GABLE HOME
BUILDING RESEARCH COUNCIL
TAFT HOUSE
THOMASMcCORMICK
ARCH231:ANATOMYOFBUILDINGS
PROFESSORRANDALLDEUTSCH
T.A.GREGMORSE
TABLE OF CONTENTS
GABLE HOME
SITE PLAN............................................................................................................................................................2-3
ELEVATIONS........................................................................................................................................................4-5
INTERIOR PLAN...................................................................................................................................................6-7
SECTIONS..............................................................................................................................................................8-9
BUILDING RESEARCH COUNCIL
OBSERVED DETAIL............................................................................................................................................11
MEASURED DETAIL............................................................................................................................................12
TAFT HOUSE
MODELED DETAIL...............................................................................................................................................14
CONSTRUCTION PROCESS...............................................................................................................................15-17
DREAM HOME
REVIT FLOOR PLANS.........................................................................................................................................18
REVIT SECTIONS.................................................................................................................................................19
REVIT INTERIOR PERSPECTIVE.......................................................................................................................20
REVIT EXTERIOR PERSPECTIVE.....................................................................................................................21
GABLE HOME 1
SITE PLAN
GABLE HOME
SITE PLAN 1/8"=1'-0"
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
PARKING
WINTER SOLSTICE
SUMMMER SOLSTICE
0 12 4 8
6'-3" 6' 43'-3" 6'-41
2" 1'-11
2"
11'-111
4"
6'-103
4"
3'-413
16"
3'-515
16"
1'-01"6'-41
2"37'-101
4"3'-9"
5'-411
16"
20'-7"
11'-415
16"
14'-2 5
16"
30'-11 3
16"
28'-713
16"
2
SITE PLAN SKETCH
GABLE HOME
SITE PLAN SKETCH
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
3
ELEVATIONS
GABLE HOME
ELEVATIONS 1/8"=1'-0"
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
SOLAR VOLTAIC PANELS
WATER RETENTION TANKS
ELECTRICAL BOX
ELECTRICAL BOX
ELECTRICAL BOX
WATER RETENTION TANKS
WATER RETENTION TANKS
6'-11
2"
7'-6"
3'-1 1
16"
9'-3"
4'-1"
2'-11
2" 4'-11 1
16" 2'-815
16" 2'-101
2" 2'-101
2" 9'-101
2" 2'-101
2" 8'-2" 6'-81
2" 6'-7" 6'-3" 6'-11
2" 11'-111
4" 5'-5" 4'-47
8" 4'-45
8" 6'-41
2" 5'-81
4"
6'-11
2" 6'-11
2" 2'-10" 7' 5' 8'-5" 14'-93
8" 8'-0 1
16" 4'-615
16" 2'-61
2" 12'-03
4" 2'-51
2" 4'-7" 3'-413
16" 3'-711
16" 12'-03
4"
4
ELEVATION SKETCH
GABLE HOME
ELEVATION SKETCH
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
5
INTERIOR PLAN
GABLE HOME
INTERIOR PLAN 1/8"=1'-0"
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
4'-10" 2'-7" 2'-8" 3'-6" 8'-3" 7'-10" 8'-3"
2'-7"
3'-1"
1'-65
8"
2'-87
8"
2'-2"
3'-10" 2'-7" 14'-8" 2'-7" 2'-7" 7'-7" 2'-3"
9"
2'-3"
9"
2'-3"
4'-11"
3'
BEDROOM HALLWAY
