The document provides a shareholder update from Aura Minerals regarding their Sao Francisco gold mine in Brazil. It discusses several options to improve the mine plan including continuing current operations, splitting the pit into phases, or dedicating 3-4 months to waste stripping. The preferred option is 4 months of waste stripping to create wider benches for safer and more efficient mining. This would expose higher grade ore, improve haul roads and operations, and allow maintenance. Retreating tailings could produce an additional 9,000-11,000 oz annually. With cost savings and higher production, cash costs are projected to decrease to $700-740/oz.