A Novel Installation Method
for Deepwater Conductors
1Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
TLWP, Offshore Brasil
• Field layout and target spec
• Jetted conductors – review
• Driven conductors – review 
• Installation methodology
• Obstacles and solutions
• As installed condition
• Conclusions
Overview
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
2
24 m
36 m
9% Grade
Field layout & target spec
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
3
15 @ 60 m x 914mm x 38mm WT – 60T
5 Templates
±10cm
1 deg
Horizontal
Inclination 
Tolerance
Stick‐up 
Tolerance
1182m 
Water Depth
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
4
Jetted conductors ‐ review
+ Very mature method
+ Very long conductors address capacity 
uncertainty
– Reduced soil cohesion
– Reconsolidation time varies
– Susceptible to shallow flow (Ursa)
– Long rig‐time hold – costly
– Settles if hold period is too short
– Imprecise AS‐BUILT well coordinates
ADVANTAGES / CHALLENGESADVANTAGES / CHALLENGES
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
5
Driven conductors ‐ review
+ Mature driving technology (pre‐1900)
+ Batch‐set cost benefits
+ Affordable installation vessels
+ Precise control of final position
+ Short installation time
+ Use shorter conductor for same soils
– Experienced installers are few
– Specialized equipment (Hammer, STS, 
shuttle system)
ADVANTAGES / CHALLENGESADVANTAGES / CHALLENGES
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
6
Installation methodology
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
7
Installation methodology
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
8
Project resources
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
9
Equipment onboard
TP‐1
TP‐2
TP‐3
TP‐4
TP‐5
TP‐6
TP‐7
Working 
Zone
Acoustic Positioning SystemAcoustic Positioning System
Deepwater Subsea HammerDeepwater Subsea Hammer
• MENCK 270kJ
• Up to 3000m WD
• LBL Array
• 7 Compatts
Shuttle SystemShuttle System
STS HeadSTS Head
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
10
Installation procedure
Tripod with Compattx7
LogisticsInstallation
1.  Deploy LBL array1.  Deploy LBL array 2.  Deploy 5 templates2.  Deploy 5 templates
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
11
Installation procedure
3.  Deploy Conductor3.  Deploy Conductor
4.  Self‐weight penetration4.  Self‐weight penetration
Verticality Check
Guide Cone
5. ROV Suction Penetration5. ROV Suction Penetration
Suction at STS Head
Pressure gauge
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
12
Installation procedure
Detached STS Head
Open guide cones
6.  STS & template recovery6.  STS & template recovery
Driving complete
Land hammer
7.  Batch hammering7.  Batch hammering
Spider Tool and Compatt
8.  Final as‐laid survey8.  Final as‐laid survey
Self‐weight
• Avg: 14.4m (~26%)
• Min: 13.0m
• Max: 15.4m
Suction
• Avg: 16.3m (~29%)
• Add: +2.0m (~3.6%)
• Min: +1.5m
• Max: +2.8m
As‐installed condition
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
13
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
14
• Any subsea installation
• Immediate capacities known
• Meet strict location spec
• Precise stick‐up control
Conclusions
• Time savings
• Work begins immediately
• Off Rig critical path
• Less soil disturbance
Tuesday, April 8th
, 2014
17:00‐17:20
Marine Construction & Engineering Deepwater Developments
Madrid, Spain
15
Novel Installation Method for Deepwater Conductors
Presenting Author:
Jonathon Miller
(jonathon.miller@intermoor.com)
Co‐Authors:
Michael O’Driscoll
João Ruiz
Ariel de Silvio
www.intermoor.com
Angola     Brazil     Egypt     Malaysia     Mexico     Nigeria  Norway    Singapore     United Kingdom   United States

More Related Content

Similar to A novel installation method for deepwater well conductors 2014-04-08-10 madrid - rev 8

Kongsberg Maritime AUVs
Kongsberg Maritime AUVs Kongsberg Maritime AUVs
Kongsberg Maritime AUVs
Hydrographic Society Benelux
 
CV_mki2015Nov
CV_mki2015NovCV_mki2015Nov
CV_mki2015Nov
Mikael Kirkegaard
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Global CCS Institute
 