CLOSET
BATHROOM
KITCHEN
LIVING AREA
MICROWAVE OVEN
BREAKER
WATER HEATER
CLOTHES WASHER/DRYER
11'-31
4"7'-7"9'-9"
2'-10"
2'-101
2"
6'-61
2"
2'
2'-9" 2'-6"
1'-7"
2'-7"
2'-51
2"
SINK
STOVETOP
2'-2" 2'-2"
1'-11" 1'-11" 2'-55
8"
REFRIGERATOR
3'-51
8"
1'-73
8"
DISH WASHER
6
GABLE HOME
INTERIOR PLAN SKETCH
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
INTERIOR PLAN SKETCH 7
SECTIONS
GABLE HOME
SECTIONS 1/8"=1'-0"
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
SECTIONSECTION
ROOF APEX
16'-0"
WALL HEIGHT
7'-0"
7'
4'-9"
3'-9"
2'-1"
4'-5"
2'-11"
6'
1'-4"
2'-11"
4'-71
2"
2'-10"
4'-2"
8
SECTION SKETCHES
GABLE HOME
SECTION SKETCHES
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
9
BUILDING RESEARCH COUNCIL 10
OBSERVED DETAIL
BUILDING RESEARCH COUNCIL
OBSERVED DETAIL DRAWING
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
11
MEASURED DETAIL
BUILDING RESEARCH COUNCIL
MEASURED DETAIL 1:20
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
SCALE: 1:20
0 1 2 4 6
1
2
3
4
5
6
7
8
9
10
11
12
13
14
DOUBLE TOP PLATE
VAPOR BARRIER
2x6 WOOD STUD
VERTICAL BOARD SIDING
BATT INSULATION
CARPET
SUBFLOOR
2x8 FLOOR JOIST
SOLE PLATE
END JOIST
SIDEWALK
DOUBLE SILL PLATE
POLYETHYLENE BARRIER
CONCRETE FOUNDATION
1
2
3
5
4
6
7
8
9
10
11
12
13
14
12
TAFT HOUSE 13
MODELED DETAIL
TAFT HOUSE
MODELED DETAIL
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
14
CONSTRUCTION PROCESS
TAFT HOUSE
CONSTRUCTION PROCESS
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
Stage 1: Concrete foundation system placed into site. A
base of gravel is poured before layers of sand, a mois-
ture barrier and the 4 inch concrete slab are installed.
Stage 2: Brick ledge installed on top of concrete
retaining walls. Windows placed into brick ledge.
Stage 3: Balloon framing is installed. Floor joists are
installed. Firestops are placed in between studs. Over-
sized headers installed for first floor window openings.
Cripple installed with second floor window headers.
Stage 4: Wood rafter framing installed. Header and
fascia installed around rafters.
Stage 6: Ceiling Joists placed between rafters.Insu-
lation installed within walls and Ceilings.
Stage 5: Wall sheathing installed before roof sheathing.
Louvered vent placed into gable end wall.
15
CONSTRUCTION PROCESS
TAFT HOUSE
CONSTRUCTION PROCESS
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
Stage 7: Tyvek paper placed on top of plywood sheath-
ing. Tyvek paper used for walls while 15 pound as-
phalt-saturated felt used for roof.
Stage 8: Windows placed into framing. Stage 9: Asphalt shingle roofing installed above as-
phalt-saturated felt.
Stage 10: Horizontal board siding installed into ply-wood
sheathing.
Stage 11: Dry wall installed on interior walls. Finishing
dry wall panels placed onto ceilings. Wood flooring in-
stalled.
16
CONSTRUCTION VIEWS
TAFT HOUSE
CONSTRUCTION VIEWS
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
Interior View
Exterior view with floor to
floor heights.
17
DREAM HOME REVIT FLOOR PLANS
DREAM HOME
REVIT FLOOR PLANS
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
18
DREAM HOME REVIT SECTIONS
DREAM HOME
REVIT SECTIONS
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
19
DREAM HOME REVIT INTERIOR PERSPECTIVE
DREAM HOME
REVIT INTERIOR PERSPECTIVE
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
20
DREAM HOME REVIT EXTERIOR PERSPECTIVE
DREAM HOME
REVIT EXTERIOR PERSPECTIVE
ARCHITECTURE 231
RANDALL DEUTSCH
GREG MORSE
FALL 2014
THOMAS McCORMICK
21

