10666 Pelican Preserve Blvd.
Apt 101
Fort Myers, FL, 33913
239-674-7160
aaitony@yahoo.com
Anthony A Iannacone
Objective Seeking to use my skills.
Experience 7/1999–1/2010 PECO Energy Philadelphia, PA
Senior Contract Specialist
 Manage all related activities and work teams across Exelon (technical,
legal, regulatory, financial, billing, collections) to insure a successful
interconnection project; Independent Power Producer (IPP)/ or new
transmission load/ line or municipality is connected to the system, with
minimal cost and risk to PECO Energy.
 Administer all strategies of Transmission business related to Real Estate
activities. Manage the Strategic Right of Way Plan, leases and renewals
for existing Rights of Way and manage all existing transmission properties
held for future use, including the acquisition and disposition of Real Estate
properties.
 Develop, maintain, and improve relationships through the negotiation,
management, ongoing administration, and mediation of all interconnection
contracts/agreements with the generators, transmission owners, RTOs,
distributed generators, and all other parties interconnected to our system.
3/1998–7/1999 Delmarva Power & Light Co. Wilmington, DE
Project Engineer in Interconnection Arrangements
 Have been in this position since March 1998. I was offered this job
during the staffing process of the Delmarva Power and Light Company
and the Atlantic Energy Company merger.
 Team leader for developing a DPL response to a Transco proposal by
PEPCO & PSE&G while continuing to follow industry developments in
establishing Independent Transmission Companies.
 Performed dynamic analysis using PSS/e version. 25 for the Motiva
MAAC filing. Coordinated and composed Motiva MAAC filing for
submittal to MAAC ACC.
 Attended Planning Committee meetings as requested by Manager
 Developed Interconnection Agreement for Motiva Enterprise, L.L.C.
6/1993– 3/1998 Atlantic Energy Pleasantville, NJ
Senior Engineer in System Planning
 Direct and manage all aspects of assigned research and analytical
studies as requested by management. Trained others in the department
as needed.
 Monitored new load growth/and provide technical assistance to field
engineers in the Atlantic City area.
 Performed a Five Year (1998-2003) Transmission Expansion Study for
the Atlantic City Area using PSS/e version 24.
 Performed Import Capability Studies as needed for Vineland Electric and
Atlantic Energy.
 Analyzed the impact on the AE Transmission System for the loss of B. L.
England Generating Station due to Nox Emission Regulations. Using
both PSS/e and the Promod IV transmission constraint module.
 Chairman of VEM interregional transmission working group from 7/1993
to 7/1994
 Chairman of PJM System Reliability Task Force from 5/1993 to 5/1994
 Chairman of AE NOx working group
6/1991– 6/1993 Atlantic Energy Pleasantville, NJ
Senior Engineer in Capacity Planning
 Performed the highest degrees of technical and organizational
competency in the study of capacity expansion plans.
 Utilizing PROMOD III and other software to perform analysis and to
develop reports to management.
 Performed production cost studies for the addition of various NUGs to
AE’s transmission system.
 Performed analysis as requested involving the PJM capacity allocation
and accounting procedures.
 Represented Atlantic Energy in PJM power pool planning activities.
6/1977 – 6/1991 Atlantic Energy Pleasantville, N
Senior Engineer in System Planning
 All of the same responsibilities as mentioned above.
 Chairman of the PJM Stability Working Group
 Member of Load and Capacity Working Group
 Member of System Reliability Task Force.
 Member of Capacity and Transmission Subcommittee
6/1975 – 6/1977 Florida Power & Light Company WPB, FL
Relay Specialist
 I was responsible for new construction, maintenance, and diagnosing
equipment problems in the West Palm Beach area.
6/1974 – 6/1975 Florida Power & Light Co Delray Beach, FL
Commercial Service Representative
 I was FPL’s contact to customers in a specific area. I initiated work
orders and material procurements.
8/1971 – 6/1974 Atlantic City Electric Co Atlantic City, NJ
Relay and Control Design Engineer
 After graduating from college, I began as a junior engineer in this
department. I developed my relay and control design knowledge while
working here.
Education 1966–1971 Rutgers University New Brunswick, NJ
 B.A., Liberal Arts.
 B.S. Electrical Engineering
I have used Microsoft Office products throughout my career. I still use
them at Home.
