Added support for ◆◆◆.
・○○○○○○
-△△△
-□□□
How to Read each page of requirement description
1
This document summarizes key information for each requirement. For more
information, please refer to the intra-mart requirement information disclosure
site or each documentation of products.
*Classification
*Category
The classification which we have provided
in this update
such as "Updates," "Added functions," “Functional Enhancements,"
"Improved functions," "Information disclosure," "Improved
operations,".
Explanations, graphics and images, explaining
the outline of the supported contents are
described.
Intra-mart Requirement Information Disclosure Site: https://issue.intra-mart.jp
Product Documentation Site: https://document.intra-mart.jp
Update category (such as “Platform”)
corresponding the content being explained
© 2023 NTT DATA INTRAMART CORPORATION
Intra-mart Requirement Information Disclosure Site( https://issue.intra-mart.jp/)
This document contains major update information from the contents of the requirement information disclosure site.
Please also refer to the requirement information disclosure site if you would like to know more information and details.
About Requirement Information Disclosure Site
2
https://issue.intra-mart.jp/projects/iap
https://issue.intra-mart.jp/projects/iac
https://issue.intra-mart.jp/projects/bpm
*Category
*Category
Ticket Number
You can search
by ticket number.
© 2023 NTT DATA INTRAMART CORPORATION
Requirement Information Disclosure Site:
Links to Requirements for 2023 Spring ①
3
Products and functions List of requirements URL
intra-mart Accel Platform https://issue.intra-mart.jp/projects/iap/issues?query_id=876
Accel Studio https://issue.intra-mart.jp/projects/accelstudio/issues?query_id=878
IM-BloomMaker https://issue.intra-mart.jp/projects/bloommaker/issues?query_id=864
IM-FormaDesigner https://issue.intra-mart.jp/projects/forma/issues?query_id=865
IM-BIS https://issue.intra-mart.jp/projects/bis/issues?query_id=863
e Builder https://issue.intra-mart.jp/projects/ebuilder/issues?query_id=862
intra-mart Accel Documents https://issue.intra-mart.jp/projects/iad/issues?query_id=874
© 2023 NTT DATA INTRAMART CORPORATION
1. System Requirements
2. Accel Platform
3. Accel Studio
4. IM-BloomMaker
Contents
4
5. IM-Workflow
6. Service Linkage
7. Accel Documents
© 2023 NTT DATA INTRAMART CORPORATION
1. System Requirements
5
© 2023 NTT DATA INTRAMART CORPORATION
Server Requirements
• Red Hat Enterprise Linux 9 added
• Microsoft SQL Server 2022 added
• PostgreSQL 15 added
Client Requirements
• Google Chrome / Microsoft Edge 110
• macOS Ventura added
• macOS Catalina removed
• iPadOS 14 removed
System Requirements
6
Update
System
Requirements
© 2023 NTT DATA INTRAMART CORPORATION
2. Accel Platform
7
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
The change history of data registered based on the entity (* 2) of IM-Repository (* 1) can now be displayed.
Display Change History of Entity Data
8
Added Functions
Platform
*1 IM-Repository: an application that can manage the various terms used on the intra-mart Accel Platform and their metadata
Reference (IM-Repository User's Guide) https://document.intra-mart.jp/library/iap/public/im_repository/im_repository_user_guide/texts/summary/index.html
*2 Entity in IM-Repository is the function of defining and managing a meaningful set of data
You will be able to check who registered and
updated data and when.
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
IM-Logic Designer mapping settings have been improved to make mapping easier even
when there are many input and output elements.
IM-LogicDesigner Mapping Dialog Improvement
9
Improvement
Platform
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Added a function to convert property names.
IM-LogicDesigner Mapping Dialog Improvement
10
Added Functions
Platform
Mappings for different property cases can be mapped on an object-by-
object basis rather than on a property-by-property basis.
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Added the debug log output function of logic flow.
The logs are stored in the tenant DB and can be deleted by a delete job.
The log can be downloaded from the screen.
IM-LogicDesigner debug log output function
11
It is intended to be used for debugging flows during the development phase
and for investigating errors during operation.