More Related Content

Similar to ARCH 231 FINAL BOOK DOCUMENTS PDF

Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Refratechnik Group
 
Masonry homes construction manual
Masonry homes construction manualMasonry homes construction manual
Masonry homes construction manual
Krm Chari
 
Hihomes Concrewall Design Build Market
Hihomes Concrewall Design Build MarketHihomes Concrewall Design Build Market
Hihomes Concrewall Design Build MarketHujaj Khan
 
Eb075 concrete floors
Eb075 concrete floorsEb075 concrete floors
Eb075 concrete floors
FernandoJoseObandoVi
 
Concrete Rib House - Complete
Concrete Rib House - CompleteConcrete Rib House - Complete
Concrete Rib House - Complete
Dennis Ashendorf
 
Dslip report
Dslip reportDslip report
Dslip report
Joanna Ding
 
DSLIP 2015 Technical Report
DSLIP 2015 Technical ReportDSLIP 2015 Technical Report
DSLIP 2015 Technical Report
Joanna Ding
 
Presentation - 1240 Villas
Presentation - 1240 VillasPresentation - 1240 Villas
Presentation - 1240 VillasIssam M. Faqir
 
Finishing works detail of residence building
Finishing works detail of residence buildingFinishing works detail of residence building
Finishing works detail of residence building
shamal das
 
MUROS DE RETENCIÓN
MUROS DE RETENCIÓN MUROS DE RETENCIÓN
MUROS DE RETENCIÓN
Alejandro Cabrera
 
Retailer x distribution centre walkround energy survey april 2010
Retailer x distribution centre walkround energy survey april 2010Retailer x distribution centre walkround energy survey april 2010
Retailer x distribution centre walkround energy survey april 2010
Royal Mail
 
Retailer x distribution centre walkround energy survey april 2010
Retailer x distribution centre walkround energy survey april 2010Retailer x distribution centre walkround energy survey april 2010
Retailer x distribution centre walkround energy survey april 2010
Royal Mail
 
chemical industries cement industry rotary Kiln.2023.pdf
chemical industries cement industry rotary Kiln.2023.pdfchemical industries cement industry rotary Kiln.2023.pdf
chemical industries cement industry rotary Kiln.2023.pdf
DimaJawhar
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil Engineers
Phurba Tamang
 
Tata blue scope roof maintenance procedure
Tata blue scope roof maintenance procedureTata blue scope roof maintenance procedure
Tata blue scope roof maintenance procedure
Prudhvi raj
 
Visual Dictionary BSCI 2300
Visual Dictionary BSCI 2300Visual Dictionary BSCI 2300
Visual Dictionary BSCI 2300Sp10nail
 

Similar to ARCH 231 FINAL BOOK DOCUMENTS PDF (20)

Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"Installation of Refractory Materials in Rotary Kilns ”Essential principles"
Installation of Refractory Materials in Rotary Kilns ”Essential principles"
 
Masonry homes construction manual
Masonry homes construction manualMasonry homes construction manual
Masonry homes construction manual
 
Hihomes Concrewall Design Build Market
Hihomes Concrewall Design Build MarketHihomes Concrewall Design Build Market
Hihomes Concrewall Design Build Market
 
Eb075 concrete floors
Eb075 concrete floorsEb075 concrete floors
Eb075 concrete floors
 
Concrete Rib House - Complete
Concrete Rib House - CompleteConcrete Rib House - Complete
Concrete Rib House - Complete
 
Dslip report
Dslip reportDslip report
Dslip report
 
DSLIP 2015 Technical Report
DSLIP 2015 Technical ReportDSLIP 2015 Technical Report
DSLIP 2015 Technical Report
 
Presentation - 1240 Villas
Presentation - 1240 VillasPresentation - 1240 Villas
Presentation - 1240 Villas
 
Finishing works detail of residence building
Finishing works detail of residence buildingFinishing works detail of residence building
Finishing works detail of residence building
 
MUROS DE RETENCIÓN
MUROS DE RETENCIÓN MUROS DE RETENCIÓN
MUROS DE RETENCIÓN
 
vacation work report 2
vacation work report 2vacation work report 2
vacation work report 2
 
