
Measures for abating Lake Pollution

1) Replacement/ Rehabilitation/ Up gradation of
   old sewerage net work – Laterals and Trunk
   sewers in core city
2) Creation of New Sewerage Net Work
      Erstwhile CMC area        – 2300 Kms
      110 Villages              – 2000 Kms
                       Total     – 4300 Kms
3) Creation of Additional Treatment capacity to
   treat wastewater produced in the new areas
On going projects

Environmental Action Plan – A
 Replacement and Rehabilitation of existing
sewers
 Total length – 33 Kms
 Cost – Rs. 47 Crores under NRCP
 Work is completed
On going projects

Environmental Action Plan – B
 Replacement and Rehabilitation of existing
  sewers
 Total length – 70 Kms
 Taken up under 8 packages
 Cost – Rs. 176 Crores under JnNURM & JICA
 Project period 2010-2013
On going projects

Zero Flow in Hebbal drainage zone
 Length – 19 Kms
 Taken up under 3 packages
 Cost – Rs. 35 Crores under BWSSB funds
  & Mega city funds
 Project period 2010-2013
On going projects
       Providing UGD Facilities to 8 ULBs in BBMP area
• Estimated Cost                  :   Rs. 1098.15 Crore

• Amount put to bid               :   Rs. 966.21 Crore

• Awarded Cost                    :   Rs. 1191.79 Crore

• Funding                         :   JnNURM - World Bank

• Project Period                  :   4 Years

• Length of pipeline to be laid   :   2300 Kms

• Number of packages              :   24
On going projects - progress
 Sl              ULB’s           Total Pipe  Progress   Percentage   Completion
No.                              laying Qty achieved in                Date
                                    to be      Kms
                                achieved in
                                     Kms
1     Yelahanka CMC                    60.28      57.82   95.92%       Feb-13
2     Byatarayanapura CMC             468.81     269.46   57.47%       Feb-14
3     Mahadevapura CMC                357.11     155.81   43.63%       Sep-15
4     Krishnarajapuram CMC            314.85     246.91   78.42%       Feb-14
5     Bommanahalli CMC                466.91     260.84   55.86%       Feb-14
6     Rajarajeshwarinagar CMC         117.22      78.37   66.85%       Feb-14
7     Kengeri TMC                      57.62       14.1   24.47%       Sep-14
8     Dasarahalli CMC                 470.92     374.61   79.54%       Feb-14
                TOTAL               2313.72     1457.91   63.01%       Sep-15
Future projects
 Construction of new treatment plants
 11 Numbers under JICA assistance
 339 MLD Capacity with nutrient removal treatment process
 300 MLD plant at V Valley at a cost of Rs. 396 Crore

 Environmental Action Plan – C
 Cost – Rs. 360 Crores
 Length – 109 Kms

 Water supply and Sanitation to 110 Villages
 Awaiting clearance from Central Government
Treatment plants proposed under CWSS Stage IV Phase II


Name                        Capacity in MLD   Process (Including BNR)
Raja Canal                        40          Extended Aeration (EA)
Horamavu Agara                    20          Sequential Batch Reactor (SBR)
Nagasandra                        20          SBR
Chikkabanavara                    5           SBR
Kadugodi                          6           SBR
Kachohalli                        3           Membrane Bio – Reactor
Kengeri                           60          Activated Sludge Process (ASP)
K & C Valley                      60          ASP
Bellandur Amanikere               90          ASP
Doddabele                         20          SBR
Yellemallappa Chetty Kere         15          SBR
Total                            339
Quantity of used water treated in
      the existing treatment plants
                              Average daily inflow in ML
   Month    2006     2007      2008     2009       2010    2011     2012
January     198.89   246.07    210.01 307.00 303.28        271.98   259.98
February    233.55   247.32    216.15 316.33 318.15        251.02   277.56
March       236.92   234.59    264.28 313.87 330.55        261.97   275.28
April       269.88   264.22    305.91 277.75 276.15        274.92   270.90
May         310.17   276.99    294.20 251.55 323.67        251.50   249.71
June        224.34   299.24    304.44 244.93 307.66        279.12   285.55
July        245.12   289.05    278.76 236.87 308.70        304.51   356.58
August      253.33   327.73    301.85 275.66 306.78        285.22   354.27
September   295.74   268.33    257.06 292.62 285.64        252.68   356.13
October     301.31   247.88    261.78 271.95 297.04        304.74   383.27
November    288.76   238.10    264.39 265.12 301.92        309.28   379.74
December    245.59   217.67    303.05 269.91 275.20        249.00   384.29
Average     258.72   263.18    272.75 276.72 302.88        274.81   320.50
Monthly Average inflow to treatment plants in MLD