Added Functions
Platform
© 2023 NTT DATA INTRAMART CORPORATION
If you select a flow to be debugged before executing the flow, the log will be output.
IM-LogicDesigner debug log output function
- Example of setting up
12
Added Functions
Platform
© 2023 NTT DATA INTRAMART CORPORATION
Flow and task input and output values, error messages, and stack traces when errors occur are
output.
IM-LogicDesigner debug log output function
- Example of screen
13
Added Functions
Platform
© 2023 NTT DATA INTRAMART CORPORATION
Added new login screen.
Available by selecting the "Login Screen 2 Column Design"
module.
• The logo, image and title can be changed
• “Information” can be used to give information to users
attempting to log in
New login screen added,
existing login screen improved
14
Improvement of UX/UI
UI/UX improvements for existing login screens.
Improvements include:
• Login Screen
• Improvement of UI
• SAML authentication button
• Design Modifications and Operation with Keyboard
Buttons
• Login Portlet
• Improvement of UI
• SAML authentication button in the login portlet
• Design Modifications and Operation with Keyboard
Buttons
• Multi-Factor Authentication Screen
• Changed focus order when TAB is pressed
"Login screen two-column design"
Added Functions
© 2023 NTT DATA INTRAMART CORPORATION
3. Accel Studio/Accel Studio Template
15
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Changed the specification
for making apps public and private
16
We removed the function that makes applications public or private, and added the function to perform
blocking and unblocking of all resources.
Specification Changes
Accel Studio
• The "Public/Private Applications"
function that existed until 2022 Winter
has been removed.
• Starting with 2023 Spring, we provide
the function "blocking/unblocking all
resources" linked with the application.
• You can now confirm blocked
resources in the authorization setting
screen.
Blocked
© 2023 NTT DATA INTRAMART CORPORATION
• In the application generated by “Simple Workflow” template,
standard workflow is used when you use attachments.
• This has changed from IM-BloomMaker's implementation using the file upload element.
[Background of the change]
Modified to make user data for apps created from simple workflow template
subject to full-text search crawlers.
• We have increased the maximum number of columns generated in template-
created applications.
• If you increase the number of columns too much, the screen layout will collapse, and you will
need to correct it after creating the application.
Accel Studio - Other Changes
17
Specification Changes
Accel Studio
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Accel Studio Template
- Task Management Application
18
Added the graph display function.
You can use it as a sample for creating a chart, including database access and search process.
Added Functions
Accel Studio
© 2023 NTT DATA INTRAMART CORPORATION

What can be done with this function
Accel Studio Template- Added Catalog Details
19
Added documents that explain the content of each template, how to create it, how to use it, and
examples of its use.
Template Catalog(existing)
Template Catalog Details(new)
Improvement
Accel Studio
© 2023 NTT DATA INTRAMART CORPORATION
4. IM-BloomMaker
20
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
IM-BloomMaker - Specification Changes
21
Switching container pages (tabs on the designer screen) is now treated the same as page transitions.
[Notes]
This specification change may affect the properties “lockOnJoin” and “unlockOnLeave” of the element “Exclusive
Control”. Example that may affect is as follows.
Example of influence
The behavior is different when you create a content definition that contains both a container page (A) with an exclusive
control element and a container page (B) for another page view, and then switch the container page view from A to B.
• 2022 Winter or earlier
The lock is not released when the “unlockOnLeave” property of the exclusive control element is enabled
• 2023 Spring or earlier
The lock is released when the “unlockOnLeave” property of the exclusive
control element is enabled
Specification Changes
IM-BloomMaker
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Rich Table
- Added label attribute to dataSource
22
Added the label attribute to dataSource of string, integer, double, fraction
and date types.
Improved it to make the existing value attribute an internal value and the
label attribute available for on-screen display.
This allows sorting by the number of internal values, even in strings such as
'20KB’ , '10MB’ on display. As a limitation, editing directly on rich tables
is not allowed when the label attribute is used.
Added Functions
IM-BloomMaker
This is a rich table with column1 sorted by value.