May, 2003 I completed a Project Management Course from Penn State
University, earning 11.2 CEU’s.

AAIProfessionalResume[1]

  • 1.
    10666 Pelican PreserveBlvd. Apt 101 Fort Myers, FL, 33913 239-674-7160 aaitony@yahoo.com Anthony A Iannacone Objective Seeking to use my skills. Experience 7/1999–1/2010 PECO Energy Philadelphia, PA Senior Contract Specialist  Manage all related activities and work teams across Exelon (technical, legal, regulatory, financial, billing, collections) to insure a successful interconnection project; Independent Power Producer (IPP)/ or new transmission load/ line or municipality is connected to the system, with minimal cost and risk to PECO Energy.  Administer all strategies of Transmission business related to Real Estate activities. Manage the Strategic Right of Way Plan, leases and renewals for existing Rights of Way and manage all existing transmission properties held for future use, including the acquisition and disposition of Real Estate properties.  Develop, maintain, and improve relationships through the negotiation, management, ongoing administration, and mediation of all interconnection contracts/agreements with the generators, transmission owners, RTOs, distributed generators, and all other parties interconnected to our system. 3/1998–7/1999 Delmarva Power & Light Co. Wilmington, DE Project Engineer in Interconnection Arrangements  Have been in this position since March 1998. I was offered this job during the staffing process of the Delmarva Power and Light Company and the Atlantic Energy Company merger.  Team leader for developing a DPL response to a Transco proposal by PEPCO & PSE&G while continuing to follow industry developments in establishing Independent Transmission Companies.  Performed dynamic analysis using PSS/e version. 25 for the Motiva MAAC filing. Coordinated and composed Motiva MAAC filing for submittal to MAAC ACC.  Attended Planning Committee meetings as requested by Manager  Developed Interconnection Agreement for Motiva Enterprise, L.L.C. 6/1993– 3/1998 Atlantic Energy Pleasantville, NJ Senior Engineer in System Planning  Direct and manage all aspects of assigned research and analytical studies as requested by management. Trained others in the department as needed.  Monitored new load growth/and provide technical assistance to field engineers in the Atlantic City area.
  • 2.
     Performed aFive Year (1998-2003) Transmission Expansion Study for the Atlantic City Area using PSS/e version 24.  Performed Import Capability Studies as needed for Vineland Electric and Atlantic Energy.  Analyzed the impact on the AE Transmission System for the loss of B. L. England Generating Station due to Nox Emission Regulations. Using both PSS/e and the Promod IV transmission constraint module.  Chairman of VEM interregional transmission working group from 7/1993 to 7/1994  Chairman of PJM System Reliability Task Force from 5/1993 to 5/1994  Chairman of AE NOx working group 6/1991– 6/1993 Atlantic Energy Pleasantville, NJ Senior Engineer in Capacity Planning  Performed the highest degrees of technical and organizational competency in the study of capacity expansion plans.  Utilizing PROMOD III and other software to perform analysis and to develop reports to management.  Performed production cost studies for the addition of various NUGs to AE’s transmission system.  Performed analysis as requested involving the PJM capacity allocation and accounting procedures.  Represented Atlantic Energy in PJM power pool planning activities. 6/1977 – 6/1991 Atlantic Energy Pleasantville, N Senior Engineer in System Planning  All of the same responsibilities as mentioned above.  Chairman of the PJM Stability Working Group  Member of Load and Capacity Working Group  Member of System Reliability Task Force.  Member of Capacity and Transmission Subcommittee 6/1975 – 6/1977 Florida Power & Light Company WPB, FL Relay Specialist  I was responsible for new construction, maintenance, and diagnosing equipment problems in the West Palm Beach area. 6/1974 – 6/1975 Florida Power & Light Co Delray Beach, FL Commercial Service Representative  I was FPL’s contact to customers in a specific area. I initiated work orders and material procurements. 8/1971 – 6/1974 Atlantic City Electric Co Atlantic City, NJ Relay and Control Design Engineer  After graduating from college, I began as a junior engineer in this department. I developed my relay and control design knowledge while
  • 3.
    working here. Education 1966–1971Rutgers University New Brunswick, NJ  B.A., Liberal Arts.  B.S. Electrical Engineering I have used Microsoft Office products throughout my career. I still use them at Home. May, 2003 I completed a Project Management Course from Penn State University, earning 11.2 CEU’s.