The purpose of this presentation is to provide general information about Fortescue Metals Group
Ltd (“Fortescue”). It is not recommended that any person makes any investment decision in relation
to Fortescue based on this presentation. This presentation contains certain statements which may
constitute “forward-looking statements”. Such statements are only predictions and are subject to
inherent risks and uncertainties which could cause actual values, results, performance or
achievements to differ materially from those expressed, implied or projected in any forward-looking
statements. No representation or warranty, express or implied, is made by Fortescue that the
material contained in this presentation will be achieved or prove to be correct. Except for statutory
liability which cannot be excluded, each of Fortescue, its officers, employees and advisers
expressly disclaims any responsibility for the accuracy or completeness of the material contained in
this presentation and excludes all liability whatsoever (including in negligence) for any loss or
damage which may be suffered by any person as a consequence of any information in this
presentation or any error or omission therefrom. Fortescue accepts no responsibility to update any
person regarding any inaccuracy, omission or change in information in this presentation or any
other information made available to a person nor any obligation to furnish the person with any
further information.
Additional Information
This presentation should be read in conjunction with the Annual Report at 30 June 2020 together
with any announcements made by Fortescue in accordance with its continuous disclosure
obligations arising under the Corporations Act 2001 and ASX Listing Rules. Any references to
reserve and resources estimations should be read in conjunction with Fortescue’s Ore Reserves
and Mineral Resources statements released to the Australian Securities Exchange on 21 August
2020. Fortescue confirms in the subsequent public report that it is not aware of any new information
or data that materially affects the information included in the relevant market announcement and, in
the case of estimates of mineral resources or ore reserves, that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed. All amounts within this presentation are stated in United
States Dollars consistent with the functional currency of Fortescue Metals Group Ltd, unless
otherwise stated. Tables contained within this presentation may contain immaterial rounding
differences.
3
Senior Mining Engineer
• Open pit mining engineer with over 16 years of experience
– Production, Mine Planning and consulting
Current role
• FMG – Senior Mine Planning Engineer (Iron Bridge magnetite Project)
• Strategic planning, Long Term and 5YMP and
• Long Term Mine Design
About me
Santhosh Mulky
4
Datamine Studio OP – about 9 years, found the following capabilities very useful
• Ore loss and Dilution modelling
• Dynamic Pit Designing tool
Minemax – From 2012 till date
• First project – FS of a OP gold mine with a trade-off study (Trolley Assist Vs
Conventional Shovel/Truck – Expit Belt conveying)
Strategic Planning in my current role
• Reserve estimation
• Capacity studies
• Various scenarios to evaluate the extended mine life cases
• Sensitivities to evaluate the sensitivity to price and cost
• To obtain guidance on grade binning/material type strategy
Datamine Mine Planning Tools - Experience
5
• Commodities: Iron ore, Copper, Gold, Silver, Phosphate, Potash, Rare Earths Element, PGE etc.
• Combined OP and UG optimisation study for the locked in UG scheduling scenarios – to decide the
optimum time for introducing underground after applying a capital trigger
• Trade off studies e.g. Trolley Assist vs Conventional Shovel and Truck vs Expit Belt Conveying
• Multi pit project optimisation with backfilling options
• Mining and Plant capacity studies
• Processing Technological option evaluation
• Mining ramp-up studies with capitals for truck and shovels
• Mining, Processing and Logistics simultaneous schedule optimisation
• Ore binding (ROM material types) strategy for operations
Minemax experience
Nature and type of work carried out (at previous consulting role)
6
7
Strategic Planning - Preparation
Ore loss and Dilution and modelling – Regularisation to selected SMU size
• Pit optimisation
• To obtain guidance on mining pushbacks (staged mining)
• Various scenarios created by varying the pushback sizes (emphasising mainly on the initial mining
phases)
• Haulage study to obtain haul cycle data for mine ore and waste haulage and reclaiming from stockpiles
to plants – this was used in minemax to calculate truck numbers and enable truck purchase
• Grade tonnage curves to define material types/stockpiles
Products
• Three product types were considered and a penalty model was applied
• This allowed minemax optimise the plan based on the revenue, cost and available inventory to
make the optimum blend
8
• Minemax was setup as per the project description using the pit inventory and guidance obtained from the
preparatory steps (Pushbacks, material types, Cycle time etc)
• Appx 6 minemax models created as per the matrix below
(Max difference for NPV for the scenarios in the table above was over 3%)
• Products
– 3 product types were considered and a penalty model was applied (Fe%, SiO2%, Al2O3%, P%)
– This approach enabled minemax generate ‘optimum product’ based on revenue, cost making best use
of the available mineral inventory
– ‘Allowing product mix’ vary year by year allows scheduler address price as a key factor in the
optimisation process
Strategic Planning – Modelling Approach
Minemax Scenarios
matrix (NPV populated
after completing the
scenarios)
Material Types/Stockpiling Scenario
1 2 3
Pushbacks
Scenarios
1
2
3
9
How the plan was optimised : Apart from modelling and applying cost to mining,
processing and logistics in line with the project setup
– By allowing minemax to vary the product mix
– By varying the pushback sizes
– By varying the materials/stockpiles
Capital expenditure profile
– Mining fleet
– Processing plant capital, time of construction and size
– Logistics options and timing of capital
Project Findings and Outcome
10
Guidance on physicals
– Selection of ultimate pit through the schedule (shells not mined after the end of the
schedule excluded from the LOM pits)
– Mining sequence
– Ore binning strategy to improve blending
– Variable COG –for various sources of mining
– Variable COG – at various plants to achieve the optimum product mix by year
Key drivers – sensitivity to NPV
– Price, Logistics cost and processing cost
– Processing cost
– Mining cost
Project Findings and Outcome
11
Any questions?
12
13