The value contains data with "cm" removed from the displayed string.
Sorting by strings shows 10cm, 1cm, 2cm, and 5cm in that order.
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Rich Table
- Added number formatting function
23
Added the function to display formatted numbers as strings.
The same format is available for the element “numeric Input
(Format)”.
Sort process is sorted by numbers, not by formatted strings.
Added Functions
IM-BloomMaker
Example of Format
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Rich Text Box
- controlling the display of headers and footers
24
Added the property to show/hide the header and footer of rich text box.
You can hide unnecessary header and footer when you put a rich text box in read-only
mode, such as when you use it as an HTML viewer.
Added Functions
IM-BloomMaker
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Added information of system locale
to "environment" variable
25
Added server information (serverInfo) to variable “environment”.
The following information is available:
• System Locale List
• System Time Zone
• Tenant Standard Calendar ID
• The First Day of the Week
• Tenant Locale
• Tenant Time Zone
Added Functions
IM-BloomMaker
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
File upload button labels
now can be changed
26
It is now possible to change the label of the file select button for the elements "File upload" and
"Multi-file upload."
If the property "readonly" is enabled, the specified string will not be used.
If you do not change, the default string "Click here to select a file" is displayed.
Improvement
IM-BloomMaker
For standard strings
For modified strings
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Date and Time Input Elements
27
The option has been added to assign "Invalid Date" to a variable when an invalid date is
entered in the date/time input element.
This makes it possible to check whether it is a blank or an error with an incorrect date.
Improvement
IM-BloomMaker
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Disable side bar elements
28
Added the function to hide side bar containers by specifying query parameters.
When using the content type "Bulma" or "Bulma Theme Colored," the side bar container may be used. In some
cases, such as when displaying content that includes side bar container on a sub screen, you may not need side
bar container.
Although it is controllable by using the property "showSideBar," we have improved it so that it can also be
controlled by a query parameter to the request.
Please add "imui-theme-builder-module = headwithcontainer" as a query parameter to the URL which is created
as a routing definition.
The side bar container will be also disabled when being displayed on a mobile application.
Improvement
IM-BloomMaker
© 2023 NTT DATA INTRAMART CORPORATION
Disable hide side bar elements
- Examples of hiding
29
Added Functions
IM-BloomMaker
Contents using side bar container
Viewed on a PC
Viewed in a mobile app
Viewed a URL with query parameters on
a PC
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Other new functions and improvements
30
• Added “Page Icon” property to container settings
It can now be displayed as a favicon by specifying the URL of the icon placed on the web
server.
Added/Improved
Functions
IM-BloomMaker
• Performance improvements for design document output
We reviewed process in the design document output and reduced the time to process.
© 2023 NTT DATA INTRAMART CORPORATION
5. IM-Workflow
31
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Improved Accel Studio Workflow
Management Screen
32
A notification appears indicating that you need node settings.
It appears when you add a node, change the node ID, and so on.
Improvement
IM-Workflow
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
User data in the workflow
for full-text search
33
The user data in the workflow created by the workflow template is available by full-text
search.
Improvement
IM-Workflow
Set the target flow and the target user data.
(Equivalent to Forma full-text search)
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Asynchronous process output logs
can now be displayed
34
The log output by "matter end process, arrival process" is displayed on matter operation screen.
Added Functions
IM-Workflow
Error return values of various user programs
which you created can be checked
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Added Replacement Strings to Message Definition
35
When withdrawing, message notification can now be sent to the user who has processed the
node which you are withdrawing.
Improvement
IM-Workflow
The following matter has been Withdraw by aoyagi.
As a result, recipients of this notification do not need to take any of the following actions.
<Nodes that No Longer Require Process> approve
[Matter Information]
-----------------------------------
<Flow Name> sample
<Matter Number> 00001
<Matter Name> sample workflow
-----------------------------------
<This message is also sent to the following users.>
Ikuta,ueda,hayashi
-----------------------------------
<Process Waiting Node> apply
<Preprocessing Node Name> approve
Example of Message Notification
© 2023 NTT DATA INTRAMART CORPORATION
6. Service Linkage
36
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Added LogicDesigner task for box linkage function
37
Added LogicDesigner tasks for the Box linkage shown below.
