The document provides a shareholder update from Aura Minerals regarding their Sao Francisco gold mine in Brazil. It discusses several options to improve the mine plan including continuing current operations, splitting the pit into phases, or dedicating 3-4 months to waste stripping. The preferred option is 4 months of waste stripping to create wider benches for safer and more efficient mining. This would expose higher grade ore, improve haul roads and operations, and allow maintenance. Retreating tailings could produce an additional 9,000-11,000 oz annually. With cost savings and higher production, cash costs are projected to decrease to $700-740/oz.
Plateau Energy Metals Corp Presentation (July 2019)Bianca Pisciola
This document provides an overview of Plateau Energy Metals Inc. and its lithium and uranium projects in Peru. Key points include:
- Plateau controls a large 930 sq km land package in southern Peru which includes the Falchani lithium and Macusani uranium projects.
- An initial resource estimate for Falchani indicates over 60 million tonnes of indicated resources averaging 2,954 ppm lithium and over 260 million tonnes of inferred resources averaging 2,706 ppm lithium. Metallurgical testing indicates the lithium can be processed to over 99.5% purity.
- The Macusani uranium project has shallow, volcanic surficial deposits and was the largest uranium
Torex Gold is growing its Morelos Gold Project in Mexico, which includes building its initial open pit mine and exploring for additional deposits. The feasibility study confirmed robust economics for the project, with an after-tax IRR of 24.2% and average annual production of 375,000 ounces of gold over the mine life. Torex has advanced the project significantly, including permitting, community relations, exploration drilling, and a C$380 million equity financing. The company will focus on continuing permitting and development work, while exploring additional targets on its large land package.
The document summarizes the Ovoot Coking Coal Project in Mongolia acquired by Aspire Mining Limited, an Australian company. It describes the project's geology and drilling results which indicated thick multiple coal seams. It outlines the deal terms under which Aspire acquired the project, providing cash and shares to the vendors. This has significantly increased the project's value. The document argues that listing on the Australian Securities Exchange provides benefits for funding exploration of early stage projects in Mongolia through access to capital markets.
This document provides an investor presentation for Teranga Gold Corporation, outlining key details of the company including production and cost profiles, mineral reserves, growth opportunities, and exploration plans. Teranga has mineral reserves of 2.81 million ounces of gold and aims to increase production to 250,000-350,000 ounces per year through integrating recent acquisitions and pursuing organic growth opportunities at its properties in Senegal. The company expects to be debt-free by the end of 2014 and able to generate free cash flow going forward.
12 01-14 december investor presentationTeranga Gold
This document provides an investor presentation for Teranga Gold Corporation. It summarizes the company's key metrics including production outlook, cost profile, reserves, resources and growth opportunities. Teranga expects to produce around 215,000 ounces of gold in 2014 at total cash costs of $725 per ounce and all-in sustaining costs of $900 per ounce. The company is pursuing organic growth initiatives at its Sabodala gold mine in Senegal to increase production to 250,000-350,000 ounces per year. Teranga also has a large land package in Senegal it is exploring for additional resources.
This document provides an overview of an investment opportunity in Black Iron Inc., an iron ore mining company with projects in Ukraine. It summarizes the company's key assets including its Shymanivske deposit which has over 600 million tons of reserves grading over 30% iron. It also details the positive economics from a feasibility study including annual production of 10 million tons and strong financial metrics. Additionally, it outlines Black Iron's major partnership with Metinvest, Ukraine's largest mining and steel company, which will provide significant financing and off-take for the project.
This corporate presentation from Black Iron Inc. summarizes an investment opportunity in an iron ore project in Ukraine. Key points include:
- Black Iron has completed a positive bankable feasibility study for its Shymanivske iron ore project in Ukraine, which shows potential for high value, low cost production.
- The project has a large mineral resource, access to key infrastructure like rail and port, and is located near existing producers and markets.
- The presentation highlights the project's economics from the feasibility study, including annual production of 9.9 million tonnes of 68% iron concentrate and attractive financial metrics.
The document provides a shareholder update from Aura Minerals regarding their Sao Francisco gold mine in Brazil. It discusses several options to improve the mine plan including continuing current operations, splitting the pit into phases, or dedicating 3-4 months to waste stripping. The preferred option is 4 months of waste stripping to create wider benches for safer and more efficient mining. This would expose higher grade ore, improve haul roads and operations, and allow maintenance. Retreating tailings could produce an additional 9,000-11,000 oz annually. With cost savings and higher production, cash costs are projected to decrease to $700-740/oz.
Plateau Energy Metals Corp Presentation (July 2019)Bianca Pisciola
This document provides an overview of Plateau Energy Metals Inc. and its lithium and uranium projects in Peru. Key points include:
- Plateau controls a large 930 sq km land package in southern Peru which includes the Falchani lithium and Macusani uranium projects.
- An initial resource estimate for Falchani indicates over 60 million tonnes of indicated resources averaging 2,954 ppm lithium and over 260 million tonnes of inferred resources averaging 2,706 ppm lithium. Metallurgical testing indicates the lithium can be processed to over 99.5% purity.
- The Macusani uranium project has shallow, volcanic surficial deposits and was the largest uranium
Torex Gold is growing its Morelos Gold Project in Mexico, which includes building its initial open pit mine and exploring for additional deposits. The feasibility study confirmed robust economics for the project, with an after-tax IRR of 24.2% and average annual production of 375,000 ounces of gold over the mine life. Torex has advanced the project significantly, including permitting, community relations, exploration drilling, and a C$380 million equity financing. The company will focus on continuing permitting and development work, while exploring additional targets on its large land package.
The document summarizes the Ovoot Coking Coal Project in Mongolia acquired by Aspire Mining Limited, an Australian company. It describes the project's geology and drilling results which indicated thick multiple coal seams. It outlines the deal terms under which Aspire acquired the project, providing cash and shares to the vendors. This has significantly increased the project's value. The document argues that listing on the Australian Securities Exchange provides benefits for funding exploration of early stage projects in Mongolia through access to capital markets.
This document provides an investor presentation for Teranga Gold Corporation, outlining key details of the company including production and cost profiles, mineral reserves, growth opportunities, and exploration plans. Teranga has mineral reserves of 2.81 million ounces of gold and aims to increase production to 250,000-350,000 ounces per year through integrating recent acquisitions and pursuing organic growth opportunities at its properties in Senegal. The company expects to be debt-free by the end of 2014 and able to generate free cash flow going forward.