More Related Content

Similar to 9. Santhosh Mulky, Fortescue Metals - A Powerful Tool to Unlock Potential Value

Black Iron February 2017 Corporate Presentation
Black Iron February 2017 Corporate PresentationBlack Iron February 2017 Corporate Presentation
Black Iron February 2017 Corporate Presentation
blackiron
 
Pekka_Bergström_2016
Pekka_Bergström_2016Pekka_Bergström_2016
Pekka_Bergström_2016
Pekka Bergstrom
 
Introduction to Metocean: Quantifying the impact and effect of weather and se...
Introduction to Metocean: Quantifying the impact and effect of weather and se...Introduction to Metocean: Quantifying the impact and effect of weather and se...
Introduction to Metocean: Quantifying the impact and effect of weather and se...
Institute of Marine Engineering, Science &Technology
 
Fortune Minerals - Investor Presentation - January 2014
Fortune Minerals -  Investor Presentation - January 2014Fortune Minerals -  Investor Presentation - January 2014
Fortune Minerals - Investor Presentation - January 2014
Company Spotlight
 
Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014
Company Spotlight
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
Teranga Gold
 
Quarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdfQuarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdf
seemasindwani
 
Quarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdfQuarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdf
seemasindwani
 
Teranga Gold Investor Presentation August 2014
Teranga Gold Investor Presentation August 2014Teranga Gold Investor Presentation August 2014
Teranga Gold Investor Presentation August 2014
Teranga Gold
 
September 2013
September 2013September 2013
September 2013
forbescoal
 
Ure corporate webcast 20141204 (final)
Ure corporate webcast 20141204 (final)Ure corporate webcast 20141204 (final)
Ure corporate webcast 20141204 (final)
Urenergy
 
201610 bki corp_pres
201610 bki corp_pres201610 bki corp_pres
201610 bki corp_pres
blackiron
 
Fmc corporate presentationjune 2013
Fmc corporate presentationjune 2013Fmc corporate presentationjune 2013
Fmc corporate presentationjune 2013
forbescoal
 
Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016
Mohamed Shady
 
Quarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdfQuarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdf
seemasindwani
 