Treatment Plant and capacity   January-13      February-13      March-13
V Valley 180 MLD                       68.17            67.18          74.45
Mailasandra 75 MLD                     47.14            48.99          52.58
Nagasandra 20 MLD                       7.24             5.68           7.34
Hebbal 60 MLD STP                      18.25            34.16          34.16
Yelahanka 10 MLD STP                    4.28             5.21           5.51
Jakkur 10 MLD STP                       4.44             4.70           4.91
Raja Canal 40 MLD STP                  19.00            28.04          39.35
K R Purum 20 MLD STP                    9.89            12.38          12.18
Kadabeesanahalli 50 MLD                27.44            36.43          36.12
K & C Valley 218 MLD                  144.85          148.09          149.64
K & C Valley 30 MLD                    28.89            28.81          30.27
Lal Bagh 1.50 MLD                       1.20             1.08           1.08
Cubbon Park 1.50 MLD                    1.06             1.25           0.85
Madivala 4 MLD                          3.79             3.79           3.79
Kempambudhi 1 MLD                       1.00             1.00           1.00
Total - 721 MLD                       386.64          426.76          453.22
Benefits after the completion of UGD works under KMRP


Erstwhile ULB           Name of the Lake           No. of
                                                   lakes
Yelahanka     Attur, Puttenahalli, Yelahanka,        6
              Allalasandra, Jakkur, Shivanahalli
Bytarayanpura Chikkabanavara, Singapura,            15
              Abbegeri, Vidrayanapura,
              Doddabommasandra, Tindlu,
              Hebbal, Nagavara, Jakkur,
              Rachenahalli, Amruthahalli,
              Hennur, Byrathikhane, Kalkere,
              Rampura
Benefits after the completion of UGD works under KMRP

 Erstwhile           Name of the Lake             No. of
    ULB                                           lakes
Mahadeva Munekollal, Sadaramangala,                 18
pura & K R Bhattrahalli, Vengeankere,
Purum      Ramamurthy Nagar, Basavapura,
           Yellemallappa Chetty, Kaggadasapura,
           Vibhuthipura, Varthur,
           Mahadevapura, Ganghadhar,
           Doddakundenahalli, Kundenahalli,
           Rajupallya, Benniganahalli, Sigehalli,
           Siddapura
Benefits after the completion of UGD works under KMRP

 Erstwhile           Name of the Lake           No. of
    ULB                                         lakes
Bommana Jaraganahalli, Chunchanaghatta,           16
halli      Puttenahalli, Kothunur, Arekere,
           Hulimavu, Madivala, Agaram, Varthur,
           Begur, Chikkabegur, Singasandra,
           Kadagi Singasandra, Somasundra
           palya, Garvibhavpalya, Hosapalya
R R Nagar Mallathahalli, Hosakere, Kengeri,        5
& Kengeri Dubasapalya, Halgevadrahalli
Benefits after the completion of UGD works under KMRP

 Erstwhile             Name of the Lake          No. of
    ULB                                          lakes
Dasarahalli Dasarahalli, Doddabidrakallu,          10
            Herohalli, Laggere, Shivapura,
            Pillappakatte, Bagalkunte,
            Mallasandra, Chikkabanavara,
            Nelegadaranahalli
            Total                                 70
Action taken by BWSSB in preventing pollution of Lakes

More Related Content

Viewers also liked

Mumbai Lakes Restoration
Mumbai Lakes RestorationMumbai Lakes Restoration
Mumbai Lakes Restoration
Pigtail Pundits
 
Bangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground waterBangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground waterBhargavi Rao
 
Metropolis India Managing Urban Growth
Metropolis India Managing Urban GrowthMetropolis India Managing Urban Growth
Metropolis India Managing Urban GrowthAnupam Yog
 
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATION
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATIONA STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATION
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATION
Amartya Jha
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Ekonnect
 

Viewers also liked (7)

Mumbai Lakes Restoration
Mumbai Lakes RestorationMumbai Lakes Restoration
Mumbai Lakes Restoration
 
Bangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground waterBangalore's lakes and impact on ground water
Bangalore's lakes and impact on ground water
 
Cleaning lakes
Cleaning lakesCleaning lakes
Cleaning lakes
 
Metropolis India Managing Urban Growth
Metropolis India Managing Urban GrowthMetropolis India Managing Urban Growth
Metropolis India Managing Urban Growth
 
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATION
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATIONA STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATION
A STUDY ON THE IMPACT OF POLLUTION IN BELLANDUR LAKE DUE TO URBANIZATION
 
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
Lake Restoration Projects Being Undertaken by BDA_Bangalore Development Autho...
 
