- The presentation summarizes the Selenge Iron Ore Project in Mongolia, which contains four primary iron ore targets with a total exploration target of 250-400 million tonnes.
- Drilling at the Bayantsogt target has outlined an initial JORC resource of 33 million tonnes at 24.4% iron and metallurgical testing indicates the ore can produce a high grade 65-66% iron concentrate.
- The project is well located for supplying iron ore to inland steel mills in northern China, with strong demand and prices for magnetite concentrate.