12 01-14 december investor presentationTeranga Gold
This document provides an investor presentation for Teranga Gold Corporation. It summarizes the company's key metrics including production outlook, cost profile, reserves, resources and growth opportunities. Teranga expects to produce around 215,000 ounces of gold in 2014 at total cash costs of $725 per ounce and all-in sustaining costs of $900 per ounce. The company is pursuing organic growth initiatives at its Sabodala gold mine in Senegal to increase production to 250,000-350,000 ounces per year. Teranga also has a large land package in Senegal it is exploring for additional resources.
This document provides an overview of an investment opportunity in Black Iron Inc., an iron ore mining company with projects in Ukraine. It summarizes the company's key assets including its Shymanivske deposit which has over 600 million tons of reserves grading over 30% iron. It also details the positive economics from a feasibility study including annual production of 10 million tons and strong financial metrics. Additionally, it outlines Black Iron's major partnership with Metinvest, Ukraine's largest mining and steel company, which will provide significant financing and off-take for the project.
This corporate presentation from Black Iron Inc. summarizes an investment opportunity in an iron ore project in Ukraine. Key points include:
- Black Iron has completed a positive bankable feasibility study for its Shymanivske iron ore project in Ukraine, which shows potential for high value, low cost production.
- The project has a large mineral resource, access to key infrastructure like rail and port, and is located near existing producers and markets.
- The presentation highlights the project's economics from the feasibility study, including annual production of 9.9 million tonnes of 68% iron concentrate and attractive financial metrics.
Black Iron February 2017 Corporate Presentationblackiron
This corporate presentation from Black Iron Inc. summarizes an investment opportunity in their Shymanivske iron ore project located in Ukraine. Key highlights include a bankable feasibility study showing a large resource of over 645 million tonnes, low capital and operating costs, secured infrastructure access, and attractive project economics with an after-tax IRR of 39% and NPV of $2.6 billion. The presentation outlines Black Iron's strategy to finalize project funding through equity investment, debt financing, and off-take agreements to advance the project towards production.
Pekka Bergström is a senior geomechanics engineer with over 20 years of experience in hard rock mining. He holds several degrees including a Graduate Certificate in Mine Design and Planning and an MSc in Geology and Mineralogy. He has worked extensively in both open pit and underground mines in Finland, Australia, and Ireland. His areas of expertise include geotechnical monitoring, seismic monitoring, ground support design, and drill and blast design. Currently he works as a Senior Drill/Blast and Geotechnical Engineer for Boliden Kevitsa Mining Oy in Finland, where he is responsible for drill and blast operations and rock mechanics of the open pit mine.
For offshore industries such as renewables and oil and gas, meteorological and oceanographic (metocean) conditions have a major impact on the design of facilities and their subsequent operations.
Knowledge of wind, wave, current, water level and weather conditions is essential to contribute to optimum design and efficient operations. Sound use of metocean data and information can assist with improved safety and reduced costs. This 2 or 3 day course takes place in several locations throughout the world.
Fortune Minerals - Investor Presentation - January 2014Company Spotlight
- The document is an investor presentation for a Canadian mineral development company that owns two late-stage projects, a metallurgical coal project and a gold-cobalt project.
- The met coal project, called Arctos Anthracite, has completed a positive feasibility study and environmental assessment work is underway. It aims to produce high quality ultra-low volatile PCI coal.
- The company has a strategic partnership with POSCO, one of the world's largest steel companies, for the Arctos project which validates the project and will aid in its development.
Fortune Minerals Investor Presentation - January 2014Company Spotlight
- The document is an investor presentation for Fortune Minerals outlining their two late-stage mineral development projects in Canada: the Arctos Anthracite Project and the NICO gold-cobalt project.
- The Arctos project has completed a positive feasibility study and environmental assessment and is advancing permitting to begin production. It would be an open-pit mine producing high-quality metallurgical coal.
- Fortune Minerals also provided updates on project economics from the feasibility study, resource estimates, permitting progress, partnerships including with POSCO, and plans to further advance the project.
Teranga Gold Corporation held a presentation focused on delivering growth at the Denver Gold Forum on September 17, 2014. The presentation summarized Teranga's operations, growth opportunities, and financial results for 2014. Key points included doubling reserves and resources through the acquisition of OJVG, integration of Sabodala and Masato operations, and exploration programs identifying additional reserve potential. Production is expected to increase to 250,000-350,000 ounces per year by optimizing operations and integrating assets. The presentation highlighted Teranga's goal of increasing production further to 400,000-500,000 ounces through regional exploration successes and potential additional milling capacity.
Quarterly Update - Dec 15 2022 - Final .pdfseemasindwani
1) Probe Metals continues to advance its Val-d'Or East project through exploration drilling, metallurgical testing, and permitting activities to support a PFS. Drilling in 2022 totaled 165,000 meters and showed potential resource growth at the Monique, Pascalis and Courvan deposits.
2) Exploration drilling was also conducted at Detour Quebec and Casa Cameron properties, with an unexpectedly thick copper zone intersected at Detour La Peltrie indicating significant copper potential.
3) Plans for Q1 2023 include a Monique resource update in January, followed by Pascalis and Courvan updates. Drilling will target new discoveries and resource expansion, with results reported starting in
Quarterly Update - Dec 15 2022 - Final .pdfseemasindwani
1) Probe Metals continues to advance its Val-d'Or East project through exploration drilling, metallurgical testing, and permitting activities to support a PFS. Drilling in 2022 totaled 165,000 meters and showed potential to expand resources and simplify the mine plan.
2) Exploration drilling was also carried out at Detour Quebec and Casa Cameron properties, with an unexpected thick copper zone intersected at Detour La Peltrie indicating significant copper potential.
3) Plans for Q1 2023 include resource updates, releasing 2022 drill results, additional IP surveying at Detour, follow up drilling, and continuing development activities to advance the Val-d'Or East project.
Teranga Gold Investor Presentation August 2014Teranga Gold
The document provides an investor presentation for Teranga Gold Corporation. Key points include:
- Teranga operates the only gold mine and mill in Senegal, which has produced over 1 million ounces to date.
