Scale:
Project:
Date:
Drawn:
Checked:
5/5/201512:56:44PM
12"=1'-0"
308EastGreenStreet
G.100
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
ExteriorPerspectiveRendering
12" = 1'-0"
1
Exterior Perspective
Scale:
Project:
Date:
Drawn:
Checked:
5/5/201512:57:11PM
12"=1'-0"
308EastGreenStreet
G.102
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
3DView1
12" = 1'-0"
1
3D Render 1 Copy 1
Scale:
Project:
Date:
Drawn:
Checked:
5/5/201512:57:14PM
12"=1'-0"
308EastGreenStreet
G.103
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
3DView2
12" = 1'-0"
1
3D Render 2
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:06:02PM
308EastGreenStreet
A.001
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
SitePlan
1
Site Plan
1 2 2.2 3 3.3 4 5 6 6.5 7 8 9
A
C
D
E
E.6
F
G
H
H.8
J
K
10 10.3 10.8 11 12
B.2
B
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:06:03PM
1/16"=1'-0"
308EastGreenStreet
A.100
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
FoundationPlan
1/16" = 1'-0"
1
Foundation
UP
UP
1 2 2.2 3 3.3 4 5 6 6.5 7 8 9
A
C
D
E
E.6
F
G
H
H.8
J
K
10 10.3 10.8 11 12
B.2
16' - 3 1/8" 16' - 3 3/8" 8' - 11 5/8"8' - 7 3/8" 16' - 7 5/8"1' - 2 3/8" 17' - 7" 8' - 11 5/8"8' - 10 3/8" 18' - 0" 3' - 0" 14' - 5" 5' - 9" 7' - 6" 4' - 2" 16' - 0"
B
8'-41/8"5'-77/8"21'-101/8"7'-5"10'-5"6'-10"10'-9"17'-7"20'-8"6'-0"1'-6"20'-2"
E2
E2
E2
D
E
E
D
D K
E
D
E
E
E2
D
D5
F3D5
D5
D5
D
E
A
A2
A
D5
B2
D5
A2
D5
D5
A2
A2
D5
D
D
D
D
DD
D
D5
D
D5
A2
A2
D5
A2
C1
B2
F3
B2
K
F3
E2
E2
C1
C1
C1
A
B2
B2
F
A1
F
K
F
K
F
A1
F
K
B2
F
A2
K
A2
C1
C1
A
A2
A2
E
E2
D5
F3
F3
F3
D5 F3
K
A2
C1
C1
C1
A2
D5D5
E2
K
B2
D
1
A.501
1
A.502
1
A.503
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:06:06PM
1/16"=1'-0"
308EastGreenStreet
A.101
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
FirstFloorPlan
1/16" = 1'-0"
1
1st Floor Slab
DN
UP
DN
UP
UP
1 2 2.2 3 3.3 4 5 6 6.5 7 8 9
A
C
D
E
E.6
F
G
H
H.8
J
K
10 10.3 10.8 11 12
B.2
B
1
A.501
1
A.502
1
A.503
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:06:09PM
1/16"=1'-0"
308EastGreenStreet
A.102
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
SecondFloorPlan
1/16" = 1'-0"
1
2nd Floor Slab
DNUP
DN
DN
1 2 2.2 3 3.3 4 5 6 6.5 7 8 9
A
C
D
E
E.6
F
G
H
H.8
J
K
10 10.3 10.8 11 12
B.2
B
1
A.501
1
A.502
1
A.503
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:06:11PM
1/16"=1'-0"
308EastGreenStreet
A.103
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
ThirdFloorPlan
1/16" = 1'-0"
1
3rd Floor Slab
DN
UP
1 2 2.2 3 3.3 4 5 6 6.5 7 8 9
A
C
D
E
E.6
F
G
H
H.8
J
K
10 10.3 10.8 11 12
B.2
B
1
A.501
1
A.502
1
A.503
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:06:13PM
1/16"=1'-0"
308EastGreenStreet
A.104
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
FourthFloorPlan
1/16" = 1'-0"
1
4th Floor Slab
DN
UP
UP
1 2 2.2 3 3.3 4 5 6 6.5 7 8 9
A
C
D
E
E.6
F
G
H
H.8
J
K
10 10.3 10.8 11 12
B.2
B
1
A.501
A.201
1
A.201
3
1
A.502
1
A.503
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:06:17PM
1/16"=1'-0"
308EastGreenStreet
A.105a
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
FifthFloorPlan
1/16" = 1'-0"
1
5th Floor Slab
DN
UP
1 2 2.2 3 3.3 4 5 6 6.5 7 8 9
A
C
D
E
E.6
F
G
H
H.8
J
K
10 10.3 10.8 11 12
B.2
B
1
A.501
A.201
2
A.201
4
1
A.502
1
A.503
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:06:20PM
1/16"=1'-0"
308EastGreenStreet
A.105b
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
FifthFloorIntermediatePlan
2 2.2 3 3.3
C
D
2' - 8"
11' - 0 25/32"
2' - 11 1/8"6' - 0"2' - 8"
2' - 8"
7' - 9 7/8"7' - 6 1/2" 18' - 5 15/16"
1
A.502
2 2.2 3 3.3
C
D
7' - 6 3/16" 8' - 10 3/8" 3' - 6 3/32"
2'-10"
7' - 6 3/16" 8' - 1 29/32"
1
A.502
2.2 3 3.3 4 5
A
B.2
B
0' - 0 5/8" 11' - 0 25/32"
18' - 1 5/16" 7' - 9 7/8" 9' - 0 3/16"
3'-53/8"11'-37/32"
2.2 3 3.3 4 5
A
B
12' - 11 5/32" 7' - 4 15/16"
7' - 4 15/16"8' - 10 3/8"
3'-73/8"
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:06:22PM
1/8"=1'-0"
308EastGreenStreet
A.201
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
EnlargedPlanUnitsAandB
1/8" = 1'-0"
1
Typical Unit A
1/8" = 1'-0"
2
Typical Unit A Intermediate
1/8" = 1'-0"
3
Typical Unit B
1/8" = 1'-0"
4
Typical Unit B Intermediate
1st Floor Slab
0' - 0"
2nd Floor Slab
14' - 8"
T.O. Footing
-5' - 0"
B.O. Footing
-6' - 0"
1 2 2.2 3 3.3 45 6 6.5 7 8 9 10 10.3 10.811 12
3rd Floor Slab
23' - 6"
4th Floor Slab
32' - 4"
5th Floor Slab
43' - 10"
Penthouse Parapet
259' - 0"
Foundation Wall
Bottom
-5' - 7 15/16"
5th Floor Slab
Courtyard
43' - 0"
6th Floor Slab
61' - 10"
7th Floor Slab
79' - 10"
8th Floor Slab
97' - 10"
9th Floor Slab
115' - 10"
10th Floor Slab
133' - 10"
11th Floor Slab
151' - 10"
12th Floor Slab
169' - 10"
13th Floor Slab
187' - 10"
14th Floor Slab
205' - 10"
15th Floor Slab
223' - 10"
