Introduction of the Project
• The second phase of Coastal Cities Pollution Control Projects supporting the
Government’s comprehensive program to improve the provision of efficient
and sustainable wastewater services in Croatia’s coastal cities and thus improve
coastal water quality along the Adriatic Coast.
• The CCPCP 2 comprises of three components: (1) Wastewater investments (2)
Institutional strengthening (3) Seawater quality monitoring
• The total Bank financing for CCPCP APL2 in the amount of Euro 60 million
(US$ 87.5 million equivalent) and has been supported by the GEF grant in the
amount of US$ 6.4 million.
• The project is effective as of June 4, 2009 and closes on September 30, 2014.
• Implementing agencies:
• (i) Croatian Waters (components 1,2,3A)
• (ii) Ministry of Environmental Protection, Physical Planning and Construction.
(component 3b)
Project Objectives & Outcomes
• The project objectives:
- to improve the provision of efficient and sustainable wastewater
services in participating municipalities
- to reduce the nutrient load entering Croatia's coastal waters from
participating municipalities
- to pilot innovative wastewater treatment solutions in selected
municipalities.
Results in Stress Reduction
• As the project is in early stage, no tangible results available at this
point, but target project outcomes are:
- a percent of households in participating cities would able to
connect to wastewater services is by the closing date expected to
increase from 46 to 76 percent;
- a percent of wastewater collected that is treated is expected to
increase from 15 to 71 percent.
Results in Environmental Status
• Impact will be felt only after end of all construction activities, at
the end of the project.
• Target: 50% reduction in pollution and nutrient load in cities
with enhanced nutrient removal
• Target: Increased knowledge of alternative nutrient reduction
waste water treatment technologies
Process Results
• Component 1:
• All 21 sub loan agreement have been signed committing full loan
amount, including four GEF co-financing sub-projects: (i)
Metkovic; secondary WWTP with enhanced nutrient removal (ii)
Kastelir; constructed wetland WWTP (iii) Trsteno; constructed
wetlands WWTP, (iv) Medulin; WWTP with nutrient removal
Conclusion
• Project still in early stage, and the overall project progress has
been rated as moderately satisfactory based to on the
improvement in project implementation, after initial delay. The
WB team will continue with close supervision of all project
activities that is expected to lead to successful project completion.
• The project is setting the stage for similar schemes that will be
financed by EU funds
• Needs in a sector as huge and project role is to set an example

More Related Content

Similar to 6-Presentation Croatian Coastal Cities Project_Stipe Gabric

1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
Environmental Protection Agency, Ireland
 
Melamchi water supply project (mwsp)
Melamchi water supply project (mwsp)Melamchi water supply project (mwsp)
Melamchi water supply project (mwsp)
Shisam Neupane
 
water quality
water qualitywater quality
The African Development Bank in Action Activities in the water and sanitation...
The African Development Bank in Action Activities in the water and sanitation...The African Development Bank in Action Activities in the water and sanitation...
The African Development Bank in Action Activities in the water and sanitation...
George Appiah
 
20161216 angolan national plan for rural water & sanitation (nrwssp) af...
20161216 angolan national plan for rural water & sanitation (nrwssp)   af...20161216 angolan national plan for rural water & sanitation (nrwssp)   af...
20161216 angolan national plan for rural water & sanitation (nrwssp) af...
Development Workshop Angola
 
Prezentare MLPS Comitet Director din 19 noiembrie 2012
Prezentare MLPS Comitet Director din 19 noiembrie 2012Prezentare MLPS Comitet Director din 19 noiembrie 2012
Prezentare MLPS Comitet Director din 19 noiembrie 2012GIZ Moldova
 
Item 5.2 NDB finance for sdgs
Item 5.2 NDB finance for sdgsItem 5.2 NDB finance for sdgs
Item 5.2 NDB finance for sdgs
OECD Environment
 
DRAINAGE.pdf
DRAINAGE.pdfDRAINAGE.pdf
DRAINAGE.pdf
PHILIPADIMADO
 
Project Note MLPS
Project Note MLPSProject Note MLPS
Project Note MLPSGIZ Moldova
 