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Javier Cantera
 
Alternative vertical tunneling techniques
Alternative vertical tunneling techniquesAlternative vertical tunneling techniques
Alternative vertical tunneling techniques
Erhan Uludag
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
patrickhudd
 
Construction and survey accuracies for the execution of rockworks
Construction and survey accuracies for the execution of rockworksConstruction and survey accuracies for the execution of rockworks
Construction and survey accuracies for the execution of rockworks
Hydrographic Society Benelux
 
VERD Q.I. Renewable Energy Expert
VERD Q.I. Renewable Energy ExpertVERD Q.I. Renewable Energy Expert
VERD Q.I. Renewable Energy Expert
Sabine Christiaens
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
DEGIMA SA
 
Swwe300615 presentation
Swwe300615 presentationSwwe300615 presentation
Swwe300615 presentation
Association for Project Management
 
Imran qaiser cv
Imran qaiser cvImran qaiser cv
Imran qaiser cv
Imran Qaiser
 
Day 2 - Session 5: Global Hotspots (part 2)
Day 2 - Session 5: Global Hotspots (part 2)Day 2 - Session 5: Global Hotspots (part 2)
Day 2 - Session 5: Global Hotspots (part 2)
Objective Capital Conferences
 
Statoil at OTC 2014 - The Power of Possible
Statoil at OTC 2014 - The Power of PossibleStatoil at OTC 2014 - The Power of Possible
Statoil at OTC 2014 - The Power of Possible
Statoil
 
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance DredgingVedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam design & Techincal Consultancy Pvt Ltd.
 
GREEN TECHNOLOGY SOLUTIONS FOR DEEP SEA MINING LOGISTICS
GREEN TECHNOLOGY SOLUTIONS FOR DEEP SEA MINING LOGISTICSGREEN TECHNOLOGY SOLUTIONS FOR DEEP SEA MINING LOGISTICS
GREEN TECHNOLOGY SOLUTIONS FOR DEEP SEA MINING LOGISTICS
iQHub
 
Lanes Group Plc
Lanes Group PlcLanes Group Plc
What is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaWhat is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in Australia
Midas Engineering Group
 
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offs
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offsDeswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offs
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offs
Deswik
 
Typical challenges in tunnelling
Typical challenges in tunnellingTypical challenges in tunnelling
Typical challenges in tunnelling
Antti Nykänen
 
Ng pres antwerpen 08122010
Ng pres antwerpen 08122010Ng pres antwerpen 08122010
Ng pres antwerpen 08122010
Hydrographic Society Benelux
 

Similar to A novel installation method for deepwater well conductors 2014-04-08-10 madrid - rev 8 (20)

Kongsberg Maritime AUVs
Kongsberg Maritime AUVs Kongsberg Maritime AUVs
Kongsberg Maritime AUVs
 
CV_mki2015Nov
CV_mki2015NovCV_mki2015Nov
CV_mki2015Nov
 
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of AlbertaMonitoring measuring and verification, Gonzalo Zambrano, University of Alberta
Monitoring measuring and verification, Gonzalo Zambrano, University of Alberta
 
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
Check out the latest projects of the Maritime, Naval, Offshore & Marine Energ...
 
Alternative vertical tunneling techniques
Alternative vertical tunneling techniquesAlternative vertical tunneling techniques
Alternative vertical tunneling techniques
 
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
Patrick Hudd Me Mo October 2010 Raise Boring Presentation Rev 1
 
Construction and survey accuracies for the execution of rockworks
Construction and survey accuracies for the execution of rockworksConstruction and survey accuracies for the execution of rockworks
Construction and survey accuracies for the execution of rockworks
 
VERD Q.I. Renewable Energy Expert
VERD Q.I. Renewable Energy ExpertVERD Q.I. Renewable Energy Expert
VERD Q.I. Renewable Energy Expert
 
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
MARITIME, NAVAL, OFFSHORE & MARINE ENERGY WELDING SPECIALISTS. DEGIMA Naval &...
 