Retailer x distribution centre walkround energy survey april 2010
Retailer x distribution centre walkround energy survey april 2010Retailer x distribution centre walkround energy survey april 2010
Retailer x distribution centre walkround energy survey april 2010
 
Retailer x distribution centre walkround energy survey april 2010
Retailer x distribution centre walkround energy survey april 2010Retailer x distribution centre walkround energy survey april 2010
Retailer x distribution centre walkround energy survey april 2010
 
ThermoFluid Final 2
ThermoFluid Final 2ThermoFluid Final 2
ThermoFluid Final 2
 
7 Bromley
7 Bromley7 Bromley
7 Bromley
 
TLP_ProjectReport
TLP_ProjectReportTLP_ProjectReport
TLP_ProjectReport
 
chemical industries cement industry rotary Kiln.2023.pdf
chemical industries cement industry rotary Kiln.2023.pdfchemical industries cement industry rotary Kiln.2023.pdf
chemical industries cement industry rotary Kiln.2023.pdf
 
Laboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil EngineersLaboratory Instruction Manual for Civil Engineers
Laboratory Instruction Manual for Civil Engineers
 
Tata blue scope roof maintenance procedure
Tata blue scope roof maintenance procedureTata blue scope roof maintenance procedure
Tata blue scope roof maintenance procedure
 
Visual Dictionary BSCI 2300
Visual Dictionary BSCI 2300Visual Dictionary BSCI 2300
Visual Dictionary BSCI 2300
 

More from Thomas McCormick

308 East Green Street Revit Project Book
308 East Green Street Revit Project Book308 East Green Street Revit Project Book
308 East Green Street Revit Project BookThomas McCormick
 
Board Four Boneyard Creek Intervention
Board Four Boneyard Creek InterventionBoard Four Boneyard Creek Intervention
Board Four Boneyard Creek InterventionThomas McCormick
 
Board Three Boneyard Creek Intervention
Board Three Boneyard Creek InterventionBoard Three Boneyard Creek Intervention
Board Three Boneyard Creek InterventionThomas McCormick
 
Board Two Boneyard Creek Intervention
Board Two Boneyard Creek InterventionBoard Two Boneyard Creek Intervention
Board Two Boneyard Creek InterventionThomas McCormick
 
Board One Boneyard Creek Intervention
Board One Boneyard Creek InterventionBoard One Boneyard Creek Intervention
Board One Boneyard Creek InterventionThomas McCormick
 
272 Precedent Analysis Book Individual Pages
272 Precedent Analysis Book Individual Pages272 Precedent Analysis Book Individual Pages
272 Precedent Analysis Book Individual PagesThomas McCormick
 
House to Street Presentation Boards
House to Street Presentation BoardsHouse to Street Presentation Boards
House to Street Presentation BoardsThomas McCormick
 

More from Thomas McCormick (11)

308 East Green Street Revit Project Book
308 East Green Street Revit Project Book308 East Green Street Revit Project Book
308 East Green Street Revit Project Book
 
Portfolio 01 (Compressed)
Portfolio 01 (Compressed)Portfolio 01 (Compressed)
Portfolio 01 (Compressed)
 
Earl Prize Board
Earl Prize BoardEarl Prize Board
Earl Prize Board
 
Board Four Boneyard Creek Intervention
Board Four Boneyard Creek InterventionBoard Four Boneyard Creek Intervention
Board Four Boneyard Creek Intervention
 
Board Three Boneyard Creek Intervention
Board Three Boneyard Creek InterventionBoard Three Boneyard Creek Intervention
Board Three Boneyard Creek Intervention
 
Board Two Boneyard Creek Intervention
Board Two Boneyard Creek InterventionBoard Two Boneyard Creek Intervention
Board Two Boneyard Creek Intervention
 
Board One Boneyard Creek Intervention
Board One Boneyard Creek InterventionBoard One Boneyard Creek Intervention
Board One Boneyard Creek Intervention
 
Arch 199 Brochure
Arch 199 BrochureArch 199 Brochure
Arch 199 Brochure
 
272 Precedent Analysis Book Individual Pages
272 Precedent Analysis Book Individual Pages272 Precedent Analysis Book Individual Pages
272 Precedent Analysis Book Individual Pages
 