Roof Slab
243' - 10"
Penthouse Decking
257' - 10"
5th Floor Slab
Intermediate
52' - 4"
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:08:30PM
1/32"=1'-0"
308EastGreenStreet
A.301
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
SouthElevation
1/32" = 1'-0"
1
South
1st Floor Slab
0' - 0"
2nd Floor Slab
14' - 8"
T.O. Footing
-5' - 0"
B.O. Footing
-6' - 0"
A C D E E.6 F G H H.8 J KB.2
3rd Floor Slab
23' - 6"
4th Floor Slab
32' - 4"
5th Floor Slab
43' - 10"
B
Penthouse Parapet
259' - 0"
Foundation Wall
Bottom
-5' - 7 15/16"
5th Floor Slab
Courtyard
43' - 0"
6th Floor Slab
61' - 10"
7th Floor Slab
79' - 10"
8th Floor Slab
97' - 10"
9th Floor Slab
115' - 10"
10th Floor Slab
133' - 10"
11th Floor Slab
151' - 10"
12th Floor Slab
169' - 10"
13th Floor Slab
187' - 10"
14th Floor Slab
205' - 10"
15th Floor Slab
223' - 10"
Roof Slab
243' - 10"
Penthouse Decking
257' - 10"
5th Floor Slab
Intermediate
52' - 4"
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:09:11PM
1/32"=1'-0"
308EastGreenStreet
A.302
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
EastElevation
1/32" = 1'-0"
1
East
2nd Floor Slab
14' - 8"
A C D E E.6 F G H H.8 J KB.2
3rd Floor Slab
23' - 6"
4th Floor Slab
32' - 4"
5th Floor Slab
43' - 10"
B
5th Floor Slab
Courtyard
43' - 0"
6th Floor Slab
61' - 10"
5th Floor Slab
Intermediate
52' - 4"
1
A.503
2nd Floor Slab
14' - 8"
1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 10 10.3 10.8 11 12
3rd Floor Slab
23' - 6"
4th Floor Slab
32' - 4"
5th Floor Slab
43' - 10"
1
A.501
5th Floor Slab
Courtyard
43' - 0"
6th Floor Slab
61' - 10"
5th Floor Slab
Intermediate
52' - 4"
1
A.502
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:09:34PM
1/16"=1'-0"
308EastGreenStreet
A.401
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
EnlargedElevationFloors2-5
1/16" = 1'-0"
1
East Floors 2-5
1/16" = 1'-0"
2
South Floors 2-5
A C D E E.6 F G H H.8 J KB.2B
6th Floor Slab
61' - 10"
7th Floor Slab
79' - 10"
8th Floor Slab
97' - 10"
1
A.503
1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 10 10.3 10.8 11 12
1
A.501
6th Floor Slab
61' - 10"
7th Floor Slab
79' - 10"
8th Floor Slab
97' - 10"
1
A.502
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:09:59PM
1/16"=1'-0"
308EastGreenStreet
A.402
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
EnlargedElevationFloors6-7
1/16" = 1'-0"
1
East Floors 6-7
1/16" = 1'-0"
2
South Floors 6-7
1st Floor Slab
0' - 0"
2nd Floor Slab
14' - 8"
T.O. Footing
-5' - 0"
B.O. Footing
-6' - 0"
A C D E E.6 F G H H.8 J KB.2
3rd Floor Slab
23' - 6"
4th Floor Slab
32' - 4"
5th Floor Slab
43' - 10"
B
Penthouse Parapet
259' - 0"
Foundation Wall
Bottom
-5' - 7 15/16"
5th Floor Slab
Courtyard
43' - 0"
6th Floor Slab
61' - 10"
7th Floor Slab
79' - 10"
8th Floor Slab
97' - 10"
9th Floor Slab
115' - 10"
10th Floor Slab
133' - 10"
11th Floor Slab
151' - 10"
12th Floor Slab
169' - 10"
13th Floor Slab
187' - 10"
14th Floor Slab
205' - 10"
15th Floor Slab
223' - 10"
Roof Slab
243' - 10"
Penthouse Decking
257' - 10"
5th Floor Slab
Intermediate
52' - 4"
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:10:01PM
1/32"=1'-0"
308EastGreenStreet
A.501
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
Section1
1/32" = 1'-0"
1
Section 1
1st Floor Slab
0' - 0"
2nd Floor Slab
14' - 8"
T.O. Footing
-5' - 0"
B.O. Footing
-6' - 0"
ACDEE.6FGHH.8JK B.2
3rd Floor Slab
23' - 6"
4th Floor Slab
32' - 4"
5th Floor Slab
43' - 10"
B
Foundation Wall
Bottom
-5' - 7 15/16"
5th Floor Slab
Courtyard
43' - 0"
6th Floor Slab
61' - 10"
7th Floor Slab
79' - 10"
8th Floor Slab
97' - 10"
9th Floor Slab
115' - 10"
10th Floor Slab
133' - 10"
11th Floor Slab
151' - 10"
12th Floor Slab
169' - 10"
13th Floor Slab
187' - 10"
14th Floor Slab
205' - 10"
15th Floor Slab
223' - 10"
Roof Slab
243' - 10"
5th Floor Slab
Intermediate
52' - 4"
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:10:06PM
1/32"=1'-0"
308EastGreenStreet
A.502
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
Section2
1/32" = 1'-0"
1
Section 2
2nd Floor Slab
14' - 8"
T.O. Footing
-5' - 0"
B.O. Footing
-6' - 0"
1 2 2.2 3 3.3 45 6 6.5 7 8 9 10 10.3 10.811 12
3rd Floor Slab
23' - 6"
4th Floor Slab
32' - 4"
5th Floor Slab
43' - 10"
Penthouse Parapet
259' - 0"
Foundation Wall
Bottom
-5' - 7 15/16"
5th Floor Slab
Courtyard
43' - 0"
6th Floor Slab
61' - 10"
7th Floor Slab
79' - 10"
8th Floor Slab
97' - 10"
9th Floor Slab
115' - 10"
10th Floor Slab
133' - 10"
11th Floor Slab
151' - 10"
12th Floor Slab
169' - 10"
13th Floor Slab
187' - 10"
14th Floor Slab
205' - 10"
15th Floor Slab
223' - 10"
Roof Slab
243' - 10"
Penthouse Decking
257' - 10"
5th Floor Slab
Intermediate
52' - 4"
Scale:
Project:
Date:
Drawn:
Checked:
3/6/20161:10:09PM
1/32"=1'-0"
308EastGreenStreet