- The company recently integrated the nearby OJVG mine, doubling reserves, resources, mine life and production.
- Short and medium term plans focus on optimizing the combined mine plan, mill throughput, and evaluating heap leaching to increase reserves and cash flow.
- Exploration is targeting reserve growth through drilling existing deposits and evaluating prospects across the company's large land package.
Forbes & Manhattan Coal Corp. is a growing coal producer in South Africa with bituminous and anthracite coal operations. It has a total mineable coal resource of 72.5 million tonnes of bituminous coal and 50.8 million tonnes of anthracite coal. The company aims to increase annual saleable production to 2 million tonnes within 3 years by expanding its Magdalena and Aviemore mines. Forbes & Manhattan provides concise summaries of its coal resources, mining operations, production and sales figures, management team, and investment highlights.
- The document is the transcript from a Ur-Energy teleconference and webcast that discusses the company's Lost Creek uranium production facility and Pathfinder-Shirley Basin development project.
- Lost Creek has exceeded production targets with head grades 3-4 times higher than projected, and the facility has successfully captured over 500,000 pounds of uranium between 2013-2014.
- An updated preliminary economic assessment estimates 9.2 million pounds of uranium can be recovered from Lost Creek over its lifetime at a low cash operating cost of $21.61 per pound.
This corporate presentation from Black Iron Inc. outlines an investment opportunity in an iron ore project located in Ukraine. Key points include:
- Black Iron's flagship Shymanivske project has large mineral resources, positive feasibility study economics, and access to existing infrastructure for rail, port and utilities.
- The project benefits from proximity to markets in Europe and Asia and a location in a major iron ore district of Ukraine.
- Black Iron has the required permits and is advancing the project, highlighting potential for resource expansion and low development risks relative to other geographies.
- Ukraine provides a mining-friendly jurisdiction with potential for closer European integration and a skilled workforce for the industry.
Forbes & Manhattan Coal Corp. is a growing coal producer in South Africa with two operating mines - the Magdalena mine producing bituminous coal and the Aviemore mine producing anthracite coal. The company has a large coal resource base of over 72 million tonnes of bituminous coal and over 50 million tonnes of anthracite coal. In fiscal year 2013, total saleable production was over 958,000 tonnes. The company aims to increase production to over 2 million tonnes per year. Forbes & Manhattan Coal Corp. provides South African and international customers with high quality thermal and energy coal.
This document provides biographical and professional details about Mohamed Shady. It includes his contact information, family status, education history, areas of expertise, and work experience spanning over 14 years with Schlumberger in various production engineering and project management roles in Algeria and Egypt. Some of the key projects summarized are field development plans for naturally fractured reservoirs, stimulation projects, production optimization studies, and reservoir management roles.
Quarterly Update - Dec 15 2022 - Final .pdfseemasindwani
1) Probe Metals completed significant exploration drilling at its Val-d'Or East and Detour Quebec projects in Q4 2022, with over 165,000 metres drilled at Val-d'Or East and 10,300 metres at Detour Quebec.
2) At Val-d'Or East, drilling continues to show resource growth and improved economics, with larger open pit shapes expected. A resource update for the Monique deposit is scheduled for January 2023.
3) At Detour Quebec, a 345-metre wide zone of copper-gold-silver mineralization was intersected, indicating potential for copper. Assays are pending.
4) Plans for Q1 2023 include further drilling
This document provides an overview of an investment opportunity in Black Iron Inc., an iron ore exploration and development company. Some key points:
- Black Iron is developing the Shymanivske iron ore deposit in Ukraine which has over 600 million tonnes of resources. A feasibility study shows the potential for a 9.9 million tonne per year operation with strong economics.
- The project benefits from excellent infrastructure access, including secured rail capacity, port access, and a letter of intent for power. It is located near other producers in a major iron ore district.
- A development agreement is in place with Metinvest, Ukraine's largest steel and mining company, which will fund half of project construction costs estimated at
Centrex Metals (ASX:CXM) Investor Presentation September 2014Symposium
September 2014 – Centrex Metals ASX:CXM, presented their latest investment update to over 300 investors in Sydney and Melbourne.
In this investor update, Gavin Bosch, Chief Financial Officer of CXM gives an overview of their current position and opportunities.
For more information about Centrex Metals, visit http://www.centrexmetals.com.au/
For more information about Symposium’s Investor Roadshows, visit http://symposium.net.au/InvestorRoadshow/
Iron Road - Central Eyre Iron Project Technical PresentationIron_Road_Limited
This presentation summarises some thought-provoking aspects of our technical journey, challenging the status quo and how these aspects influence the overall design.
Mining
• Understanding the CEIP orebody.
• Transition from owner mining operating traditional truck & shovel, to contract mining managing in-pit crushing & conveying (IPCC).
Ore Beneficiation
• Developing a thorough understanding of the metallurgical behaviour of the CEIP ore.
• Innovative materials handling and the elimination of a conventional tailings storage facility.
• Optimisation and the inclusion of a regrind circuit.
Infrastructure Design Philosophy
• Rotary versus bottom dump rail discharge systems.
• Port facility and high speed ship loading.
• Access and use by third parties.
Protecting the Schedule
• High density, vertically stacked modularisation.
• Parallel process design.
• Wet commissioning off-site in construction yards.
SGS Geological Services provides mineral project evaluation and mining industry services including exploration, ore body modelling, resource estimation, mine engineering, audits, and technical reports. They have over 1,000 consulting projects completed worldwide across a variety of commodities. Their expertise includes geological modelling using specialized software, geostatistics, resource estimation to international reporting standards, machine learning applications, and mining engineering to optimize projects.
This corporate presentation from Black Iron Inc. summarizes their compelling investment opportunity in iron ore in Ukraine. Black Iron owns the large Shymanivske iron ore deposit which has over 645 million tonnes of resources. They have completed a positive feasibility study showing strong economics for a 9.9 million tonne per year operation. Key advantages are access to existing infrastructure for power, rail and port, as well as a skilled local workforce. The project is located near other producers in a major iron ore district. Black Iron believes they have all the fundamentals in place for a successful low cost project and that the deposit has potential for resource expansion.
