A Complete Model of a
Business Enterprise in an
EtO and PLM Environment
A Systems Approach
© 2019 Frank Steeneken - All Rights Reserved
Introduction
This slide deck provides a picture of the underlying skeletal structure that holds a
business enterprise in an engineer-to-order (EtO) and product lifecycle management
(PLM) environment together while achieving its goals.
The Model portrays a business enterprise as a functional system for doing business,
with processes that are clearly focused on a specific goal. Through the processes, the
system fulfills its contribution in the environment.
The Model could provide a powerful baseline for improving business performance.
The method used to develop this model is an adaptation of an earlier technique called
Integrated Modeling Method*.
2© 2019 Frank Steeneken - All Rights Reserved
*www.ackley.com
Purpose and Function
The purpose of the Model is to clearly portray how work performed in Product
Development and Operations of a business enterprise in an EtO and PLM
environment, is structured, apart from the way it is managed and controlled. To
provide this clarity, feedback loops and control systems are not shown on the
diagrams.
The Model can be applied to help realign a company’s organizational structure and
business processes, with its inherent functional structure.
3© 2019 Frank Steeneken - All Rights Reserved
What is a Business Enterprise?
4
A company doing business in a marketplace environment that includes
relationships with both customers and suppliers. A business enterprise* buys
resources (“raw materials”) from suppliers in the supplier market, adds value by
transforming the resources into products, and sells the products to customers in
the customer market. The internal architecture of the business enterprise is
shaped by the nature of the marketplace environment, including the
expectations of potential customers and suppliers, economic, technological and
other conditions.
* Integrated Modeling Method: http://ackley.com/z_integrated_modeling/6_framesets/frameset_tg_glossary.html
Business
Enterprise
5
What is Engineer to Order?What is Engineer to Order?What is Engineer to Order?
Engineer-to-order* manufacturing environments are typically characterized by
high levels of product and process variation, high product complexity and deep product
structures, and low production volumes.
Each new order involves product design and development based upon customer
specifications.
Moreover, design, delivery speed and flexibility are typical order winners and the
customer order decoupling point is typically positioned at the very start of production.
*Olhager J., Strategic positioning of the order penetration point. International Journal of Production Economics, 2003.
What is a Product Life Cycle (PLC)?
All products have been thought up, created and possess a fixed life span in a business
enterprise. The lifetime of all these products may be represented in terms of a model:
the Integral Life Cycle Model for technical systems (products)*.
6
Defining Designing Constructing Producing Supporting Terminating
Phase Work performed
Defining: Exploration of the customer needs and elaboration of the requirements for the
product, production, supply and market related structures and tools, working
methods, contracts and agreements.
Designing: Design of the product, production, supply and market related structures and tools,
working methods, contracts and agreements in accordance with their requirements.
Constructing: Construction and establishment of product, production, supply and market related
structures and tools, working methods, contracts and agreements in accordance with
their design.
Producing: Manufacturing of the product and delivery to the customer.
Supporting: Support and maintenance of the product.
Terminating: Recycling of the product to generate new resources (“raw materials”) or return
(waste) resources back to the supplier(market).
*Fundamentals of Business Engineering and Management - A Systems Approach to People and Organizations, ten Haaf, Bikker and Adriaanse.
What is Product Lifecycle Management (PLM)?
Product Life Cycle Management* is the business activity of managing, in the most
effective way, a company’s products all the way across their lifecycles; from the
very first idea for a product all the way through until it is retired and disposed off.
PLM is the management system for a company’s products. It doesn’t just
manages just one of its products. It manages, in an integrated way, all of its parts
and products, and the product portfolio.
• Product Life Cycle Management (Volume 1) – 21st Century Paradigm for Product Realisation (Third Edition) ) by John Stark.
7
8
Scope of the Model
Due to an EtO situation, the development level will be initiated after a customer sales order has
been received and processed at programming level. Resource purchasing and product
manufacturing are tied to each individual sales order. No resource or product action takes place
until the sales order is received. It is assumed that where a business enterprise delivers
engineer-to-order it commits innovation within a sales order.
Appendix 4.I Main Function Model, Fundamentals of Business Engineering and Management - A Systems Approach to People and Organizations, ten Haaf, Bikker, Adriaanse
The Main Function Model* distinguishes between six main functions which should be present in
every efficiently operating business enterprise. The scope of the Model that is further elaborated
in this presentation covers the development and operations level (per type of product).
9
Focus of the Model
A business enterprise in an EtO and PLM environment is complex structure, involving many
component entities:
• Customers;
• Various transportation systems;
• Product manufacture facilities;
• Resource repository facilities;
• Suppliers.
A business enterprise in an EtO and PLM environment exists in a competitive environment
where it acts as an intermediary with added value between individual customers who need
unique and often complex products, and suppliers who produce the resources ("raw materials")
that are processed in these products.
In carrying out its function, the business enterprise often develops these products in
collaboration with their customers before producing them in their manufacturing facilities. To
this end the enterprise acquires, receives, assembles and allocates a wide range of resources
from individual suppliers in resource repository facilities.
The model focuses on the work to perform the function of the company. Although it refers to
the business entities involved, the model does not include the life cycle development of the
physical housing constructions, employees, means of transport or the equipment they use.
© 2019 Frank Steeneken - All Rights Reserved
10
How is the Model Structured?
Resource
Repository
Facilities
Product
Manufacture
Facilities
Customers
Suppliers
As a system, the sequence of work performed in purchasing resources from suppliers, and manufacturing a
unique product for a customer involves certain discrete business entities (layers). Each of these entities
provides a critical link in the business enterprise supply chain. This sequence of business entities provides an
initial breakdown to define the structure of subsystem layers.
Transporters
Transporters
Product manufacture facilities
manufacture products from
resources and transfer them to
customers who ordered them.
Resource repository facilities
interact with remote suppliers to
acquire, receive, assemble and
distribute resource components ,
used for processing into products.
BusinessEntities
SubsystemLayers
Transporters deliver quantities of
resources to resource repository
facilities.
Suppliers produce and release
resources.
Transporters deliver products to
remote customers.
Customers ustalize products to
fulfil their goal.
© 2019 Frank Steeneken - All Rights Reserved
time
To complete the overall structure, the structure of subsystem layers is overlaid with a sequence of
six core processes which represent the lifecycle of the business enterprise product.
Completion of the Overall Structure
Resource
Repository
Facilities
Product
Manufacture
Facilities
Customers
Supplier(s)
Transporters
Transporters
DefiningCoreProcess
DesigningCoreProcess
SupportigCoreProcess
TerminatingCoreProcess
ConstructingCoreProcess
ProducingCoreProcess
Core Process
Sequence Flow
11© 2019 Frank Steeneken - All Rights Reserved
Developing Detailed Subsystem Structure
12
A more detailed subsystem structure is required as a basis for defining the core
process structures.
The first task to develop the detailed subsystem structure is to translate the
activities/tasks into a sequence of basic functional steps that acquires the
resources and produces the product. These steps describe the essential supply
chain of the business enterprise.
The next task is to interpret the basic functional steps as subsystems which
portray the supply chain in terms of business structural requirements.
© 2019 Frank Steeneken - All Rights Reserved
Translate Activities/Tasks into a Sequence of Basic
Functional Steps
Activities/Tasks Basic Functional Steps
Customer uitilizes the product. UTILIZE product
Transporters deliver products to Customers. DELIVER product
Product Manufacture Facilities transfer products to Customers. TRANSFER product
Product Manufacture Facilities manufacture products. MANUFACTURE product
Product Manufacture Facilities organize resources for products to be
manufactured.
ORGANIZE resources
Resource Repository Facilities distribute resources to the Product
Manufacture Facilities.
DISTRIBUTE resources
Resource Repository Facilities assemble resources for the products to be
manufactured.
ASSEMBLE resources
Resource Repository Facilities receive ordered resources. RECEIVE resources
Transporters delivers quantities of resources to the Resource Repository
Facility.
DELIVER resources
Suppliers release the ordered resources for transport to the Resource
Repository Facilities.
RELEASE resources
Suppliers produce the resources ordered by the Resource Repository
Facilities.
PRODUCE resources
SupplyChain
© 2019 Frank Steeneken - All Rights Reserved 13
Interpret the Basic Functional Steps as Subsystems
14© 2019 Frank Steeneken - All Rights Reserved
Basic Functional Step Detailled Subsystem Layer
Customer
UTILIZE product Customer Product UtIization Subsystem
DELIVER product (optional) Product Manufacture Facility-to-Customer Transport Subsystem
TRANSFER product Product Manufacture Facility Transfer Subsystem
MANUFACTURE product Product Manufacture Facility Product Subsystem
ORGANIZE resources Product Manufacture Facility Resource Organization Subsystem
DISTRIBUTE resources Resource Repository Facility Distribution Subsystem
ASSEMBLE resources Resource Repository Facility Collection Subsystem
RECEIVE resources Resource Repository Facility Reception Subsystem
DELIVER resources Supplier-to-Resource Repository Facility Transport Subsystem
RELEASE resources Supplier Resource Release Subsystem
PRODUCE resources Supplier Resource Production Subsystem
Supplier
SupplyChain
Framework
The detailed subsystem structure provides the foundation needed to identify details of the core
processes and how they are to be performed.
When the detailed subsystems and core processes are combined, they produce a grid like
framework. Within this framework, each subsystem/core process intersection is interpreted as a
business function to be managed and performed. In terms of work to be performed, the resulting
array of subsystem/core process intersections displays the entire set of business functions of the
business enterprise.
A business function is an ongoing functional capability of the business that is sustained over time.
A business function applies resources to accomplish a particular kind of work in response to
incoming work requests. From an Object-Oriented perspective, a business function can be
thought of as an "object" that responds to incoming messages.
© 2019 Frank Steeneken - All Rights Reserved
Business
Function
Subsystem
Core
Process
15
A business function applies resources to
accomplish a particular kind of work in
response to incoming work requests and
needs to be managed.
16
time
Defining
Core Process
Designing
Core Process
Constructing
Core Process
Producing
Core Process
Supporting
Core Process
Terminating
Core Process
Customer Individual Customer
Customer
Product Utilization
Subsystem
Customer
Product Utilization
Definition
Customer
Product Utilization
Design
Customer
Product Utilization
Construction
Customer
Product Utilization
Production
Customer
Product Utilization
Support
Customer
Product Utilization
Termination
Product Manufacture
Facility-to-Customer
Transport
Subsystem
Product Manufacture
Facility-to-Customer
Transport
Definition
Product Manufacture
Facility-to-Customer
Transport
Design
Product Manufacture
Facility-to-Customer
Transport
Construction
Product Manufacture
Facility-to-Customer
Transport
Production
Product Manufacture
Facility-to-Customer
Transport
Support
Product Manufacture
Facility-to-Customer
Transport
Termination
Product Manufacture
Facility Transfer
Subsystem
Product Manufacture
Facility Transfer
Definition
Product Manufacture
Facility Transfer
Design
Product Manufacture
Facility Transfer
Construction
Product Manufacture
Facility Transfer
Production
Product Manufacture
Facility Transfer
Support
Product Manufacture
Facility Transfer
Termination
Product Manufacture
Facility Product
Subsystem
Product Manufacture
Facility Product
Definition
Product Manufacture
Facility Product
Design
Product Manufacture
Facility Product
Construction
Product Manufacture
Facility Product
Production
Product Manufacture
Product Facility
Support
Product Manufacture
Facility Product
Termination
Product Manufacture