007 NCWRM 2011 Nikitas_H2020
007 NCWRM 2011 Nikitas_H2020007 NCWRM 2011 Nikitas_H2020
007 NCWRM 2011 Nikitas_H2020
GWP-Mediterranean (GWP-Med)
 
Item 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalItem 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_final
OECD Environment
 
Rural water projects in Bolivia: Experience from Mi Agua Program
Rural water projects in Bolivia: Experience from Mi Agua ProgramRural water projects in Bolivia: Experience from Mi Agua Program
Rural water projects in Bolivia: Experience from Mi Agua Program
International Food Policy Research Institute (IFPRI)
 
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
Iwl Pcu
 
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
OECD Environment
 
Pader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportPader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportFesto Wasukira
 
Financing Water Projects - World Bank
Financing Water Projects - World BankFinancing Water Projects - World Bank
Financing Water Projects - World Bank
OECD Environment
 
Presentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM ProjectPresentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM ProjectGIZ Moldova
 
Policy and Financing on Seweraga and Septage Management in the Philippines
Policy and Financing on Seweraga and Septage Management in the PhilippinesPolicy and Financing on Seweraga and Septage Management in the Philippines
Policy and Financing on Seweraga and Septage Management in the Philippines
infosanitasi
 
WATER SUPPLY AND SANITATION DEVELOPMENT.pdf
WATER SUPPLY AND SANITATION DEVELOPMENT.pdfWATER SUPPLY AND SANITATION DEVELOPMENT.pdf
WATER SUPPLY AND SANITATION DEVELOPMENT.pdf
isrealhesingut2
 

Similar to 6-Presentation Croatian Coastal Cities Project_Stipe Gabric (20)

1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG1. River Basin Planning - some key developments - Colin Byrne, DHPLG
1. River Basin Planning - some key developments - Colin Byrne, DHPLG
 
Melamchi water supply project (mwsp)
Melamchi water supply project (mwsp)Melamchi water supply project (mwsp)
Melamchi water supply project (mwsp)
 
water quality
water qualitywater quality
water quality
 
The African Development Bank in Action Activities in the water and sanitation...
The African Development Bank in Action Activities in the water and sanitation...The African Development Bank in Action Activities in the water and sanitation...
The African Development Bank in Action Activities in the water and sanitation...
 
20161216 angolan national plan for rural water & sanitation (nrwssp) af...
20161216 angolan national plan for rural water & sanitation (nrwssp)   af...20161216 angolan national plan for rural water & sanitation (nrwssp)   af...
20161216 angolan national plan for rural water & sanitation (nrwssp) af...
 
Prezentare MLPS Comitet Director din 19 noiembrie 2012
Prezentare MLPS Comitet Director din 19 noiembrie 2012Prezentare MLPS Comitet Director din 19 noiembrie 2012
Prezentare MLPS Comitet Director din 19 noiembrie 2012
 
Item 5.2 NDB finance for sdgs
Item 5.2 NDB finance for sdgsItem 5.2 NDB finance for sdgs
Item 5.2 NDB finance for sdgs
 
DRAINAGE.pdf
DRAINAGE.pdfDRAINAGE.pdf
DRAINAGE.pdf
 
Project Note MLPS
Project Note MLPSProject Note MLPS
Project Note MLPS
 
30.UNEP_Kuwait
30.UNEP_Kuwait30.UNEP_Kuwait
30.UNEP_Kuwait
 
007 NCWRM 2011 Nikitas_H2020
007 NCWRM 2011 Nikitas_H2020007 NCWRM 2011 Nikitas_H2020
007 NCWRM 2011 Nikitas_H2020
 
Item 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_finalItem 6 b. euwi npd green_tf_ppt_final
Item 6 b. euwi npd green_tf_ppt_final
 
Rural water projects in Bolivia: Experience from Mi Agua Program
Rural water projects in Bolivia: Experience from Mi Agua ProgramRural water projects in Bolivia: Experience from Mi Agua Program
Rural water projects in Bolivia: Experience from Mi Agua Program
 
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
The Danube - Black Sea Strategic Partnership Program: Progress, Issues and Wa...
 