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...Kristy Marshall
This document discusses using scenario planning and analysis in open pit mine planning to assess sustainability and deliver sustained value. It recommends:
1. Creating multiple pit design scenarios to understand project risk, opportunities, and drivers under different inputs and assumptions.
2. Analyzing scenarios in Datamine software to efficiently generate, schedule, and evaluate pit designs on optimization shells.
3. Comparing scenario metrics like NPV, cash flow, costs to balance financial and sustainability targets for a socially and environmentally responsible mine.
This facilitates robust project valuation and selection of development options aligned with sustainability.
Black Iron February 2017 Corporate Presentationblackiron
This corporate presentation from Black Iron Inc. summarizes an investment opportunity in their Shymanivske iron ore project located in Ukraine. Key highlights include a bankable feasibility study showing a large resource of over 645 million tonnes, low capital and operating costs, secured infrastructure access, and attractive project economics with an after-tax IRR of 39% and NPV of $2.6 billion. The presentation outlines Black Iron's strategy to finalize project funding through equity investment, debt financing, and off-take agreements to advance the project towards production.
Pekka Bergström is a senior geomechanics engineer with over 20 years of experience in hard rock mining. He holds several degrees including a Graduate Certificate in Mine Design and Planning and an MSc in Geology and Mineralogy. He has worked extensively in both open pit and underground mines in Finland, Australia, and Ireland. His areas of expertise include geotechnical monitoring, seismic monitoring, ground support design, and drill and blast design. Currently he works as a Senior Drill/Blast and Geotechnical Engineer for Boliden Kevitsa Mining Oy in Finland, where he is responsible for drill and blast operations and rock mechanics of the open pit mine.
For offshore industries such as renewables and oil and gas, meteorological and oceanographic (metocean) conditions have a major impact on the design of facilities and their subsequent operations.
Knowledge of wind, wave, current, water level and weather conditions is essential to contribute to optimum design and efficient operations. Sound use of metocean data and information can assist with improved safety and reduced costs. This 2 or 3 day course takes place in several locations throughout the world.
Fortune Minerals - Investor Presentation - January 2014Company Spotlight
- The document is an investor presentation for a Canadian mineral development company that owns two late-stage projects, a metallurgical coal project and a gold-cobalt project.
- The met coal project, called Arctos Anthracite, has completed a positive feasibility study and environmental assessment work is underway. It aims to produce high quality ultra-low volatile PCI coal.
- The company has a strategic partnership with POSCO, one of the world's largest steel companies, for the Arctos project which validates the project and will aid in its development.
Fortune Minerals Investor Presentation - January 2014Company Spotlight
- The document is an investor presentation for Fortune Minerals outlining their two late-stage mineral development projects in Canada: the Arctos Anthracite Project and the NICO gold-cobalt project.
- The Arctos project has completed a positive feasibility study and environmental assessment and is advancing permitting to begin production. It would be an open-pit mine producing high-quality metallurgical coal.
- Fortune Minerals also provided updates on project economics from the feasibility study, resource estimates, permitting progress, partnerships including with POSCO, and plans to further advance the project.
Teranga Gold Corporation held a presentation focused on delivering growth at the Denver Gold Forum on September 17, 2014. The presentation summarized Teranga's operations, growth opportunities, and financial results for 2014. Key points included doubling reserves and resources through the acquisition of OJVG, integration of Sabodala and Masato operations, and exploration programs identifying additional reserve potential. Production is expected to increase to 250,000-350,000 ounces per year by optimizing operations and integrating assets. The presentation highlighted Teranga's goal of increasing production further to 400,000-500,000 ounces through regional exploration successes and potential additional milling capacity.
Quarterly Update - Dec 15 2022 - Final .pdfseemasindwani
1) Probe Metals continues to advance its Val-d'Or East project through exploration drilling, metallurgical testing, and permitting activities to support a PFS. Drilling in 2022 totaled 165,000 meters and showed potential resource growth at the Monique, Pascalis and Courvan deposits.
2) Exploration drilling was also conducted at Detour Quebec and Casa Cameron properties, with an unexpectedly thick copper zone intersected at Detour La Peltrie indicating significant copper potential.
3) Plans for Q1 2023 include a Monique resource update in January, followed by Pascalis and Courvan updates. Drilling will target new discoveries and resource expansion, with results reported starting in
Quarterly Update - Dec 15 2022 - Final .pdfseemasindwani
1) Probe Metals continues to advance its Val-d'Or East project through exploration drilling, metallurgical testing, and permitting activities to support a PFS. Drilling in 2022 totaled 165,000 meters and showed potential to expand resources and simplify the mine plan.
2) Exploration drilling was also carried out at Detour Quebec and Casa Cameron properties, with an unexpected thick copper zone intersected at Detour La Peltrie indicating significant copper potential.
3) Plans for Q1 2023 include resource updates, releasing 2022 drill results, additional IP surveying at Detour, follow up drilling, and continuing development activities to advance the Val-d'Or East project.
Teranga Gold Investor Presentation August 2014Teranga Gold
The document provides an investor presentation for Teranga Gold Corporation. Key points include:
- Teranga operates the only gold mine and mill in Senegal, which has produced over 1 million ounces to date.
- The company recently integrated the nearby OJVG mine, doubling reserves, resources, mine life and production.
- Short and medium term plans focus on optimizing the combined mine plan, mill throughput, and evaluating heap leaching to increase reserves and cash flow.
- Exploration is targeting reserve growth through drilling existing deposits and evaluating prospects across the company's large land package.
Forbes & Manhattan Coal Corp. is a growing coal producer in South Africa with bituminous and anthracite coal operations. It has a total mineable coal resource of 72.5 million tonnes of bituminous coal and 50.8 million tonnes of anthracite coal. The company aims to increase annual saleable production to 2 million tonnes within 3 years by expanding its Magdalena and Aviemore mines. Forbes & Manhattan provides concise summaries of its coal resources, mining operations, production and sales figures, management team, and investment highlights.
- The document is the transcript from a Ur-Energy teleconference and webcast that discusses the company's Lost Creek uranium production facility and Pathfinder-Shirley Basin development project.
- Lost Creek has exceeded production targets with head grades 3-4 times higher than projected, and the facility has successfully captured over 500,000 pounds of uranium between 2013-2014.
- An updated preliminary economic assessment estimates 9.2 million pounds of uranium can be recovered from Lost Creek over its lifetime at a low cash operating cost of $21.61 per pound.