Facility Resource
Organization
Subsystem
Product Manufacture
Facility Resource
Organization
Definition
Product Manufacture
Facility Resource
Organization
Design
Product Manufacture
Facility Resource
Organization
Construction
Product Manufacture
Facility Resource
Organization
Production
Product Manufacture
Facility Resource
Organization
Support
Product Manufacture
Facility Resource
Organization
Termination
Resource Repository
Facility Distribution
Subsystem
Resource Repository
Facility Distribution
Definition
Resource Repository
Facility Distribution
Design
Resource Repository
Facility Distribution
Construction
Resource Repository
Facility Distribution
Production
Resource Repository
Facility Distribution
Support
Resource Repository
Facility Distribution
Termination
Resource Repository
Facility Collection
Subsystem
Resource Repository
Facility Collection
Definition
Resource Repository
Facility Collection
Design
Resource Repository
Facility Collection
Construction
Resource Repository
Facility Collection
Production
Resource Repository
Facility Collection
Support
Resource Repository
Facility Collection
Termination
Resource Repository
Facility Reception
Subsystem
Resource Repository
Facility Reception
Definition
Resource Repository
Facility Reception
Design
Resource Repository
Facility Reception
Construction
Resource Repository
Facility Reception
Production
Resource Repository
Facility Reception
Support
Resource Repository
Facility Reception
Termination
Supplier-to-Resource
Repository
FacilityTransport
Subsystem
Supplier-to-Resource
Repository Facility
Transport
Definition
Supplier-to-Resource
Repository Facility
Transport
Design
Supplier-to-Resource
Repository Facility
Transport
Construction
Supplier-to-Resource
Repository Facility
Transport
Production
Supplier-to-Resource
Repository Facility
Transport
Support
Supplier-to-Resource
Repository Facility
Transport
Termination
Supplier Resource
Release
Subsystem
Supplier Resource
Release
Definition
Supplier Resource
Release
Design
Supplier Resource
Release
Construction
Supplier Resource
Release
Production
Supplier Resource
Release
Support
Supplier Resource
Release
Termination
Supplier Resource
Production
Subsystem
Supplier Resource
Production
Definition
Supplier Resource
Production
Design
Supplier Resource
Production
Construction
Supplier Resource
Production
Production
Supplier Resource
Production
Support
Supplier Resource
Production
Termination
Supplier Supplier Market Individual Supplier
Defining
Core Process
Designing
Core Process
Constructing
Core Process
Producing
Core Process
Supporting
Core Process
Terminating
Core Process
Core Process Functional Subsystem Business Function Core Process Sequence Flow Subsystem Life Cycle State Transition Direction
Customer
Product
Utilization
Definition
© 2019 Frank Steeneken - All Rights Reserved
17
Defining Core Process: work to be performed
Defining
Core Process
Customer Individual Customer
Customer
Product Utilization
Subsystem
Customer
Product Utilization
Definition
Product Manufacture
Facility-to-Customer
Transport
Subsystem
Product Manufacture
Facility-to-Customer
Transport
Definition
Product Manufacture
Facility Transfer
Subsystem
Product Manufacture
Facility Transfer
Definition
Product Manufacture
Facility Product
Subsystem
Product Manufacture
Facility Product
Definition
Product Manufacture
Facility Resource
Organization
Subsystem
Product Manufacture
Facility Resource
Organization
Definition
Resource Repository
Facility Distribution
Subsystem
Resource Repository
Facility Distribution
Definition
Resource Repository
Facility Collection
Subsystem
Resource Repository
Facility Collection
Definition
Resource Repository
Facility Reception
Subsystem
Resource Repository
Facility Reception
Definition
Supplier-to-Resource
Repository
FacilityTransport
Subsystem
Supplier-to-Resource
Repository Facility
Transport
Definition
Supplier Resource
Release
Subsystem
Supplier Resource
Release
Definition
Supplier Resource
Production
Subsystem
Supplier Resource
Production
Definition
Supplier Supplier Market
Defining
Core Process
© 2019 Frank Steeneken - All Rights Reserved
Requirements for resource transport capacity, route and
schedules for shipment from suppliers to resource
repository facility elaboirated.
Requirements for supplier to resource repository facility
resource release schedules elaborated.
Requirements for supplier to resource repository
facility resource production contracts elaborated.
Requirements for product transport capacity, route
and schedule for shipment from product manufacture
facility to customer elaborated.
Product requirements and requirements for production
related structures, tools, working methods and
production schedule elaborated.
Customer needs explored and requirements for
product utilization related structures, tools, working
methods and schedule elaborated.
Requirements for product transfer procedure to
customer and schedule elaborated.
Requirements for resource reception related structures, tools,
working methods and schedule elaborated.
Requirements for resource reception and
resource preparation related structures, tools,
working methods and schedule elaborated.
Requirements for resource distribution related structures,
tools, working methods and schedule elaborated.
Requirements for resource collection related
structures, tools, working methods and schedule
elaborated.
18
Designing Core Process: work to be performed
Defining
Core Process
Designing
Core Process
Customer Individual Customer
Customer
Product Utilization
Subsystem
Customer
Product Utilization
Definition
Customer
Product Utilization
Design
Product Manufacture
Facilty-to-Customer
Transport
Subsystem
Product Manufacture
Facility-to-Customer
Transport
Definition
Product Manufacture
Facility-to-Customer
Transport
Design
Product Manufacture
Facility Transfer
Subsystem
Product Manufacture
Facility Transfer
Definition
Product Manufacture
Facility Transfer
Design
Product Manufacture
Facility
Subsystem
Product Manufacture
Facility Product
Definition
Product Manufacture
Facility Product
Design
Product Manufacture
Facility Resource
Organization
Subsystem
Product Manufacture
Facility Resource
Organization
Definition
Product Manufacture
Facility Resource
Organization
Design
Resource Repository
Facility Distribution
Subsystem
Resource Repository
Facility Distribution
Definition
Resource Repository
Facility Distribution
Design
Resource Repository
Facility Collection
Subsystem
Resource Repository
Facility Collection
Definition
Resource Repository
Facility Collection
Design
Resource Repository
Facility Reception
Subsystem
Resource Repository
Facility Reception
Definition
Resource Repository
Facility Reception
Design
Supplier-to-Resource
Repository
FacilityTransport
Subsystem
Supplier-to-Resource
Repository Facility
Transport
Definition
Supplier-to-Resource
Repository Facility
Transport
Design
Supplier Resource
Release
Subsystem
Supplier Resource
Release
Definition
Supplier Resource
Release
Design
Supplier Resource
Production
Subsystem
Supplier Resource
Production
Definition
Supplier Resource
Production
Design
Supplier Supplier Market
Defining
Core Process
Designing
Core Process
© 2019 Frank Steeneken - All Rights Reserved
Resource transport capacity, route and schedules
for shipment from suppliers to resource repository
facility designed.
Supplier to resource repository facility
resource release schedules designed.
Supplier to resource repository facility
resource production contracts designed.
Product transport capacity, transport route
and schedule for shipment from product
manufacture facility to customer designed.
Product, production related structures,
tools, working methods and production
schedule designed.
Product utilization related structures,
tools, working methods and schedule
designed.
Product demonstration and product
transfer to customer procedure and
schedule designed.
Resource reception related structures,
tools, working methods and schedule
designed.
Resource reception and resource
preparation related structures, tools,
working methods and schedule designed.
Resource distribution related
structures, tools, working methods
and schedule designed.
Resource collection related structures,
tools, working methods and schedule
designed.
19
Constructing Core Process: work to be performed
Defining
Core Process
Designing
Core Process
Constructing
Core Process
Customer Individual Customer
Customer
Product Utilization
Subsystem
Customer
Product Utilization
Definition
Customer
Product Utilization
Design
Customer
Product Utilization
Construction
Product Manufacture
Facility-to-Customer
Transport
Subsystem
Product Manufacture
Facility-to-Customer
Transport
Definition
Product Manufacture
Facility-to-Customer
Transport
Design
Product Manufacture
Facility-to-Customer
Transport
Construction
Product Manufacture
Facility Transfer
Subsystem
Product Manufacture
Facility Transfer
Definition
Product Manufacture
Facility Transfer
Design
Product Manufacture
Transfer
Construction
Product Manufacture
Facility
Subsystem
Product Manufacture
Facility Product
Definition
Product Manufacture
Facility Product
Design
Product Manufacture
Facility Product
Construction
Product Manufacture
Facility Resource
Organization
Subsystem
Product Manufacture
Facility Resource
Organization
Definition
Product Manufacture
Facility Resource
Organization
Design
Product Manufacture
Facility Resource
Organization
Construction
Resource Repository
Facility Distribution
Subsystem
Resource Repository
Facility Distribution
Definition
Resource Repository
Facility Distribution
Design
Resource Repository
Facility Distribution
Construction
Resource Repository
Facility Collection
Subsystem
Resource Repository
Facility Collection
Definition
Resource Repository
Facility Collection
Design
Resource Repository
Facility Collection
Construction
Resource Repository
Facility Reception
Subsystem
Resource Repository
Facility Reception
Definition
Resource Repository
Facility Reception
Design
Resource Repository
Facility Reception
Construction
Supplier-to-Resource
Repository
FacilityTransport
Subsystem
Supplier-to-Resource
Repository Facility
Transport
Definition
Supplier-to-Resource
Repository Facility
Transport
Design
Supplier-to-Resource
Repository Facility
Transport
Construction
Supplier Resource
Release
Subsystem
Supplier Resource
Release
Definition
Supplier Resource
Release
Design
Supplier Resource
Release
Construction
Supplier Resource
Production
Subsystem
Supplier Resource
Production
Definition
Supplier Resource
Production
Design
Supplier Resource
Production
Construction
Supplier Supplier Market
Defining
Core Process
Designing
Core Process
Constructing
Core Process
© 2019 Frank Steeneken - All Rights Reserved
Resource transport capacity, route and schedules
for shipment from suppliers to resource
repository facility constructed and established.
Supplier to resource repository facility
resource release schedules constructed
and established.
Supplier to resource repository facility
resource production contracts constructed
and established.
Product transport capacity, transport route and
schedule for shipment from product manufacture
facility to customer constructed and established.
Product and production related structures,
tools, working methods and production
schedule constructed and established.
Product utilization related structures,
tools, working methods and schedule
constructed and established.
Product demonstration and product
transfer to customer procedure and
schedule constructed and designed.
Resource reception related structures,
tools, working methods and schedule
constructed and established.
Resource reception and resource preparation
related structures, tools, working methods
and schedule constructed and established.
Resource distribution related structures,
tools, working methods and schedule
constructede and established.
Resource collection related structures,
tools, working methods and schedule
constructed and established.
Producing Core Process: work to be performed
Defining
Core Process
Designing
Core Process
Constructing
Core Process
Producing
Core Process
Customer Individual Customer
Customer
Product Utilization
Subsystem
Customer
Product Utilization
Definition
Customer
Product Utilization
Design
Customer
Product Utilization
Construction
Customer
Product Utilization
Production
Product Manufacture
Facility-to-Customer
Transport
Subsystem
Product Manufacture
Facility-to-Customer
Transport
Definition
Product Manufacture
Facility-to-Customer
Transport
Design
Product Manufacture
Facility-to-Customer
Transport
Construction
Product Manufacture
Facility-to-Customer
Transport
Production
Product Manufacture
Facility Transfer
Subsystem
Product Manufacture
Facility Transfer
Definition
Product Manufacture
Facility Transfer
Design
Product Manufacture
Transfer
Construction
Product Manufacture
Transfer
Production
Product Manufacture
Facility
Subsystem
Product Manufacture
Facility Product
Definition
Product Manufacture
Facility Product
Design
Product Manufacture
Facility Product
Construction
Product Manufacture
Facility Product
Production
Product Manufacture
Facility Resource
Organization
Subsystem
Product Manufacture
Facility Resource
Organization
Definition
Product Manufacture
Facility Resource
Organization
Design
Product Manufacture
Facility Resource
Organization
Construction
Product Manufacture
Facility Resource
Organization
Production
Resource Repository
Facility Distribution
Subsystem
Resource Repository
Facility Distribution
Definition
Resource Repository
Facility Distribution
Design
Resource Repository
Facility Distribution
Construction
Resource Repository
Facility Distribution
Production
Resource Repository
Facility Collection
Subsystem
Resource Repository
Facility Collection
Definition
Resource Repository
Facility Collection
Design