Corporate Presentation August 2014
Corporate Presentation August 2014Corporate Presentation August 2014
Corporate Presentation August 2014
blackiron
 
Centrex Metals (ASX:CXM) Investor Presentation September 2014
Centrex Metals (ASX:CXM) Investor Presentation September 2014Centrex Metals (ASX:CXM) Investor Presentation September 2014
Centrex Metals (ASX:CXM) Investor Presentation September 2014
Symposium
 
Iron Road - Central Eyre Iron Project Technical Presentation
Iron Road - Central Eyre Iron Project Technical PresentationIron Road - Central Eyre Iron Project Technical Presentation
Iron Road - Central Eyre Iron Project Technical Presentation
Iron_Road_Limited
 
SGS Geological Services
SGS Geological ServicesSGS Geological Services
SGS Geological Services
SGS
 
Corporate Presentation 2017
Corporate Presentation 2017Corporate Presentation 2017
Corporate Presentation 2017
blackiron
 

Similar to 9. Santhosh Mulky, Fortescue Metals - A Powerful Tool to Unlock Potential Value (20)

Black Iron February 2017 Corporate Presentation
Black Iron February 2017 Corporate PresentationBlack Iron February 2017 Corporate Presentation
Black Iron February 2017 Corporate Presentation
 
Pekka_Bergström_2016
Pekka_Bergström_2016Pekka_Bergström_2016
Pekka_Bergström_2016
 
Introduction to Metocean: Quantifying the impact and effect of weather and se...
Introduction to Metocean: Quantifying the impact and effect of weather and se...Introduction to Metocean: Quantifying the impact and effect of weather and se...
Introduction to Metocean: Quantifying the impact and effect of weather and se...
 
Fortune Minerals - Investor Presentation - January 2014
Fortune Minerals -  Investor Presentation - January 2014Fortune Minerals -  Investor Presentation - January 2014
Fortune Minerals - Investor Presentation - January 2014
 
Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014Fortune Minerals Investor Presentation - January 2014
Fortune Minerals Investor Presentation - January 2014
 
Denver Gold Forum 2014
Denver Gold Forum 2014Denver Gold Forum 2014
Denver Gold Forum 2014
 
Quarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdfQuarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdf
 
Quarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdfQuarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdf
 
Teranga Gold Investor Presentation August 2014
Teranga Gold Investor Presentation August 2014Teranga Gold Investor Presentation August 2014
Teranga Gold Investor Presentation August 2014
 
September 2013
September 2013September 2013
September 2013
 
Ure corporate webcast 20141204 (final)
Ure corporate webcast 20141204 (final)Ure corporate webcast 20141204 (final)
Ure corporate webcast 20141204 (final)
 
201610 bki corp_pres
201610 bki corp_pres201610 bki corp_pres
201610 bki corp_pres
 
Fmc corporate presentationjune 2013
Fmc corporate presentationjune 2013Fmc corporate presentationjune 2013
Fmc corporate presentationjune 2013
 
Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016Mohamed Shady_C.V_Jan. 2016
Mohamed Shady_C.V_Jan. 2016
 
Quarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdfQuarterly Update - Dec 15 2022 - Final .pdf
Quarterly Update - Dec 15 2022 - Final .pdf
 
Corporate Presentation August 2014
Corporate Presentation August 2014Corporate Presentation August 2014
Corporate Presentation August 2014
 
Centrex Metals (ASX:CXM) Investor Presentation September 2014
Centrex Metals (ASX:CXM) Investor Presentation September 2014Centrex Metals (ASX:CXM) Investor Presentation September 2014
Centrex Metals (ASX:CXM) Investor Presentation September 2014
 
Iron Road - Central Eyre Iron Project Technical Presentation
Iron Road - Central Eyre Iron Project Technical PresentationIron Road - Central Eyre Iron Project Technical Presentation
Iron Road - Central Eyre Iron Project Technical Presentation
 
SGS Geological Services
SGS Geological ServicesSGS Geological Services
SGS Geological Services
 