Improvement
Service Linkage
Add/Update
Collaboration
Add and update folder
privilege for users.
Delete Collaboration Delete folder privilege
of users.
Acquire Embedded
Widget Tag
Acquire a Box
embedded widget tag.
Acquire File/Folder ID Acquire a file ID or a
folder ID.
In addition, we fixed bugs, and upgraded the Box Java SDK (3.7.1 to 4.0.0).
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
Provided a REST API
for IM-Common Master for General Users
38
REST API for IM-Common Master for General Users is now available.
This REST API makes it easier to create a function using the IM-Common Master in the IM-
BloomMaker screen.
APIs for users, roles, organizations, and public groups are provided.
Check the API documentation site for details on the REST API.
API Documentation - IM-Common Master (for general users)
https://api.intra-mart.jp/iap/im_master_general_rest/index.html
Improvement
IM-BloomMaker
© 2023 NTT DATA INTRAMART CORPORATION
7. intra-mart Accel Documents
39
© 2023 NTT DATA INTRAMART CORPORATION
What can be done with this function
The following requirements have been modified mainly to improve usability.
• You can view the overall progress in the export/import progress chart.
• The configuration that does not use the IMBox hides the IMBox, which is a choice of notification methods.
• Deactivates “Delete” in the bulk operation menu when creator’s right is disabled.
Accel Documents Update
40
Export/Import Progress Screen
© 2023 NTT DATA INTRAMART CORPORATION
41
• This document only covers the main topics of updates.
For more information, please visit requirement information disclosure website.
https://issue.intra-mart.jp/
• Please refer to release notes of each product for system requirements and limitations.
https://www.intra-mart.jp/document/library/
If you have any questions, please contact:
NTT DATA INTRAMART CORPORATION
Global Headquarters
E-mail: gl@intra-mart.jp

Accel_Series_2023Spring_En.ppt

  • 1.
    © 2023 NTTDATA INTRAMART CORPORATION 2023 Spring Update information intra-mart Accel Platform/Accel Series NTT Data Intra-Mart, Inc.
  • 2.
    © 2023 NTTDATA INTRAMART CORPORATION Added support for ◆◆◆. ・○○○○○○ -△△△ -□□□ How to Read each page of requirement description 1 This document summarizes key information for each requirement. For more information, please refer to the intra-mart requirement information disclosure site or each documentation of products. *Classification *Category The classification which we have provided in this update such as "Updates," "Added functions," “Functional Enhancements," "Improved functions," "Information disclosure," "Improved operations,". Explanations, graphics and images, explaining the outline of the supported contents are described. Intra-mart Requirement Information Disclosure Site: https://issue.intra-mart.jp Product Documentation Site: https://document.intra-mart.jp Update category (such as “Platform”) corresponding the content being explained
  • 3.
    © 2023 NTTDATA INTRAMART CORPORATION Intra-mart Requirement Information Disclosure Site( https://issue.intra-mart.jp/) This document contains major update information from the contents of the requirement information disclosure site. Please also refer to the requirement information disclosure site if you would like to know more information and details. About Requirement Information Disclosure Site 2 https://issue.intra-mart.jp/projects/iap https://issue.intra-mart.jp/projects/iac https://issue.intra-mart.jp/projects/bpm *Category *Category Ticket Number You can search by ticket number.
  • 4.
    © 2023 NTTDATA INTRAMART CORPORATION Requirement Information Disclosure Site: Links to Requirements for 2023 Spring ① 3 Products and functions List of requirements URL intra-mart Accel Platform https://issue.intra-mart.jp/projects/iap/issues?query_id=876 Accel Studio https://issue.intra-mart.jp/projects/accelstudio/issues?query_id=878 IM-BloomMaker https://issue.intra-mart.jp/projects/bloommaker/issues?query_id=864 IM-FormaDesigner https://issue.intra-mart.jp/projects/forma/issues?query_id=865 IM-BIS https://issue.intra-mart.jp/projects/bis/issues?query_id=863 e Builder https://issue.intra-mart.jp/projects/ebuilder/issues?query_id=862 intra-mart Accel Documents https://issue.intra-mart.jp/projects/iad/issues?query_id=874
  • 5.