Resource Repository
Facility Collection
Construction
Resource Repository
Facility Collection
Production
Resource Repository
Reception Facility
Subsystem
Resource Repository
Facility Reception
Definition
Resource Repository
Facility Reception
Design
Resource Repository
Facility Reception
Construction
Resource Repository
Facility Reception
Production
Supplier-to-Resource
Repository
FacilityTransport
Subsystem
Supplier-to-Resource
Repository Facility
Transport
Definition
Supplier-to-Resource
Repository Facility
Transport
Design
Supplier-to-Resource
Repository Facility
Transport
Construction
Supplier-to-Resource
Repository Facility
Transport
Production
Supplier Resource
Release
Subsystem
Supplier Resource
Release
Definition
Supplier Resource
Release
Design
Supplier Resource
Release
Construction
Supplier Resource
Release
Production
Supplier Resource
Production
Subsystem
Supplier Resource
Production
Definition
Supplier Resource
Production
Design
Supplier Resource
Production
Construction
Supplier Resource
Production
Production
Supplier Supplier Market Individual Supplier
Defining
Core Process
Designing
Core Process
Constructing
Core Process
Producing
Core Process
Resources transported from supplier to
the resource repository facility as
scheduled.
Resources released by supplier as scheduled.
Resources produced to meet resource
repository facility shipping schedule.
Product transported from product
manufacture facility to customer as
scheduled.
Product manufactured as scheduled.
Product deployed as scheduled.
Product demonstrated and handed
over to customer as scheduled.
Resources received (and when
necessary temporarily stored for later
use) as scheduled.
Resources received and prepared
for processing in the product as
scheduled.
20© 2019 Frank Steeneken - All Rights Reserved
Resources distributed to the
product manufacture facility as
scheduled.
Resources assembled as
scheduled.
Supporting Core Process: work to be performed
Defining
Core Process
Designing
Core Process
Constructing
Core Process
Producing
Core Process
Supporting
Core Process
Customer Individual Customer
Customer
Product Utilization
Subsystem
Customer
Product Utilization
Definition
Customer
Product Utilization
Design
Customer
Product Utilization
Construction
Customer
Product Utilization
Production
Customer
Product Utilization
Support
Product Manufacture
Facility-to-Customer
Transport
Subsystem
Product Manufacture
Facility-to-Customer
Transport
Definition
Product Manufacture
Facility-to-Customer
Transport
Design
Product Manufacture
Facility-to-Customer
Transport
Construction
Product Manufacture
Facility-to-Customer
Transport
Production
Product Manufacture
Facilty-to-Customer
Transport
Support
Product Manufacture
Facility Transfer
Subsystem
Product Manufacture
Facility Transfer
Definition
Product Manufacture
Facility Transfer
Design
Product Manufacture
Transfer
Construction
Product Manufacture
Transfer
Production
Product Manufacture
Transfer
Support
Product Manufacture
Facility Product
Subsystem
Product Manufacture
Facility Product
Definition
Product Manufacture
Facility Product
Design
Product Manufacture
Facility Product
Construction
Product Manufacture
Facility Product
Production
Product Manufacture
Facility Product
Support
Product Manufacture
Facility Resource
Organization
Subsystem
Product Manufacture
Facility Resource
Organization
Definition
Product Manufacture
Facility Resource
Organization
Design
Product Manufacture
Facility Resource
Organization
Construction
Product Manufacture
Facility Resource
Organization
Production
Product Manufacture
Facility Resource
Organization
Support
Resource Repository
Facility Distribution
Subsystem
Resource Repository
Facility Distribution
Definition
Resource Repository
Facility Distribution
Design
Resource Repository
Facility Distribution
Construction
Resource Repository
Facility Distribution
Production
Resource Repository
Facility Distribution
Support
Resource Repository
Facility Collection
Subsystem
Resource Repository
Facility Collection
Definition
Resource Repository
Facility Collection
Design
Resource Repository
Facility Collection
Construction
Resource Repository
Facility Collection
Production
Resource Repository
Facility Collection
Support
Resource Repository
Facility Reception
Subsystem
Resource Repository
Facility Reception
Definition
Resource Repository
Facility Reception
Design
Resource Repository
Facility Reception
Construction
Resource Repository
Facility Reception
Production
Resource Repository
Facility Reception
Support
Supplier-to-Resource
Repository
FacilityTransport
Subsystem
Supplier-to-Resource
Repository Facility
Transport
Definition
Supplier-to-Resource
Repository Facility
Transport
Design
Supplier-to-Resource
Repository Facility
Transport
Construction
Supplier-to-Resource
Repository Facility
Transport
Production
Supplier-to-Resource
Repository Facility
Transport
Support
Supplier Resource
Release
Subsystem
Supplier Resource
Release
Definition
Supplier Resource
Release
Design
Supplier Resource
Release
Construction
Supplier Resource
Release
Production
Supplier Resource
Release
Support
Supplier Resource
Production
Subsystem
Supplier Resource
Production
Definition
Supplier Resource
Production
Design
Supplier Resource
Production
Construction
Supplier Resource
Production
Production
Supplier Resource
Production
Support
Supplier Supplier Market Individual Supplier
Defining
Core Process
Designing
Core Process
Constructing
Core Process
Producing
Core Process
Supporting
Core Process
Product re-deployed as scheduled.
Serviced product transferred to
customer, and warranty fulfilled as
scheduled.
Product serviced as scheduled.
Replacement resources received
and prepared for product
maintenance as scheduled.
Serviced product transported from
product manufacture facility to
customer as scheduled.
Replacement resources received
(and when necessary temporarily
stored for later use) as scheduled.
Replacement resources
transported from supplier to the
resource repository.
Replacement resources released as
scheduled.
Replacement resources produced
to meet resource repository facility
or product manufacture repository
shipping schedule.
21© 2019 Frank Steeneken - All Rights Reserved
Replacment resources distributed
to the product manufacture
facility as scheduled.
Replacement resources
assembled as scheduled.
Terminating Core Process: work to be performed*
Designing
Core Process
Constructing
Core Process
Producing
Core Process
Supporting
Core Process
Terminating
Core Process
Customer Individual Supplier
Customer
Product Utilization
Subsystem
Customer
Product Utilization
Design
Customer
Product Utilization
Construction
Customer
Product Utilization
Production
Customer
Product Utilization
Support
Customer
Product Utilization
Termination
Product Manufacture
Facility-to-Customer
Transport
Subsystem
Product Manufacture
Facility-to-Customer
Transport
Design
Product Manufacture
Facility-to-Customer
Transport
Construction
Product Manufacture
Facility-to-Customer
Transport
Production
Product Manufacture
Facility-to-Customer
Transport
Support
Product Manufacture
Facility-to-Customer
Transport
Termination
Product Manufacture
Facility Transfer
Subsystem
Product Manufacture
Facility Transfer
Design
Product Manufacture
Transfer
Construction
Product Manufacture
Transfer
Production
Product Manufacture
Transfer
Support
Product Manufacture
Transfer
Termination
Product Manufacture
Facility Product
Subsystem
Product Manufacture
Facility Product
Design
Product Manufacture
Facility Product
Construction
Product Manufacture
Facility Product
Production
Product Manufacture
Facility Product
Support
Product Manufacture
Facility Product
Termination
Product Manufacture
Facility Resource
Organization
Subsystem
Product Manufacture
Facility Resource
Organization
Design
Product Manufacture
Facility Resource
Organization
Construction
Product Manufacture
Facility Resource
Organization
Production
Product Manufacture
Facility Resource
Organization
Support
Product Manufacture
Resource Organization
Termination
Resource Repository
Facility Distribution
Subsystem
Resource Repository
Facility Distribution
Design
Resource Repository
Facility Distribution
Construction
Resource Repository
Facility Distribution
Production
Resource Repository
Facility Distribution
Support
Resource Repository
Facility Distribution
Termination
Resource Repository
Facility Collection
Subsystem
Resource Repository
Facility Collection
Design
Resource Repository
Facility Collection
Construction
Resource Repository
Facility Collection
Production
Resource Repository
Facility Collection
Support
Resource Repository
Facility Collection
Termination
Resource Repository
Facility Reception
Subsystem
Resource Repository
Facility Reception
Design
Resource Repository
Facility Reception
Construction
Resource Repository
Facility Reception
Production
Resource Repository
Facility Reception
Support
Resource Repository
Facility Reception
Termination
Supplier-to-Resource
Repository
FacilityTransport
Subsystem
Supplier-to-Resource
Repository Facility
Transport
Design
Supplier-to-Resource
Repository Facility
Transport
Construction
Supplier-to-Resource
Repository Facility
Transport
Production
Supplier-to-Resource
Repository Facility
Transport
Support
Supplier-to-Resource
Repository Facility
Transport
Termination
Supplier Resource
Release
Subsystem
Supplier Resource
Release
Design
Supplier Resource
Release
Construction
Supplier Resource
Release
Production
Supplier Resource
Release
Support
Supplier Resource
Release
Termination
Supplier Resource
Production
Subsystem
Supplier Resource
Production
Design
Supplier Resource
Production
Construction
Supplier Resource
Production
Production
Supplier Resource
Production
Support
Supplier Resource
Production
Termination
Supplier Supplier Market Individual Supplier
Designing
Core Process
Constructing
Core Process
Producing
Core Process
Supporting
Core Process
Terminating
Core Process
* The Defining Core Process is not shown due to lack of space on the sheet.
End of life product transferred to
product manufacture facility.
Product dismantled into re-usable
product resources and/or waste
resources.
Re-usable resources prepared for
shipment to resource repository
and/or waste resources to supplier.
Product utilization ended.
End of life product shipped from
customer to product manufacture
facility.
End-of-life re-usable resources
prepared for return shipment to
supplier.
End-of life re-useble and/or waste
resources shipped from business
enterprise to supplier.
Waste resources taken in by
supplier.
Waste resources recycled or
destroyed by supplier.
22© 2019 Frank Steeneken - All Rights Reserved
Re-usable resources distributed
to resource repository facility.
Re-usable resources kept for
later use.
Application of the model
The Model can be applied to all types and sizes of business enterprises. The model is
intended to be used as a standardized template from which the unique characteristics
of a specific business enterprise can be clearly identified. The unique features of
different types of business enterprises may vary, depending on their business model,
size, and product portfolio’s.
All of these differences can be viewed as variations on the common underlying theme
presented in the Model. This allows the Model to be employed as a baseline template
for understanding and defining business functions for business enterprises in an EtO
and PLM environment.
Example 1: the supply chain for products whose components are produced in multiple
manufacturing facilities might have additional steps to complete the end product.
Example 2: the supply chain for products that don’t need to be transported to a
customer location might eliminate the ‘Product Manufacture Facility-to- Customer
Transport’ subsystem layer for that portion of its business.
23© 2019 Frank Steeneken - All Rights Reserved
Business Function Decomposition
The overall sequential flow of work performed by each core process determines the
flow of work as it encounters its sequence of business functions. In that context, the
work performed by a given business function is viewed as a sub-process of the overall
core process, and details of the work within the business function appear as lower-
level activities within that sub-process.
The Model provides a framework that clearly defines all business functions that are
essential to the company’s product life cycle and operation. Each of these well-defined
business functions can then be decomposed into lower levels of detail using well-
established process modeling methods and techniques.
24© 2019 Frank Steeneken - All Rights Reserved
Organizational Design
The Model’s subsystem/core process matrix can be applied to help design or realign a
company’s organizational structure with its inherent functional structure. This
framework provides a tool for (re)assigning management responsibilities toward the
more clearly defined business functions.
25© 2019 Frank Steeneken - All Rights Reserved
Takeaway
This slide deck has provided a picture of the underlying skeletal structure that holds an
EtO business enterprise in a PLM environment together while achieving its goals.
The Model introduces a comprehensive framework for managing the complexity of the
business enterprise structure, and a reusable blueprint for visualizing how such a
business enterprise actually does business.
The Model can be applied to help realign a company’s organizational structure and
business processes, with its inherent functional structure.
The Model’s clearly-defined core-processes and their functions could provide a
powerful baseline for improving business performance.
26© 2019 Frank Steeneken - All Rights Reserved
Feedback or questions?
Don't hesitate and contact me!
https://www.linkedin.com/in/businessprocessarchitect/
frank.steeneken@gmail.com
27

