This document outlines the scope of work, challenges, and actions for Puerta de Tierra's Boardwalk Phase II project on the island of Puerto Rico. The scope of work includes modifying the conceptual master plan, developing schematic and preliminary designs, and producing construction plans. Key challenges are integrating transportation study recommendations, strengthening cyclist and pedestrian safety, developing an economically feasible project, and modifying existing infrastructure. Planned actions are reducing vehicle lanes, establishing safe park access, adding separated bicycle lanes, and refurbishing walkways.