A.503
Project4
5.05.15
ThomasMcCormick
RebeccaBrouk
308EastGreenStreet
Section3
1/32" = 1'-0"
1
Section 3
3 5/8" METAL STUD @ 16"
O.C.
3" BATT INSULATION IN
WALLS
(1) LAYER 5/8" GYPSUM
BOARD EACH SIDE
16"O.C.
5" TYPICAL U.N.O. HORIZONTAL SECTION
16"O.C.
7 1/4" TYPICAL U.N.O. HORIZONTAL SECTION
6" METAL STUD @ 16"
O.C.
(1) LAYER 5/8" GYPSUM
BOARD EACH SIDE
24"O.C.
5" HORIZONTAL SECTION
3 5/8" METAL STUD @ 24"
O.C.
3" MIN. BATT INSULATION IN
SHAFT WALLS ADJACENT TO
UNITS
(1) 1/2" RC ONE SIDE @ 24" O.C.
SCREW AT STUDS
(1) LAYER 3/4" GYPSUM
BOARD
(1) LAYER 3/4" GYPSUM BOARD
16"O.C.
8 1/2" HORIZONTAL SECTION
6" METAL STUD @ 16"
O.C
(2) LAYERS 5/8" GYPSUM
BOARD EACH SIDE
3" MIN. BATT INSULATION IN
SHAFT WALLS ADJACENT TO
UNITS
16"O.C.
8" HORIZONTAL SECTION
6" METAL STUD @ 16"
O.C.
(1) LAYER 1/2" GYPSUM
BOARD
5" MIN. BATT INSULATION IN
SHAFT WALLS ADJACENT TO
UNITS
(2) LAYERS 1/2'' GYPSUM
BOARD
(1) 1/2" RC ONE SIDE @ 24"
O.C. SCREW AT STUDS
24"O.C.
7 1/2" HORIZONTAL SECTION
6" METAL
STUD @ 24"
O.C.
(1) LAYER 5/8"
GYPSUM BOARD
SCREW-ATT TO
STUDS*
3" MIN. BATT
INSULATION IN
SHAFT WALLS
ADJACENT TO UNITS
(1) LAYER 5/8"
GYPSUM BOARD
SCREW-ATT TO
CHAN
RC-1 CHAN ONE SIDE
24" O.C. SCREW-ATT
TO STUDS
24"O.C.
9 3/4" HORIZONTAL SECTION
6" METAL STUD @ 24"
O.C.
(1) LAYER 5/8" GYPSUM
BOARD SCREW-ATT TO
STUDS*
3 1/2" MIN. BATT INSULATION
(1) LAYER 5/8" GYPSUM
BOARD CORRIDOR SIDE
RC-1 CHAN ONE SIDE 24" O.C.
SCREW-ATT TO STUDS
16"O.C.
9 3/4" HORIZONTAL SECTION
6" METAL STUD @ 16" O.C.
(1) LAYER 5/8" GYPSUM
BOARD ON UNIT SIDE
3 1/2" MIN. BATT
INSULATION
(1) LAYER 5/8" GYPSUM
BOARD CORRIDOR SIDE
RC-1 CHAN ONE SIDE
24" O.C. SCREW-ATT TO
STUDS
16"O.C.
10 1/2" HORIZONTAL SECTION
6" METAL STUD @
16" O.C.
(2) LAYERS
5/8" GYPSUM
BOARD ON
UNIT SIDE
3 1/2" MIN. BATT
INSULATION
(2) LAYERS 5/8"
GYPSUM BOARD
CORRIDOR SIDE
Project:
Date:
DrawnBy:
CheckedBy:
Scale:1"=1'-0"
3/6/20161:10:11PM
REBECCABROUK
THOMAS
MCCORMICK
A.901
308EastGreen
Street
THOMASMCCORMICK
PROJECT2
1" = 1'-0"
1
A
1" = 1'-0"
2
A4
1" = 1'-0"
3
B2
1" = 1'-0"
4
B3
1" = 1'-0"
5
B4
1" = 1'-0"
6
C1
1" = 1'-0"
7
C3
1" = 1'-0"
8
C4
1" = 1'-0"
9
C5
7 5/8" VERTICAL SECTION
8" CMU TYPE D BLOCK, 2 HR
3/8" MORTAR JOINT
9 3/4" VERTICAL SECTION
8" CMU TYPE D BLOCK, 2 HR
3/8" MORTAR JOINT
2"X3" STUDS, 1 SIDE ONLY
2" SPRAY FOAM AT ALL BETWEEN
TEMPERED AND UNTEMPERED LOCATIONS, R-13
(1) LAYER OF 5/8" GYP BD.*
9" VERTICAL SECTION
8" CMU SPLIT FACE BLOCK, 2 HR
3/8" MORTAR JOINT
3" SEMI-RIGID MINERAL
WOOL BOARD INSULATION
10 1/4" VERTICAL SECTION
8" CMU SPLIT FACE
BLOCK, 2 HR
3/8" MORTAR JOINT
(1) LAYER OF 5/8"
DENSGLASS ON
INTERIOR SIDE & 2"
SPRAY FOAM (R-14).
2"X2" STUDS ON
INTERIOR SIDE
4 3/4" HORIZONTAL SECTION
GALV STEEL 'C-H' STUDS
2 1/2" DEEP @24" O.C.
1" GYPSUM WALLBOARD LINER PANEL
3" MIN. BATT INSULATION IN SHAFT
WALLS ADJACENT TO UNITS
2 LAYERS OF 5/8" GYPSUM BOARD
4 3/4" HORIZONTAL SECTION
GALV STEEL 'C-H' STUDS
2 1/2" DEEP @24" O.C.
1" GYPSUM WALLBOARD
LINER PANEL
3" MIN. BATT INSULATION IN
SHAFT
WALLS ADJACENT TO UNITS
2 LAYERS OF 5/8" GYPSUM
BOARD1 LAYER OF 5/8"
GYPSUM BOARD
(INTERIOR OF STAIR
WELL)
8 1/2" HORIZONTAL SECTION
3 1/2" MTL SDS @12" O.C. MIN
25 GAUGE STD
2 LAYERS OF 5/8" GYPSUM BOARD
12"O.C.
1/2" HAT CHANNELS
CONTINUOUS VAPOR BARRIER
2" INSULATED METAL PANEL
16"O.C.8"O.C.
VARIES, SEE PLAN HORIZONTAL SECTION
(1) LAYER 5/8"
GYPSUM BOARD
EACH SIDE
4" MIN BATT INSULATION
3 5/8" METAL STUD
@ 16" O.C.
1'-0" VERTICAL SECTION
12" CONCRETE
FOR PAINT-
SEE STRUCT
DWGS
ELASTOMERIC
COATING
AT EXTERIOR
LOCATIONS
Project:
Date:
DrawnBy:
CheckedBy:
Scale:1"=1'-0"
3/6/20161:10:13PM
REBECCABROUK
THOMAS
MCCORMICK
A.902
308EastGreen
Street
THOMASMCCORMICK
Project2
1" = 1'-0"
1
D
1" = 1'-0"
2
D5
1" = 1'-0"
3
E
1" = 1'-0"
4
E2
1" = 1'-0"
5
F 1" = 1'-0"
6
F3
1" = 1'-0"
7
G3
1" = 1'-0"
8
H
1" = 1'-0"
9
K
VARIES VERTICAL SECTION
2"X 3" METAL STUDS, 24" O.C.
12" CONCRETE FOR PAINT- SEE
STRUCT DWGS
3" SPRAY FOAM @
EXTERIOR WALLS AND
BETWEEN TEMPERED AND
UNTEMPERED SPACES
ONLY.(1) LAYER OF 5/8" GYP BD
ELASTOMERIC COATING AT
EXTERIOR LOCATIONS
9 1/4 HORIZONTAL SECTION
24"O.C.
6" METAL STUD @
24" O.C.
4"MINERAL FIBER
INSULATION (R-15 MAX)
TO EXTEND 6" ABOVE
UPTURN BEAMS
5/8" DENSGLASS
EXT. SHEATHING
1/2" AIR SPACE
2" INSULATED
METAL PANEL
(R-14)
9 3/4 HORIZONTAL SECTION
24"O.C.
6" METAL STUD @ 24"
O.C.
4"MINERAL FIBER
INSULATION (R-15 MAX)
TO EXTEND 6" ABOVE
UPTURN BEAMS
5/8" DENSGLASS EXT.
SHEATHING
1/2" AIR SPACE
2" INSULATED METAL
PANEL (R-14)
5/8" GYP. BD.
CONT. VAPOR
BARRIER (6 MIL)
FLUID APPLIED AIR
BARRIER
Project:
Date:
DrawnBy:
CheckedBy:
Scale:1"=1'-0"
3/6/20161:10:14PM
RebeccaBrouk
THOMAS
MCCORMICK
A.903
308EastGreen
Street
THOMASMCCORMICK
Project2
1" = 1'-0"
1
K4
1" = 1'-0"
2
N1
1" = 1'-0"
3
N2

