BIM: The interaction between the specifier and the Passive Fire Protection Community by Peter Capelhorn, CPA
1. BIM
THE INTERACTION BETWEEN THE SPECIFER AND THE
PASSIVE FIRE PROTECTION COMMUNITY
THE CONSTRUCTION
PUZZLE
MAKE EVERYONE WORK
COLLABORATIVELY
Peter Caplehorn RIBA Deputy CE and Policy Director CPA
2. BIM WHERE ARE WE
CONTEXT OF THE INDUSTRY
GO TO INFORMATION
WHAT YOU NEED
GUIDANCE
EXAMPLES
KEY LESSONS SO FAR
WORK SECTOR GROUPS
PASSIVE FIRE DESIGN CONTEXT
SPECIFYING
CONTRACT AND PROCUREMENT
PRODUCTION AND CONSTRUCTION
THE AS BUILT PERFORMANCE QUESTION
Q&A
Peter Caplehorn RIBA Deputy CE and Policy Director CPA
3. The silo problem
Building information Modelling
Is an industry game changer
Is not about 3D graphics
It is about DATA
It is about de-risking construction
It is therefore about efficiency
Clients will want it
You need it
Peter Caplehorn RIBA Deputy CE and Policy Director CPA
4. BIM - WHERE ARE WE
ITS ABOUT CAPTURING
AND USING THE DATA
FROM THE VERY START OF
THE PROJECT
TO IN USE AND BEYOND
Peter Caplehorn RIBA Deputy CE and Policy Director CPA
5. CONTEXT WHAT WE NEED TO UNDERSTAND
DRAWN 2.5 TIMES CONSTUCTED 1.5 TIMES - POOR VALUE
Peter Caplehorn RIBA Deputy CE and Policy Director CPA
6. EXPERIENCE TO DATE
As early as the mid 70’s Car and Plane manufacturers started to design test and
manufacture using computing.
Today this is all products and goods use digital manufacture production and
distribution.
Why not buildings?
Peter Caplehorn RIBA Deputy CE and Policy Director CPA
7. PASSIVE FIRE PROTECTION MANY BUILT EXAMPLES OF BIM
METHODOLOGY SURROUND US
Peter Caplehorn RIBA Deputy CE and Policy Director CPA
8. THE BACK STORY
Peter Caplehorn RIBA Deputy CE and Policy Director CPA
18. Demonstration Projects Experience
Further 25 underway
Feed back build on experience
Refine guidance
Peter Caplehorn RIBA Deputy CE and Policy Director CPA
19. BIM enabled tech-
Emulation
Virtual Reality
Augmented Reality
Peter Caplehorn RIBA Deputy CE and Policy Director CPA
21. LEVEL 3
Now under development
Fully interoperable
Whole team live view
Multi location multi input
Real time resolution
CONTINOUS INPUT
INTERNET OF THINGS
Peter Caplehorn RIBA Deputy CE and Policy Director CPA
22. Closing remarks-
Its all about the data
Accurate designs, Accurate performance
Fully proven before procurement
Data for Facilities Management
Data for Valuing the asset
Data future modifications
Peter Caplehorn RIBA Deputy CE and Policy Director CPA