Bangalore
BangaloreBangalore
Bangalore
 

Similar to Action taken by BWSSB in preventing pollution of Lakes

Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of Lakes
Ekonnect Knowledge Foundation
 
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013
India Water Portal
 
Presentation for cm 24.04.2012
Presentation for cm 24.04.2012Presentation for cm 24.04.2012
Presentation for cm 24.04.2012Rashid Ahmed
 
FINAL ACS Meeting JSA - 2022.pptx
FINAL ACS Meeting JSA - 2022.pptxFINAL ACS Meeting JSA - 2022.pptx
FINAL ACS Meeting JSA - 2022.pptx
ParmarDhara5
 
watson ppt.pptx
watson ppt.pptxwatson ppt.pptx
watson ppt.pptx
KUMUDKUMAR28
 
Sutp for middle sized cities in nekrtc
Sutp for middle sized cities in nekrtcSutp for middle sized cities in nekrtc
Sutp for middle sized cities in nekrtc
Basalingappa Beedi
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply scheme
Aby Mundackal
 
Maharashtra Listenership List
Maharashtra Listenership ListMaharashtra Listenership List
Maharashtra Listenership List
KSyamKumar
 
Mr. Joginder Singh IEWP @ Workshop on Water allocation, water economics and ...
Mr. Joginder Singh IEWP @  Workshop on Water allocation, water economics and ...Mr. Joginder Singh IEWP @  Workshop on Water allocation, water economics and ...
Mr. Joginder Singh IEWP @ Workshop on Water allocation, water economics and ...
India-EU Water Partnership
 
Rory Bergin - RIBA 2030 Climate Challenge
Rory Bergin - RIBA 2030 Climate ChallengeRory Bergin - RIBA 2030 Climate Challenge
Rory Bergin - RIBA 2030 Climate Challenge
IES VE
 
Water Audit.pptx
Water Audit.pptxWater Audit.pptx
Water Audit.pptx
NandiniM68
 
Bangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBBangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSB
Sangeeta (San) Banerjee
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
ADDA
 
Ganga river cleaning schemes
Ganga  river cleaning schemesGanga  river cleaning schemes
Ganga river cleaning schemes
Arvind kumar
 
project report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railwaysproject report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railways
Devesh Chaurasia
 
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMPMaster Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Ekonnect Knowledge Foundation
 
EQUITABLE Water Supply PROJECT for Pune City
EQUITABLE Water  Supply PROJECT for Pune CityEQUITABLE Water  Supply PROJECT for Pune City
EQUITABLE Water Supply PROJECT for Pune City
pmcpune
 
Highlights of work done during tenure as SE, Jamnagar
Highlights of work done during tenure as SE, JamnagarHighlights of work done during tenure as SE, Jamnagar
Highlights of work done during tenure as SE, JamnagarD R Shah
 
performance evaluation of desilting devices
performance evaluation of desilting devicesperformance evaluation of desilting devices
performance evaluation of desilting devicesGurdeep singh Johar
 

Similar to Action taken by BWSSB in preventing pollution of Lakes (20)

Action taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of LakesAction taken by BWSSB in preventing pollution of Lakes
Action taken by BWSSB in preventing pollution of Lakes
 
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013
Potential of Sewage Treatment Plants in Bangalore_V C Kumar_2013
 
Presentation for cm 24.04.2012
Presentation for cm 24.04.2012Presentation for cm 24.04.2012
Presentation for cm 24.04.2012
 
FINAL ACS Meeting JSA - 2022.pptx
FINAL ACS Meeting JSA - 2022.pptxFINAL ACS Meeting JSA - 2022.pptx
FINAL ACS Meeting JSA - 2022.pptx
 
watson ppt.pptx
watson ppt.pptxwatson ppt.pptx
watson ppt.pptx
 
Rids, anantapur
Rids, anantapurRids, anantapur
Rids, anantapur
 
Sutp for middle sized cities in nekrtc
Sutp for middle sized cities in nekrtcSutp for middle sized cities in nekrtc
Sutp for middle sized cities in nekrtc
 