More Related Content

Similar to 308 East Green Street Revit Project Book

New Portfolio Simple
New Portfolio SimpleNew Portfolio Simple
New Portfolio Simple
Nicholas Ramsingh
 
100 JAY
100 JAY100 JAY
CEDRICKWELCH
CEDRICKWELCHCEDRICKWELCH
CEDRICKWELCH
Cedrick Welch
 
C__Users_Cedrick_Documents_CAPSTONE RENDERINGS_C__Users_Cedrick_Documents_CAP...
C__Users_Cedrick_Documents_CAPSTONE RENDERINGS_C__Users_Cedrick_Documents_CAP...C__Users_Cedrick_Documents_CAPSTONE RENDERINGS_C__Users_Cedrick_Documents_CAP...
C__Users_Cedrick_Documents_CAPSTONE RENDERINGS_C__Users_Cedrick_Documents_CAP...
Cedrick Welch
 
Architectural Portfolio-Nabiha
Architectural Portfolio-NabihaArchitectural Portfolio-Nabiha
Architectural Portfolio-Nabiha
Nabiha Guaffar
 
Final 2
Final 2Final 2
Isbell Remodel - Schematic Pkg - Aug 13, 2015
Isbell Remodel - Schematic Pkg - Aug 13, 2015Isbell Remodel - Schematic Pkg - Aug 13, 2015
Isbell Remodel - Schematic Pkg - Aug 13, 2015
Brandon Swan
 
CE236_Final_2007
CE236_Final_2007CE236_Final_2007
CE236_Final_2007
Amrita Mukherjee
 
Project Planning And Control Club house design with MSP
Project Planning And Control Club house design with MSPProject Planning And Control Club house design with MSP
Project Planning And Control Club house design with MSP
Ayush khandelwal
 
Sample Unit Plan BIM Wall Layouts
Sample Unit Plan BIM Wall LayoutsSample Unit Plan BIM Wall Layouts
Sample Unit Plan BIM Wall Layouts
Geoffrey Jennings
 

Similar to 308 East Green Street Revit Project Book (10)

New Portfolio Simple
New Portfolio SimpleNew Portfolio Simple
New Portfolio Simple
 
100 JAY
100 JAY100 JAY
100 JAY
 
CEDRICKWELCH
CEDRICKWELCHCEDRICKWELCH
CEDRICKWELCH
 
C__Users_Cedrick_Documents_CAPSTONE RENDERINGS_C__Users_Cedrick_Documents_CAP...
C__Users_Cedrick_Documents_CAPSTONE RENDERINGS_C__Users_Cedrick_Documents_CAP...C__Users_Cedrick_Documents_CAPSTONE RENDERINGS_C__Users_Cedrick_Documents_CAP...
C__Users_Cedrick_Documents_CAPSTONE RENDERINGS_C__Users_Cedrick_Documents_CAP...
 