This corporate presentation from Black Iron Inc. outlines an investment opportunity in an iron ore project located in Ukraine. Key points include:
- Black Iron's flagship Shymanivske project has large mineral resources, positive feasibility study economics, and access to existing infrastructure for rail, port and utilities.
- The project benefits from proximity to markets in Europe and Asia and a location in a major iron ore district of Ukraine.
- Black Iron has the required permits and is advancing the project, highlighting potential for resource expansion and low development risks relative to other geographies.
- Ukraine provides a mining-friendly jurisdiction with potential for closer European integration and a skilled workforce for the industry.
Forbes & Manhattan Coal Corp. is a growing coal producer in South Africa with two operating mines - the Magdalena mine producing bituminous coal and the Aviemore mine producing anthracite coal. The company has a large coal resource base of over 72 million tonnes of bituminous coal and over 50 million tonnes of anthracite coal. In fiscal year 2013, total saleable production was over 958,000 tonnes. The company aims to increase production to over 2 million tonnes per year. Forbes & Manhattan Coal Corp. provides South African and international customers with high quality thermal and energy coal.
This document provides biographical and professional details about Mohamed Shady. It includes his contact information, family status, education history, areas of expertise, and work experience spanning over 14 years with Schlumberger in various production engineering and project management roles in Algeria and Egypt. Some of the key projects summarized are field development plans for naturally fractured reservoirs, stimulation projects, production optimization studies, and reservoir management roles.
Quarterly Update - Dec 15 2022 - Final .pdfseemasindwani
1) Probe Metals completed significant exploration drilling at its Val-d'Or East and Detour Quebec projects in Q4 2022, with over 165,000 metres drilled at Val-d'Or East and 10,300 metres at Detour Quebec.
2) At Val-d'Or East, drilling continues to show resource growth and improved economics, with larger open pit shapes expected. A resource update for the Monique deposit is scheduled for January 2023.
3) At Detour Quebec, a 345-metre wide zone of copper-gold-silver mineralization was intersected, indicating potential for copper. Assays are pending.
4) Plans for Q1 2023 include further drilling
This document provides an overview of an investment opportunity in Black Iron Inc., an iron ore exploration and development company. Some key points:
- Black Iron is developing the Shymanivske iron ore deposit in Ukraine which has over 600 million tonnes of resources. A feasibility study shows the potential for a 9.9 million tonne per year operation with strong economics.
- The project benefits from excellent infrastructure access, including secured rail capacity, port access, and a letter of intent for power. It is located near other producers in a major iron ore district.
- A development agreement is in place with Metinvest, Ukraine's largest steel and mining company, which will fund half of project construction costs estimated at
Centrex Metals (ASX:CXM) Investor Presentation September 2014Symposium
September 2014 – Centrex Metals ASX:CXM, presented their latest investment update to over 300 investors in Sydney and Melbourne.
In this investor update, Gavin Bosch, Chief Financial Officer of CXM gives an overview of their current position and opportunities.
For more information about Centrex Metals, visit http://www.centrexmetals.com.au/
For more information about Symposium’s Investor Roadshows, visit http://symposium.net.au/InvestorRoadshow/
Iron Road - Central Eyre Iron Project Technical PresentationIron_Road_Limited
This presentation summarises some thought-provoking aspects of our technical journey, challenging the status quo and how these aspects influence the overall design.
Mining
• Understanding the CEIP orebody.
• Transition from owner mining operating traditional truck & shovel, to contract mining managing in-pit crushing & conveying (IPCC).
Ore Beneficiation
• Developing a thorough understanding of the metallurgical behaviour of the CEIP ore.
• Innovative materials handling and the elimination of a conventional tailings storage facility.
• Optimisation and the inclusion of a regrind circuit.
Infrastructure Design Philosophy
• Rotary versus bottom dump rail discharge systems.
• Port facility and high speed ship loading.
• Access and use by third parties.
Protecting the Schedule
• High density, vertically stacked modularisation.
• Parallel process design.
• Wet commissioning off-site in construction yards.
SGS Geological Services provides mineral project evaluation and mining industry services including exploration, ore body modelling, resource estimation, mine engineering, audits, and technical reports. They have over 1,000 consulting projects completed worldwide across a variety of commodities. Their expertise includes geological modelling using specialized software, geostatistics, resource estimation to international reporting standards, machine learning applications, and mining engineering to optimize projects.
This corporate presentation from Black Iron Inc. summarizes their compelling investment opportunity in iron ore in Ukraine. Black Iron owns the large Shymanivske iron ore deposit which has over 645 million tonnes of resources. They have completed a positive feasibility study showing strong economics for a 9.9 million tonne per year operation. Key advantages are access to existing infrastructure for power, rail and port, as well as a skilled local workforce. The project is located near other producers in a major iron ore district. Black Iron believes they have all the fundamentals in place for a successful low cost project and that the deposit has potential for resource expansion.
Similar to 9. Santhosh Mulky, Fortescue Metals - A Powerful Tool to Unlock Potential Value (20)
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...Kristy Marshall
This document discusses using scenario planning and analysis in open pit mine planning to assess sustainability and deliver sustained value. It recommends:
1. Creating multiple pit design scenarios to understand project risk, opportunities, and drivers under different inputs and assumptions.
2. Analyzing scenarios in Datamine software to efficiently generate, schedule, and evaluate pit designs on optimization shells.
3. Comparing scenario metrics like NPV, cash flow, costs to balance financial and sustainability targets for a socially and environmentally responsible mine.
This facilitates robust project valuation and selection of development options aligned with sustainability.
5. Pedro Ladeira, Datamine - Probability of Achieving Certain Economic Outcom...Kristy Marshall
Probability of Achieving Certain Economic Outcomes (Summit); New Mine Design Technologies
Contact sales@dataminesoftware.com to enquire about Datamine software solutions.
2. Jonathan Nortier and Ali Sirkeci, AMC - Evaluate Your Options with MinemaxKristy Marshall
This document discusses how Minemax software can be used to evaluate mining options and scenarios. It provides three case studies where Minemax was used: 1) A capacity study to determine the optimal plant size, testing various scenarios. 2) A study of a TSF constrained project to determine the optimal pit design. 3) A study involving pit sequencing and plant feed determination for a project with multiple ore types requiring blending to meet processing constraints. The document emphasizes how Minemax allows evaluation of numerous scenarios quickly and generation of practical mining schedules.