    © 2023 NTTDATA INTRAMART CORPORATION 1. System Requirements 2. Accel Platform 3. Accel Studio 4. IM-BloomMaker Contents 4 5. IM-Workflow 6. Service Linkage 7. Accel Documents
  • 6.
    © 2023 NTTDATA INTRAMART CORPORATION 1. System Requirements 5
  • 7.
    © 2023 NTTDATA INTRAMART CORPORATION Server Requirements • Red Hat Enterprise Linux 9 added • Microsoft SQL Server 2022 added • PostgreSQL 15 added Client Requirements • Google Chrome / Microsoft Edge 110 • macOS Ventura added • macOS Catalina removed • iPadOS 14 removed System Requirements 6 Update System Requirements
  • 8.
    © 2023 NTTDATA INTRAMART CORPORATION 2. Accel Platform 7
  • 9.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function The change history of data registered based on the entity (* 2) of IM-Repository (* 1) can now be displayed. Display Change History of Entity Data 8 Added Functions Platform *1 IM-Repository: an application that can manage the various terms used on the intra-mart Accel Platform and their metadata Reference (IM-Repository User's Guide) https://document.intra-mart.jp/library/iap/public/im_repository/im_repository_user_guide/texts/summary/index.html *2 Entity in IM-Repository is the function of defining and managing a meaningful set of data You will be able to check who registered and updated data and when.
  • 10.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function IM-Logic Designer mapping settings have been improved to make mapping easier even when there are many input and output elements. IM-LogicDesigner Mapping Dialog Improvement 9 Improvement Platform
  • 11.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Added a function to convert property names. IM-LogicDesigner Mapping Dialog Improvement 10 Added Functions Platform Mappings for different property cases can be mapped on an object-by- object basis rather than on a property-by-property basis.
  • 12.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Added the debug log output function of logic flow. The logs are stored in the tenant DB and can be deleted by a delete job. The log can be downloaded from the screen. IM-LogicDesigner debug log output function 11 It is intended to be used for debugging flows during the development phase and for investigating errors during operation. Added Functions Platform
  • 13.
    © 2023 NTTDATA INTRAMART CORPORATION If you select a flow to be debugged before executing the flow, the log will be output. IM-LogicDesigner debug log output function - Example of setting up 12 Added Functions Platform
  • 14.
    © 2023 NTTDATA INTRAMART CORPORATION Flow and task input and output values, error messages, and stack traces when errors occur are output. IM-LogicDesigner debug log output function - Example of screen 13 Added Functions Platform
  • 15.
    © 2023 NTTDATA INTRAMART CORPORATION Added new login screen. Available by selecting the "Login Screen 2 Column Design" module. • The logo, image and title can be changed • “Information” can be used to give information to users attempting to log in New login screen added, existing login screen improved 14 Improvement of UX/UI UI/UX improvements for existing login screens. Improvements include: • Login Screen • Improvement of UI • SAML authentication button • Design Modifications and Operation with Keyboard Buttons • Login Portlet • Improvement of UI • SAML authentication button in the login portlet • Design Modifications and Operation with Keyboard Buttons • Multi-Factor Authentication Screen • Changed focus order when TAB is pressed "Login screen two-column design" Added Functions
  • 16.
    © 2023 NTTDATA INTRAMART CORPORATION 3. Accel Studio/Accel Studio Template 15
  • 17.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Changed the specification for making apps public and private 16 We removed the function that makes applications public or private, and added the function to perform blocking and unblocking of all resources. Specification Changes Accel Studio • The "Public/Private Applications" function that existed until 2022 Winter has been removed. • Starting with 2023 Spring, we provide the function "blocking/unblocking all resources" linked with the application. • You can now confirm blocked resources in the authorization setting screen. Blocked
  • 18.