Design water supply scheme
Design water supply schemeDesign water supply scheme
Design water supply scheme
 
Maharashtra Listenership List
Maharashtra Listenership ListMaharashtra Listenership List
Maharashtra Listenership List
 
Mr. Joginder Singh IEWP @ Workshop on Water allocation, water economics and ...
Mr. Joginder Singh IEWP @  Workshop on Water allocation, water economics and ...Mr. Joginder Singh IEWP @  Workshop on Water allocation, water economics and ...
Mr. Joginder Singh IEWP @ Workshop on Water allocation, water economics and ...
 
Rory Bergin - RIBA 2030 Climate Challenge
Rory Bergin - RIBA 2030 Climate ChallengeRory Bergin - RIBA 2030 Climate Challenge
Rory Bergin - RIBA 2030 Climate Challenge
 
Water Audit.pptx
Water Audit.pptxWater Audit.pptx
Water Audit.pptx
 
Bangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSBBangalore's Water Supply situation - BWSSB
Bangalore's Water Supply situation - BWSSB
 
BWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities BnagaloreBWSSB presentation - Water Supply Realities Bnagalore
BWSSB presentation - Water Supply Realities Bnagalore
 
Ganga river cleaning schemes
Ganga  river cleaning schemesGanga  river cleaning schemes
Ganga river cleaning schemes
 
project report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railwaysproject report on water supply works under supervision of indian railways
project report on water supply works under supervision of indian railways
 
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMPMaster Plan Project Report on Remodeling of Storm Water Drains_BBMP
Master Plan Project Report on Remodeling of Storm Water Drains_BBMP
 
EQUITABLE Water Supply PROJECT for Pune City
EQUITABLE Water  Supply PROJECT for Pune CityEQUITABLE Water  Supply PROJECT for Pune City
EQUITABLE Water Supply PROJECT for Pune City
 
Highlights of work done during tenure as SE, Jamnagar
Highlights of work done during tenure as SE, JamnagarHighlights of work done during tenure as SE, Jamnagar
Highlights of work done during tenure as SE, Jamnagar
 
performance evaluation of desilting devices
performance evaluation of desilting devicesperformance evaluation of desilting devices
performance evaluation of desilting devices
 

Recently uploaded

Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
UiPathCommunity
 
Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.
ViralQR
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
Thijs Feryn
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
Kari Kakkonen
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
Pierluigi Pugliese
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
Ralf Eggert
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
Dorra BARTAGUIZ
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
Guy Korland
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
Jemma Hussein Allen
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
DianaGray10
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
UiPathCommunity
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
91mobiles
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Nexer Digital
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Ramesh Iyer
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
Product School
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
Sri Ambati
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 

Recently uploaded (20)

Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
Dev Dives: Train smarter, not harder – active learning and UiPath LLMs for do...
 
Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.Welocme to ViralQR, your best QR code generator.
Welocme to ViralQR, your best QR code generator.
 
Accelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish CachingAccelerate your Kubernetes clusters with Varnish Caching
Accelerate your Kubernetes clusters with Varnish Caching
 
DevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA ConnectDevOps and Testing slides at DASA Connect
DevOps and Testing slides at DASA Connect
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
 
PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)PHP Frameworks: I want to break free (IPC Berlin 2024)
PHP Frameworks: I want to break free (IPC Berlin 2024)
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
GraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge GraphGraphRAG is All You need? LLM & Knowledge Graph
GraphRAG is All You need? LLM & Knowledge Graph
 
The Future of Platform Engineering
The Future of Platform EngineeringThe Future of Platform Engineering
The Future of Platform Engineering
 
UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4UiPath Test Automation using UiPath Test Suite series, part 4
UiPath Test Automation using UiPath Test Suite series, part 4
 
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
Le nuove frontiere dell'AI nell'RPA con UiPath Autopilot™
 
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdfSmart TV Buyer Insights Survey 2024 by 91mobiles.pdf
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf
 
Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?Elizabeth Buie - Older adults: Are we really designing for our future selves?
Elizabeth Buie - Older adults: Are we really designing for our future selves?
 
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
Builder.ai Founder Sachin Dev Duggal's Strategic Approach to Create an Innova...
 