1. Jonathan Graham, Datamine - Welcome to the Strategic Open Pit Mine Plannin...Kristy Marshall
As the leading technology provider in the industry, we create value for customers through knowledge sharing, optimal mine planning strategies, and outstanding results. Datamine is a true global leader in mining software with 26 offices worldwide and over 400 employees. They offer the broadest technical solutions across the mining value chain, developing their own core products, acquiring proven technologies, and partnering with specialists.
This document outlines the new features in Supervisor 8.13 including conditional simulation, QQ plots, optimum digline analysis, GT curve analysis, and probability plots. It also summarizes previously released features in versions 8.11 and 8.12. Planned future releases are mentioned, including multivariate simulation in version 8.14. The webinar agenda includes explanations of the new features, design principles, and how to provide feedback or get involved in the pre-release program. Users are encouraged to download the latest version, watch feature demo videos, and share feedback to help improve the software.
HCL Notes und Domino Lizenzkostenreduzierung in der Welt von DLAUpanagenda
Webinar Recording: https://www.panagenda.com/webinars/hcl-notes-und-domino-lizenzkostenreduzierung-in-der-welt-von-dlau/
DLAU und die Lizenzen nach dem CCB- und CCX-Modell sind für viele in der HCL-Community seit letztem Jahr ein heißes Thema. Als Notes- oder Domino-Kunde haben Sie vielleicht mit unerwartet hohen Benutzerzahlen und Lizenzgebühren zu kämpfen. Sie fragen sich vielleicht, wie diese neue Art der Lizenzierung funktioniert und welchen Nutzen sie Ihnen bringt. Vor allem wollen Sie sicherlich Ihr Budget einhalten und Kosten sparen, wo immer möglich. Das verstehen wir und wir möchten Ihnen dabei helfen!
Wir erklären Ihnen, wie Sie häufige Konfigurationsprobleme lösen können, die dazu führen können, dass mehr Benutzer gezählt werden als nötig, und wie Sie überflüssige oder ungenutzte Konten identifizieren und entfernen können, um Geld zu sparen. Es gibt auch einige Ansätze, die zu unnötigen Ausgaben führen können, z. B. wenn ein Personendokument anstelle eines Mail-Ins für geteilte Mailboxen verwendet wird. Wir zeigen Ihnen solche Fälle und deren Lösungen. Und natürlich erklären wir Ihnen das neue Lizenzmodell.
Nehmen Sie an diesem Webinar teil, bei dem HCL-Ambassador Marc Thomas und Gastredner Franz Walder Ihnen diese neue Welt näherbringen. Es vermittelt Ihnen die Tools und das Know-how, um den Überblick zu bewahren. Sie werden in der Lage sein, Ihre Kosten durch eine optimierte Domino-Konfiguration zu reduzieren und auch in Zukunft gering zu halten.
Diese Themen werden behandelt
- Reduzierung der Lizenzkosten durch Auffinden und Beheben von Fehlkonfigurationen und überflüssigen Konten
- Wie funktionieren CCB- und CCX-Lizenzen wirklich?
- Verstehen des DLAU-Tools und wie man es am besten nutzt
- Tipps für häufige Problembereiche, wie z. B. Team-Postfächer, Funktions-/Testbenutzer usw.
- Praxisbeispiele und Best Practices zum sofortigen Umsetzen
Threats to mobile devices are more prevalent and increasing in scope and complexity. Users of mobile devices desire to take full advantage of the features
available on those devices, but many of the features provide convenience and capability but sacrifice security. This best practices guide outlines steps the users can take to better protect personal devices and information.
Let's Integrate MuleSoft RPA, COMPOSER, APM with AWS IDP along with Slackshyamraj55
Discover the seamless integration of RPA (Robotic Process Automation), COMPOSER, and APM with AWS IDP enhanced with Slack notifications. Explore how these technologies converge to streamline workflows, optimize performance, and ensure secure access, all while leveraging the power of AWS IDP and real-time communication via Slack notifications.
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Speck&Tech
ABSTRACT: A prima vista, un mattoncino Lego e la backdoor XZ potrebbero avere in comune il fatto di essere entrambi blocchi di costruzione, o dipendenze di progetti creativi e software. La realtà è che un mattoncino Lego e il caso della backdoor XZ hanno molto di più di tutto ciò in comune.
Partecipate alla presentazione per immergervi in una storia di interoperabilità, standard e formati aperti, per poi discutere del ruolo importante che i contributori hanno in una comunità open source sostenibile.
BIO: Sostenitrice del software libero e dei formati standard e aperti. È stata un membro attivo dei progetti Fedora e openSUSE e ha co-fondato l'Associazione LibreItalia dove è stata coinvolta in diversi eventi, migrazioni e formazione relativi a LibreOffice. In precedenza ha lavorato a migrazioni e corsi di formazione su LibreOffice per diverse amministrazioni pubbliche e privati. Da gennaio 2020 lavora in SUSE come Software Release Engineer per Uyuni e SUSE Manager e quando non segue la sua passione per i computer e per Geeko coltiva la sua curiosità per l'astronomia (da cui deriva il suo nickname deneb_alpha).
Generating privacy-protected synthetic data using Secludy and MilvusZilliz
During this demo, the founders of Secludy will demonstrate how their system utilizes Milvus to store and manipulate embeddings for generating privacy-protected synthetic data. Their approach not only maintains the confidentiality of the original data but also enhances the utility and scalability of LLMs under privacy constraints. Attendees, including machine learning engineers, data scientists, and data managers, will witness first-hand how Secludy's integration with Milvus empowers organizations to harness the power of LLMs securely and efficiently.
UiPath Test Automation using UiPath Test Suite series, part 6DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 6. In this session, we will cover Test Automation with generative AI and Open AI.
UiPath Test Automation with generative AI and Open AI webinar offers an in-depth exploration of leveraging cutting-edge technologies for test automation within the UiPath platform. Attendees will delve into the integration of generative AI, a test automation solution, with Open AI advanced natural language processing capabilities.