More Related Content

What's hot

المحاضرة 153 بعنوان مقدمة عن البنية المؤسسية
المحاضرة 153 بعنوان مقدمة عن البنية المؤسسيةالمحاضرة 153 بعنوان مقدمة عن البنية المؤسسية
المحاضرة 153 بعنوان مقدمة عن البنية المؤسسية
Egyptian Engineers Association
 
Implementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_tImplementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_t
17TUME122MITHUNM
 
A method to_define_an_enterprise_architecture_using_the_zachman_framework
A method to_define_an_enterprise_architecture_using_the_zachman_frameworkA method to_define_an_enterprise_architecture_using_the_zachman_framework
A method to_define_an_enterprise_architecture_using_the_zachman_framework
bambangpadhi
 
Essential layers artifact_and_dependencies_of_ea
Essential layers artifact_and_dependencies_of_eaEssential layers artifact_and_dependencies_of_ea
Essential layers artifact_and_dependencies_of_ea
bambangpadhi
 

What's hot (10)

Togaf 9 Approach Ver1 0
Togaf 9   Approach Ver1 0Togaf 9   Approach Ver1 0
Togaf 9 Approach Ver1 0
 
Systemic approach towards enterprise functional decomposition
Systemic approach towards enterprise functional decompositionSystemic approach towards enterprise functional decomposition
Systemic approach towards enterprise functional decomposition
 
SAP PLM
SAP PLMSAP PLM
SAP PLM
 
What is EA In a Nutshell
What is EA In a NutshellWhat is EA In a Nutshell
What is EA In a Nutshell
 
Functional decomposition
Functional decompositionFunctional decomposition
Functional decomposition
 
Iarjset n core tech 8
Iarjset n core tech 8Iarjset n core tech 8
Iarjset n core tech 8
 