    © 2023 NTTDATA INTRAMART CORPORATION • In the application generated by “Simple Workflow” template, standard workflow is used when you use attachments. • This has changed from IM-BloomMaker's implementation using the file upload element. [Background of the change] Modified to make user data for apps created from simple workflow template subject to full-text search crawlers. • We have increased the maximum number of columns generated in template- created applications. • If you increase the number of columns too much, the screen layout will collapse, and you will need to correct it after creating the application. Accel Studio - Other Changes 17 Specification Changes Accel Studio
  • 19.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Accel Studio Template - Task Management Application 18 Added the graph display function. You can use it as a sample for creating a chart, including database access and search process. Added Functions Accel Studio
  • 20.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Accel Studio Template- Added Catalog Details 19 Added documents that explain the content of each template, how to create it, how to use it, and examples of its use. Template Catalog(existing) Template Catalog Details(new) Improvement Accel Studio
  • 21.
    © 2023 NTTDATA INTRAMART CORPORATION 4. IM-BloomMaker 20
  • 22.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function IM-BloomMaker - Specification Changes 21 Switching container pages (tabs on the designer screen) is now treated the same as page transitions. [Notes] This specification change may affect the properties “lockOnJoin” and “unlockOnLeave” of the element “Exclusive Control”. Example that may affect is as follows. Example of influence The behavior is different when you create a content definition that contains both a container page (A) with an exclusive control element and a container page (B) for another page view, and then switch the container page view from A to B. • 2022 Winter or earlier The lock is not released when the “unlockOnLeave” property of the exclusive control element is enabled • 2023 Spring or earlier The lock is released when the “unlockOnLeave” property of the exclusive control element is enabled Specification Changes IM-BloomMaker
  • 23.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Rich Table - Added label attribute to dataSource 22 Added the label attribute to dataSource of string, integer, double, fraction and date types. Improved it to make the existing value attribute an internal value and the label attribute available for on-screen display. This allows sorting by the number of internal values, even in strings such as '20KB’ , '10MB’ on display. As a limitation, editing directly on rich tables is not allowed when the label attribute is used. Added Functions IM-BloomMaker This is a rich table with column1 sorted by value. The value contains data with "cm" removed from the displayed string. Sorting by strings shows 10cm, 1cm, 2cm, and 5cm in that order.
  • 24.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Rich Table - Added number formatting function 23 Added the function to display formatted numbers as strings. The same format is available for the element “numeric Input (Format)”. Sort process is sorted by numbers, not by formatted strings. Added Functions IM-BloomMaker Example of Format
  • 25.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Rich Text Box - controlling the display of headers and footers 24 Added the property to show/hide the header and footer of rich text box. You can hide unnecessary header and footer when you put a rich text box in read-only mode, such as when you use it as an HTML viewer. Added Functions IM-BloomMaker
  • 26.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Added information of system locale to "environment" variable 25 Added server information (serverInfo) to variable “environment”. The following information is available: • System Locale List • System Time Zone • Tenant Standard Calendar ID • The First Day of the Week • Tenant Locale • Tenant Time Zone Added Functions IM-BloomMaker
  • 27.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function File upload button labels now can be changed 26 It is now possible to change the label of the file select button for the elements "File upload" and "Multi-file upload." If the property "readonly" is enabled, the specified string will not be used. If you do not change, the default string "Click here to select a file" is displayed. Improvement IM-BloomMaker For standard strings For modified strings
  • 28.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Date and Time Input Elements 27 The option has been added to assign "Invalid Date" to a variable when an invalid date is entered in the date/time input element. This makes it possible to check whether it is a blank or an error with an incorrect date. Improvement IM-BloomMaker
  • 29.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Disable side bar elements 28 Added the function to hide side bar containers by specifying query parameters. When using the content type "Bulma" or "Bulma Theme Colored," the side bar container may be used. In some cases, such as when displaying content that includes side bar container on a sub screen, you may not need side bar container. Although it is controllable by using the property "showSideBar," we have improved it so that it can also be controlled by a query parameter to the request. Please add "imui-theme-builder-module = headwithcontainer" as a query parameter to the URL which is created as a routing definition. The side bar container will be also disabled when being displayed on a mobile application. Improvement IM-BloomMaker
  • 30.