Corporate Presentation 2017
Corporate Presentation 2017Corporate Presentation 2017
Corporate Presentation 2017
 

More from Kristy Marshall

8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
Kristy Marshall
 
7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
Kristy Marshall
 
5. Pedro Ladeira, Datamine - Probability of Achieving Certain Economic Outcom...
5. Pedro Ladeira, Datamine - Probability of Achieving Certain Economic Outcom...5. Pedro Ladeira, Datamine - Probability of Achieving Certain Economic Outcom...
5. Pedro Ladeira, Datamine - Probability of Achieving Certain Economic Outcom...
Kristy Marshall
 
4. Joe Kraft, Minemax - Minemax Scheduler Applications
4. Joe Kraft, Minemax - Minemax Scheduler Applications4. Joe Kraft, Minemax - Minemax Scheduler Applications
4. Joe Kraft, Minemax - Minemax Scheduler Applications
Kristy Marshall
 
3. Stuart Swapp and Aaron Loffler, Entech - Optimisation Improvements for Nar...
3. Stuart Swapp and Aaron Loffler, Entech - Optimisation Improvements for Nar...3. Stuart Swapp and Aaron Loffler, Entech - Optimisation Improvements for Nar...
3. Stuart Swapp and Aaron Loffler, Entech - Optimisation Improvements for Nar...
Kristy Marshall
 
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
Kristy Marshall
 
1. Jonathan Graham, Datamine - Welcome to the Strategic Open Pit Mine Plannin...
1. Jonathan Graham, Datamine - Welcome to the Strategic Open Pit Mine Plannin...1. Jonathan Graham, Datamine - Welcome to the Strategic Open Pit Mine Plannin...
1. Jonathan Graham, Datamine - Welcome to the Strategic Open Pit Mine Plannin...
Kristy Marshall
 
Supervisor 8.13 New Release Webinar
Supervisor 8.13 New Release WebinarSupervisor 8.13 New Release Webinar
Supervisor 8.13 New Release Webinar
Kristy Marshall
 

More from Kristy Marshall (8)

8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
 
7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka7.  Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
7. Chung Chen, Iluka - Portfolio Optimisation using Minemax in Iluka
 
5. Pedro Ladeira, Datamine - Probability of Achieving Certain Economic Outcom...
5. Pedro Ladeira, Datamine - Probability of Achieving Certain Economic Outcom...5. Pedro Ladeira, Datamine - Probability of Achieving Certain Economic Outcom...
5. Pedro Ladeira, Datamine - Probability of Achieving Certain Economic Outcom...
 
4. Joe Kraft, Minemax - Minemax Scheduler Applications
4. Joe Kraft, Minemax - Minemax Scheduler Applications4. Joe Kraft, Minemax - Minemax Scheduler Applications
4. Joe Kraft, Minemax - Minemax Scheduler Applications
 
3. Stuart Swapp and Aaron Loffler, Entech - Optimisation Improvements for Nar...
3. Stuart Swapp and Aaron Loffler, Entech - Optimisation Improvements for Nar...3. Stuart Swapp and Aaron Loffler, Entech - Optimisation Improvements for Nar...
3. Stuart Swapp and Aaron Loffler, Entech - Optimisation Improvements for Nar...
 
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with Minemax
 
1. Jonathan Graham, Datamine - Welcome to the Strategic Open Pit Mine Plannin...
1. Jonathan Graham, Datamine - Welcome to the Strategic Open Pit Mine Plannin...1. Jonathan Graham, Datamine - Welcome to the Strategic Open Pit Mine Plannin...
1. Jonathan Graham, Datamine - Welcome to the Strategic Open Pit Mine Plannin...
 