Architectural Portfolio-Nabiha
Architectural Portfolio-NabihaArchitectural Portfolio-Nabiha
Architectural Portfolio-Nabiha
 
Final 2
Final 2Final 2
Final 2
 
Isbell Remodel - Schematic Pkg - Aug 13, 2015
Isbell Remodel - Schematic Pkg - Aug 13, 2015Isbell Remodel - Schematic Pkg - Aug 13, 2015
Isbell Remodel - Schematic Pkg - Aug 13, 2015
 
CE236_Final_2007
CE236_Final_2007CE236_Final_2007
CE236_Final_2007
 
Project Planning And Control Club house design with MSP
Project Planning And Control Club house design with MSPProject Planning And Control Club house design with MSP
Project Planning And Control Club house design with MSP
 
Sample Unit Plan BIM Wall Layouts
Sample Unit Plan BIM Wall LayoutsSample Unit Plan BIM Wall Layouts
Sample Unit Plan BIM Wall Layouts
 

More from Thomas McCormick

Portfolio 01 (Compressed)
Portfolio 01 (Compressed)Portfolio 01 (Compressed)
Portfolio 01 (Compressed)
Thomas McCormick
 
Earl Prize Board
Earl Prize BoardEarl Prize Board
Earl Prize Board
Thomas McCormick
 
Board Four Boneyard Creek Intervention
Board Four Boneyard Creek InterventionBoard Four Boneyard Creek Intervention
Board Four Boneyard Creek Intervention
Thomas McCormick
 
Board Three Boneyard Creek Intervention
Board Three Boneyard Creek InterventionBoard Three Boneyard Creek Intervention
Board Three Boneyard Creek Intervention
Thomas McCormick
 
Board One Boneyard Creek Intervention
Board One Boneyard Creek InterventionBoard One Boneyard Creek Intervention
Board One Boneyard Creek Intervention
Thomas McCormick
 
Arch 199 Brochure
Arch 199 BrochureArch 199 Brochure
Arch 199 Brochure
Thomas McCormick
 
272 Precedent Analysis Book Individual Pages
272 Precedent Analysis Book Individual Pages272 Precedent Analysis Book Individual Pages
272 Precedent Analysis Book Individual Pages
Thomas McCormick
 
House to Street Presentation Boards
House to Street Presentation BoardsHouse to Street Presentation Boards
House to Street Presentation Boards
Thomas McCormick
 
The Bottle Project Boards
The Bottle Project BoardsThe Bottle Project Boards
The Bottle Project Boards
Thomas McCormick
 
ARCH 231 FINAL BOOK DOCUMENTS PDF
ARCH 231 FINAL BOOK DOCUMENTS PDFARCH 231 FINAL BOOK DOCUMENTS PDF
ARCH 231 FINAL BOOK DOCUMENTS PDF
Thomas McCormick
 

More from Thomas McCormick (10)

Portfolio 01 (Compressed)
Portfolio 01 (Compressed)Portfolio 01 (Compressed)
Portfolio 01 (Compressed)
 
Earl Prize Board
Earl Prize BoardEarl Prize Board
Earl Prize Board
 
Board Four Boneyard Creek Intervention
Board Four Boneyard Creek InterventionBoard Four Boneyard Creek Intervention
Board Four Boneyard Creek Intervention
 
Board Three Boneyard Creek Intervention
Board Three Boneyard Creek InterventionBoard Three Boneyard Creek Intervention
Board Three Boneyard Creek Intervention
 
Board One Boneyard Creek Intervention
Board One Boneyard Creek InterventionBoard One Boneyard Creek Intervention
Board One Boneyard Creek Intervention
 
Arch 199 Brochure
Arch 199 BrochureArch 199 Brochure
Arch 199 Brochure
 
272 Precedent Analysis Book Individual Pages
272 Precedent Analysis Book Individual Pages272 Precedent Analysis Book Individual Pages
272 Precedent Analysis Book Individual Pages
 
House to Street Presentation Boards
House to Street Presentation BoardsHouse to Street Presentation Boards
House to Street Presentation Boards
 
The Bottle Project Boards
The Bottle Project BoardsThe Bottle Project Boards
The Bottle Project Boards
 
ARCH 231 FINAL BOOK DOCUMENTS PDF
ARCH 231 FINAL BOOK DOCUMENTS PDFARCH 231 FINAL BOOK DOCUMENTS PDF
ARCH 231 FINAL BOOK DOCUMENTS PDF
 