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...Item 2.3 -	Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
Item 2.3 - Danube-Prut & Black Sea RBMP cycle II ready for adoption and impro...
 
Pader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement ReportPader SCAP100 Stakeholder Engagement Report
Pader SCAP100 Stakeholder Engagement Report
 
Financing Water Projects - World Bank
Financing Water Projects - World BankFinancing Water Projects - World Bank
Financing Water Projects - World Bank
 
Presentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM ProjectPresentation of the Modernization of Local Public Services in the RM Project
Presentation of the Modernization of Local Public Services in the RM Project
 
Policy and Financing on Seweraga and Septage Management in the Philippines
Policy and Financing on Seweraga and Septage Management in the PhilippinesPolicy and Financing on Seweraga and Septage Management in the Philippines
Policy and Financing on Seweraga and Septage Management in the Philippines
 
WATER SUPPLY AND SANITATION DEVELOPMENT.pdf
WATER SUPPLY AND SANITATION DEVELOPMENT.pdfWATER SUPPLY AND SANITATION DEVELOPMENT.pdf
WATER SUPPLY AND SANITATION DEVELOPMENT.pdf
 

More from Iwl Pcu

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)
Iwl Pcu
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)
Iwl Pcu
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Iwl Pcu
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)
Iwl Pcu
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designing
Iwl Pcu
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)
Iwl Pcu
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs Publication
Iwl Pcu
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)
Iwl Pcu
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 

More from Iwl Pcu (20)

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designing
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs Publication
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 

6-Presentation Croatian Coastal Cities Project_Stipe Gabric

  • 1. IBRD: Croatia Coastal Cities Pollution Control Project 2 Mr. Stjepan Gabric, Senior Project Officer & Task Team Leader E-mail: sgabric@worldbank.org
  • 2. Introduction of the Project • The second phase of Coastal Cities Pollution Control Projects supporting the Government’s comprehensive program to improve the provision of efficient and sustainable wastewater services in Croatia’s coastal cities and thus improve coastal water quality along the Adriatic Coast. • The CCPCP 2 comprises of three components: (1) Wastewater investments (2) Institutional strengthening (3) Seawater quality monitoring • The total Bank financing for CCPCP APL2 in the amount of Euro 60 million (US$ 87.5 million equivalent) and has been supported by the GEF grant in the amount of US$ 6.4 million. • The project is effective as of June 4, 2009 and closes on September 30, 2014. • Implementing agencies: • (i) Croatian Waters (components 1,2,3A) • (ii) Ministry of Environmental Protection, Physical Planning and Construction. (component 3b)
  • 3. Project Objectives & Outcomes • The project objectives: - to improve the provision of efficient and sustainable wastewater services in participating municipalities - to reduce the nutrient load entering Croatia's coastal waters from participating municipalities - to pilot innovative wastewater treatment solutions in selected municipalities.
  • 4. Results in Stress Reduction • As the project is in early stage, no tangible results available at this point, but target project outcomes are: - a percent of households in participating cities would able to connect to wastewater services is by the closing date expected to increase from 46 to 76 percent; - a percent of wastewater collected that is treated is expected to increase from 15 to 71 percent.
  • 5. Results in Environmental Status • Impact will be felt only after end of all construction activities, at the end of the project. • Target: 50% reduction in pollution and nutrient load in cities with enhanced nutrient removal • Target: Increased knowledge of alternative nutrient reduction waste water treatment technologies
  • 6. Process Results • Component 1: • All 21 sub loan agreement have been signed committing full loan amount, including four GEF co-financing sub-projects: (i) Metkovic; secondary WWTP with enhanced nutrient removal (ii) Kastelir; constructed wetland WWTP (iii) Trsteno; constructed wetlands WWTP, (iv) Medulin; WWTP with nutrient removal
  • 7. Conclusion • Project still in early stage, and the overall project progress has been rated as moderately satisfactory based to on the improvement in project implementation, after initial delay. The WB team will continue with close supervision of all project activities that is expected to lead to successful project completion. • The project is setting the stage for similar schemes that will be financed by EU funds • Needs in a sector as huge and project role is to set an example