This document provides a technical description of a proposed organic compost manufacturing plant that would process 120,000 tons of municipal solid waste per year. The objectives of the project are to extend the life of existing landfills, compost organic waste to produce fertilizers for farming, and reduce the amount of organic waste sent to landfills by 250,000 tons annually. The document describes the selection and composting processes, building classifications, leachate pools, and refining, fermentation, and storage areas. It also provides economic details of the project including construction, machinery, management costs, and a proposed public-private partnership legal model.
1. TECHNICAL DESCRIPTION AND PROJECTS
manufacturing plant ORGANIC COMPOST
FROM MUNICIPAL SOLID WASTE (TRASH)
for 120,000 tons / year
Domingo Monserrat i Pitarch
Ingeniero Caminos Canales y Puertos
Técnico urbanista
Técnica y Construcción de Catalunya, SL
Casa Ragué I+D Work Center
2. Project Vision
To solve the endemic problem of URBAN SOLID WASTE (TRASH) by
transforming organic compost (natural fertilizer)
More efficient use of landfills and STRETCH OF YOUR LIFE
3. objective of the project
1. EXTENDING THE LIFE OF THE LANDFILL (annual
contribution is reduced to 1/3 of the current)
2. COMPOSTING ORGANIC WASTE COLLECTED (120,000
tons annually). IN WHICH TRANSFORA Fertilizers for farming
3. ORGANIC WASTE NEEDS 250 000 tons / year
10. PROYECTO EN ESTADO MÉRIDA DE PLANTA DE TRATAMIENTO RESIDUOS SÓLIDOS URBANOS
MANUFACTURING PLANT COMPOST
TÉCNICA Y CONSTRUCCIÓN DE CATALUÑA, SL
11. PROYECTO EN ESTADO MÉRIDA DE PLANTA DE TRATAMIENTO RESIDUOS SÓLIDOS URBANOS
MANUFACTURING PLANT COMPOST
BUILDING CLASSIFICATION
TÉCNICA Y CONSTRUCCIÓN DE CATALUÑA, SL
12. PROYECTO EN ESTADO MÉRIDA DE PLANTA DE TRATAMIENTO RESIDUOS SÓLIDOS URBANOS
BUILDING CLASSIFICATION
TÉCNICA Y CONSTRUCCIÓN DE CATALUÑA, SL
13. PROYECTO EN ESTADO MÉRIDA DE PLANTA DE TRATAMIENTO RESIDUOS SÓLIDOS URBANOS
MANUFACTURING PLANT COMPOST
POOLS LEACHATES
TÉCNICA Y CONSTRUCCIÓN DE CATALUÑA, SL
14. PROYECTO EN ESTADO MÉRIDA DE PLANTA DE TRATAMIENTO RESIDUOS SÓLIDOS URBANOS
POOLS LEACHATES
TÉCNICA Y CONSTRUCCIÓN DE CATALUÑA, SL
15. PROYECTO EN ESTADO MÉRIDA DE PLANTA DE TRATAMIENTO RESIDUOS SÓLIDOS URBANOS
MANUFACTURING PLANT COMPOST
BUILDING REFINING
TÉCNICA Y CONSTRUCCIÓN DE CATALUÑA, SL
16. PROYECTO EN ESTADO MÉRIDA DE PLANTA DE TRATAMIENTO RESIDUOS SÓLIDOS URBANOS
BUILDING REFINING
TÉCNICA Y CONSTRUCCIÓN DE CATALUÑA, SL
17. PROYECTO EN ESTADO MÉRIDA DE PLANTA DE TRATAMIENTO RESIDUOS SÓLIDOS URBANOS
MANUFACTURING PLANT COMPOST
STORAGE
SLAB FERMENTATION
TÉCNICA Y CONSTRUCCIÓN DE CATALUÑA, SL
18. PROJECT ECONOMIC DETAILS
:
PLANTA DE FABRIACION
OBRA CIVIL 18.979.986,04
NAVE CLASIFICACION 3.710.978,75
INSTALACION Y MAQUINARIA 38.635.044,60
SEGURIDAD Y SALUD 199.613,94
CONTROL DE CALIDAD 199.650,00
TOTAL 61.725.273,33
MODELO DE GESTION 5.819.418,00
TOTAL PROYECTO 67.544.691,33
IMPLANTACION 6.754.469,13
TOTAL 74.299.160,46
19. LEGAL MODEL
CONTRACT PPP (public private project).
18 months of construction
6 years of exploitation
Transfer to state facilities to 7 years
20. LEGAL MODEL
• public Sector
• Project Promotion
• Feasibility Analysis
• Financial analysis, legal and technical
• Identification and transfer of risks
• Proof positive net benefit
• Guarantee-guarantee project
21. LEGAL MODEL
Private Sector.
Construction of the plant
financial Model
Project Management
Training Consortium
Search for funding
6 years of exploitation
Transfer to state facilities to 7 years
22. CONCLUSIONS
Technical, economic and financial.
Increasing the useful life of the landfill
Production of organic fertilizers at prices
assessed by the state
Reduction of fertilizer imports by state
23. GESTIÓN AMBIENTAL
• Tanto la ejecución como la construcción de las
plantas se elaboran con una adecuada gestión
ambiental, certificada por la Norma UNE-EN ISO
14001