المحاضرة 153 بعنوان مقدمة عن البنية المؤسسية
المحاضرة 153 بعنوان مقدمة عن البنية المؤسسيةالمحاضرة 153 بعنوان مقدمة عن البنية المؤسسية
المحاضرة 153 بعنوان مقدمة عن البنية المؤسسية
 
Implementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_tImplementation framework for_plm_a_case_study_in_t
Implementation framework for_plm_a_case_study_in_t
 
A method to_define_an_enterprise_architecture_using_the_zachman_framework
A method to_define_an_enterprise_architecture_using_the_zachman_frameworkA method to_define_an_enterprise_architecture_using_the_zachman_framework
A method to_define_an_enterprise_architecture_using_the_zachman_framework
 
Essential layers artifact_and_dependencies_of_ea
Essential layers artifact_and_dependencies_of_eaEssential layers artifact_and_dependencies_of_ea
Essential layers artifact_and_dependencies_of_ea
 

Similar to A Complete Model of a Business Enterprise in an EtO and PLM environment

6 Trng2_PLM&Windchill_Overview.pdf
6 Trng2_PLM&Windchill_Overview.pdf6 Trng2_PLM&Windchill_Overview.pdf
6 Trng2_PLM&Windchill_Overview.pdf
RatheshPriyanK1
 
PLA and the SC 2002-04-15
PLA and the SC 2002-04-15PLA and the SC 2002-04-15
PLA and the SC 2002-04-15
Jay van Zyl
 
ERP and PLM Integration Considerations by Richard Bourke
ERP and PLM Integration Considerations by Richard BourkeERP and PLM Integration Considerations by Richard Bourke
ERP and PLM Integration Considerations by Richard Bourke
Amplephi
 
Maximizing the Value of PLM and ERP: Integration and Collaboration - Updated
Maximizing the Value of PLM and ERP: Integration and Collaboration - UpdatedMaximizing the Value of PLM and ERP: Integration and Collaboration - Updated
Maximizing the Value of PLM and ERP: Integration and Collaboration - Updated
Amplephi
 
Unpredictable
UnpredictableUnpredictable
Unpredictable
calmr.io
 

Similar to A Complete Model of a Business Enterprise in an EtO and PLM environment (20)

PLCM MODULE 1-Dr.GMS JSSATEB.pptx
PLCM MODULE 1-Dr.GMS JSSATEB.pptxPLCM MODULE 1-Dr.GMS JSSATEB.pptx
PLCM MODULE 1-Dr.GMS JSSATEB.pptx
 
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Paper
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-PaperICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Paper
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Paper
 
System Engineering ISO 15288 Supported by PLM
System Engineering ISO 15288 Supported by PLMSystem Engineering ISO 15288 Supported by PLM
System Engineering ISO 15288 Supported by PLM
 
Business Intelligence Module 3
Business Intelligence Module 3Business Intelligence Module 3
Business Intelligence Module 3
 
Agile manufacturing.pptx
Agile manufacturing.pptxAgile manufacturing.pptx
Agile manufacturing.pptx
 
Conig® v1.5 Converged Information Governance
Conig® v1.5 Converged Information GovernanceConig® v1.5 Converged Information Governance
Conig® v1.5 Converged Information Governance
 
6 Trng2_PLM&Windchill_Overview.pdf
6 Trng2_PLM&Windchill_Overview.pdf6 Trng2_PLM&Windchill_Overview.pdf
6 Trng2_PLM&Windchill_Overview.pdf
 
EclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse Stardust
EclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse StardustEclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse Stardust
EclipseCon BPM Day Ludwigsburg - Roundtrip Modelling with Eclipse Stardust
 
CONIG® v1.5 Converged Information Governance
CONIG® v1.5 Converged Information GovernanceCONIG® v1.5 Converged Information Governance
CONIG® v1.5 Converged Information Governance
 
PLA and the SC 2002-04-15
PLA and the SC 2002-04-15PLA and the SC 2002-04-15
PLA and the SC 2002-04-15
 
Maxing valueplmerp august2011rev4
Maxing valueplmerp august2011rev4Maxing valueplmerp august2011rev4
Maxing valueplmerp august2011rev4
 
ERP and PLM Integration Considerations by Richard Bourke
ERP and PLM Integration Considerations by Richard BourkeERP and PLM Integration Considerations by Richard Bourke
ERP and PLM Integration Considerations by Richard Bourke
 
Maximizing the Value of PLM and ERP: Integration and Collaboration - Updated
Maximizing the Value of PLM and ERP: Integration and Collaboration - UpdatedMaximizing the Value of PLM and ERP: Integration and Collaboration - Updated
Maximizing the Value of PLM and ERP: Integration and Collaboration - Updated
 
Product life cycle management
Product life cycle managementProduct life cycle management
Product life cycle management
 
Developing an Agile Schedule in Microsoft Project - It is Possible!
Developing an Agile Schedule in Microsoft Project - It is Possible!Developing an Agile Schedule in Microsoft Project - It is Possible!
Developing an Agile Schedule in Microsoft Project - It is Possible!
 
Developing an Agile Schedule in Microsoft Project - It is Possible!
Developing an Agile Schedule in Microsoft Project - It is Possible!Developing an Agile Schedule in Microsoft Project - It is Possible!
Developing an Agile Schedule in Microsoft Project - It is Possible!
 
Pom unit 1
Pom unit 1Pom unit 1
Pom unit 1
 
Enterprise Agile at Lockheed Martin - 4th February 2014
Enterprise Agile at Lockheed Martin - 4th February 2014Enterprise Agile at Lockheed Martin - 4th February 2014
Enterprise Agile at Lockheed Martin - 4th February 2014
 
Unpredictable
UnpredictableUnpredictable
Unpredictable
 
Ch 8 solutions
Ch 8 solutionsCh 8 solutions
Ch 8 solutions
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
MayuraD1
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 