Supervisor 8.13 New Release Webinar
Supervisor 8.13 New Release WebinarSupervisor 8.13 New Release Webinar
Supervisor 8.13 New Release Webinar
 

Recently uploaded

How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
Daiki Mogmet Ito
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
Matthew Sinclair
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
panagenda
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
shyamraj55
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
Matthew Sinclair
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Speck&Tech
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
Zilliz
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
DianaGray10
 
UI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentationUI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentation
Wouter Lemaire
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
panagenda
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
Alpen-Adria-Universität
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
Brandon Minnick, MBA
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
ssuserfac0301
 
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptxOcean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
SitimaJohn
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Safe Software
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 

Recently uploaded (20)

How to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For FlutterHow to use Firebase Data Connect For Flutter
How to use Firebase Data Connect For Flutter
 
20240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 202420240607 QFM018 Elixir Reading List May 2024
20240607 QFM018 Elixir Reading List May 2024
 
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUHCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAU
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with SlackLet's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slack
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
20240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 202420240609 QFM020 Irresponsible AI Reading List May 2024
20240609 QFM020 Irresponsible AI Reading List May 2024
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
 
Generating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and MilvusGenerating privacy-protected synthetic data using Secludy and Milvus
Generating privacy-protected synthetic data using Secludy and Milvus
 
UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6UiPath Test Automation using UiPath Test Suite series, part 6
UiPath Test Automation using UiPath Test Suite series, part 6
 
UI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentationUI5 Controls simplified - UI5con2024 presentation
UI5 Controls simplified - UI5con2024 presentation
 
HCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAUHCL Notes and Domino License Cost Reduction in the World of DLAU
HCL Notes and Domino License Cost Reduction in the World of DLAU
 
Video Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the FutureVideo Streaming: Then, Now, and in the Future
Video Streaming: Then, Now, and in the Future
 
Choosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptxChoosing The Best AWS Service For Your Website + API.pptx
Choosing The Best AWS Service For Your Website + API.pptx
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
Taking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdfTaking AI to the Next Level in Manufacturing.pdf
Taking AI to the Next Level in Manufacturing.pdf
 
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptxOcean lotus Threat actors project by John Sitima 2024 (1).pptx
Ocean lotus Threat actors project by John Sitima 2024 (1).pptx
 
Driving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success StoryDriving Business Innovation: Latest Generative AI Advancements & Success Story
Driving Business Innovation: Latest Generative AI Advancements & Success Story
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 