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
De-mystifying Zero to One: Design Informed Techniques for Greenfield Innovati...
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
GenAISummit 2024 May 28 Sri Ambati Keynote: AGI Belongs to The Community in O...
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 

Action taken by BWSSB in preventing pollution of Lakes

  • 1. Action taken by BWSSB in preventing pollution of Lakes
  • 2. Bangalore Valley System  Well defined valleys – 4 Major valleys  Koramangala  Challaghatta  Hebbal  Vrishabhavathi – Minor valleys  Arkavathi, Kathriguppe and Kethamaranahalli (Vrishabhavathi Valley)  Taverekere (Koramangala valley)
  • 4. Reasons for pollution of Lakes  Un planned growth of city  Un sewered pockets such as slums and erstwhile CMC areas  Damage of main sewers  Blockages and overflows in the sewer system  Direct letting out of raw wastewater into storm water drainage system from un-sewered as well as sewered pockets  Lack of adequate infrastructure facilities  Dumping of solid waste within the drainage zones
  • 5. Sewerage management in Bangalore Facts  Total sewage generated in Bangalore – 1000 MLD  Sewerage connections – 8 Lakh  Sewerage network Laterals (< 300 mm dia) – 3367 Kms Trunk Sewers (>300 mm dia) – 302 Kms  Number of plants – 14  Sewage treatment capacity – 721 MLD  Average Present treatment – 453 MLD
  • 6. Measures for abating Lake Pollution 1) Replacement/ Rehabilitation/ Up gradation of old sewerage net work – Laterals and Trunk sewers in core city 2) Creation of New Sewerage Net Work  Erstwhile CMC area – 2300 Kms  110 Villages – 2000 Kms Total – 4300 Kms 3) Creation of Additional Treatment capacity to treat wastewater produced in the new areas
  • 7. On going projects Environmental Action Plan – A  Replacement and Rehabilitation of existing sewers  Total length – 33 Kms  Cost – Rs. 47 Crores under NRCP  Work is completed
  • 8. On going projects Environmental Action Plan – B  Replacement and Rehabilitation of existing sewers  Total length – 70 Kms  Taken up under 8 packages  Cost – Rs. 176 Crores under JnNURM & JICA  Project period 2010-2013
  • 9. On going projects Zero Flow in Hebbal drainage zone  Length – 19 Kms  Taken up under 3 packages  Cost – Rs. 35 Crores under BWSSB funds & Mega city funds  Project period 2010-2013
  • 10. On going projects Providing UGD Facilities to 8 ULBs in BBMP area • Estimated Cost : Rs. 1098.15 Crore • Amount put to bid : Rs. 966.21 Crore • Awarded Cost : Rs. 1191.79 Crore • Funding : JnNURM - World Bank • Project Period : 4 Years • Length of pipeline to be laid : 2300 Kms • Number of packages : 24
  • 11. On going projects - progress Sl ULB’s Total Pipe Progress Percentage Completion No. laying Qty achieved in Date to be Kms achieved in Kms 1 Yelahanka CMC 60.28 57.82 95.92% Feb-13 2 Byatarayanapura CMC 468.81 269.46 57.47% Feb-14 3 Mahadevapura CMC 357.11 155.81 43.63% Sep-15 4 Krishnarajapuram CMC 314.85 246.91 78.42% Feb-14 5 Bommanahalli CMC 466.91 260.84 55.86% Feb-14 6 Rajarajeshwarinagar CMC 117.22 78.37 66.85% Feb-14 7 Kengeri TMC 57.62 14.1 24.47% Sep-14 8 Dasarahalli CMC 470.92 374.61 79.54% Feb-14 TOTAL 2313.72 1457.91 63.01% Sep-15
  • 12. Future projects  Construction of new treatment plants  11 Numbers under JICA assistance  339 MLD Capacity with nutrient removal treatment process  300 MLD plant at V Valley at a cost of Rs. 396 Crore  Environmental Action Plan – C  Cost – Rs. 360 Crores  Length – 109 Kms  Water supply and Sanitation to 110 Villages  Awaiting clearance from Central Government