Throughout the session, participants will discover how this synergy empowers testers to automate repetitive tasks, enhance testing accuracy, and expedite the software testing life cycle. Topics covered include the seamless integration process, practical use cases, and the benefits of harnessing AI-driven automation for UiPath testing initiatives. By attending this webinar, testers, and automation professionals can gain valuable insights into harnessing the power of AI to optimize their test automation workflows within the UiPath ecosystem, ultimately driving efficiency and quality in software development processes.
What will you get from this session?
1. Insights into integrating generative AI.
2. Understanding how this integration enhances test automation within the UiPath platform
3. Practical demonstrations
4. Exploration of real-world use cases illustrating the benefits of AI-driven test automation for UiPath
Topics covered:
What is generative AI
Test Automation with generative AI and Open AI.
UiPath integration with generative AI
Speaker:
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
HCL Notes and Domino License Cost Reduction in the World of DLAUpanagenda
Webinar Recording: https://www.panagenda.com/webinars/hcl-notes-and-domino-license-cost-reduction-in-the-world-of-dlau/
The introduction of DLAU and the CCB & CCX licensing model caused quite a stir in the HCL community. As a Notes and Domino customer, you may have faced challenges with unexpected user counts and license costs. You probably have questions on how this new licensing approach works and how to benefit from it. Most importantly, you likely have budget constraints and want to save money where possible. Don’t worry, we can help with all of this!
We’ll show you how to fix common misconfigurations that cause higher-than-expected user counts, and how to identify accounts which you can deactivate to save money. There are also frequent patterns that can cause unnecessary cost, like using a person document instead of a mail-in for shared mailboxes. We’ll provide examples and solutions for those as well. And naturally we’ll explain the new licensing model.
Join HCL Ambassador Marc Thomas in this webinar with a special guest appearance from Franz Walder. It will give you the tools and know-how to stay on top of what is going on with Domino licensing. You will be able lower your cost through an optimized configuration and keep it low going forward.
These topics will be covered
- Reducing license cost by finding and fixing misconfigurations and superfluous accounts
- How do CCB and CCX licenses really work?
- Understanding the DLAU tool and how to best utilize it
- Tips for common problem areas, like team mailboxes, functional/test users, etc
- Practical examples and best practices to implement right away
In his public lecture, Christian Timmerer provides insights into the fascinating history of video streaming, starting from its humble beginnings before YouTube to the groundbreaking technologies that now dominate platforms like Netflix and ORF ON. Timmerer also presents provocative contributions of his own that have significantly influenced the industry. He concludes by looking at future challenges and invites the audience to join in a discussion.
Have you ever been confused by the myriad of choices offered by AWS for hosting a website or an API?
Lambda, Elastic Beanstalk, Lightsail, Amplify, S3 (and more!) can each host websites + APIs. But which one should we choose?
Which one is cheapest? Which one is fastest? Which one will scale to meet our needs?
Join me in this session as we dive into each AWS hosting service to determine which one is best for your scenario and explain why!
Unlocking Productivity: Leveraging the Potential of Copilot in Microsoft 365, a presentation by Christoforos Vlachos, Senior Solutions Manager – Modern Workplace, Uni Systems
How to Get CNIC Information System with Paksim Ga.pptxdanishmna97
Pakdata Cf is a groundbreaking system designed to streamline and facilitate access to CNIC information. This innovative platform leverages advanced technology to provide users with efficient and secure access to their CNIC details.
Taking AI to the Next Level in Manufacturing.pdfssuserfac0301
Read Taking AI to the Next Level in Manufacturing to gain insights on AI adoption in the manufacturing industry, such as:
1. How quickly AI is being implemented in manufacturing.
2. Which barriers stand in the way of AI adoption.
3. How data quality and governance form the backbone of AI.
4. Organizational processes and structures that may inhibit effective AI adoption.
6. Ideas and approaches to help build your organization's AI strategy.
Ocean lotus Threat actors project by John Sitima 2024 (1).pptxSitimaJohn
Ocean Lotus cyber threat actors represent a sophisticated, persistent, and politically motivated group that poses a significant risk to organizations and individuals in the Southeast Asian region. Their continuous evolution and adaptability underscore the need for robust cybersecurity measures and international cooperation to identify and mitigate the threats posed by such advanced persistent threat groups.
Driving Business Innovation: Latest Generative AI Advancements & Success StorySafe Software
Are you ready to revolutionize how you handle data? Join us for a webinar where we’ll bring you up to speed with the latest advancements in Generative AI technology and discover how leveraging FME with tools from giants like Google Gemini, Amazon, and Microsoft OpenAI can supercharge your workflow efficiency.
During the hour, we’ll take you through:
Guest Speaker Segment with Hannah Barrington: Dive into the world of dynamic real estate marketing with Hannah, the Marketing Manager at Workspace Group. Hear firsthand how their team generates engaging descriptions for thousands of office units by integrating diverse data sources—from PDF floorplans to web pages—using FME transformers, like OpenAIVisionConnector and AnthropicVisionConnector. This use case will show you how GenAI can streamline content creation for marketing across the board.
Ollama Use Case: Learn how Scenario Specialist Dmitri Bagh has utilized Ollama within FME to input data, create custom models, and enhance security protocols. This segment will include demos to illustrate the full capabilities of FME in AI-driven processes.
Custom AI Models: Discover how to leverage FME to build personalized AI models using your data. Whether it’s populating a model with local data for added security or integrating public AI tools, find out how FME facilitates a versatile and secure approach to AI.
We’ll wrap up with a live Q&A session where you can engage with our experts on your specific use cases, and learn more about optimizing your data workflows with AI.
This webinar is ideal for professionals seeking to harness the power of AI within their data management systems while ensuring high levels of customization and security. Whether you're a novice or an expert, gain actionable insights and strategies to elevate your data processes. Join us to see how FME and AI can revolutionize how you work with data!
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc
How does your privacy program stack up against your peers? What challenges are privacy teams tackling and prioritizing in 2024?
In the fifth annual Global Privacy Benchmarks Survey, we asked over 1,800 global privacy professionals and business executives to share their perspectives on the current state of privacy inside and outside of their organizations. This year’s report focused on emerging areas of importance for privacy and compliance professionals, including considerations and implications of Artificial Intelligence (AI) technologies, building brand trust, and different approaches for achieving higher privacy competence scores.