9. Santhosh Mulky, Fortescue Metals - A Powerful Tool to Unlock Potential Value

  • 1. 1 A powerful tool to unlock potential value Santhosh Mulky 12 March 2021
  • 2. 2 Forward Looking Statements Disclaimer Important Notice The purpose of this presentation is to provide general information about Fortescue Metals Group Ltd (“Fortescue”). It is not recommended that any person makes any investment decision in relation to Fortescue based on this presentation. This presentation contains certain statements which may constitute “forward-looking statements”. Such statements are only predictions and are subject to inherent risks and uncertainties which could cause actual values, results, performance or achievements to differ materially from those expressed, implied or projected in any forward-looking statements. No representation or warranty, express or implied, is made by Fortescue that the material contained in this presentation will be achieved or prove to be correct. Except for statutory liability which cannot be excluded, each of Fortescue, its officers, employees and advisers expressly disclaims any responsibility for the accuracy or completeness of the material contained in this presentation and excludes all liability whatsoever (including in negligence) for any loss or damage which may be suffered by any person as a consequence of any information in this presentation or any error or omission therefrom. Fortescue accepts no responsibility to update any person regarding any inaccuracy, omission or change in information in this presentation or any other information made available to a person nor any obligation to furnish the person with any further information. Additional Information This presentation should be read in conjunction with the Annual Report at 30 June 2020 together with any announcements made by Fortescue in accordance with its continuous disclosure obligations arising under the Corporations Act 2001 and ASX Listing Rules. Any references to reserve and resources estimations should be read in conjunction with Fortescue’s Ore Reserves and Mineral Resources statements released to the Australian Securities Exchange on 21 August 2020. Fortescue confirms in the subsequent public report that it is not aware of any new information or data that materially affects the information included in the relevant market announcement and, in the case of estimates of mineral resources or ore reserves, that all material assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and have not materially changed. All amounts within this presentation are stated in United States Dollars consistent with the functional currency of Fortescue Metals Group Ltd, unless otherwise stated. Tables contained within this presentation may contain immaterial rounding differences.
  • 3. 3 Senior Mining Engineer • Open pit mining engineer with over 16 years of experience – Production, Mine Planning and consulting Current role • FMG – Senior Mine Planning Engineer (Iron Bridge magnetite Project) • Strategic planning, Long Term and 5YMP and • Long Term Mine Design About me Santhosh Mulky
  • 4. 4 Datamine Studio OP – about 9 years, found the following capabilities very useful • Ore loss and Dilution modelling • Dynamic Pit Designing tool Minemax – From 2012 till date • First project – FS of a OP gold mine with a trade-off study (Trolley Assist Vs Conventional Shovel/Truck – Expit Belt conveying) Strategic Planning in my current role • Reserve estimation • Capacity studies • Various scenarios to evaluate the extended mine life cases • Sensitivities to evaluate the sensitivity to price and cost • To obtain guidance on grade binning/material type strategy Datamine Mine Planning Tools - Experience
  • 5. 5 • Commodities: Iron ore, Copper, Gold, Silver, Phosphate, Potash, Rare Earths Element, PGE etc. • Combined OP and UG optimisation study for the locked in UG scheduling scenarios – to decide the optimum time for introducing underground after applying a capital trigger • Trade off studies e.g. Trolley Assist vs Conventional Shovel and Truck vs Expit Belt Conveying • Multi pit project optimisation with backfilling options • Mining and Plant capacity studies • Processing Technological option evaluation • Mining ramp-up studies with capitals for truck and shovels • Mining, Processing and Logistics simultaneous schedule optimisation • Ore binding (ROM material types) strategy for operations Minemax experience Nature and type of work carried out (at previous consulting role)
  • 6. 6
  • 7. 7 Strategic Planning - Preparation Ore loss and Dilution and modelling – Regularisation to selected SMU size • Pit optimisation • To obtain guidance on mining pushbacks (staged mining) • Various scenarios created by varying the pushback sizes (emphasising mainly on the initial mining phases) • Haulage study to obtain haul cycle data for mine ore and waste haulage and reclaiming from stockpiles to plants – this was used in minemax to calculate truck numbers and enable truck purchase • Grade tonnage curves to define material types/stockpiles Products • Three product types were considered and a penalty model was applied • This allowed minemax optimise the plan based on the revenue, cost and available inventory to make the optimum blend
  • 8. 8 • Minemax was setup as per the project description using the pit inventory and guidance obtained from the preparatory steps (Pushbacks, material types, Cycle time etc) • Appx 6 minemax models created as per the matrix below (Max difference for NPV for the scenarios in the table above was over 3%) • Products – 3 product types were considered and a penalty model was applied (Fe%, SiO2%, Al2O3%, P%) – This approach enabled minemax generate ‘optimum product’ based on revenue, cost making best use of the available mineral inventory – ‘Allowing product mix’ vary year by year allows scheduler address price as a key factor in the optimisation process Strategic Planning – Modelling Approach Minemax Scenarios matrix (NPV populated after completing the scenarios) Material Types/Stockpiling Scenario 1 2 3 Pushbacks Scenarios 1 2 3
  • 9. 9 How the plan was optimised : Apart from modelling and applying cost to mining, processing and logistics in line with the project setup – By allowing minemax to vary the product mix – By varying the pushback sizes – By varying the materials/stockpiles Capital expenditure profile – Mining fleet – Processing plant capital, time of construction and size – Logistics options and timing of capital Project Findings and Outcome
  • 10. 10 Guidance on physicals – Selection of ultimate pit through the schedule (shells not mined after the end of the schedule excluded from the LOM pits) – Mining sequence – Ore binning strategy to improve blending – Variable COG –for various sources of mining – Variable COG – at various plants to achieve the optimum product mix by year Key drivers – sensitivity to NPV – Price, Logistics cost and processing cost – Processing cost – Mining cost Project Findings and Outcome