    © 2023 NTTDATA INTRAMART CORPORATION Disable hide side bar elements - Examples of hiding 29 Added Functions IM-BloomMaker Contents using side bar container Viewed on a PC Viewed in a mobile app Viewed a URL with query parameters on a PC
  • 31.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Other new functions and improvements 30 • Added “Page Icon” property to container settings It can now be displayed as a favicon by specifying the URL of the icon placed on the web server. Added/Improved Functions IM-BloomMaker • Performance improvements for design document output We reviewed process in the design document output and reduced the time to process.
  • 32.
    © 2023 NTTDATA INTRAMART CORPORATION 5. IM-Workflow 31
  • 33.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Improved Accel Studio Workflow Management Screen 32 A notification appears indicating that you need node settings. It appears when you add a node, change the node ID, and so on. Improvement IM-Workflow
  • 34.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function User data in the workflow for full-text search 33 The user data in the workflow created by the workflow template is available by full-text search. Improvement IM-Workflow Set the target flow and the target user data. (Equivalent to Forma full-text search)
  • 35.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Asynchronous process output logs can now be displayed 34 The log output by "matter end process, arrival process" is displayed on matter operation screen. Added Functions IM-Workflow Error return values of various user programs which you created can be checked
  • 36.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Added Replacement Strings to Message Definition 35 When withdrawing, message notification can now be sent to the user who has processed the node which you are withdrawing. Improvement IM-Workflow The following matter has been Withdraw by aoyagi. As a result, recipients of this notification do not need to take any of the following actions. <Nodes that No Longer Require Process> approve [Matter Information] ----------------------------------- <Flow Name> sample <Matter Number> 00001 <Matter Name> sample workflow ----------------------------------- <This message is also sent to the following users.> Ikuta,ueda,hayashi ----------------------------------- <Process Waiting Node> apply <Preprocessing Node Name> approve Example of Message Notification
  • 37.
    © 2023 NTTDATA INTRAMART CORPORATION 6. Service Linkage 36
  • 38.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Added LogicDesigner task for box linkage function 37 Added LogicDesigner tasks for the Box linkage shown below. Improvement Service Linkage Add/Update Collaboration Add and update folder privilege for users. Delete Collaboration Delete folder privilege of users. Acquire Embedded Widget Tag Acquire a Box embedded widget tag. Acquire File/Folder ID Acquire a file ID or a folder ID. In addition, we fixed bugs, and upgraded the Box Java SDK (3.7.1 to 4.0.0).
  • 39.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function Provided a REST API for IM-Common Master for General Users 38 REST API for IM-Common Master for General Users is now available. This REST API makes it easier to create a function using the IM-Common Master in the IM- BloomMaker screen. APIs for users, roles, organizations, and public groups are provided. Check the API documentation site for details on the REST API. API Documentation - IM-Common Master (for general users) https://api.intra-mart.jp/iap/im_master_general_rest/index.html Improvement IM-BloomMaker
  • 40.
    © 2023 NTTDATA INTRAMART CORPORATION 7. intra-mart Accel Documents 39
  • 41.
    © 2023 NTTDATA INTRAMART CORPORATION What can be done with this function The following requirements have been modified mainly to improve usability. • You can view the overall progress in the export/import progress chart. • The configuration that does not use the IMBox hides the IMBox, which is a choice of notification methods. • Deactivates “Delete” in the bulk operation menu when creator’s right is disabled. Accel Documents Update 40 Export/Import Progress Screen
  • 42.
    © 2023 NTTDATA INTRAMART CORPORATION 41 • This document only covers the main topics of updates. For more information, please visit requirement information disclosure website. https://issue.intra-mart.jp/ • Please refer to release notes of each product for system requirements and limitations. https://www.intra-mart.jp/document/library/ If you have any questions, please contact: NTT DATA INTRAMART CORPORATION Global Headquarters E-mail: gl@intra-mart.jp