A Complete Model of a Business Enterprise in an EtO and PLM environment

  • 1. A Complete Model of a Business Enterprise in an EtO and PLM Environment A Systems Approach © 2019 Frank Steeneken - All Rights Reserved
  • 2. Introduction This slide deck provides a picture of the underlying skeletal structure that holds a business enterprise in an engineer-to-order (EtO) and product lifecycle management (PLM) environment together while achieving its goals. The Model portrays a business enterprise as a functional system for doing business, with processes that are clearly focused on a specific goal. Through the processes, the system fulfills its contribution in the environment. The Model could provide a powerful baseline for improving business performance. The method used to develop this model is an adaptation of an earlier technique called Integrated Modeling Method*. 2© 2019 Frank Steeneken - All Rights Reserved *www.ackley.com
  • 3. Purpose and Function The purpose of the Model is to clearly portray how work performed in Product Development and Operations of a business enterprise in an EtO and PLM environment, is structured, apart from the way it is managed and controlled. To provide this clarity, feedback loops and control systems are not shown on the diagrams. The Model can be applied to help realign a company’s organizational structure and business processes, with its inherent functional structure. 3© 2019 Frank Steeneken - All Rights Reserved
  • 4. What is a Business Enterprise? 4 A company doing business in a marketplace environment that includes relationships with both customers and suppliers. A business enterprise* buys resources (“raw materials”) from suppliers in the supplier market, adds value by transforming the resources into products, and sells the products to customers in the customer market. The internal architecture of the business enterprise is shaped by the nature of the marketplace environment, including the expectations of potential customers and suppliers, economic, technological and other conditions. * Integrated Modeling Method: http://ackley.com/z_integrated_modeling/6_framesets/frameset_tg_glossary.html Business Enterprise
  • 5. 5 What is Engineer to Order?What is Engineer to Order?What is Engineer to Order? Engineer-to-order* manufacturing environments are typically characterized by high levels of product and process variation, high product complexity and deep product structures, and low production volumes. Each new order involves product design and development based upon customer specifications. Moreover, design, delivery speed and flexibility are typical order winners and the customer order decoupling point is typically positioned at the very start of production. *Olhager J., Strategic positioning of the order penetration point. International Journal of Production Economics, 2003.
  • 6. What is a Product Life Cycle (PLC)? All products have been thought up, created and possess a fixed life span in a business enterprise. The lifetime of all these products may be represented in terms of a model: the Integral Life Cycle Model for technical systems (products)*. 6 Defining Designing Constructing Producing Supporting Terminating Phase Work performed Defining: Exploration of the customer needs and elaboration of the requirements for the product, production, supply and market related structures and tools, working methods, contracts and agreements. Designing: Design of the product, production, supply and market related structures and tools, working methods, contracts and agreements in accordance with their requirements. Constructing: Construction and establishment of product, production, supply and market related structures and tools, working methods, contracts and agreements in accordance with their design. Producing: Manufacturing of the product and delivery to the customer. Supporting: Support and maintenance of the product. Terminating: Recycling of the product to generate new resources (“raw materials”) or return (waste) resources back to the supplier(market). *Fundamentals of Business Engineering and Management - A Systems Approach to People and Organizations, ten Haaf, Bikker and Adriaanse.
  • 7. What is Product Lifecycle Management (PLM)? Product Life Cycle Management* is the business activity of managing, in the most effective way, a company’s products all the way across their lifecycles; from the very first idea for a product all the way through until it is retired and disposed off. PLM is the management system for a company’s products. It doesn’t just manages just one of its products. It manages, in an integrated way, all of its parts and products, and the product portfolio. • Product Life Cycle Management (Volume 1) – 21st Century Paradigm for Product Realisation (Third Edition) ) by John Stark. 7
  • 8. 8 Scope of the Model Due to an EtO situation, the development level will be initiated after a customer sales order has been received and processed at programming level. Resource purchasing and product manufacturing are tied to each individual sales order. No resource or product action takes place until the sales order is received. It is assumed that where a business enterprise delivers engineer-to-order it commits innovation within a sales order. Appendix 4.I Main Function Model, Fundamentals of Business Engineering and Management - A Systems Approach to People and Organizations, ten Haaf, Bikker, Adriaanse The Main Function Model* distinguishes between six main functions which should be present in every efficiently operating business enterprise. The scope of the Model that is further elaborated in this presentation covers the development and operations level (per type of product).
  • 9. 9 Focus of the Model A business enterprise in an EtO and PLM environment is complex structure, involving many component entities: • Customers; • Various transportation systems; • Product manufacture facilities; • Resource repository facilities; • Suppliers. A business enterprise in an EtO and PLM environment exists in a competitive environment where it acts as an intermediary with added value between individual customers who need unique and often complex products, and suppliers who produce the resources ("raw materials") that are processed in these products. In carrying out its function, the business enterprise often develops these products in collaboration with their customers before producing them in their manufacturing facilities. To this end the enterprise acquires, receives, assembles and allocates a wide range of resources from individual suppliers in resource repository facilities. The model focuses on the work to perform the function of the company. Although it refers to the business entities involved, the model does not include the life cycle development of the physical housing constructions, employees, means of transport or the equipment they use. © 2019 Frank Steeneken - All Rights Reserved
  • 10. 10 How is the Model Structured? Resource Repository Facilities Product Manufacture Facilities Customers Suppliers As a system, the sequence of work performed in purchasing resources from suppliers, and manufacturing a unique product for a customer involves certain discrete business entities (layers). Each of these entities provides a critical link in the business enterprise supply chain. This sequence of business entities provides an initial breakdown to define the structure of subsystem layers. Transporters Transporters Product manufacture facilities manufacture products from resources and transfer them to customers who ordered them. Resource repository facilities interact with remote suppliers to acquire, receive, assemble and distribute resource components , used for processing into products. BusinessEntities SubsystemLayers Transporters deliver quantities of resources to resource repository facilities. Suppliers produce and release resources. Transporters deliver products to remote customers. Customers ustalize products to fulfil their goal. © 2019 Frank Steeneken - All Rights Reserved
  • 11. time To complete the overall structure, the structure of subsystem layers is overlaid with a sequence of six core processes which represent the lifecycle of the business enterprise product. Completion of the Overall Structure Resource Repository Facilities Product Manufacture Facilities Customers Supplier(s) Transporters Transporters DefiningCoreProcess DesigningCoreProcess SupportigCoreProcess TerminatingCoreProcess ConstructingCoreProcess ProducingCoreProcess Core Process Sequence Flow 11© 2019 Frank Steeneken - All Rights Reserved
  • 12. Developing Detailed Subsystem Structure 12 A more detailed subsystem structure is required as a basis for defining the core process structures. The first task to develop the detailed subsystem structure is to translate the activities/tasks into a sequence of basic functional steps that acquires the resources and produces the product. These steps describe the essential supply chain of the business enterprise. The next task is to interpret the basic functional steps as subsystems which portray the supply chain in terms of business structural requirements. © 2019 Frank Steeneken - All Rights Reserved
  • 13. Translate Activities/Tasks into a Sequence of Basic Functional Steps Activities/Tasks Basic Functional Steps Customer uitilizes the product. UTILIZE product Transporters deliver products to Customers. DELIVER product Product Manufacture Facilities transfer products to Customers. TRANSFER product Product Manufacture Facilities manufacture products. MANUFACTURE product Product Manufacture Facilities organize resources for products to be manufactured. ORGANIZE resources Resource Repository Facilities distribute resources to the Product Manufacture Facilities. DISTRIBUTE resources Resource Repository Facilities assemble resources for the products to be manufactured. ASSEMBLE resources Resource Repository Facilities receive ordered resources. RECEIVE resources Transporters delivers quantities of resources to the Resource Repository Facility. DELIVER resources Suppliers release the ordered resources for transport to the Resource Repository Facilities. RELEASE resources Suppliers produce the resources ordered by the Resource Repository Facilities. PRODUCE resources SupplyChain © 2019 Frank Steeneken - All Rights Reserved 13
  • 14. Interpret the Basic Functional Steps as Subsystems 14© 2019 Frank Steeneken - All Rights Reserved Basic Functional Step Detailled Subsystem Layer Customer UTILIZE product Customer Product UtIization Subsystem DELIVER product (optional) Product Manufacture Facility-to-Customer Transport Subsystem TRANSFER product Product Manufacture Facility Transfer Subsystem MANUFACTURE product Product Manufacture Facility Product Subsystem ORGANIZE resources Product Manufacture Facility Resource Organization Subsystem DISTRIBUTE resources Resource Repository Facility Distribution Subsystem ASSEMBLE resources Resource Repository Facility Collection Subsystem RECEIVE resources Resource Repository Facility Reception Subsystem DELIVER resources Supplier-to-Resource Repository Facility Transport Subsystem RELEASE resources Supplier Resource Release Subsystem PRODUCE resources Supplier Resource Production Subsystem Supplier SupplyChain
  • 15. Framework The detailed subsystem structure provides the foundation needed to identify details of the core processes and how they are to be performed. When the detailed subsystems and core processes are combined, they produce a grid like framework. Within this framework, each subsystem/core process intersection is interpreted as a business function to be managed and performed. In terms of work to be performed, the resulting array of subsystem/core process intersections displays the entire set of business functions of the business enterprise. A business function is an ongoing functional capability of the business that is sustained over time. A business function applies resources to accomplish a particular kind of work in response to incoming work requests. From an Object-Oriented perspective, a business function can be thought of as an "object" that responds to incoming messages. © 2019 Frank Steeneken - All Rights Reserved Business Function Subsystem Core Process 15 A business function applies resources to accomplish a particular kind of work in response to incoming work requests and needs to be managed.