Swwe300615 presentation
Swwe300615 presentationSwwe300615 presentation
Swwe300615 presentation
 
Imran qaiser cv
Imran qaiser cvImran qaiser cv
Imran qaiser cv
 
Day 2 - Session 5: Global Hotspots (part 2)
Day 2 - Session 5: Global Hotspots (part 2)Day 2 - Session 5: Global Hotspots (part 2)
Day 2 - Session 5: Global Hotspots (part 2)
 
Statoil at OTC 2014 - The Power of Possible
Statoil at OTC 2014 - The Power of PossibleStatoil at OTC 2014 - The Power of Possible
Statoil at OTC 2014 - The Power of Possible
 
Vedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance DredgingVedam Designs: Solutions for Shallow Water maintenance Dredging
Vedam Designs: Solutions for Shallow Water maintenance Dredging
 
GREEN TECHNOLOGY SOLUTIONS FOR DEEP SEA MINING LOGISTICS
GREEN TECHNOLOGY SOLUTIONS FOR DEEP SEA MINING LOGISTICSGREEN TECHNOLOGY SOLUTIONS FOR DEEP SEA MINING LOGISTICS
GREEN TECHNOLOGY SOLUTIONS FOR DEEP SEA MINING LOGISTICS
 
Lanes Group Plc
Lanes Group PlcLanes Group Plc
Lanes Group Plc
 
What is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in AustraliaWhat is the Future for Magnetite Projects in Australia
What is the Future for Magnetite Projects in Australia
 
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offs
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offsDeswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offs
Deswik-IPCC2013 Presentation-Scenario based analysis of IPCC trade-offs
 
Typical challenges in tunnelling
Typical challenges in tunnellingTypical challenges in tunnelling
Typical challenges in tunnelling
 
Ng pres antwerpen 08122010
Ng pres antwerpen 08122010Ng pres antwerpen 08122010
Ng pres antwerpen 08122010
 

Recently uploaded

Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
Divyanshu
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Massimo Talia
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
MadhavJungKarki
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
DharmaBanothu
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
snaprevwdev
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
AlvianRamadhani5
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
Kamal Acharya
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
aryanpankaj78
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
Dwarkadas J Sanghvi College of Engineering
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
Shiny Christobel
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
nedcocy
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
harshapolam10
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 

Recently uploaded (20)

Null Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAMNull Bangalore | Pentesters Approach to AWS IAM
Null Bangalore | Pentesters Approach to AWS IAM
 
Levelised Cost of Hydrogen (LCOH) Calculator Manual
Levelised Cost of Hydrogen  (LCOH) Calculator ManualLevelised Cost of Hydrogen  (LCOH) Calculator Manual
Levelised Cost of Hydrogen (LCOH) Calculator Manual
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
1FIDIC-CONSTRUCTION-CONTRACT-2ND-ED-2017-RED-BOOK.pdf
 
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
A high-Speed Communication System is based on the Design of a Bi-NoC Router, ...
 
openshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoinopenshift technical overview - Flow of openshift containerisatoin
openshift technical overview - Flow of openshift containerisatoin
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf5G Radio Network Througput Problem Analysis HCIA.pdf
5G Radio Network Througput Problem Analysis HCIA.pdf
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
Supermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdfSupermarket Management System Project Report.pdf
Supermarket Management System Project Report.pdf
 
Digital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptxDigital Twins Computer Networking Paper Presentation.pptx
Digital Twins Computer Networking Paper Presentation.pptx
 
Introduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.pptIntroduction to Computer Networks & OSI MODEL.ppt
Introduction to Computer Networks & OSI MODEL.ppt
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
Zener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and ApplicationsZener Diode and its V-I Characteristics and Applications
Zener Diode and its V-I Characteristics and Applications
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
一比一原版(爱大毕业证书)爱荷华大学毕业证如何办理
 
SCALING OF MOS CIRCUITS m .pptx
SCALING OF MOS CIRCUITS m                 .pptxSCALING OF MOS CIRCUITS m                 .pptx
SCALING OF MOS CIRCUITS m .pptx
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 

A novel installation method for deepwater well conductors 2014-04-08-10 madrid - rev 8