  • 13. Treatment plants proposed under CWSS Stage IV Phase II Name Capacity in MLD Process (Including BNR) Raja Canal 40 Extended Aeration (EA) Horamavu Agara 20 Sequential Batch Reactor (SBR) Nagasandra 20 SBR Chikkabanavara 5 SBR Kadugodi 6 SBR Kachohalli 3 Membrane Bio – Reactor Kengeri 60 Activated Sludge Process (ASP) K & C Valley 60 ASP Bellandur Amanikere 90 ASP Doddabele 20 SBR Yellemallappa Chetty Kere 15 SBR Total 339
  • 14. Quantity of used water treated in the existing treatment plants Average daily inflow in ML Month 2006 2007 2008 2009 2010 2011 2012 January 198.89 246.07 210.01 307.00 303.28 271.98 259.98 February 233.55 247.32 216.15 316.33 318.15 251.02 277.56 March 236.92 234.59 264.28 313.87 330.55 261.97 275.28 April 269.88 264.22 305.91 277.75 276.15 274.92 270.90 May 310.17 276.99 294.20 251.55 323.67 251.50 249.71 June 224.34 299.24 304.44 244.93 307.66 279.12 285.55 July 245.12 289.05 278.76 236.87 308.70 304.51 356.58 August 253.33 327.73 301.85 275.66 306.78 285.22 354.27 September 295.74 268.33 257.06 292.62 285.64 252.68 356.13 October 301.31 247.88 261.78 271.95 297.04 304.74 383.27 November 288.76 238.10 264.39 265.12 301.92 309.28 379.74 December 245.59 217.67 303.05 269.91 275.20 249.00 384.29 Average 258.72 263.18 272.75 276.72 302.88 274.81 320.50
  • 15. Monthly Average inflow to treatment plants in MLD Treatment Plant and capacity January-13 February-13 March-13 V Valley 180 MLD 68.17 67.18 74.45 Mailasandra 75 MLD 47.14 48.99 52.58 Nagasandra 20 MLD 7.24 5.68 7.34 Hebbal 60 MLD STP 18.25 34.16 34.16 Yelahanka 10 MLD STP 4.28 5.21 5.51 Jakkur 10 MLD STP 4.44 4.70 4.91 Raja Canal 40 MLD STP 19.00 28.04 39.35 K R Purum 20 MLD STP 9.89 12.38 12.18 Kadabeesanahalli 50 MLD 27.44 36.43 36.12 K & C Valley 218 MLD 144.85 148.09 149.64 K & C Valley 30 MLD 28.89 28.81 30.27 Lal Bagh 1.50 MLD 1.20 1.08 1.08 Cubbon Park 1.50 MLD 1.06 1.25 0.85 Madivala 4 MLD 3.79 3.79 3.79 Kempambudhi 1 MLD 1.00 1.00 1.00 Total - 721 MLD 386.64 426.76 453.22
  • 16. Benefits after the completion of UGD works under KMRP Erstwhile ULB Name of the Lake No. of lakes Yelahanka Attur, Puttenahalli, Yelahanka, 6 Allalasandra, Jakkur, Shivanahalli Bytarayanpura Chikkabanavara, Singapura, 15 Abbegeri, Vidrayanapura, Doddabommasandra, Tindlu, Hebbal, Nagavara, Jakkur, Rachenahalli, Amruthahalli, Hennur, Byrathikhane, Kalkere, Rampura
  • 17. Benefits after the completion of UGD works under KMRP Erstwhile Name of the Lake No. of ULB lakes Mahadeva Munekollal, Sadaramangala, 18 pura & K R Bhattrahalli, Vengeankere, Purum Ramamurthy Nagar, Basavapura, Yellemallappa Chetty, Kaggadasapura, Vibhuthipura, Varthur, Mahadevapura, Ganghadhar, Doddakundenahalli, Kundenahalli, Rajupallya, Benniganahalli, Sigehalli, Siddapura
  • 18. Benefits after the completion of UGD works under KMRP Erstwhile Name of the Lake No. of ULB lakes Bommana Jaraganahalli, Chunchanaghatta, 16 halli Puttenahalli, Kothunur, Arekere, Hulimavu, Madivala, Agaram, Varthur, Begur, Chikkabegur, Singasandra, Kadagi Singasandra, Somasundra palya, Garvibhavpalya, Hosapalya R R Nagar Mallathahalli, Hosakere, Kengeri, 5 & Kengeri Dubasapalya, Halgevadrahalli
  • 19. Benefits after the completion of UGD works under KMRP Erstwhile Name of the Lake No. of ULB lakes Dasarahalli Dasarahalli, Doddabidrakallu, 10 Herohalli, Laggere, Shivapura, Pillappakatte, Bagalkunte, Mallasandra, Chikkabanavara, Nelegadaranahalli Total 70