  • 16. 16 time Defining Core Process Designing Core Process Constructing Core Process Producing Core Process Supporting Core Process Terminating Core Process Customer Individual Customer Customer Product Utilization Subsystem Customer Product Utilization Definition Customer Product Utilization Design Customer Product Utilization Construction Customer Product Utilization Production Customer Product Utilization Support Customer Product Utilization Termination Product Manufacture Facility-to-Customer Transport Subsystem Product Manufacture Facility-to-Customer Transport Definition Product Manufacture Facility-to-Customer Transport Design Product Manufacture Facility-to-Customer Transport Construction Product Manufacture Facility-to-Customer Transport Production Product Manufacture Facility-to-Customer Transport Support Product Manufacture Facility-to-Customer Transport Termination Product Manufacture Facility Transfer Subsystem Product Manufacture Facility Transfer Definition Product Manufacture Facility Transfer Design Product Manufacture Facility Transfer Construction Product Manufacture Facility Transfer Production Product Manufacture Facility Transfer Support Product Manufacture Facility Transfer Termination Product Manufacture Facility Product Subsystem Product Manufacture Facility Product Definition Product Manufacture Facility Product Design Product Manufacture Facility Product Construction Product Manufacture Facility Product Production Product Manufacture Product Facility Support Product Manufacture Facility Product Termination Product Manufacture Facility Resource Organization Subsystem Product Manufacture Facility Resource Organization Definition Product Manufacture Facility Resource Organization Design Product Manufacture Facility Resource Organization Construction Product Manufacture Facility Resource Organization Production Product Manufacture Facility Resource Organization Support Product Manufacture Facility Resource Organization Termination Resource Repository Facility Distribution Subsystem Resource Repository Facility Distribution Definition Resource Repository Facility Distribution Design Resource Repository Facility Distribution Construction Resource Repository Facility Distribution Production Resource Repository Facility Distribution Support Resource Repository Facility Distribution Termination Resource Repository Facility Collection Subsystem Resource Repository Facility Collection Definition Resource Repository Facility Collection Design Resource Repository Facility Collection Construction Resource Repository Facility Collection Production Resource Repository Facility Collection Support Resource Repository Facility Collection Termination Resource Repository Facility Reception Subsystem Resource Repository Facility Reception Definition Resource Repository Facility Reception Design Resource Repository Facility Reception Construction Resource Repository Facility Reception Production Resource Repository Facility Reception Support Resource Repository Facility Reception Termination Supplier-to-Resource Repository FacilityTransport Subsystem Supplier-to-Resource Repository Facility Transport Definition Supplier-to-Resource Repository Facility Transport Design Supplier-to-Resource Repository Facility Transport Construction Supplier-to-Resource Repository Facility Transport Production Supplier-to-Resource Repository Facility Transport Support Supplier-to-Resource Repository Facility Transport Termination Supplier Resource Release Subsystem Supplier Resource Release Definition Supplier Resource Release Design Supplier Resource Release Construction Supplier Resource Release Production Supplier Resource Release Support Supplier Resource Release Termination Supplier Resource Production Subsystem Supplier Resource Production Definition Supplier Resource Production Design Supplier Resource Production Construction Supplier Resource Production Production Supplier Resource Production Support Supplier Resource Production Termination Supplier Supplier Market Individual Supplier Defining Core Process Designing Core Process Constructing Core Process Producing Core Process Supporting Core Process Terminating Core Process Core Process Functional Subsystem Business Function Core Process Sequence Flow Subsystem Life Cycle State Transition Direction Customer Product Utilization Definition © 2019 Frank Steeneken - All Rights Reserved
  • 17. 17 Defining Core Process: work to be performed Defining Core Process Customer Individual Customer Customer Product Utilization Subsystem Customer Product Utilization Definition Product Manufacture Facility-to-Customer Transport Subsystem Product Manufacture Facility-to-Customer Transport Definition Product Manufacture Facility Transfer Subsystem Product Manufacture Facility Transfer Definition Product Manufacture Facility Product Subsystem Product Manufacture Facility Product Definition Product Manufacture Facility Resource Organization Subsystem Product Manufacture Facility Resource Organization Definition Resource Repository Facility Distribution Subsystem Resource Repository Facility Distribution Definition Resource Repository Facility Collection Subsystem Resource Repository Facility Collection Definition Resource Repository Facility Reception Subsystem Resource Repository Facility Reception Definition Supplier-to-Resource Repository FacilityTransport Subsystem Supplier-to-Resource Repository Facility Transport Definition Supplier Resource Release Subsystem Supplier Resource Release Definition Supplier Resource Production Subsystem Supplier Resource Production Definition Supplier Supplier Market Defining Core Process © 2019 Frank Steeneken - All Rights Reserved Requirements for resource transport capacity, route and schedules for shipment from suppliers to resource repository facility elaboirated. Requirements for supplier to resource repository facility resource release schedules elaborated. Requirements for supplier to resource repository facility resource production contracts elaborated. Requirements for product transport capacity, route and schedule for shipment from product manufacture facility to customer elaborated. Product requirements and requirements for production related structures, tools, working methods and production schedule elaborated. Customer needs explored and requirements for product utilization related structures, tools, working methods and schedule elaborated. Requirements for product transfer procedure to customer and schedule elaborated. Requirements for resource reception related structures, tools, working methods and schedule elaborated. Requirements for resource reception and resource preparation related structures, tools, working methods and schedule elaborated. Requirements for resource distribution related structures, tools, working methods and schedule elaborated. Requirements for resource collection related structures, tools, working methods and schedule elaborated.
  • 18. 18 Designing Core Process: work to be performed Defining Core Process Designing Core Process Customer Individual Customer Customer Product Utilization Subsystem Customer Product Utilization Definition Customer Product Utilization Design Product Manufacture Facilty-to-Customer Transport Subsystem Product Manufacture Facility-to-Customer Transport Definition Product Manufacture Facility-to-Customer Transport Design Product Manufacture Facility Transfer Subsystem Product Manufacture Facility Transfer Definition Product Manufacture Facility Transfer Design Product Manufacture Facility Subsystem Product Manufacture Facility Product Definition Product Manufacture Facility Product Design Product Manufacture Facility Resource Organization Subsystem Product Manufacture Facility Resource Organization Definition Product Manufacture Facility Resource Organization Design Resource Repository Facility Distribution Subsystem Resource Repository Facility Distribution Definition Resource Repository Facility Distribution Design Resource Repository Facility Collection Subsystem Resource Repository Facility Collection Definition Resource Repository Facility Collection Design Resource Repository Facility Reception Subsystem Resource Repository Facility Reception Definition Resource Repository Facility Reception Design Supplier-to-Resource Repository FacilityTransport Subsystem Supplier-to-Resource Repository Facility Transport Definition Supplier-to-Resource Repository Facility Transport Design Supplier Resource Release Subsystem Supplier Resource Release Definition Supplier Resource Release Design Supplier Resource Production Subsystem Supplier Resource Production Definition Supplier Resource Production Design Supplier Supplier Market Defining Core Process Designing Core Process © 2019 Frank Steeneken - All Rights Reserved Resource transport capacity, route and schedules for shipment from suppliers to resource repository facility designed. Supplier to resource repository facility resource release schedules designed. Supplier to resource repository facility resource production contracts designed. Product transport capacity, transport route and schedule for shipment from product manufacture facility to customer designed. Product, production related structures, tools, working methods and production schedule designed. Product utilization related structures, tools, working methods and schedule designed. Product demonstration and product transfer to customer procedure and schedule designed. Resource reception related structures, tools, working methods and schedule designed. Resource reception and resource preparation related structures, tools, working methods and schedule designed. Resource distribution related structures, tools, working methods and schedule designed. Resource collection related structures, tools, working methods and schedule designed.
  • 19. 19 Constructing Core Process: work to be performed Defining Core Process Designing Core Process Constructing Core Process Customer Individual Customer Customer Product Utilization Subsystem Customer Product Utilization Definition Customer Product Utilization Design Customer Product Utilization Construction Product Manufacture Facility-to-Customer Transport Subsystem Product Manufacture Facility-to-Customer Transport Definition Product Manufacture Facility-to-Customer Transport Design Product Manufacture Facility-to-Customer Transport Construction Product Manufacture Facility Transfer Subsystem Product Manufacture Facility Transfer Definition Product Manufacture Facility Transfer Design Product Manufacture Transfer Construction Product Manufacture Facility Subsystem Product Manufacture Facility Product Definition Product Manufacture Facility Product Design Product Manufacture Facility Product Construction Product Manufacture Facility Resource Organization Subsystem Product Manufacture Facility Resource Organization Definition Product Manufacture Facility Resource Organization Design Product Manufacture Facility Resource Organization Construction Resource Repository Facility Distribution Subsystem Resource Repository Facility Distribution Definition Resource Repository Facility Distribution Design Resource Repository Facility Distribution Construction Resource Repository Facility Collection Subsystem Resource Repository Facility Collection Definition Resource Repository Facility Collection Design Resource Repository Facility Collection Construction Resource Repository Facility Reception Subsystem Resource Repository Facility Reception Definition Resource Repository Facility Reception Design Resource Repository Facility Reception Construction Supplier-to-Resource Repository FacilityTransport Subsystem Supplier-to-Resource Repository Facility Transport Definition Supplier-to-Resource Repository Facility Transport Design Supplier-to-Resource Repository Facility Transport Construction Supplier Resource Release Subsystem Supplier Resource Release Definition Supplier Resource Release Design Supplier Resource Release Construction Supplier Resource Production Subsystem Supplier Resource Production Definition Supplier Resource Production Design Supplier Resource Production Construction Supplier Supplier Market Defining Core Process Designing Core Process Constructing Core Process © 2019 Frank Steeneken - All Rights Reserved Resource transport capacity, route and schedules for shipment from suppliers to resource repository facility constructed and established. Supplier to resource repository facility resource release schedules constructed and established. Supplier to resource repository facility resource production contracts constructed and established. Product transport capacity, transport route and schedule for shipment from product manufacture facility to customer constructed and established. Product and production related structures, tools, working methods and production schedule constructed and established. Product utilization related structures, tools, working methods and schedule constructed and established. Product demonstration and product transfer to customer procedure and schedule constructed and designed. Resource reception related structures, tools, working methods and schedule constructed and established. Resource reception and resource preparation related structures, tools, working methods and schedule constructed and established. Resource distribution related structures, tools, working methods and schedule constructede and established. Resource collection related structures, tools, working methods and schedule constructed and established.