See how organizational priorities and strategic approaches to data security and privacy are evolving around the globe.
This webinar will review:
- The top 10 privacy insights from the fifth annual Global Privacy Benchmarks Survey
- The top challenges for privacy leaders, practitioners, and organizations in 2024
- Key themes to consider in developing and maintaining your privacy program
2. 2
Forward
Looking
Statements
Disclaimer
Important Notice
The purpose of this presentation is to provide general information about Fortescue Metals Group
Ltd (“Fortescue”). It is not recommended that any person makes any investment decision in relation
to Fortescue based on this presentation. This presentation contains certain statements which may
constitute “forward-looking statements”. Such statements are only predictions and are subject to
inherent risks and uncertainties which could cause actual values, results, performance or
achievements to differ materially from those expressed, implied or projected in any forward-looking
statements. No representation or warranty, express or implied, is made by Fortescue that the
material contained in this presentation will be achieved or prove to be correct. Except for statutory
liability which cannot be excluded, each of Fortescue, its officers, employees and advisers
expressly disclaims any responsibility for the accuracy or completeness of the material contained in
this presentation and excludes all liability whatsoever (including in negligence) for any loss or
damage which may be suffered by any person as a consequence of any information in this
presentation or any error or omission therefrom. Fortescue accepts no responsibility to update any
person regarding any inaccuracy, omission or change in information in this presentation or any
other information made available to a person nor any obligation to furnish the person with any
further information.
Additional Information
This presentation should be read in conjunction with the Annual Report at 30 June 2020 together
with any announcements made by Fortescue in accordance with its continuous disclosure
obligations arising under the Corporations Act 2001 and ASX Listing Rules. Any references to
reserve and resources estimations should be read in conjunction with Fortescue’s Ore Reserves
and Mineral Resources statements released to the Australian Securities Exchange on 21 August
2020. Fortescue confirms in the subsequent public report that it is not aware of any new information
or data that materially affects the information included in the relevant market announcement and, in
the case of estimates of mineral resources or ore reserves, that all material assumptions and
technical parameters underpinning the estimates in the relevant market announcement continue to
apply and have not materially changed. All amounts within this presentation are stated in United
States Dollars consistent with the functional currency of Fortescue Metals Group Ltd, unless
otherwise stated. Tables contained within this presentation may contain immaterial rounding
differences.
3. 3
Senior Mining Engineer
• Open pit mining engineer with over 16 years of experience
– Production, Mine Planning and consulting
Current role
• FMG – Senior Mine Planning Engineer (Iron Bridge magnetite Project)
• Strategic planning, Long Term and 5YMP and
• Long Term Mine Design
About me
Santhosh Mulky
4. 4
Datamine Studio OP – about 9 years, found the following capabilities very useful
• Ore loss and Dilution modelling
• Dynamic Pit Designing tool
Minemax – From 2012 till date
• First project – FS of a OP gold mine with a trade-off study (Trolley Assist Vs
Conventional Shovel/Truck – Expit Belt conveying)
Strategic Planning in my current role
• Reserve estimation
• Capacity studies
• Various scenarios to evaluate the extended mine life cases
• Sensitivities to evaluate the sensitivity to price and cost
• To obtain guidance on grade binning/material type strategy
Datamine Mine Planning Tools - Experience
5. 5
• Commodities: Iron ore, Copper, Gold, Silver, Phosphate, Potash, Rare Earths Element, PGE etc.
• Combined OP and UG optimisation study for the locked in UG scheduling scenarios – to decide the
optimum time for introducing underground after applying a capital trigger
• Trade off studies e.g. Trolley Assist vs Conventional Shovel and Truck vs Expit Belt Conveying
• Multi pit project optimisation with backfilling options
• Mining and Plant capacity studies
• Processing Technological option evaluation
• Mining ramp-up studies with capitals for truck and shovels
• Mining, Processing and Logistics simultaneous schedule optimisation
• Ore binding (ROM material types) strategy for operations
Minemax experience
Nature and type of work carried out (at previous consulting role)
7. 7
Strategic Planning - Preparation
Ore loss and Dilution and modelling – Regularisation to selected SMU size
• Pit optimisation
• To obtain guidance on mining pushbacks (staged mining)
• Various scenarios created by varying the pushback sizes (emphasising mainly on the initial mining
phases)
• Haulage study to obtain haul cycle data for mine ore and waste haulage and reclaiming from stockpiles
to plants – this was used in minemax to calculate truck numbers and enable truck purchase
• Grade tonnage curves to define material types/stockpiles
Products
• Three product types were considered and a penalty model was applied
• This allowed minemax optimise the plan based on the revenue, cost and available inventory to
make the optimum blend
8. 8
• Minemax was setup as per the project description using the pit inventory and guidance obtained from the
preparatory steps (Pushbacks, material types, Cycle time etc)
• Appx 6 minemax models created as per the matrix below
(Max difference for NPV for the scenarios in the table above was over 3%)
• Products
– 3 product types were considered and a penalty model was applied (Fe%, SiO2%, Al2O3%, P%)
– This approach enabled minemax generate ‘optimum product’ based on revenue, cost making best use
of the available mineral inventory
– ‘Allowing product mix’ vary year by year allows scheduler address price as a key factor in the
optimisation process
Strategic Planning – Modelling Approach
Minemax Scenarios
matrix (NPV populated
after completing the
scenarios)
Material Types/Stockpiling Scenario
1 2 3
Pushbacks
Scenarios
1
2
3
9. 9
How the plan was optimised : Apart from modelling and applying cost to mining,
processing and logistics in line with the project setup
– By allowing minemax to vary the product mix
– By varying the pushback sizes
– By varying the materials/stockpiles
Capital expenditure profile
– Mining fleet
– Processing plant capital, time of construction and size
– Logistics options and timing of capital
Project Findings and Outcome
10. 10
Guidance on physicals
– Selection of ultimate pit through the schedule (shells not mined after the end of the
schedule excluded from the LOM pits)
– Mining sequence
– Ore binning strategy to improve blending
– Variable COG –for various sources of mining
– Variable COG – at various plants to achieve the optimum product mix by year
Key drivers – sensitivity to NPV
– Price, Logistics cost and processing cost
– Processing cost
– Mining cost
Project Findings and Outcome