308 East Green Street Revit Project Book

  • 5. 1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 A C D E E.6 F G H H.8 J K 10 10.3 10.8 11 12 B.2 B Scale: Project: Date: Drawn: Checked: 3/6/20161:06:03PM 1/16"=1'-0" 308EastGreenStreet A.100 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet FoundationPlan 1/16" = 1'-0" 1 Foundation
  • 6. UP UP 1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 A C D E E.6 F G H H.8 J K 10 10.3 10.8 11 12 B.2 16' - 3 1/8" 16' - 3 3/8" 8' - 11 5/8"8' - 7 3/8" 16' - 7 5/8"1' - 2 3/8" 17' - 7" 8' - 11 5/8"8' - 10 3/8" 18' - 0" 3' - 0" 14' - 5" 5' - 9" 7' - 6" 4' - 2" 16' - 0" B 8'-41/8"5'-77/8"21'-101/8"7'-5"10'-5"6'-10"10'-9"17'-7"20'-8"6'-0"1'-6"20'-2" E2 E2 E2 D E E D D K E D E E E2 D D5 F3D5 D5 D5 D E A A2 A D5 B2 D5 A2 D5 D5 A2 A2 D5 D D D D DD D D5 D D5 A2 A2 D5 A2 C1 B2 F3 B2 K F3 E2 E2 C1 C1 C1 A B2 B2 F A1 F K F K F A1 F K B2 F A2 K A2 C1 C1 A A2 A2 E E2 D5 F3 F3 F3 D5 F3 K A2 C1 C1 C1 A2 D5D5 E2 K B2 D 1 A.501 1 A.502 1 A.503 Scale: Project: Date: Drawn: Checked: 3/6/20161:06:06PM 1/16"=1'-0" 308EastGreenStreet A.101 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet FirstFloorPlan 1/16" = 1'-0" 1 1st Floor Slab
  • 7. DN UP DN UP UP 1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 A C D E E.6 F G H H.8 J K 10 10.3 10.8 11 12 B.2 B 1 A.501 1 A.502 1 A.503 Scale: Project: Date: Drawn: Checked: 3/6/20161:06:09PM 1/16"=1'-0" 308EastGreenStreet A.102 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet SecondFloorPlan 1/16" = 1'-0" 1 2nd Floor Slab
  • 8. DNUP DN DN 1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 A C D E E.6 F G H H.8 J K 10 10.3 10.8 11 12 B.2 B 1 A.501 1 A.502 1 A.503 Scale: Project: Date: Drawn: Checked: 3/6/20161:06:11PM 1/16"=1'-0" 308EastGreenStreet A.103 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet ThirdFloorPlan 1/16" = 1'-0" 1 3rd Floor Slab
  • 9. DN UP 1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 A C D E E.6 F G H H.8 J K 10 10.3 10.8 11 12 B.2 B 1 A.501 1 A.502 1 A.503 Scale: Project: Date: Drawn: Checked: 3/6/20161:06:13PM 1/16"=1'-0" 308EastGreenStreet A.104 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet FourthFloorPlan 1/16" = 1'-0" 1 4th Floor Slab
  • 10. DN UP UP 1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 A C D E E.6 F G H H.8 J K 10 10.3 10.8 11 12 B.2 B 1 A.501 A.201 1 A.201 3 1 A.502 1 A.503 Scale: Project: Date: Drawn: Checked: 3/6/20161:06:17PM 1/16"=1'-0" 308EastGreenStreet A.105a Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet FifthFloorPlan 1/16" = 1'-0" 1 5th Floor Slab
  • 11. DN UP 1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 A C D E E.6 F G H H.8 J K 10 10.3 10.8 11 12 B.2 B 1 A.501 A.201 2 A.201 4 1 A.502 1 A.503 Scale: Project: Date: Drawn: Checked: 3/6/20161:06:20PM 1/16"=1'-0" 308EastGreenStreet A.105b Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet FifthFloorIntermediatePlan
  • 12. 2 2.2 3 3.3 C D 2' - 8" 11' - 0 25/32" 2' - 11 1/8"6' - 0"2' - 8" 2' - 8" 7' - 9 7/8"7' - 6 1/2" 18' - 5 15/16" 1 A.502 2 2.2 3 3.3 C D 7' - 6 3/16" 8' - 10 3/8" 3' - 6 3/32" 2'-10" 7' - 6 3/16" 8' - 1 29/32" 1 A.502 2.2 3 3.3 4 5 A B.2 B 0' - 0 5/8" 11' - 0 25/32" 18' - 1 5/16" 7' - 9 7/8" 9' - 0 3/16" 3'-53/8"11'-37/32" 2.2 3 3.3 4 5 A B 12' - 11 5/32" 7' - 4 15/16" 7' - 4 15/16"8' - 10 3/8" 3'-73/8" Scale: Project: Date: Drawn: Checked: 3/6/20161:06:22PM 1/8"=1'-0" 308EastGreenStreet A.201 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet EnlargedPlanUnitsAandB 1/8" = 1'-0" 1 Typical Unit A 1/8" = 1'-0" 2 Typical Unit A Intermediate 1/8" = 1'-0" 3 Typical Unit B 1/8" = 1'-0" 4 Typical Unit B Intermediate
  • 13. 1st Floor Slab 0' - 0" 2nd Floor Slab 14' - 8" T.O. Footing -5' - 0" B.O. Footing -6' - 0" 1 2 2.2 3 3.3 45 6 6.5 7 8 9 10 10.3 10.811 12 3rd Floor Slab 23' - 6" 4th Floor Slab 32' - 4" 5th Floor Slab 43' - 10" Penthouse Parapet 259' - 0" Foundation Wall Bottom -5' - 7 15/16" 5th Floor Slab Courtyard 43' - 0" 6th Floor Slab 61' - 10" 7th Floor Slab 79' - 10" 8th Floor Slab 97' - 10" 9th Floor Slab 115' - 10" 10th Floor Slab 133' - 10" 11th Floor Slab 151' - 10" 12th Floor Slab 169' - 10" 13th Floor Slab 187' - 10" 14th Floor Slab 205' - 10" 15th Floor Slab 223' - 10" Roof Slab 243' - 10" Penthouse Decking 257' - 10" 5th Floor Slab Intermediate 52' - 4" Scale: Project: Date: Drawn: Checked: 3/6/20161:08:30PM 1/32"=1'-0" 308EastGreenStreet A.301 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet SouthElevation 1/32" = 1'-0" 1 South