House to Street Presentation Boards
House to Street Presentation BoardsHouse to Street Presentation Boards
House to Street Presentation Boards
 
The Bottle Project Boards
The Bottle Project BoardsThe Bottle Project Boards
The Bottle Project Boards
 

ARCH 231 FINAL BOOK DOCUMENTS PDF

  • 1. GABLE HOME BUILDING RESEARCH COUNCIL TAFT HOUSE THOMASMcCORMICK ARCH231:ANATOMYOFBUILDINGS PROFESSORRANDALLDEUTSCH T.A.GREGMORSE
  • 2. TABLE OF CONTENTS GABLE HOME SITE PLAN............................................................................................................................................................2-3 ELEVATIONS........................................................................................................................................................4-5 INTERIOR PLAN...................................................................................................................................................6-7 SECTIONS..............................................................................................................................................................8-9 BUILDING RESEARCH COUNCIL OBSERVED DETAIL............................................................................................................................................11 MEASURED DETAIL............................................................................................................................................12 TAFT HOUSE MODELED DETAIL...............................................................................................................................................14 CONSTRUCTION PROCESS...............................................................................................................................15-17 DREAM HOME REVIT FLOOR PLANS.........................................................................................................................................18 REVIT SECTIONS.................................................................................................................................................19 REVIT INTERIOR PERSPECTIVE.......................................................................................................................20 REVIT EXTERIOR PERSPECTIVE.....................................................................................................................21
  • 4. SITE PLAN GABLE HOME SITE PLAN 1/8"=1'-0" ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK PARKING WINTER SOLSTICE SUMMMER SOLSTICE 0 12 4 8 6'-3" 6' 43'-3" 6'-41 2" 1'-11 2" 11'-111 4" 6'-103 4" 3'-413 16" 3'-515 16" 1'-01"6'-41 2"37'-101 4"3'-9" 5'-411 16" 20'-7" 11'-415 16" 14'-2 5 16" 30'-11 3 16" 28'-713 16" 2
  • 5. SITE PLAN SKETCH GABLE HOME SITE PLAN SKETCH ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK 3
  • 6. ELEVATIONS GABLE HOME ELEVATIONS 1/8"=1'-0" ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK SOLAR VOLTAIC PANELS WATER RETENTION TANKS ELECTRICAL BOX ELECTRICAL BOX ELECTRICAL BOX WATER RETENTION TANKS WATER RETENTION TANKS 6'-11 2" 7'-6" 3'-1 1 16" 9'-3" 4'-1" 2'-11 2" 4'-11 1 16" 2'-815 16" 2'-101 2" 2'-101 2" 9'-101 2" 2'-101 2" 8'-2" 6'-81 2" 6'-7" 6'-3" 6'-11 2" 11'-111 4" 5'-5" 4'-47 8" 4'-45 8" 6'-41 2" 5'-81 4" 6'-11 2" 6'-11 2" 2'-10" 7' 5' 8'-5" 14'-93 8" 8'-0 1 16" 4'-615 16" 2'-61 2" 12'-03 4" 2'-51 2" 4'-7" 3'-413 16" 3'-711 16" 12'-03 4" 4
  • 7. ELEVATION SKETCH GABLE HOME ELEVATION SKETCH ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK 5