  • 20. Producing Core Process: work to be performed Defining Core Process Designing Core Process Constructing Core Process Producing Core Process Customer Individual Customer Customer Product Utilization Subsystem Customer Product Utilization Definition Customer Product Utilization Design Customer Product Utilization Construction Customer Product Utilization Production Product Manufacture Facility-to-Customer Transport Subsystem Product Manufacture Facility-to-Customer Transport Definition Product Manufacture Facility-to-Customer Transport Design Product Manufacture Facility-to-Customer Transport Construction Product Manufacture Facility-to-Customer Transport Production Product Manufacture Facility Transfer Subsystem Product Manufacture Facility Transfer Definition Product Manufacture Facility Transfer Design Product Manufacture Transfer Construction Product Manufacture Transfer Production Product Manufacture Facility Subsystem Product Manufacture Facility Product Definition Product Manufacture Facility Product Design Product Manufacture Facility Product Construction Product Manufacture Facility Product Production Product Manufacture Facility Resource Organization Subsystem Product Manufacture Facility Resource Organization Definition Product Manufacture Facility Resource Organization Design Product Manufacture Facility Resource Organization Construction Product Manufacture Facility Resource Organization Production Resource Repository Facility Distribution Subsystem Resource Repository Facility Distribution Definition Resource Repository Facility Distribution Design Resource Repository Facility Distribution Construction Resource Repository Facility Distribution Production Resource Repository Facility Collection Subsystem Resource Repository Facility Collection Definition Resource Repository Facility Collection Design Resource Repository Facility Collection Construction Resource Repository Facility Collection Production Resource Repository Reception Facility Subsystem Resource Repository Facility Reception Definition Resource Repository Facility Reception Design Resource Repository Facility Reception Construction Resource Repository Facility Reception Production Supplier-to-Resource Repository FacilityTransport Subsystem Supplier-to-Resource Repository Facility Transport Definition Supplier-to-Resource Repository Facility Transport Design Supplier-to-Resource Repository Facility Transport Construction Supplier-to-Resource Repository Facility Transport Production Supplier Resource Release Subsystem Supplier Resource Release Definition Supplier Resource Release Design Supplier Resource Release Construction Supplier Resource Release Production Supplier Resource Production Subsystem Supplier Resource Production Definition Supplier Resource Production Design Supplier Resource Production Construction Supplier Resource Production Production Supplier Supplier Market Individual Supplier Defining Core Process Designing Core Process Constructing Core Process Producing Core Process Resources transported from supplier to the resource repository facility as scheduled. Resources released by supplier as scheduled. Resources produced to meet resource repository facility shipping schedule. Product transported from product manufacture facility to customer as scheduled. Product manufactured as scheduled. Product deployed as scheduled. Product demonstrated and handed over to customer as scheduled. Resources received (and when necessary temporarily stored for later use) as scheduled. Resources received and prepared for processing in the product as scheduled. 20© 2019 Frank Steeneken - All Rights Reserved Resources distributed to the product manufacture facility as scheduled. Resources assembled as scheduled.
  • 21. Supporting Core Process: work to be performed Defining Core Process Designing Core Process Constructing Core Process Producing Core Process Supporting Core Process Customer Individual Customer Customer Product Utilization Subsystem Customer Product Utilization Definition Customer Product Utilization Design Customer Product Utilization Construction Customer Product Utilization Production Customer Product Utilization Support Product Manufacture Facility-to-Customer Transport Subsystem Product Manufacture Facility-to-Customer Transport Definition Product Manufacture Facility-to-Customer Transport Design Product Manufacture Facility-to-Customer Transport Construction Product Manufacture Facility-to-Customer Transport Production Product Manufacture Facilty-to-Customer Transport Support Product Manufacture Facility Transfer Subsystem Product Manufacture Facility Transfer Definition Product Manufacture Facility Transfer Design Product Manufacture Transfer Construction Product Manufacture Transfer Production Product Manufacture Transfer Support Product Manufacture Facility Product Subsystem Product Manufacture Facility Product Definition Product Manufacture Facility Product Design Product Manufacture Facility Product Construction Product Manufacture Facility Product Production Product Manufacture Facility Product Support Product Manufacture Facility Resource Organization Subsystem Product Manufacture Facility Resource Organization Definition Product Manufacture Facility Resource Organization Design Product Manufacture Facility Resource Organization Construction Product Manufacture Facility Resource Organization Production Product Manufacture Facility Resource Organization Support Resource Repository Facility Distribution Subsystem Resource Repository Facility Distribution Definition Resource Repository Facility Distribution Design Resource Repository Facility Distribution Construction Resource Repository Facility Distribution Production Resource Repository Facility Distribution Support Resource Repository Facility Collection Subsystem Resource Repository Facility Collection Definition Resource Repository Facility Collection Design Resource Repository Facility Collection Construction Resource Repository Facility Collection Production Resource Repository Facility Collection Support Resource Repository Facility Reception Subsystem Resource Repository Facility Reception Definition Resource Repository Facility Reception Design Resource Repository Facility Reception Construction Resource Repository Facility Reception Production Resource Repository Facility Reception Support Supplier-to-Resource Repository FacilityTransport Subsystem Supplier-to-Resource Repository Facility Transport Definition Supplier-to-Resource Repository Facility Transport Design Supplier-to-Resource Repository Facility Transport Construction Supplier-to-Resource Repository Facility Transport Production Supplier-to-Resource Repository Facility Transport Support Supplier Resource Release Subsystem Supplier Resource Release Definition Supplier Resource Release Design Supplier Resource Release Construction Supplier Resource Release Production Supplier Resource Release Support Supplier Resource Production Subsystem Supplier Resource Production Definition Supplier Resource Production Design Supplier Resource Production Construction Supplier Resource Production Production Supplier Resource Production Support Supplier Supplier Market Individual Supplier Defining Core Process Designing Core Process Constructing Core Process Producing Core Process Supporting Core Process Product re-deployed as scheduled. Serviced product transferred to customer, and warranty fulfilled as scheduled. Product serviced as scheduled. Replacement resources received and prepared for product maintenance as scheduled. Serviced product transported from product manufacture facility to customer as scheduled. Replacement resources received (and when necessary temporarily stored for later use) as scheduled. Replacement resources transported from supplier to the resource repository. Replacement resources released as scheduled. Replacement resources produced to meet resource repository facility or product manufacture repository shipping schedule. 21© 2019 Frank Steeneken - All Rights Reserved Replacment resources distributed to the product manufacture facility as scheduled. Replacement resources assembled as scheduled.
  • 22. Terminating Core Process: work to be performed* Designing Core Process Constructing Core Process Producing Core Process Supporting Core Process Terminating Core Process Customer Individual Supplier Customer Product Utilization Subsystem Customer Product Utilization Design Customer Product Utilization Construction Customer Product Utilization Production Customer Product Utilization Support Customer Product Utilization Termination Product Manufacture Facility-to-Customer Transport Subsystem Product Manufacture Facility-to-Customer Transport Design Product Manufacture Facility-to-Customer Transport Construction Product Manufacture Facility-to-Customer Transport Production Product Manufacture Facility-to-Customer Transport Support Product Manufacture Facility-to-Customer Transport Termination Product Manufacture Facility Transfer Subsystem Product Manufacture Facility Transfer Design Product Manufacture Transfer Construction Product Manufacture Transfer Production Product Manufacture Transfer Support Product Manufacture Transfer Termination Product Manufacture Facility Product Subsystem Product Manufacture Facility Product Design Product Manufacture Facility Product Construction Product Manufacture Facility Product Production Product Manufacture Facility Product Support Product Manufacture Facility Product Termination Product Manufacture Facility Resource Organization Subsystem Product Manufacture Facility Resource Organization Design Product Manufacture Facility Resource Organization Construction Product Manufacture Facility Resource Organization Production Product Manufacture Facility Resource Organization Support Product Manufacture Resource Organization Termination Resource Repository Facility Distribution Subsystem Resource Repository Facility Distribution Design Resource Repository Facility Distribution Construction Resource Repository Facility Distribution Production Resource Repository Facility Distribution Support Resource Repository Facility Distribution Termination Resource Repository Facility Collection Subsystem Resource Repository Facility Collection Design Resource Repository Facility Collection Construction Resource Repository Facility Collection Production Resource Repository Facility Collection Support Resource Repository Facility Collection Termination Resource Repository Facility Reception Subsystem Resource Repository Facility Reception Design Resource Repository Facility Reception Construction Resource Repository Facility Reception Production Resource Repository Facility Reception Support Resource Repository Facility Reception Termination Supplier-to-Resource Repository FacilityTransport Subsystem Supplier-to-Resource Repository Facility Transport Design Supplier-to-Resource Repository Facility Transport Construction Supplier-to-Resource Repository Facility Transport Production Supplier-to-Resource Repository Facility Transport Support Supplier-to-Resource Repository Facility Transport Termination Supplier Resource Release Subsystem Supplier Resource Release Design Supplier Resource Release Construction Supplier Resource Release Production Supplier Resource Release Support Supplier Resource Release Termination Supplier Resource Production Subsystem Supplier Resource Production Design Supplier Resource Production Construction Supplier Resource Production Production Supplier Resource Production Support Supplier Resource Production Termination Supplier Supplier Market Individual Supplier Designing Core Process Constructing Core Process Producing Core Process Supporting Core Process Terminating Core Process * The Defining Core Process is not shown due to lack of space on the sheet. End of life product transferred to product manufacture facility. Product dismantled into re-usable product resources and/or waste resources. Re-usable resources prepared for shipment to resource repository and/or waste resources to supplier. Product utilization ended. End of life product shipped from customer to product manufacture facility. End-of-life re-usable resources prepared for return shipment to supplier. End-of life re-useble and/or waste resources shipped from business enterprise to supplier. Waste resources taken in by supplier. Waste resources recycled or destroyed by supplier. 22© 2019 Frank Steeneken - All Rights Reserved Re-usable resources distributed to resource repository facility. Re-usable resources kept for later use.
  • 23. Application of the model The Model can be applied to all types and sizes of business enterprises. The model is intended to be used as a standardized template from which the unique characteristics of a specific business enterprise can be clearly identified. The unique features of different types of business enterprises may vary, depending on their business model, size, and product portfolio’s. All of these differences can be viewed as variations on the common underlying theme presented in the Model. This allows the Model to be employed as a baseline template for understanding and defining business functions for business enterprises in an EtO and PLM environment. Example 1: the supply chain for products whose components are produced in multiple manufacturing facilities might have additional steps to complete the end product. Example 2: the supply chain for products that don’t need to be transported to a customer location might eliminate the ‘Product Manufacture Facility-to- Customer Transport’ subsystem layer for that portion of its business. 23© 2019 Frank Steeneken - All Rights Reserved
  • 24. Business Function Decomposition The overall sequential flow of work performed by each core process determines the flow of work as it encounters its sequence of business functions. In that context, the work performed by a given business function is viewed as a sub-process of the overall core process, and details of the work within the business function appear as lower- level activities within that sub-process. The Model provides a framework that clearly defines all business functions that are essential to the company’s product life cycle and operation. Each of these well-defined business functions can then be decomposed into lower levels of detail using well- established process modeling methods and techniques. 24© 2019 Frank Steeneken - All Rights Reserved
  • 25. Organizational Design The Model’s subsystem/core process matrix can be applied to help design or realign a company’s organizational structure with its inherent functional structure. This framework provides a tool for (re)assigning management responsibilities toward the more clearly defined business functions. 25© 2019 Frank Steeneken - All Rights Reserved
  • 26. Takeaway This slide deck has provided a picture of the underlying skeletal structure that holds an EtO business enterprise in a PLM environment together while achieving its goals. The Model introduces a comprehensive framework for managing the complexity of the business enterprise structure, and a reusable blueprint for visualizing how such a business enterprise actually does business. The Model can be applied to help realign a company’s organizational structure and business processes, with its inherent functional structure. The Model’s clearly-defined core-processes and their functions could provide a powerful baseline for improving business performance. 26© 2019 Frank Steeneken - All Rights Reserved
  • 27. Feedback or questions? Don't hesitate and contact me! https://www.linkedin.com/in/businessprocessarchitect/ frank.steeneken@gmail.com 27