The document discusses creating a 3D contour map from a survey of a mine site divided into 10 meter benches. It describes excavating in 10 meter benches according to excavator suitability, with options to doze or crush blasted material from a 72 meter cliff. Precise volume calculations and coordinates are provided for excavation at the site over multiple years based on a CAD design of the mine plan.