  • 14. 1st Floor Slab 0' - 0" 2nd Floor Slab 14' - 8" T.O. Footing -5' - 0" B.O. Footing -6' - 0" A C D E E.6 F G H H.8 J KB.2 3rd Floor Slab 23' - 6" 4th Floor Slab 32' - 4" 5th Floor Slab 43' - 10" B Penthouse Parapet 259' - 0" Foundation Wall Bottom -5' - 7 15/16" 5th Floor Slab Courtyard 43' - 0" 6th Floor Slab 61' - 10" 7th Floor Slab 79' - 10" 8th Floor Slab 97' - 10" 9th Floor Slab 115' - 10" 10th Floor Slab 133' - 10" 11th Floor Slab 151' - 10" 12th Floor Slab 169' - 10" 13th Floor Slab 187' - 10" 14th Floor Slab 205' - 10" 15th Floor Slab 223' - 10" Roof Slab 243' - 10" Penthouse Decking 257' - 10" 5th Floor Slab Intermediate 52' - 4" Scale: Project: Date: Drawn: Checked: 3/6/20161:09:11PM 1/32"=1'-0" 308EastGreenStreet A.302 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet EastElevation 1/32" = 1'-0" 1 East
  • 15. 2nd Floor Slab 14' - 8" A C D E E.6 F G H H.8 J KB.2 3rd Floor Slab 23' - 6" 4th Floor Slab 32' - 4" 5th Floor Slab 43' - 10" B 5th Floor Slab Courtyard 43' - 0" 6th Floor Slab 61' - 10" 5th Floor Slab Intermediate 52' - 4" 1 A.503 2nd Floor Slab 14' - 8" 1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 10 10.3 10.8 11 12 3rd Floor Slab 23' - 6" 4th Floor Slab 32' - 4" 5th Floor Slab 43' - 10" 1 A.501 5th Floor Slab Courtyard 43' - 0" 6th Floor Slab 61' - 10" 5th Floor Slab Intermediate 52' - 4" 1 A.502 Scale: Project: Date: Drawn: Checked: 3/6/20161:09:34PM 1/16"=1'-0" 308EastGreenStreet A.401 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet EnlargedElevationFloors2-5 1/16" = 1'-0" 1 East Floors 2-5 1/16" = 1'-0" 2 South Floors 2-5
  • 16. A C D E E.6 F G H H.8 J KB.2B 6th Floor Slab 61' - 10" 7th Floor Slab 79' - 10" 8th Floor Slab 97' - 10" 1 A.503 1 2 2.2 3 3.3 4 5 6 6.5 7 8 9 10 10.3 10.8 11 12 1 A.501 6th Floor Slab 61' - 10" 7th Floor Slab 79' - 10" 8th Floor Slab 97' - 10" 1 A.502 Scale: Project: Date: Drawn: Checked: 3/6/20161:09:59PM 1/16"=1'-0" 308EastGreenStreet A.402 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet EnlargedElevationFloors6-7 1/16" = 1'-0" 1 East Floors 6-7 1/16" = 1'-0" 2 South Floors 6-7
  • 17. 1st Floor Slab 0' - 0" 2nd Floor Slab 14' - 8" T.O. Footing -5' - 0" B.O. Footing -6' - 0" A C D E E.6 F G H H.8 J KB.2 3rd Floor Slab 23' - 6" 4th Floor Slab 32' - 4" 5th Floor Slab 43' - 10" B Penthouse Parapet 259' - 0" Foundation Wall Bottom -5' - 7 15/16" 5th Floor Slab Courtyard 43' - 0" 6th Floor Slab 61' - 10" 7th Floor Slab 79' - 10" 8th Floor Slab 97' - 10" 9th Floor Slab 115' - 10" 10th Floor Slab 133' - 10" 11th Floor Slab 151' - 10" 12th Floor Slab 169' - 10" 13th Floor Slab 187' - 10" 14th Floor Slab 205' - 10" 15th Floor Slab 223' - 10" Roof Slab 243' - 10" Penthouse Decking 257' - 10" 5th Floor Slab Intermediate 52' - 4" Scale: Project: Date: Drawn: Checked: 3/6/20161:10:01PM 1/32"=1'-0" 308EastGreenStreet A.501 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet Section1 1/32" = 1'-0" 1 Section 1
  • 18. 1st Floor Slab 0' - 0" 2nd Floor Slab 14' - 8" T.O. Footing -5' - 0" B.O. Footing -6' - 0" ACDEE.6FGHH.8JK B.2 3rd Floor Slab 23' - 6" 4th Floor Slab 32' - 4" 5th Floor Slab 43' - 10" B Foundation Wall Bottom -5' - 7 15/16" 5th Floor Slab Courtyard 43' - 0" 6th Floor Slab 61' - 10" 7th Floor Slab 79' - 10" 8th Floor Slab 97' - 10" 9th Floor Slab 115' - 10" 10th Floor Slab 133' - 10" 11th Floor Slab 151' - 10" 12th Floor Slab 169' - 10" 13th Floor Slab 187' - 10" 14th Floor Slab 205' - 10" 15th Floor Slab 223' - 10" Roof Slab 243' - 10" 5th Floor Slab Intermediate 52' - 4" Scale: Project: Date: Drawn: Checked: 3/6/20161:10:06PM 1/32"=1'-0" 308EastGreenStreet A.502 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet Section2 1/32" = 1'-0" 1 Section 2
  • 19. 2nd Floor Slab 14' - 8" T.O. Footing -5' - 0" B.O. Footing -6' - 0" 1 2 2.2 3 3.3 45 6 6.5 7 8 9 10 10.3 10.811 12 3rd Floor Slab 23' - 6" 4th Floor Slab 32' - 4" 5th Floor Slab 43' - 10" Penthouse Parapet 259' - 0" Foundation Wall Bottom -5' - 7 15/16" 5th Floor Slab Courtyard 43' - 0" 6th Floor Slab 61' - 10" 7th Floor Slab 79' - 10" 8th Floor Slab 97' - 10" 9th Floor Slab 115' - 10" 10th Floor Slab 133' - 10" 11th Floor Slab 151' - 10" 12th Floor Slab 169' - 10" 13th Floor Slab 187' - 10" 14th Floor Slab 205' - 10" 15th Floor Slab 223' - 10" Roof Slab 243' - 10" Penthouse Decking 257' - 10" 5th Floor Slab Intermediate 52' - 4" Scale: Project: Date: Drawn: Checked: 3/6/20161:10:09PM 1/32"=1'-0" 308EastGreenStreet A.503 Project4 5.05.15 ThomasMcCormick RebeccaBrouk 308EastGreenStreet Section3 1/32" = 1'-0" 1 Section 3