  • 8. INTERIOR PLAN GABLE HOME INTERIOR PLAN 1/8"=1'-0" ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK 4'-10" 2'-7" 2'-8" 3'-6" 8'-3" 7'-10" 8'-3" 2'-7" 3'-1" 1'-65 8" 2'-87 8" 2'-2" 3'-10" 2'-7" 14'-8" 2'-7" 2'-7" 7'-7" 2'-3" 9" 2'-3" 9" 2'-3" 4'-11" 3' BEDROOM HALLWAY CLOSET BATHROOM KITCHEN LIVING AREA MICROWAVE OVEN BREAKER WATER HEATER CLOTHES WASHER/DRYER 11'-31 4"7'-7"9'-9" 2'-10" 2'-101 2" 6'-61 2" 2' 2'-9" 2'-6" 1'-7" 2'-7" 2'-51 2" SINK STOVETOP 2'-2" 2'-2" 1'-11" 1'-11" 2'-55 8" REFRIGERATOR 3'-51 8" 1'-73 8" DISH WASHER 6
  • 9. GABLE HOME INTERIOR PLAN SKETCH ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK INTERIOR PLAN SKETCH 7
  • 10. SECTIONS GABLE HOME SECTIONS 1/8"=1'-0" ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK SECTIONSECTION ROOF APEX 16'-0" WALL HEIGHT 7'-0" 7' 4'-9" 3'-9" 2'-1" 4'-5" 2'-11" 6' 1'-4" 2'-11" 4'-71 2" 2'-10" 4'-2" 8
  • 11. SECTION SKETCHES GABLE HOME SECTION SKETCHES ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK 9
  • 13. OBSERVED DETAIL BUILDING RESEARCH COUNCIL OBSERVED DETAIL DRAWING ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK 11
  • 14. MEASURED DETAIL BUILDING RESEARCH COUNCIL MEASURED DETAIL 1:20 ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK SCALE: 1:20 0 1 2 4 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 DOUBLE TOP PLATE VAPOR BARRIER 2x6 WOOD STUD VERTICAL BOARD SIDING BATT INSULATION CARPET SUBFLOOR 2x8 FLOOR JOIST SOLE PLATE END JOIST SIDEWALK DOUBLE SILL PLATE POLYETHYLENE BARRIER CONCRETE FOUNDATION 1 2 3 5 4 6 7 8 9 10 11 12 13 14 12
  • 16. MODELED DETAIL TAFT HOUSE MODELED DETAIL ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK 14
  • 17. CONSTRUCTION PROCESS TAFT HOUSE CONSTRUCTION PROCESS ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK Stage 1: Concrete foundation system placed into site. A base of gravel is poured before layers of sand, a mois- ture barrier and the 4 inch concrete slab are installed. Stage 2: Brick ledge installed on top of concrete retaining walls. Windows placed into brick ledge. Stage 3: Balloon framing is installed. Floor joists are installed. Firestops are placed in between studs. Over- sized headers installed for first floor window openings. Cripple installed with second floor window headers. Stage 4: Wood rafter framing installed. Header and fascia installed around rafters. Stage 6: Ceiling Joists placed between rafters.Insu- lation installed within walls and Ceilings. Stage 5: Wall sheathing installed before roof sheathing. Louvered vent placed into gable end wall. 15
  • 18. CONSTRUCTION PROCESS TAFT HOUSE CONSTRUCTION PROCESS ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK Stage 7: Tyvek paper placed on top of plywood sheath- ing. Tyvek paper used for walls while 15 pound as- phalt-saturated felt used for roof. Stage 8: Windows placed into framing. Stage 9: Asphalt shingle roofing installed above as- phalt-saturated felt. Stage 10: Horizontal board siding installed into ply-wood sheathing. Stage 11: Dry wall installed on interior walls. Finishing dry wall panels placed onto ceilings. Wood flooring in- stalled. 16
  • 19. CONSTRUCTION VIEWS TAFT HOUSE CONSTRUCTION VIEWS ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK Interior View Exterior view with floor to floor heights. 17
  • 20. DREAM HOME REVIT FLOOR PLANS DREAM HOME REVIT FLOOR PLANS ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK 18
  • 21. DREAM HOME REVIT SECTIONS DREAM HOME REVIT SECTIONS ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK 19
  • 22. DREAM HOME REVIT INTERIOR PERSPECTIVE DREAM HOME REVIT INTERIOR PERSPECTIVE ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK 20
  • 23. DREAM HOME REVIT EXTERIOR PERSPECTIVE DREAM HOME REVIT EXTERIOR PERSPECTIVE ARCHITECTURE 231 RANDALL DEUTSCH GREG MORSE FALL 2014 THOMAS McCORMICK 21