  • 20. 3 5/8" METAL STUD @ 16" O.C. 3" BATT INSULATION IN WALLS (1) LAYER 5/8" GYPSUM BOARD EACH SIDE 16"O.C. 5" TYPICAL U.N.O. HORIZONTAL SECTION 16"O.C. 7 1/4" TYPICAL U.N.O. HORIZONTAL SECTION 6" METAL STUD @ 16" O.C. (1) LAYER 5/8" GYPSUM BOARD EACH SIDE 24"O.C. 5" HORIZONTAL SECTION 3 5/8" METAL STUD @ 24" O.C. 3" MIN. BATT INSULATION IN SHAFT WALLS ADJACENT TO UNITS (1) 1/2" RC ONE SIDE @ 24" O.C. SCREW AT STUDS (1) LAYER 3/4" GYPSUM BOARD (1) LAYER 3/4" GYPSUM BOARD 16"O.C. 8 1/2" HORIZONTAL SECTION 6" METAL STUD @ 16" O.C (2) LAYERS 5/8" GYPSUM BOARD EACH SIDE 3" MIN. BATT INSULATION IN SHAFT WALLS ADJACENT TO UNITS 16"O.C. 8" HORIZONTAL SECTION 6" METAL STUD @ 16" O.C. (1) LAYER 1/2" GYPSUM BOARD 5" MIN. BATT INSULATION IN SHAFT WALLS ADJACENT TO UNITS (2) LAYERS 1/2'' GYPSUM BOARD (1) 1/2" RC ONE SIDE @ 24" O.C. SCREW AT STUDS 24"O.C. 7 1/2" HORIZONTAL SECTION 6" METAL STUD @ 24" O.C. (1) LAYER 5/8" GYPSUM BOARD SCREW-ATT TO STUDS* 3" MIN. BATT INSULATION IN SHAFT WALLS ADJACENT TO UNITS (1) LAYER 5/8" GYPSUM BOARD SCREW-ATT TO CHAN RC-1 CHAN ONE SIDE 24" O.C. SCREW-ATT TO STUDS 24"O.C. 9 3/4" HORIZONTAL SECTION 6" METAL STUD @ 24" O.C. (1) LAYER 5/8" GYPSUM BOARD SCREW-ATT TO STUDS* 3 1/2" MIN. BATT INSULATION (1) LAYER 5/8" GYPSUM BOARD CORRIDOR SIDE RC-1 CHAN ONE SIDE 24" O.C. SCREW-ATT TO STUDS 16"O.C. 9 3/4" HORIZONTAL SECTION 6" METAL STUD @ 16" O.C. (1) LAYER 5/8" GYPSUM BOARD ON UNIT SIDE 3 1/2" MIN. BATT INSULATION (1) LAYER 5/8" GYPSUM BOARD CORRIDOR SIDE RC-1 CHAN ONE SIDE 24" O.C. SCREW-ATT TO STUDS 16"O.C. 10 1/2" HORIZONTAL SECTION 6" METAL STUD @ 16" O.C. (2) LAYERS 5/8" GYPSUM BOARD ON UNIT SIDE 3 1/2" MIN. BATT INSULATION (2) LAYERS 5/8" GYPSUM BOARD CORRIDOR SIDE Project: Date: DrawnBy: CheckedBy: Scale:1"=1'-0" 3/6/20161:10:11PM REBECCABROUK THOMAS MCCORMICK A.901 308EastGreen Street THOMASMCCORMICK PROJECT2 1" = 1'-0" 1 A 1" = 1'-0" 2 A4 1" = 1'-0" 3 B2 1" = 1'-0" 4 B3 1" = 1'-0" 5 B4 1" = 1'-0" 6 C1 1" = 1'-0" 7 C3 1" = 1'-0" 8 C4 1" = 1'-0" 9 C5
  • 21. 7 5/8" VERTICAL SECTION 8" CMU TYPE D BLOCK, 2 HR 3/8" MORTAR JOINT 9 3/4" VERTICAL SECTION 8" CMU TYPE D BLOCK, 2 HR 3/8" MORTAR JOINT 2"X3" STUDS, 1 SIDE ONLY 2" SPRAY FOAM AT ALL BETWEEN TEMPERED AND UNTEMPERED LOCATIONS, R-13 (1) LAYER OF 5/8" GYP BD.* 9" VERTICAL SECTION 8" CMU SPLIT FACE BLOCK, 2 HR 3/8" MORTAR JOINT 3" SEMI-RIGID MINERAL WOOL BOARD INSULATION 10 1/4" VERTICAL SECTION 8" CMU SPLIT FACE BLOCK, 2 HR 3/8" MORTAR JOINT (1) LAYER OF 5/8" DENSGLASS ON INTERIOR SIDE & 2" SPRAY FOAM (R-14). 2"X2" STUDS ON INTERIOR SIDE 4 3/4" HORIZONTAL SECTION GALV STEEL 'C-H' STUDS 2 1/2" DEEP @24" O.C. 1" GYPSUM WALLBOARD LINER PANEL 3" MIN. BATT INSULATION IN SHAFT WALLS ADJACENT TO UNITS 2 LAYERS OF 5/8" GYPSUM BOARD 4 3/4" HORIZONTAL SECTION GALV STEEL 'C-H' STUDS 2 1/2" DEEP @24" O.C. 1" GYPSUM WALLBOARD LINER PANEL 3" MIN. BATT INSULATION IN SHAFT WALLS ADJACENT TO UNITS 2 LAYERS OF 5/8" GYPSUM BOARD1 LAYER OF 5/8" GYPSUM BOARD (INTERIOR OF STAIR WELL) 8 1/2" HORIZONTAL SECTION 3 1/2" MTL SDS @12" O.C. MIN 25 GAUGE STD 2 LAYERS OF 5/8" GYPSUM BOARD 12"O.C. 1/2" HAT CHANNELS CONTINUOUS VAPOR BARRIER 2" INSULATED METAL PANEL 16"O.C.8"O.C. VARIES, SEE PLAN HORIZONTAL SECTION (1) LAYER 5/8" GYPSUM BOARD EACH SIDE 4" MIN BATT INSULATION 3 5/8" METAL STUD @ 16" O.C. 1'-0" VERTICAL SECTION 12" CONCRETE FOR PAINT- SEE STRUCT DWGS ELASTOMERIC COATING AT EXTERIOR LOCATIONS Project: Date: DrawnBy: CheckedBy: Scale:1"=1'-0" 3/6/20161:10:13PM REBECCABROUK THOMAS MCCORMICK A.902 308EastGreen Street THOMASMCCORMICK Project2 1" = 1'-0" 1 D 1" = 1'-0" 2 D5 1" = 1'-0" 3 E 1" = 1'-0" 4 E2 1" = 1'-0" 5 F 1" = 1'-0" 6 F3 1" = 1'-0" 7 G3 1" = 1'-0" 8 H 1" = 1'-0" 9 K
  • 22. VARIES VERTICAL SECTION 2"X 3" METAL STUDS, 24" O.C. 12" CONCRETE FOR PAINT- SEE STRUCT DWGS 3" SPRAY FOAM @ EXTERIOR WALLS AND BETWEEN TEMPERED AND UNTEMPERED SPACES ONLY.(1) LAYER OF 5/8" GYP BD ELASTOMERIC COATING AT EXTERIOR LOCATIONS 9 1/4 HORIZONTAL SECTION 24"O.C. 6" METAL STUD @ 24" O.C. 4"MINERAL FIBER INSULATION (R-15 MAX) TO EXTEND 6" ABOVE UPTURN BEAMS 5/8" DENSGLASS EXT. SHEATHING 1/2" AIR SPACE 2" INSULATED METAL PANEL (R-14) 9 3/4 HORIZONTAL SECTION 24"O.C. 6" METAL STUD @ 24" O.C. 4"MINERAL FIBER INSULATION (R-15 MAX) TO EXTEND 6" ABOVE UPTURN BEAMS 5/8" DENSGLASS EXT. SHEATHING 1/2" AIR SPACE 2" INSULATED METAL PANEL (R-14) 5/8" GYP. BD. CONT. VAPOR BARRIER (6 MIL) FLUID APPLIED AIR BARRIER Project: Date: DrawnBy: CheckedBy: Scale:1"=1'-0" 3/6/20161:10:14PM RebeccaBrouk THOMAS MCCORMICK A.903 308EastGreen Street THOMASMCCORMICK Project2 1" = 1'-0" 1 K4 1" = 1'-0" 2 N1 1" = 1'-0" 3 N2